17.12.2020 Views

API RP 581 - 3rd Ed.2016 - Add.2-2020 - Risk-Based Inspection Methodology

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RISK-BASED INSPECTION METHODOLOGY, PART 3—CONSEQUENCE OF FAILURE METHODOLOGY 3-7

Table 3.2—COF Calculation Type Based on Equipment and Component Type

Equipment/Component Type

Area Based

Consequence Calculation Type

Financial Based

Air cooler Yes Yes

Compressor Yes Yes

Heat exchanger (shell, channel) Yes Yes

Heat exchanger bundle No Yes

Pipe Yes Yes

PRD No Yes

Pressure vessel (drum, column filter,

reactor)

Yes

Yes

Pump Yes Yes

Tank shell course Yes Yes

Tank bottom No Yes

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!