3.A-16 API RECOMMENDED PRACTICE 581Table 3.A.3.3—Specific Event Probabilities—Continuous Release Autoignition LikelyFluidC1-C2C3-C4Probabilityof IgnitionFinal Liquid State—Processed Above AITProbabilities of OutcomeVCE Fireball Flash Fire Jet Fire Pool FireC5C6-C8 1 1C9-C12 1 1C13-C16 1 0.5 0.5C17-C25 1 0.5 0.5C25+ 1 1H2H2SStyrene 1 1Final Gas State—Processed Above AITFluidProbabilityof IgnitionProbabilities of OutcomeVCE Fireball Flash Fire Jet Fire Pool FireC1-C2 0.7 0.7C3-C4 0.7 0.7C5 0.7 0.7C6-C8 0.7 0.7C9-C12 0.7 0.7C13-C16C17-C25C25+H2 0.9 0.9H2S 0.9 0.9Styrene 1 1NOTE 1 Shaded areas represent outcomes that are not possible.NOTE 2 Must be processed at least 27 °C (80 °F) above AIT.
RISK-BASED INSPECTION METHODOLOGY, PART 3, ANNEX 3.A—BASIS FOR CONSEQUENCE METHODOLOGY 3.A-17Table 3.A.3.4—Specific Event Probabilities—Instantaneous Release Autoignition LikelyFluidProbability ofIgnitionFinal Liquid State—Processed Above AITC1-C2 0.7 0.7C3-C4 0.7 0.7C5 0.7 0.7C6-C8 0.7 0.7C9-C12 0.7 0.7Probabilities of OutcomeVCE Fireball Flash Fire Jet Fire Pool FireC13-C16C17-C25C25+H2 0.9 0.9H2S 0.9 0.9Styrene 1 1Final Gas State—Processed Above AITFluidProbability ofIgnitionProbabilities of OutcomeVCE Fireball Flash Fire Jet Fire Pool FireC1-C2 0.7 0.7C3-C4 0.7 0.7C5 0.7 0.7C6-C8 0.7 0.7C9-C12 0.7 0.7C13-C16C17-C25C25+H2 0.9 0.9H2S 0.9 0.9Styrene 1 1NOTE 1 Shaded areas represent outcomes that are not possible.NOTE 2 Must be processed at least 27 °C (80 °F) above AIT.
- Page 479 and 480: 3-98 API RECOMMENDED PRACTICE 581e)
- Page 481 and 482: 3-100 API RECOMMENDED PRACTICE 581i
- Page 483 and 484: 3-102 API RECOMMENDED PRACTICE 5812
- Page 485 and 486: 3-104 API RECOMMENDED PRACTICE 581T
- Page 487 and 488: 3-106 API RECOMMENDED PRACTICE 581m
- Page 489 and 490: 3-108 API RECOMMENDED PRACTICE 581A
- Page 491 and 492: 3-110 API RECOMMENDED PRACTICE 581i
- Page 493 and 494: 3-112 API RECOMMENDED PRACTICE 581a
- Page 495 and 496: 3-114 API RECOMMENDED PRACTICE 581C
- Page 497 and 498: 3-116 API RECOMMENDED PRACTICE 581H
- Page 499 and 500: 3-118 API RECOMMENDED PRACTICE 581p
- Page 501 and 502: 3-120 API RECOMMENDED PRACTICE 581r
- Page 503 and 504: 3-122 API RECOMMENDED PRACTICE 581x
- Page 505 and 506: 3-124 API RECOMMENDED PRACTICE 581T
- Page 507 and 508: 3-126 API RECOMMENDED PRACTICE 581F
- Page 509 and 510: 3-128 API RECOMMENDED PRACTICE 581p
- Page 511 and 512: 3-130 API RECOMMENDED PRACTICE 581F
- Page 513 and 514: CONTENTS3.A.1 GENERAL .............
