<strong>GL</strong> Noble Denton<br />
energıze<br />
e n e r g y. e ff i c i e n c y. e n g i n e e r i n g .<br />
<strong>oil</strong> & <strong>gas</strong><br />
Getting to the Top<br />
design Unique Combination of Competencies<br />
rules Following in Captain Noble’s Footsteps<br />
software SynerGEE Affects Energy Costs<br />
Issue <strong>01</strong> • 2<strong>01</strong>0<br />
www.gl-nobledenton.com<br />
3
<strong>01</strong>/2<strong>01</strong>0<br />
editorial<br />
John Wishart<br />
To Our Readers<br />
We are working hard to establish ourselves and be recognized as a leading advisor to the<br />
<strong>oil</strong> and <strong>gas</strong> industry. <strong>GL</strong> Noble Denton has a comprehensive service portfolio ready to<br />
assist to provide safe, sustainable solutions with quality you can trust, wherever you operate.<br />
As a full-service provider and independent advisors with broad upstream and midstream<br />
competence for the complete asset lifecycle, we provide consulting, design, assurance and<br />
project execution. <strong>GL</strong> Noble Denton combines excellent engineering and analytical skills with<br />
operational experience of offshore, maritime and onshore <strong>oil</strong> and <strong>gas</strong> assets.<br />
Given the breadth of our skills, our experience and as one of the mechanisms of<br />
keeping our customers informed, we have launched a customer magazine to let you know on<br />
a regular basis about the scope of our activities. We hope this updates you on the projects<br />
we are involved with and the technical and operational challenges we are dealing with. While<br />
safety, integrity, reliability and performance are our fixed targets, we rely on our strong<br />
expert ise in complex <strong>oil</strong> and <strong>gas</strong> assets such as MODUs, FPSOs, pipelines, subsea systems,<br />
OSVs, marine operations, project management and software services to get the job done.<br />
Our focus is beyond a given project. We share your understanding of a challeng-<br />
ing commercial environment as well as legislative changes and your concern about safe and<br />
clean energy supplies. Today’s demand to balance energy, security, employment, and<br />
economic development with combating global climate change requires diversity,<br />
competition and, after all, efficiency. In less than 30 years, the world will need 45 per cent<br />
more energy than it consumes now, and double current demand by 2050. While this<br />
projection requires a huge investment, it is of greatest importance for the industry to<br />
preserve the global climate and to reduce greenhouse <strong>gas</strong>.<br />
<strong>GL</strong> Noble Denton has the ambition to play its part promoting innovation, quality<br />
and efficiency in energy exploration, production and transportation. We are ready to assess<br />
investment choices and engineering designs as a way of making sure that you, our clients,<br />
remain competitive – today and in the future.<br />
Yours sincerely,<br />
John Wishart<br />
President, <strong>GL</strong> Noble Denton<br />
3
contents <strong>01</strong>/2<strong>01</strong>0<br />
40<br />
syneRgee:<br />
software for cost<br />
optimisation at<br />
pump stations<br />
12<br />
CORROsIOn:<br />
yours faithfully:<br />
rust loves<br />
sea water<br />
32<br />
spadeadam:<br />
the need<br />
for full-scale<br />
testing<br />
14<br />
mOORIng:<br />
ultra-deepwater<br />
research – new<br />
possibilities<br />
28<br />
18<br />
ResOuRCes:<br />
supply and<br />
demand – the<br />
peak <strong>oil</strong> mystery<br />
guIdelInes:<br />
following in<br />
Captain noble’s<br />
footsteps<br />
31<br />
InTeRvIeW:<br />
david Wells<br />
about his new<br />
business unit<br />
36<br />
InsTallaTIOn:<br />
dynamic<br />
positioning –<br />
faster than ever<br />
4 energıze
8<br />
22<br />
safeTy: preventing<br />
accidents –<br />
human factors<br />
engineering<br />
<strong>01</strong>/2<strong>01</strong>0<br />
desIgn:<br />
a unique<br />
combination of<br />
competencies<br />
21<br />
envIROnmenT:<br />
efficient coal<br />
<strong>gas</strong>ification<br />
technology<br />
42<br />
aWaRds:<br />
gl noble denton’s<br />
software solutions<br />
acclaimed<br />
profile inbrief<br />
gl noble denton in Brief<br />
<strong>GL</strong> Noble Denton is a TeChnICal advIsOR and TRusTed paRTneR for<br />
the <strong>oil</strong> and <strong>gas</strong> industry.<br />
The <strong>oil</strong> and <strong>gas</strong> business segment of the <strong>GL</strong> <strong>Group</strong> helps to design,<br />
build, install and operate <strong>oil</strong> and <strong>gas</strong> onshore, maritime and<br />
offshore assets to ensure safeTy, susTaInaBIlITy and<br />
supeRIOR value.<br />
