API RP 581 - 3rd Ed.2016 - Add.2-2020 - Risk-Based Inspection Methodology

luis.alberto.mayorga.plaza
from luis.alberto.mayorga.plaza More from this publisher
17.12.2020 Views

PART 1—INTRODUCTION TO RISK-BASED INSPECTION METHODOLOGY 1-31RiskTotal Risk WithoutInspection at theRisk Target DateCRisk TargetBATotal Risk withInspection at theRisk Target DatePlan PeriodInstallationDateRBIDateTarget Date,InspectionPerformedPlanDatetimeFigure 4.6—Case 1: Inspection Planning when the Risk Target is Exceeded During the Plan Period

1-32 API RECOMMENDED PRACTICE 581RiskTotal Risk WithoutInspection at theRisk Target DateRisk TargetTotal Risk withInspection at theRisk Target DateInstallationDateRBI & Risk TargetDate, InspectionPerformedPlan DatetimeFigure 4.7—Case 2: Inspection Planning when the Risk Target HasBeen Exceeded at or Prior to the RBI Date

PART 1—INTRODUCTION TO RISK-BASED INSPECTION METHODOLOGY 1-31

Risk

Total Risk Without

Inspection at the

Risk Target Date

C

Risk Target

B

A

Total Risk with

Inspection at the

Risk Target Date

Plan Period

Installation

Date

RBI

Date

Target Date,

Inspection

Performed

Plan

Date

time

Figure 4.6—Case 1: Inspection Planning when the Risk Target is Exceeded During the Plan Period