- Page 515 and 516: Risk-Based Inspection MethodologyPa
- Page 517 and 518: RISK-BASED INSPECTION METHODOLOGY,
- Page 519 and 520: RISK-BASED INSPECTION METHODOLOGY,
- Page 521 and 522: RISK-BASED INSPECTION METHODOLOGY,
- Page 523 and 524: RISK-BASED INSPECTION METHODOLOGY,
- Page 525 and 526: RISK-BASED INSPECTION METHODOLOGY,
- Page 527 and 528: RISK-BASED INSPECTION METHODOLOGY,
- Page 529: RISK-BASED INSPECTION METHODOLOGY,
- Page 533 and 534: RISK-BASED INSPECTION METHODOLOGY,
- Page 535 and 536: RISK-BASED INSPECTION METHODOLOGY,
- Page 537 and 538: RISK-BASED INSPECTION METHODOLOGY,
- Page 539 and 540: RISK-BASED INSPECTION METHODOLOGY,
- Page 541 and 542: CONTENTS1 GENERAL………………
- Page 543 and 544: 3.B-2 API RECOMMENDED PRACTICE 5813
- Page 545 and 546: 3.B-4 API RECOMMENDED PRACTICE 581T
- Page 547 and 548: PART 5SPECIAL EQUIPMENT5-1
- Page 549 and 550: Consequence of Failure Methodology
- Page 551 and 552: Risk-Based Inspection MethodologyPa
- Page 553 and 554: RISK-BASED INSPECTION METHODOLOGY,
- Page 555 and 556: RISK-BASED INSPECTION METHODOLOGY,
- Page 557 and 558: RISK-BASED INSPECTION METHODOLOGY,
- Page 559 and 560: RISK-BASED INSPECTION METHODOLOGY,
- Page 561 and 562: RISK-BASED INSPECTION METHODOLOGY,
- Page 563 and 564: RISK-BASED INSPECTION METHODOLOGY,
- Page 565 and 566: RISK-BASED INSPECTION METHODOLOGY,
- Page 567 and 568: RISK-BASED INSPECTION METHODOLOGY,
- Page 569 and 570: RISK-BASED INSPECTION METHODOLOGY,
- Page 571 and 572: RISK-BASED INSPECTION METHODOLOGY,
- Page 573 and 574: RISK-BASED INSPECTION METHODOLOGY,
- Page 575 and 576: RISK-BASED INSPECTION METHODOLOGY,
- Page 577 and 578: RISK-BASED INSPECTION METHODOLOGY,
- Page 579 and 580: RISK-BASED INSPECTION METHODOLOGY,
RISK-BASED INSPECTION METHODOLOGY, PART 3, ANNEX 3.A—BASIS FOR CONSEQUENCE METHODOLOGY 3.A-17
Table 3.A.3.4—Specific Event Probabilities—Instantaneous Release Autoignition Likely
Fluid
Probability of
Ignition
Final Liquid State—Processed Above AIT
C1-C2 0.7 0.7
C3-C4 0.7 0.7
C5 0.7 0.7
C6-C8 0.7 0.7
C9-C12 0.7 0.7
Probabilities of Outcome
VCE Fireball Flash Fire Jet Fire Pool Fire
C13-C16
C17-C25
C25+
H2 0.9 0.9
H2S 0.9 0.9
Styrene 1 1
Final Gas State—Processed Above AIT
Fluid
Probability of
Ignition
Probabilities of Outcome
VCE Fireball Flash Fire Jet Fire Pool Fire
C1-C2 0.7 0.7
C3-C4 0.7 0.7
C5 0.7 0.7
C6-C8 0.7 0.7
C9-C12 0.7 0.7
C13-C16
C17-C25
C25+
H2 0.9 0.9
H2S 0.9 0.9
Styrene 1 1
NOTE 1 Shaded areas represent outcomes that are not possible.
NOTE 2 Must be processed at least 27 °C (80 °F) above AIT.