17.12.2020 Views

API RP 581 - 3rd Ed.2016 - Add.2-2020 - Risk-Based Inspection Methodology

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RISK-BASED INSPECTION METHODOLOGY, PART 2—PROBABILITY OF FAILURE METHODOLOGY 2-75

11.10 Figures

STEP 1: Determine the

susceptibility for cracking

Cracks

present?

Yes

High

Susceptibility

Cracks

Removed?

No

Yes

No

Exposed to S

and O 2 and H 2O during

operation?

Yes

FFS

No

Exposed to S

and O 2 and H 2O during

shutdown?

No

Not Susceptible

Alloy

Yes

Thermal

History

Determine Susceptibility

Using Table 11.2.

Op. Temp

Yes

Use downtime

protection according to

NACE RP 0170?

No

Reduce Susceptibility

Determined by 1 Level

High -> Medium

Medium -> Low

Low -> None

STEP 2: Determine the time in-service,

age, since the last inspection.

STEP 3: Determine the number of inspections

and the corresponding inspection

effectiveness category for all past inspections

using Table 2.C.9.5.

STEP 4: Determine the severity index

from Table 11.3.

STEP 5: Determine the base damage

factor for PTA cracking using Table 6.3.

STEP 6: Calculate the escalation in the

damage factor using Equation (2.30).

Figure 11.1—Determination of the PASCC DF

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!