PART 1—INTRODUCTION TO RISK-BASED INSPECTION METHODOLOGY 1-29

10,000

3.1E-01

5

High

Damage Factor / POF Category

1,000

4

100

3

10

2

1

Low

Medium

Medium-High

3.1E-02

3.1E-03

3.1E-04

3.1E-05

Probability of failure, events/year

1

(gff = 3.06E-5)

0

3.1E-06

10 A 100 B 1,000 C 10,000 D 100,000 E 1,000,000

Consequence of Failure, ft 2 / COF Category

0.1 ft2/year 10 ft2/year 1,000 ft2/year

Figure 4.4—Example Iso-risk Plot for Consequence Area