Sewerage Emery Gould, assistant, to run the plant. 11-17-1954<br />
Sewage Plant (cont) Nelson Fuller, temporarily in charge of the Sewer Plant, asks for deodorant<br />
chemical. 1955<br />
$1,650 voted for final plans. 8-16-1955<br />
Fourteen named to Sewer Plant Study. 10-4-1955<br />
Sewer Study Committee meets, disagrees.<br />
Committee talking of rebuilding the sewerage treatment plant - may cost $800,000.<br />
10-20-1955<br />
City to study sewer rebuilding plans. 1-14-1956<br />
The City is planning a new drainage system for the north east. 4-12-1956<br />
Fuller's offer to reorganize rejected by the State. 4-18-1956<br />
Fuller asks the City for an old pumper as supp. 5-3-1956<br />
The Mayor to assign sewer management to the water commission.<br />
Nussbaumer, Clarke and Velzy sue the City for $27,320 for sewer system once<br />
11-6-1956<br />
discussed, never built. 11-14-1956<br />
Hearing planned on combining the Water and Sewerage departments. 12-18-1956<br />
Transfer of Sewerage to the Water Department not opposed. 12-28-1956<br />
Those who object to sewerage tax must pay the tax then ask for a hearing. 3-22-1957<br />
The <strong>County</strong> to aid the City in drainage problem in the north east section of the City.<br />
Fuller concerned over sewer cut-ins - says drainage causes trouble in the<br />
6-28-1957<br />
sanitary lines. 7-26-1957<br />
Test wells to be dug in the north east. 10-17-1957<br />
William C. Larson, engineer for sewer plans for East Main Street rebuilding. 10-22-1957<br />
New pump purchased. 10-26-1957<br />
The City to boost sewer rentals to equal water. 12-17-1957<br />
East Main sewer work estimate $466,000. 3-25-1958<br />
Contract let on Cedar Street sewer - for the milk plant. 9-<strong>24</strong>-1958<br />
The State is testing the disposal system. 3-<strong>24</strong>-1959<br />
Years wait on bids saves $300. 3-25-1959<br />
East Main sewer work to be expensive. 4-14-1959<br />
The compression system devised by Fuller breaks down. 5-1-1959<br />
Sewer break on East Main defies repair.<br />
The City agrees to spend $400,000 to rebuild the East Main sewer while<br />
5-16-1959<br />
Arterial work is done. 7-3-1959<br />
Pumps for the East Main sewer lift arrive. 8-18-1959<br />
The City seeks the cooperation of the Town on sewers in border areas. 11-10-1959<br />
Sewer work starts on East Main. 11-23-1959<br />
Sewer work on East Main starts near Vine Street. 11-25-1959<br />
Picture of the start of sewer work on East Main. 12-1-1959<br />
The City told to expand the sewerage plant or to build a new one. 2-25-1960<br />
Sewer work on East Main is complete. 5-21-1960<br />
Meeting on sewage disposal breakdowns. 8-<strong>24</strong>-1960<br />
Sewer plant needs rehabilitation. 11-18-1960<br />
DeWitt S. Abel the new sanitary engineer. 11-30-1960<br />
Report on the sewer lift on Clinton, not working well. 2-27-1961<br />
East Main work acceptance put off because of a need to change the sewer lift. 2-28-1961<br />
Former disposal plant suggested as the site for a park.<br />
The City is offering bonds worth $421,000 for sanitary sewer on East Main, etc.<br />
$260,000 for sewer, $83,000 for street improvement, and $780,000(sic) for<br />
3-1-1961<br />
new water line. 4-6-1961<br />
The City bonds taken by Solomon Brothers and Hutzler of NY at 2.6%. 4-20-1961<br />
Grand Canal pumping station not working. 6-6-1961<br />
The City and Town collaborating on a program for water, sewers.<br />
Sewer cleaning operation, begun in November, now completed - weather delayed<br />
6-29-1961<br />
the work. 9-9-1961<br />
Planners approve a western section site for the sewerage treatment plant. 11-<strong>24</strong>-1961<br />
The City starts a capital fund for sewer improvement. 12-28-1961<br />
West Main residents oppose the proposed location of the Sewage Treatment Plant. 5-11, 15-1962<br />
The City takes an option on the sewer plant site - court action threatened. 5-29-1962