B.Sc. Computer Technology - Anna University
B.Sc. Computer Technology - Anna University
B.Sc. Computer Technology - Anna University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
UNIT III WIRLESS LAN 9<br />
Wireless LAN – IEEE 802.11 - Architecture – services – MAC – Physical layer – IEEE 802.11a -<br />
802.11b standards – HIPERLAN – Blue Tooth.<br />
UNIT IV MOBILE NETWORK LAYER 9<br />
Mobile IP – Dynamic Host Configuration Protocol - Routing – DSDV – DSR – Alternative<br />
Metrics.<br />
UNIT V TRANSPORT AND APPLICATION LAYERS 7<br />
Traditional TCP – Classical TCP improvements – WAP, WAP 2.0.<br />
TOTAL : 45<br />
REFERENCE BOOKS:<br />
1. Jochen <strong>Sc</strong>hiller, “Mobile Communications”, PHI/Pearson Education, Second Edition, 2003.<br />
(Unit I Chap 1,2 &3- Unit II chap 4,5 &6-Unit III Chap 7.Unit IV Chap 8- Unit V Chap 9&10.)<br />
2. William Stallings, “Wireless Communications and Networks”, PHI/Pearson Education, 2002.<br />
(Unit I Chapter – 7&10-Unit II Chap 9)<br />
3. Kaveh Pahlavan, Prasanth Krishnamoorthy, “Principles of Wireless Networks”, PHI/Pearson<br />
Education, 2003.<br />
4. Uwe Hansmann, Lothar Merk, Martin S. Nicklons and Thomas Stober, “Principles of Mobile<br />
Computing”, Springer, New York, 2003.<br />
YCS015 SOFTWARE PROJECT MANAGEMENT L T P C<br />
3 0 0 3<br />
UNIT I INTRODUCTION TO SOFTWARE PROJECT MANAGEMENT 9<br />
Project Definition – Contract Management – Activities Covered by Software Project<br />
Management – Overview Of Project Planning – Stepwise Project Planning.<br />
UNIT II PROJECT EVALUATION 9<br />
Strategic Assessment – Technical Assessment – Cost Benefit Analysis – Cash Flow<br />
Forecasting – Cost Benefit Evaluation Techniques – Risk Evaluation. – software effort<br />
estimation<br />
UNIT III ACTIVITY PLANNING 9<br />
Objectives – Project <strong>Sc</strong>hedule – Sequencing and <strong>Sc</strong>heduling Activities – Network Planning<br />
Models – Forward Pass – Backward Pass – Activity Float – Shortening Project Duration –<br />
Activity on Arrow Networks – Risk Management – Nature Of Risk – Types Of Risk – Managing<br />
Risk – Hazard Identification – Hazard Analysis – Risk Planning and Control.<br />
UNIT IV MONITORING AND CONTROL 9<br />
Resource allocation - identifying and scheduling resources – publishing resource and cost<br />
schedule – scheduling sequence - Creating Framework – Collecting The Data – Visualizing<br />
Progress – Cost Monitoring – Earned Value – Priortizing Monitoring – Getting Project Back To<br />
Target – Change Control – Managing Contracts – Introduction – Types Of Contract – Stages In<br />
Contract Placement – Typical Terms Of A Contract – Contract Management – Acceptance.<br />