Infrastructure : Tentative Budget: for FY12-13<br />
1. HSCs up gradation/Renovation<br />
Sl.<br />
No.<br />
Particular Situation Analysis Units Unit Cost Tentative Budget<br />
1. HSC In 413 HSCs only 131 HSCs 79 20 lakhs 1580 Lakh<br />
Building having own building in which 52<br />
HSCs have renovated and rest 79<br />
HSCs need new building<br />
2. Equipment As per IPHS all 413 HSCs<br />
required all equipment<br />
413 25000 103.25 Lakh<br />
3. Furniture In 413 HSCs required all<br />
furniture<br />
As per IPHS<br />
413 80000 330.4 Lakh<br />
Total 2013.65Lakhs<br />
2. APHCs up-gradation/ Renovation<br />
Sl.<br />
No.<br />
Particular Situation Analysis Units Unit Cost Tentative Budget<br />
1. APHC In the <strong>District</strong> 43 APHCs are<br />
34 80 Lakh 2720 Lakh<br />
Building functional. In which 34 need new<br />
Building<br />
2. Boundary wall Need boundary wall with Iron gate to 41 5 Lakh 205 Lakh<br />
of the campus protect all valuable goods for existing<br />
with Iran gate all APHCs<br />
3. Equipment As per IPHS norm follow required<br />
Equipment for existing all APHCs<br />
43 3 Lakh 129 Lakh<br />
4. Furniture As per IPHS norm follow required<br />
furniture for existing all APHCs<br />
43 1 lakh 43 Lakh<br />
Total 3097 Lakhs<br />
3. Non functional existing 5 PHC to be functional 24*7<br />
SL.NO Particular Situational Analysis Unit Unit Cost Tentative Budget<br />
1 PHC Building 3 PHC need to<br />
renovate<br />
3 80 lakhs 240 Lakhs<br />
2 Boundary wall 3 out of 5 PHC need 3 5 lakhs 15 Lakhs<br />
of the campus construction of<br />
with Iran gate Boundary wall with<br />
Iron Gate<br />
3 Equipment 5PHC need all required<br />
equipments<br />
5 5 lakhs 25 Lakhs<br />
4 Furniture 5PHC need minimum<br />
required furniture<br />
5 2 lakhs 10 Lakhs<br />
Total 290 Lakhs<br />
107 | P a g e D i s t r i c t H e a l t h A c t i o n P l a n 2 0 1 2 - 1 3 D H S , S a r a n