17.12.2020 Views

API RP 581 - 3rd Ed.2016 - Add.2-2020 - Risk-Based Inspection Methodology

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RISK-BASED INSPECTION METHODOLOGY, PART 2—PROBABILITY OF FAILURE METHODOLOGY 2-125

1. If the coating has failed at the time of inspection when age tke was established, then

Coat adj = 0

2. If the coating has not failed at the time of inspection when age tke was established, use Equation

(2.36) to calculate Coat adj

( ) ( )

Coat min C ,age min C ,age age

adj = age coat − age coat − tke

(2.67)

g) STEP 7—Determine the in-service time, age, over which external CUI ClSCC may have occurred using

Equation (2.68).

age age Coat

= crack − adj

(2.68)

h) STEP 8—Determine the number of inspections performed with no cracking detected or cracking was

repaired and the corresponding inspection effectiveness category using Section 18.6.2 for past

inspections performed during the in-service time. Combine the inspections to the highest effectiveness

performed using Section 3.4.3. Cracking detected but not repaired should be evaluated and future

inspection recommendations based upon FFS evaluation.

i) STEP 9—Determine the base DF for CUI ClSCC,

CUI − ClSCC

D fB

, using Table 6.3 based on the number of

inspections and the highest inspection effectiveness determined in STEP 8 and the Severity Index, S VI ,

from STEP 2.

j) STEP 10—Calculate the escalation in the DF based on the time in service since the last inspection

using the age from STEP 7 and Equation (2.69). In this equation, it is assumed that the probability for

cracking will increase with time since the last inspection as a result of increased exposure to upset

conditions and other non-normal conditions.

CUI −ClSCC

11 .

( fB ( ) )

CUI −ClSCC

D f = min D ⋅ max[ age, 1. 0] , 5000 (2.69)

18.7 Nomenclature

age

age coat

age crack

C age

Coat adj

is the component in-service time since the last cracking inspection or service start date

is the in-service time since the coating installation

is the in-service time since the last ClSCC inspection

is the total anticipated coating life from the time of installation

is the coating adjustment

CUI − ClSCC

D f

is the DF for CUI ClSCC

CUI − ClSCC

D fB

is the base value of the DF for CUI ClSCC

S VI

is the Severity Index

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!