Doppelmayr/Garaventa Yearbook 2020
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Funicular Railways<br />
120-FUL Magglingenbahn<br />
Verkehrsbetriebe Biel<br />
Biel | Switzerland<br />
Inclined length 1,693 m<br />
Vertical rise 442 m<br />
Speed 6.0 m/s<br />
Capacity 1,050 PPH<br />
In less than five months, the Magglingenbahn funicular<br />
underwent a complete rebuild. A special feature of this installation<br />
is the energy storage system, which Frey AG Stans<br />
developed in collaboration with the University of Lucerne<br />
and was used here for the first time. This innovation has<br />
made it possible to reduce power costs and to utilize the<br />
energy obtained efficiently. The power produced with a generator<br />
can now be stored, making it available when required.<br />
This significantly reduces the expenditure on energy – as<br />
part of the running costs – because it means that the funicular<br />
draws less power from the mains in normal operation.<br />
10