Food Processing Plant Design & layout
locate boiler room, power station, cooling towers, water pumping station etc. on
periphery but adjacent to the area of largest use
The usual clearances between pipes including flanges and lagging and between
pipes and other objects should be 25 mm but this should be increased if hot pipes
run near plastic pipes, cables etc.
Steam and water mains, electricity and telephone cables etc. should, in general, run
parallel to the road system and should avoid going through plant area
Locate office building close to the main entrance
Provide adequate parking facilities for vehicles waiting to load / unload, cars,
scooters etc.
Plan roads in such a manner that the vehicles do not pass through process areas.
Ideally, outside of a plant should be accessible on all four sides by road
Workshop and general stores should be located within easy access of the processing
units.
Table 8.1 Typical clearances between various units for preliminary site layouts
Area To Clearance, m
Plant areas
15
Boilers and furnaces 15
Blow down stacks with flares
Gas holders
To the adjacent unit, main roads or
boundary
30
30
Cooling towers 30
Effluent plants 15
Loading areas
15
Ware houses 30
Offices and canteens 30
Medical center 30
To process units
Garage 30
Fire station 30
Work shops 30
Main roads 12