2.B-102 API RECOMMENDED PRACTICE 581

2.B.12.8

Figures

Start

Determine Base Corrosion Rate

using Table 2.B.12.2.

Calculate Soil Resistivity

Factor using Table 2.B.12.3.

No

Soil Resistivity

considered for Base

CR ?

Yes

Determine Operating Temperature

factor using Table 2.B.12.4.

Determine Cathodic Protection System

effectiveness using Table 2.B.12.5.

Is there a coating?

No

Yes

Set Coating Effectiveness Factor

to 1.0

Determine Coating Effectiveness Factor

Using Table 2.B.12.6.

Calculate estimated

corrosion rate

Using Equation 2.B.21.

Estimated

Corrosion Rate

Figure 2.B.12.1—Soil-side Corrosion—Determination of Corrosion Rate