Caribbean Compass Yachting Magazine - November 2020
Welcome to Caribbean Compass, the most widely-read boating publication in the Caribbean! THE MOST NEWS YOU CAN USE - feature articles on cruising destinations, regattas, environment, events... Welcome to Caribbean Compass, the most widely-read boating publication in the Caribbean! THE MOST NEWS YOU CAN USE - feature articles on cruising destinations, regattas, environment, events...
— Continued from previous page • Bonaire. All vessels traveling to Bonaire will need clearance from the Port Authority. The Health Declaration form available at https://bonairepublichealth.org/ en/form must be completed at least 48 hours prior to departure for Bonaire by all crewmembers. All yachts must have a marina or boatyard booking before coming. All yachts coming to Bonaire regardless of point of departure must undertake 14 days quarantine an arrival in Bonaire. • Panama. In addition to the usual ship’s papers and crew passports, arrive in Panama with your last port clearance, a list of your last ten ports with departure dates and, in addition to negative PCR tests for everyone 48 hours prior to departure from the last port, a sworn statement signed by the captain that everyone aboard is Covid-free. If obtaining a PCR test within that time frame is impossible (e.g. due to a long passage), enquire of your chosen marina in advance if they will be able to arrange a test for you on arrival. As things are changing rapidly, engaging an agent could be helpful. “an optimal and attractive long term solution to the problem.” There has been no stormy weather recently to see how well the temporary protection works. Storm surges were dreaded before the boulders were put in place, as it was the opinion of some that only one storm was needed for the isthmus to be breached. Although the Mayreau residents were not consulted before the temporary sea defense began, they are hoping for consultation when the state is ready to put a permanent solution in place. Channel swimmers update Last month we reported that Katie Blair would be the first person to attempt to swim from St. Lucia to Martinique and back to St. Lucia. Unfortunately, she was unable to complete the second leg of the swim after being taken off course by strong west-setting currents in the channel. NOVEMBER 2020 CARIBBEAN COMPASS PAGE 6 Salt Whistle Bay update In our July issue’s cover story, we reported on the efforts of residents of the tiny island of Mayreau in the Grenadines to preserve the narrow, fragile isthmus that protects iconic Salt Whistle Bay by creating a barrier of hundreds of conch shells. Apparently this grassroots effort spurred the government of SVG to take action. According to reports in the local Searchlight newspaper, Mayreau residents are satisfied with the temporary emergency coastal protection works, consisting of boulders, completed at Salt Whistle Bay, and are looking forward to the promised permanent solution. As reported by Searchlight, during a sitting of Parliament, in providing an update on the situation at Salt Whistle Bay, Minister of Finance Camillo Gonsalves noted that EC$1.3 million has been allocated to address it. Government’s intention is to spend EC$300,000 this year, and EC$1 million in 2021. The Minister said that tidal and bathymetric studies among other things are ongoing so as to devise CHRIS DOYLE However, 12-year-old Christophe Maleau completed his swimming challenge on October 10th. It took him nearly 14 hours to swim from St. Lucia to Martinique. In fairly good sea conditions, he swam with ease, taking a break every 20 minutes for nourishment. Support catamarans were on the water. Christophe took the challenge as part of Pink October, is to support all women with cancer. His first challenge took place in 2017, swimming 6.4 kilometres between Anse Mitan and la Française in Fort-de-France. The following year he tackled the 26 kilometers between Le Diamant and Schoelcher. Read the full story at www.en24news.com/2020/10/at-12-years-old-christophemaleau-succeeded-in-swimming-the-crossing-between-sainte-luc.html In Stock! Perkins M300C Marine Engine Commercially rated 6.6 liter engine producing 300 hp @ 2400 rpm Same size as current M225Ti Emissions compliant with IMO2 Wastgate turbo charger for better low engine speed performance and faster acceleration 500 hour oil change intervals Low fuel consumption Gear driven fresh water and sea water pump Primary and secondary fuel filters 90 amp alternator Providing excellent reliability and fuel economy, while being clean, quiet and smooth in operation. Low noise, rapid starting and low emissions are achieved with advanced combustion systems that allow for precise, multiple injections within each combustion cycle, reducing fuel use and lowering emissions Call us today and mention this ad to receive a special discount info@partsandpower.com www.partsandpower.com +1 284-494-2830/440-2830 Your Power Solution Company
NOVEMBER 2020 CARIBBEAN COMPASS PAGE 7
- Page 1 and 2: C A R I B B E A N On-line C MPASS N
- Page 3 and 4: KEN DYER The Caribbean’s Monthly
- Page 5: — Continued from previous page
- Page 9 and 10: — Continued from previous page Th
- Page 11 and 12: Owned and managed by Camper & Nicho
- Page 13 and 14: YACHT INSURANCE IN THE CARIBBEAN by
- Page 15 and 16: YACHT INSURANCE IN THE CARIBBEAN Wh
- Page 17 and 18: PRODUCT POSTINGS Whether you’re g
- Page 19 and 20: — Continued from previous page Mo
