RISK-BASED INSPECTION METHODOLOGY, PART 2, ANNEX 2.B—DETERMINATION OF CORROSION RATES 2.B-75

2.B.10.7

Figures

Start

Is H 2 0

Present?

Yes

Determine pH

Is

pH > 7?

Yes

Proceed to

Paragraph 2.B.7.

No

No

Estimated Corrosion

Rate is 0

No

Is

pH < 4.5?

Yes

Are Chlorides

Present?

Yes

Proceed to

Paragraph 2.B.2.

No

Material of

construction is

carbon or low

alloy?

No

CR=2mpy

Yes

Determine corrosion

rate CR pH from

Table 2.B.10.2.

• pH

• Temperature °F

Determine adjustment

factor for oxygen From

Table 2.B.10.3.

Oxygen (ppb)

Determine adjustment

factor for velocity F v from

Equations 2.B.2 to 2.B.4.

Velocity (fps)

Calculate Final Corrosion

Rate

CR = CR pH x F o x F v

Estimated

Corrosion Rate

Figure 2.B.10.1—Acid Sour Water—Determination of Corrosion Rate