06.05.2020 Views

Doppelmayr/Garaventa Yearbook 2020

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Funicular Railways<br />

120-FUL Magglingenbahn<br />

Verkehrsbetriebe Biel<br />

Biel | Switzerland<br />

Inclined length 1,693 m<br />

Vertical rise 442 m<br />

Speed 6.0 m/s<br />

Capacity 1,050 PPH<br />

In less than five months, the Magglingenbahn funicular<br />

underwent a complete rebuild. A special feature of this installation<br />

is the energy storage system, which Frey AG Stans<br />

developed in collaboration with the University of Lucerne<br />

and was used here for the first time. This innovation has<br />

made it possible to reduce power costs and to utilize the<br />

energy obtained efficiently. The power produced with a generator<br />

can now be stored, making it available when required.<br />

This significantly reduces the expenditure on energy – as<br />

part of the running costs – because it means that the funicular<br />

draws less power from the mains in normal operation.<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!