RISK-BASED INSPECTION METHODOLOGY, PART 2, ANNEX 2.A—MANAGEMENT SYSTEMS WORKBOOK 2.A-3

Table 2.A.3—Process Hazard Analysis

1

2

3

4

Questions

What percentage of all process units that handle hazardous chemicals at the facility

have had a formal process hazard analysis (PHA) within the last 5 years?

Possible

Score

Has a priority order been established for conducting future PHAs? 5

Does the basis for the prioritization address the following factors?

a. The quantity of toxic, flammable, or explosive material at the site. 1

b. The level of toxicity or reactivity of the materials. 1

c. The number of people in the immediate proximity of the facility, including both onsite

and off-site locations.

d. Process complexity. 1

e. Severe operating conditions or conditions that can cause corrosion or erosion. 1

Do the PHAs conducted to date address the following?

a. The hazards of the process. 2

b. A review of previous incident/accident reports from the unit being analyzed to

identify any previous incidents that had a potential for catastrophic

consequences.

c. Engineering and administrative controls applicable to the hazards and their

interrelationships.

d. Consequences of failure of engineering and administrative controls. 2

e. Facilities siting. 2

f. Human factors. 2

g. A qualitative evaluation of the possible safety and health effects of failure. 2

Based on the most recent PHA conducted:

a. was the team leader experienced in the technique being employed? 3

b. had the team leader received formal training in the method being employed? 3

c. was at least one member of the team an expert on the process being analyzed? 3

d. were all appropriate disciplines represented on the team or brought in as

required during the analysis?

e. was at least one member of the team a person who did not participate in the

original design of the facility?

% × 10

1

2

2

3

3

Actual