Infrastructure : Tentative Budget: for FY12-13<br />

1. HSCs up gradation/Renovation<br />

Sl.<br />

No.<br />

Particular Situation Analysis Units Unit Cost Tentative Budget<br />

1. HSC In 413 HSCs only 131 HSCs 79 20 lakhs 1580 Lakh<br />

Building having own building in which 52<br />

HSCs have renovated and rest 79<br />

HSCs need new building<br />

2. Equipment As per IPHS all 413 HSCs<br />

required all equipment<br />

413 25000 103.25 Lakh<br />

3. Furniture In 413 HSCs required all<br />

furniture<br />

As per IPHS<br />

413 80000 330.4 Lakh<br />

Total 2013.65Lakhs<br />

2. APHCs up-gradation/ Renovation<br />

Sl.<br />

No.<br />

Particular Situation Analysis Units Unit Cost Tentative Budget<br />

1. APHC In the <strong>District</strong> 43 APHCs are<br />

34 80 Lakh 2720 Lakh<br />

Building functional. In which 34 need new<br />

Building<br />

2. Boundary wall Need boundary wall with Iron gate to 41 5 Lakh 205 Lakh<br />

of the campus protect all valuable goods for existing<br />

with Iran gate all APHCs<br />

3. Equipment As per IPHS norm follow required<br />

Equipment for existing all APHCs<br />

43 3 Lakh 129 Lakh<br />

4. Furniture As per IPHS norm follow required<br />

furniture for existing all APHCs<br />

43 1 lakh 43 Lakh<br />

Total 3097 Lakhs<br />

3. Non functional existing 5 PHC to be functional 24*7<br />

SL.NO Particular Situational Analysis Unit Unit Cost Tentative Budget<br />

1 PHC Building 3 PHC need to<br />

renovate<br />

3 80 lakhs 240 Lakhs<br />

2 Boundary wall 3 out of 5 PHC need 3 5 lakhs 15 Lakhs<br />

of the campus construction of<br />

with Iran gate Boundary wall with<br />

Iron Gate<br />

3 Equipment 5PHC need all required<br />

equipments<br />

5 5 lakhs 25 Lakhs<br />

4 Furniture 5PHC need minimum<br />

required furniture<br />

5 2 lakhs 10 Lakhs<br />

Total 290 Lakhs<br />