The location analyst presents to the management both the cost and the intangible data

results. In such cases, management could take a decision based on a simple composite

measure method illustrated below with the aid of a numerical example.

4.7 Composite measure method and location break-even analysis composite measure

method

The steps of the composite measure method are:

Develop a list of all relevant factors

Assign a scale to each factor and designate some minimum

Weigh the factors relative to each other in light of importance towards achievement

of system goals. .

Score each potential location according to the designated scale and multiply the

scores by the weights.

Total the points each location and either (a) use them in conjunction with a separate

economic analysis, or (b) include an economic factors in the list of factors and choose

the location on the basis of maximum points.

The following illustrates the composite measure method with a numerical example. There

are three potential sites and five relevant factors like transportation costs per week, labour

costs per week, raw material supply, maintenance facilities and community attitude. The

costs are in rupees whereas for the last three factors, points are assigned on 0-100 scale. The

data collected is shown in the following Table.

Table Payoff matrix

Factor

Potential sites

S1 S2 S3

Transportation cost/week Rs

FI

800

640

580

Labour cost/week, Rs.

F2

1180

1020

1160

Raw material supply

F3

30

80

70

Maintenance facilities

F4

60

20

30

Community attitude

F5

50

80

70

The location analyst has pre-established weights for various factors. This includes a

standard of 1.0 for each Rs.10 a week of economic advantage. Other weights applicable are

2.0 on raw material supply, 0.5 on maintenance facilities and 2.5 on community attitudes.

Also the organization prescribes a minimum acceptable score of 30 for maintenance

facilities.