RISK-BASED INSPECTION METHODOLOGY, PART 2—PROBABILITY OF FAILURE METHODOLOGY 2-93

Table 14.3—Determination of Severity Index—HIC/SOHIC-HF

Susceptibility

Severity Index—S VI

High 100

Medium 10

Low 1

None 0

Table 14.4—On-line Monitoring Adjustment Factors for HIC/SOHIC-HF

On-line Monitoring Method

Adjustment Factors as a Function of

On-line Monitoring—F OM

Key process variables 2

Hydrogen probes 2

Key process variables and hydrogen probes 4

NOTE The adjustment factors shown above are estimates providing a measure of the relative

effectiveness of various on-line monitoring methods. Factors based on the user’s experience can be used

as a substitute for the values presented in this table.