1-32 API RECOMMENDED PRACTICE 581

Risk

Total Risk Without

Inspection at the

Risk Target Date

Risk Target

Total Risk with

Inspection at the

Risk Target Date

Installation

Date

RBI & Risk Target

Date, Inspection

Performed

Plan Date

time

Figure 4.7—Case 2: Inspection Planning when the Risk Target Has

Been Exceeded at or Prior to the RBI Date