- Page 21 and 22: OUR ISLAND BIRDS BY BELA BROWN I’
- Page 23 and 24: LOOK OUT FOR… Life is Just a Bowl
- Page 25 and 26: — Continued from previous page
- Page 27 and 28: NOVEMBER CALENDAR 1 Public holiday
- Page 29 and 30: Caribbean Compass Market Place SVG
- Page 31 and 32: The World’s Leader in Multihull S
— Continued from previous page<br />
• Bonaire. All vessels traveling to Bonaire will need clearance from the Port<br />
Authority. The Health Declaration form available at https://bonairepublichealth.org/<br />
en/form must be completed at least 48 hours prior to departure for Bonaire by all<br />
crewmembers. All yachts must have a marina or boatyard booking before coming.<br />
All yachts coming to Bonaire regardless of point of departure must undertake 14<br />
days quarantine an arrival in Bonaire.<br />
• Panama. In addition to the usual ship’s papers and crew passports, arrive in<br />
Panama with your last port clearance, a list of your last ten ports with departure<br />
dates and, in addition to negative PCR tests for everyone 48 hours prior to departure<br />
from the last port, a sworn statement signed by the captain that everyone aboard is<br />
Covid-free. If obtaining a PCR test within that time frame is impossible (e.g. due to a<br />
long passage), enquire of your chosen marina in advance if they will be able to<br />
arrange a test for you on arrival. As things are changing rapidly, engaging an agent<br />
could be helpful.<br />
“an optimal and attractive long term solution to the problem.”<br />
There has been no stormy weather recently to see how well the temporary<br />
protection works. Storm surges were dreaded before the boulders were put in<br />
place, as it was the opinion of some that only one storm was needed for the isthmus<br />
to be breached.<br />
Although the Mayreau residents were not consulted before the temporary sea<br />
defense began, they are hoping for consultation when the state is ready to put a<br />
permanent solution in place.<br />
Channel swimmers update<br />
Last month we reported that Katie Blair would be the first person to attempt to<br />
swim from St. Lucia to Martinique and back to St. Lucia. Unfortunately, she was<br />
unable to complete the second leg of the swim after being taken off course by<br />
strong west-setting currents in the channel.<br />
NOVEMBER <strong>2020</strong> CARIBBEAN COMPASS PAGE 6<br />
Salt Whistle Bay update<br />
In our July issue’s cover<br />
story, we reported on the<br />
efforts of residents of the<br />
tiny island of Mayreau in<br />
the Grenadines to<br />
preserve the narrow,<br />
fragile isthmus that<br />
protects iconic Salt<br />
Whistle Bay by creating a<br />
barrier of hundreds of<br />
conch shells. Apparently<br />
this grassroots effort<br />
spurred the government<br />
of SVG to take action.<br />
According to reports in<br />
the local Searchlight<br />
newspaper, Mayreau<br />
residents are satisfied<br />
with the temporary<br />
emergency coastal<br />
protection works,<br />
consisting of boulders,<br />
completed at Salt Whistle<br />
Bay, and are looking<br />
forward to the promised<br />
permanent solution.<br />
As reported by<br />
Searchlight, during a<br />
sitting of Parliament, in<br />
providing an update on the situation at Salt Whistle Bay, Minister of Finance Camillo<br />
Gonsalves noted that EC$1.3 million has been allocated to address it. Government’s<br />
intention is to spend EC$300,000 this year, and EC$1 million in 2021. The Minister said<br />
that tidal and bathymetric studies among other things are ongoing so as to devise<br />
CHRIS DOYLE<br />
However, 12-year-old Christophe Maleau completed his swimming challenge on<br />
October 10th. It took him nearly 14 hours to swim from St. Lucia to Martinique. In<br />
fairly good sea conditions, he swam with ease, taking a break every 20 minutes for<br />
nourishment. Support catamarans were on the water.<br />
Christophe took the challenge as part of Pink October, is to support all women with<br />
cancer. His first challenge took place in 2017, swimming 6.4 kilometres between<br />
Anse Mitan and la Française in Fort-de-France.<br />
The following year he tackled the 26 kilometers between Le Diamant<br />
and Schoelcher.<br />
Read the full story at www.en24news.com/<strong>2020</strong>/10/at-12-years-old-christophemaleau-succeeded-in-swimming-the-crossing-between-sainte-luc.html<br />
In Stock!<br />
Perkins M300C Marine Engine<br />
Commercially rated 6.6 liter engine producing 300 hp @ 2400 rpm<br />
Same size as current M225Ti<br />
Emissions compliant with IMO2<br />
Wastgate turbo charger for better low engine<br />
speed performance and faster acceleration<br />
500 hour oil change intervals<br />
Low fuel consumption<br />
Gear driven fresh water and sea water pump<br />
Primary and secondary fuel filters<br />
90 amp alternator<br />
Providing excellent reliability and fuel economy, while being clean, quiet and smooth in<br />
operation. Low noise, rapid starting and low emissions are achieved with advanced<br />
combustion systems that allow for precise, multiple injections within each combustion<br />
cycle, reducing fuel use and lowering emissions<br />
Call us today and mention this ad to receive a special discount<br />
info@partsandpower.com www.partsandpower.com +1 284-494-2830/440-2830<br />
Your Power Solution Company