<strong>GL</strong> Noble Denton is the meRgeR BeTWeen geRmanIsCheR llOyd’s<br />
(gl) OIl & <strong>gas</strong> BusIness and nOBle denTOn, a premier provider of li-<br />
fecycle marine and offshore engineering services. Since January 2<strong>01</strong>0,<br />
they have been offering their services as <strong>GL</strong> Noble Denton.<br />
<strong>GL</strong> Noble Denton is a full-service provider with broad upstream and<br />
midstream competence fOR The COmpleTe asseT lIfeCyCle.<br />
<strong>GL</strong> Noble Denton combines excellent engineering and analytical skills<br />
with operational experience of offshore, maritime and onshore <strong>oil</strong> and<br />
<strong>gas</strong> assets. The <strong>oil</strong> and <strong>gas</strong> business segment of <strong>GL</strong> employs mORe Than<br />
3,000 engIneeRs and expeRTs In 80 COunTRIes.<br />
We have strong expertise in complex <strong>oil</strong> and <strong>gas</strong> assets such as<br />
MODUs, FPSOs, pipelines, subsea systems, OSVs – and assurance, asset<br />
integrity, safety and risk, marine operations, project management and<br />
software services to match. The scope of technical services includes safe-<br />
ty, integrity, reliability and performance management.<br />
<strong>GL</strong> Noble Denton is a TRuly IndependenT advIsOR without any vested<br />
interest in selling a design, installation, fabrication or equipment.<br />
<strong>GL</strong> Noble Denton services <strong>oil</strong> and <strong>gas</strong> clients in onshore production,<br />
onshore pipelines, storage, import terminals, LNG, refineries and pet-<br />
rochemicals, distribution networks as well as mobile offshore drilling<br />
units, mobile offshore production units, fixed platforms, subsea, risers<br />
and flowlines, offshore support vessels, tankers and shipping and off-<br />
shore pipelines. We oversee and support the full lifecycle of an asset<br />
from project concept to decommissioning. The business segment has<br />
a glOBal ReaCh In The OIl and <strong>gas</strong> CenTRes of the world.<br />
gl Noble Denton<br />
www.gl-nobledenton.com<br />
5
<strong>oil</strong> asiatridentconsulting<br />
& <strong>gas</strong> merger<br />
6<br />
Offering consulting across<br />
the entire asset lifecycle,<br />
<strong>GL</strong> Noble Denton combines<br />
exceptional engineering<br />
and analytical skills with<br />
operational experience of<br />
offshore and onshore <strong>oil</strong><br />
and <strong>gas</strong> assets. Photo:<br />
Atlantic Hose<br />
energıze
advanced<br />
engıneerıng<br />
<strong>01</strong>/2<strong>01</strong>0 7
advanced engineering design<br />
Centre of Design Competency<br />
<strong>GL</strong> Noble Denton is the leading consultant for jack-up rigs and<br />
dynamic positioning services as well as for design work<br />
“These new vessels are complex in both the jack-<br />
up and dynamic positioning areas,” says David<br />
Rowan, Managing Director, Execution Services<br />
at <strong>GL</strong> Noble Denton. “We add a practical dimension to such<br />
units because we have extensive experience in managing off-<br />
shore wind farm projects and are currently overseeing the<br />
biggest offshore wind farm to-date, the Thanet project off the<br />
UK south-east coast.”<br />
<strong>GL</strong> Noble Denton has been awarded a contract by a<br />
company for jack-up system upgrade design work offshore<br />
as well as overall project management services for this<br />
development.<br />
“One element of our design work success was our previ-<br />
ous experience with mobile offshore production unit conver-<br />
sions. In the case of the Legendre project, we developed an<br />
innovative top-tensioned-riser concept that saved the client a<br />
lot of money by eliminating a large wellhead support platform.<br />
We also addressed the challenge of seabed scour, a common<br />
problem for mat-type units on hard bottoms, by developing an<br />
anti-scour system that could be quickly deployed by remote-<br />
operated vehicle.”<br />
Current projects include jack-up system design work.<br />
“We have performed many basic designs for FPSOs, jack-up<br />
units, and other offshore equipment. The aim of basic de-<br />
8 energıze
sign is to establish the main characteristics of the unit and<br />
develop preliminary performance criteria and initial costing.”<br />
Heritage in Rig Design<br />
“As an example, the ‘Legendre’ mobile offshore production<br />
unit, as purchased by Oceaneering, was unsuited to its in-<br />
tended use in harsh environments. During the basic design<br />
phase, we developed an innovative ‘pipe-in-pipe’ configura-<br />
tion for the legs that re-configured the existing structure very<br />
cost-effectively to withstand the significantly-increased loads.<br />
Once we had shown it was doable we moved into the detail<br />
