You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
WORLD NEWS<br />
IGY wins contract to run SKD<br />
UK: Island Global Yachting (IGY <strong>Marina</strong>s) has been awarded a contract to<br />
operate, market and brand the 185-berth St Katharine Docks <strong>Marina</strong> (SKD<br />
<strong>Marina</strong>) in London, England. The facility is owned by property funds managed<br />
by Blackstone, one of the world’s leading investment firms.<br />
IGY CEO Thomas Mukamal<br />
welcomes the boost to the IGY<br />
portfolio. “IGY is honoured to have<br />
been selected to manage and flag<br />
the St Katharine Docks <strong>Marina</strong>,” he<br />
said. “This is a thrilling opportunity<br />
for IGY to showcase our industryleading<br />
marina operations and global<br />
marketing platform for which IGY has<br />
become well known.”<br />
SKD is the only marina in central<br />
IBEX and COVID-19<br />
USA: Organisers of the International BoatBuilders’ Exhibition and Conference<br />
(IBEX) are optimistic the show will open as planned on Tuesday 29th<br />
September <strong>2020</strong>.<br />
The show organisers report that they<br />
are closely monitoring Florida’s ‘Three<br />
Phases of Re-Opening Guidelines’ and<br />
the state’s progress, as well as working<br />
with the Tampa Convention Center and<br />
Visit Tampa Bay to develop health and<br />
safety protocols to protect exhibitors,<br />
sponsors and visitors.<br />
“We are optimistic that by September<br />
the state of Florida will be open for<br />
large events to take place and that<br />
public confidence will have been<br />
restored and IBEX will open on<br />
schedule,” said IBEX show director<br />
Anne Dunbar. “We will continue to<br />
monitor announcements by local<br />
government officials and the guidelines<br />
Drystack plan at St Joe <strong>Marina</strong><br />
USA: The St Joe Company plans to construct a dry boat storage facility at Port<br />
St Joe <strong>Marina</strong> in Port St Joe, Florida. The marina, which is owned by St Joe and<br />
sits alongside St Joseph’s Bay with quick access to the Gulf of Mexico and the<br />
Intracoastal Waterway, was damaged by Hurricane Michael in October 2018.<br />
Plans call for the new drystack to be<br />
approximately 63,200ft² (5,870m²) and<br />
have 252 dry boat slips. The largest will<br />
be designed to accommodate boats of<br />
up to 45ft (14m) in length.<br />
“As we were planning this project, it<br />
was important that we not only rebuild<br />
what was there previously, but create a<br />
space that the people of Port St Joe and<br />
the boating community could be proud<br />
of,” explained Patrick Murphy, senior vice<br />
president of operations for St Joe. “We<br />
are thrilled to be through the planning<br />
London and is located 40nm up the<br />
River Thames. It is adjacent to the<br />
historic Tower of London and close<br />
to many of the city’s most famous<br />
tourist attractions. The asset was<br />
recently renovated by Blackstone and<br />
has evolved into a thriving waterside<br />
community, featuring a mix of<br />
commercial, residential, retail, food and<br />
beverage amenities that surround the<br />
marina.<br />
of the CDC. During the past 30 IBEX<br />
shows we have weathered three new<br />
host cities, several hurricane threats,<br />
one great recession, and now together<br />
we will manage the coronavirus<br />
challenges.”<br />
“If, with an abundance of caution and<br />
complete focus on the health and safety<br />
of our exhibitors, sponsors and visitors,<br />
we are required to alter the format of<br />
IBEX, we will make an announcement<br />
accordingly. It is our hope that IBEX will<br />
spark much needed business for the<br />
marine industry and be the beginning<br />
of a strong recovery season for us all,”<br />
she added.<br />
www.ibexshow.com<br />
and permitting phase of this project and<br />
ready to kick off construction.”<br />
Planning and permitting is underway<br />
for additional phases of the marina with<br />
plans to include around 48 wet slips,<br />
a ship’s store and other amenities.<br />
“Boating is central to the lifestyle in Port<br />
St Joe for so many,” said Port St Joe<br />
mayor, Rex Buzzett. “The marina serves<br />
as such an important gathering spot<br />
for our residents and visitors. Getting it<br />
closer to opening is something that we<br />
have been looking forward to.”<br />
www.marinaworld.com - <strong>May</strong>/<strong>June</strong> <strong>2020</strong> 7<br />
Successful<br />
Waterfront<br />
Development<br />
Starts with<br />
Lasting<br />
Infrastructure.<br />
EXPERT DOCK BUILDER<br />
AND MARINE CONTRACTOR<br />
bellingham-marine.com<br />
800-733-5679