RUTH McEVOY COLLECTION 28<br />

SUBJECT TEXT DATE<br />

Sewerage The Town and City seek solution to combined sewerage disposal plans. 7-20-1962<br />

Sewage Plant (cont) The Council authorizes plans for a plant on the site - West Main and the Creek. 8-14-1962<br />

West Main residents to fight sewage plant location. 8-15-1962<br />

The Council determined on the above site - or nearby. 8-28-1962<br />

The Council determined on a site between the Creek and River Street. 9-11-1962<br />

Aerial picture of the Sewage Treatment Plant. 9-29-1962<br />

No federal funds for the sewage treatment plant. 3-22-1963<br />

Contract let for sewage lift for the northeast section. 4-2-1963<br />

Federal funds assured for. 10-10-1963<br />

The Council approves $1,129,600 bond issue for the Treatment Plant. 2-25-1964<br />

The Council awards sewer contracts. 3-12-1964<br />

Washington approves sewer expansion plans - bids approved.<br />

William C. Pahl Construction Co. moves equipment to the site of the new sewage<br />

3-18-1964<br />

plant.<br />

Federal funds cut by $30,000 - the City paid $21,000 for the site - expected total<br />

4-8-1964<br />

cost $1,520,000. 4-<strong>24</strong>-1964<br />

Picture of the start of the Treatment Plant. 4-30-1964<br />

A strike stops work on the plant. 5-19-1964<br />

Sewer work delayed by strike. 5-28-1964<br />

Winegar on progress on the plant.<br />

The pumping station near Walnut Street bridge to be automated - to pump to the<br />

8-31-1964<br />

treatment plant. Description of the new sewage treatment plant. 9-2-1964<br />

Picture of steel work going up. 11-18-1964<br />

Picture of work progress. 12-3-1964<br />

Picture of the new treatment plant. 4-<strong>24</strong>-1965<br />

Picture of the treatment building. 7-3-1965<br />

Article on first installed. 7-17-1965<br />

Treatment plant tested - works well. 10-19-1965<br />

Picture of the new treatment plant. 10-20-1965<br />

The new plant is almost completely operative.<br />

See: Water and Sewerage.<br />

10-29-1965<br />

Full page of pictures of the Sewerage plant. 11-13-1965<br />

Picture of the nearly completed sewerage plant from the air. 10-29-1966<br />

Sewerage Plant said not the cause of west end odors.<br />

The City seeks $1,400,000 in federal funds for a water pollution control plant -<br />

6-16-1967<br />

Housing & Urban Renewal. 8-1-1967<br />

Sludge from the plant available. 11-11-1967<br />

Sewer system bids rejected - too high.<br />

The City pumps 10million gallons of flood water on the north east into the storm<br />

5-14-1968<br />

sewer - picture. 5-13-1969<br />

Picture of progress on the plant improvements. 7-11-1969<br />

The Sewer Department asks for mains for West Main Street and Lewiston Road. 8-25-1969<br />

West Main residents protest sewer plant odor.<br />

Sewer men find a crosslink from the storm sewer to the sanitary sewer line -<br />

7-14, 18-1970<br />

clean up helps the flow. 10-8-1970<br />

The College to construct its own line. 11-10-1970<br />

A major sewer break feared - East Avenue collapses. 4-19, 22-1971<br />

The College and Town agree on sewer. 4-27-1971<br />

Philip Weiss makes a complaint for his constituents on sewer odor on West Main. 5-25-1971<br />

Weather changes charged a cause of odors. 7-1-1971<br />

The City to increase the capacity of the treatment plant - flat topography a problem. 12-29-1971<br />

Federal funds for the sewerage system cut. 11-29-1972<br />

The City to hire an engineering firm for sewer work.<br />

The State says the City must complete the water pollution plant, however it<br />

5-30-1973<br />

affects finances. 7-20-1973<br />

The City hesitates to serve Kings Plaza - may overload the main system. 7-21-1973<br />

The Clinton area sewer line contended. 7-<strong>24</strong>-1973<br />

Sixteen member committee chosen to mediate the dispute. 8-13-1973