design phase. Our heritage in rig design has two roots: firstly<br />
our acquisition of Standard Engineering, a company that has<br />
designed numerous semi-submersible mobile offshore drilling<br />
units. Examples are latest-generation rigs such as the Aker<br />
H-6, the biggest semi-submersible mobile offshore drilling<br />
unit ever developed.” Standard Engineering has been involved<br />
in semi-submersibles pretty much since their inception and<br />
<strong>01</strong>/2<strong>01</strong>0<br />
Photo: Gazprom<br />
experience.<br />
offshore drilling<br />
units have to<br />
satisfy specific<br />
requirements.<br />
has worked on all the industry’s “work-horses” such as the<br />
Aker H-3 for many years. “Our second root is Noble Denton,<br />
acknowledged as the world’s leading jack-up unit consultancy.<br />
Noble Denton has built up a huge breadth of knowledge in<br />
jack-up design and operation, which proved beneficial in the<br />
‘Legendre’ example. We were able to turn this rig into a very<br />
efficient production unit after it had lain idle for years because<br />
of inherent design problems.”<br />
The two main design competency centres are in Norway<br />
and Sharjah. The former is supported by a strong team based<br />
in Poland that is focused mostly on marine systems. The<br />
<strong>Group</strong> is considering expanding design centres into both the<br />
Far East and Brazil in response to cli-<br />
ent requests. “<strong>GL</strong> Noble Denton believes<br />
in putting the right person on the job.<br />
Thanks to our large and geographically-<br />
diverse staff we can place personnel<br />
where needed to best fit the requirements<br />
of the work at hand. This has two ben-<br />
efits: first it allows the ‘best for client’ per-<br />
son to be used, and second it offers our staff the ability to<br />
travel and advance their careers.”<br />
abstract<br />
<strong>GL</strong> Noble Denton has<br />
extensive experience in<br />
managing offshore<br />
projects.<br />
Know-how in design and<br />
operation advances<br />
efficient production.<br />
<strong>GL</strong> Noble Denton operates in a matrix structure with four<br />
regions – the Americas, Europe, Middle East and Far East –<br />
and four business segments: Technical Assurance, Advanced<br />
Engineering Consultancy, Marine Operations and Consultancy<br />
and Execution Services, complemented by a Major Accounts<br />
segment. Each region is further broken into countries, and<br />
each segment into individual service lines. “This organisation-<br />
al structure will allow us to perform a much broader range of<br />
services and to be a single stop for clients. Our average job<br />
size is expected to increase noticeably,” says Mr Rowan. Cm<br />
<strong>GL</strong> NobLe DeNtoN expeRt:<br />
David rowan<br />
Managing Director Execution services<br />
Phone: +713 543 4319<br />
E-Mail: david.rowan@gl-group.com<br />
9
advanced engineering design<br />
Giant. Newer,<br />
bigger: the<br />
6th generation<br />
of Aker rigs.<br />
A Unique Combination<br />
of Competencies<br />
In Norway, the first two aker H-6e rigs leave the yard –<br />
the world’s largest semi-submersible mobile offshore drilling<br />
units. <strong>GL</strong> Noble Denton was a preferred partner not only for<br />
hull design<br />
The first two Aker H-6e semi-submersible rigs,<br />
“Aker Barents” and “Aker Spitsbergen”, are now<br />
operational. They represent the sixth generation<br />
of drilling rigs from Aker Solutions.<br />
With a displacement of 56,900 tonnes and a deck area<br />
of 6,300 m², these are the largest drilling rigs ever built.<br />
With the H-6e rigs, Aker Solutions takes offshore drilling into<br />
harsher environments at high latitudes and in greater water<br />
depths.<br />
Aker Spitsbergen and Aker Barents are now fully operational<br />
in the North Atlantic and the North Sea after an initial<br />
period of offshore testing and commissioning. For several<br />
decades, <strong>GL</strong> Noble Denton’s design department in Brevik /<br />
Norway has been one of Aker Solutions’ preferred partners<br />
for hull design.<br />
In the Aker H-6e project <strong>GL</strong> Noble Denton has been responsible<br />
for all detailed design, engineering and strength<br />
analyses of the substructure (everything located below the<br />
10 energıze
top of the columns). <strong>GL</strong> Noble Denton has also played an<br />
important role in following up on the construction of the pontoons,<br />
columns and bracings at Dubai Drydocks (now Drydocks<br />
World-Dubai).<br />
A Key Factor for Success<br />
At the peak of the project, 56 engineers where involved,<br />
representing disciplines as diverse as naval architecture,<br />
machinery, piping and structural engineering as well as electrical,<br />
