RISK-BASED INSPECTION METHODOLOGY, PART 3—CONSEQUENCE OF FAILURE METHODOLOGY 3-53

Table 4.7—Leak Durations Based on Detection and Isolation Systems

Detection System Rating Isolation System Rating Maximum Leak Duration, ld

max

A

A

A

B

B

C

A

B

C

A or B

C

A, B, or C

20 minutes for 1 /4 in. leaks

10 minutes for d2 min [ D, 1]

5 minutes for d [ D ]

= leaks

3

= min , 41 leaks

30 minutes for 1 /4 in. leaks

20 minutes for d2 min [ D, 1]

10 minutes for d [ D ]

= leaks

3

= min , 41 leaks

40 minutes for 1 /4 in. leaks

30 minutes for d2 min [ D, 1]

20 minutes for d [ D ]

= leaks

3

= min , 41 leaks

40 minutes for 1 /4 in. leaks

30 minutes for d2 min [ D, 1]

20 minutes for d [ D ]

= leaks

3

= min , 41 leaks

1 hour for 1 /4 in. leaks

30 minutes for d2 min [ D, 1]

20 minutes for d [ D ]

= leaks

3

= min , 41 leaks

1 hour for 1 /4 in. leaks

40 minutes for d2 min [ D, 1]

20 minutes for d [ D ]

= leaks

3

= min , 41 leaks