PART 1—INTRODUCTION TO RISK-BASED INSPECTION METHODOLOGY 1-27

Table 4.2—Numerical Values Associated with POF and Financial-based COF Categories

a, b, c

Probability Category Consequence

Category d

Category

Probability Range DF Range Category Range ($)

1 P f (t,I E ) ≤ 3.06E-05 D f-total ≤ 1 A

fin

CA ≤ 10,000

f

fin

2 3.06E-05 < P f (t,I E ) ≤ 3.06E-04 1 < D f-total ≤ 10 B 10,000 < CA ≤ 100,000

fin

3 3.06E-04 < P f (t,I E ) ≤ 3.06E-03 10 < D f-total ≤ 100 C 100,000 < CA ≤ 1,000,000

fin

4 3.06E-03 < P f (t,I E ) ≤ 3.06E-02 100 < D f-total ≤ 1000 D 1,000,000 < CA ≤ 10,000,000

f

f

f

5 P f (t,I E ) > 3.06E-02 D f-total > 1000 E

fin

CA > 10,000,000

f

a

POF values are based on a gff of 3.06E-05 and an FMS of 1.0. If the suggested gff values of Part 2, Table 3.1 are used, the

probability range does not apply to AST shell course, AST bottoms and centrifugal compressors.

b

In terms of POF, see Part 1, Section 4.1.

c

In terms of the total DF, see Part 2, Section 3.4.2.

d

In terms of consequence area, see Part 3, Section 4.12.1.

4.7 Figures

Total Risk

Risk

Risk for Damage 1

A+B+C=Total Risk

Risk for Damage 2

A

B

C

Risk for Damage 3

Installation

Date

Figure 4.1—Superposition Principle for the Calculation of Risk