instrument and telecommunications (EIT) engineering.<br />
After completion of the substructure, the hulls were towed to<br />
Norway for assembly of the topside.<br />
“We are proud and honoured to have been part of this<br />
cutting-edge technology project,” says Engineering Manager<br />
Tor Lønnerød of <strong>GL</strong> Noble Denton. “Hull design has been the<br />
basis of our company since it was founded in 1978. Our longtime<br />
collaboration with Aker has been a key factor in bringing<br />
us to where we are today.”<br />
<strong>01</strong>/2<strong>01</strong>0<br />
In 2009 the design department in Brevik, Norway, merged<br />
operations with their former competitor Standard Engineering<br />
in the neighbouring city of Sandef-<br />
abstract<br />
jord. Today, the joint <strong>GL</strong> Noble Denton<br />
and Brevik-Sandefjord team represents In the project, <strong>GL</strong> Noble<br />
Denton was responsible for<br />
a unique combination of technology the substructure.<br />
competencies in the field of mobile off- At the peak of the project,<br />
56 engineers were involved,<br />
shore units. Over the past 25 years, the<br />
representing different<br />
two companies have jointly contributed to disciplines.<br />
the design of 175 mobile offshore units.<br />
“Such an accumulation of experience is hard to find anywhere<br />
else on the planet,” says Lønnerød. mwH<br />
<strong>GL</strong> NobLe DeNtoN expeRt:<br />
tor Lønnerød<br />
General Manager <strong>GL</strong> Noble Denton brevik and Global Design<br />
Phone: +47 35 51 71 15<br />
E-Mail: tor.lonnerod@gl-group.com<br />
Finishing. After<br />
completion of the<br />
substructure, the<br />
hulls were towed<br />
to Norway.<br />
11
advanced engineering corrosion<br />
Yours Faithfully:<br />
Rust Loves Sea Water<br />
steel and salt water make a corrosive couple. Protecting offshore structures<br />
against rust can be a frustrating task, to say the least. Even small mistakes will<br />
show soon. remote locations and environmental issues add to the headache<br />
abstract<br />
Economically and ecologically<br />
feasible anticorrosion concepts<br />
for offshore structures<br />
are in high demand.<br />
The unique conditions in the<br />
environment must be noted.<br />
Proper corrosion protection not only means<br />
long-term cost-savings but is also a safety-<br />
critical issue. Therefore optimised, economically<br />
and ecologically feasible anticorrosion concepts for offshore<br />
structures are in high demand. The topic was discussed in<br />
depth during the 9th Conference on Corrosion Protection in<br />
Maritime Engineering in January.<br />
The Copper-Nickel Alternative<br />
Bernd Sagebiel of KME Germany, a manufacturer of copper-<br />
nickel alloy products for seawater applications specialising in<br />
the protection of highly exposed transitional and splash zones<br />
of offshore structures, explained: “Cathodic<br />
protection is effective in zones of structures<br />
that are permanently immersed in water.<br />
However, it is largely ineffective in transi-<br />
tional and splash zones, because the metal<br />
is not continuously in contact with seawater,<br />
the electrolyte.” The traditional method of<br />
protecting steel components in this area uses PU (polyurethane)<br />
or epoxy resin. But, Sagebiel said, there is an attractive alterna-<br />
tive: “High-strength copper-nickel alloys have been widely used<br />
for their excellent resistance to seawater corrosion, their high<br />
inherent resistance to biofouling, and good fabricability.”<br />
One of the first major anticorrosion applications of the<br />
copper-nickel alloy CuNi 90/10 in tidal and splash zones were<br />
offshore platform legs in the Morecambe Bay <strong>gas</strong> field in<br />
the Irish Sea, in 1984. The support columns of all platforms<br />
were sheathed in copper-nickel sheets from +13 to –2 metres<br />
above and below the lowest water level. The metal sheets<br />
were 4 mm thick and were welded directly onto the steel. The<br />
underwater sections of the columns were protected cathodic-<br />
ally with zinc anodes fixed directly to the steel. No corrosion<br />
allowance was specified.<br />
“Regular inspections have found no indication of corrosion<br />
on the steel or the alloy cladding,” Sagebiel emphasised. Since<br />
the robust nature of the material also prevented mechanical<br />
damage, there was never any need for repairs in the alloy-<br />
protected zone. “The fact that the transition and splash zones<br />
of the steel columns neither require corrosion coatings nor any<br />
repairs or maintenance work clearly shows that copper-nickel<br />
alloy cladding is a durable, economical alternative to conven-<br />
tional protection methods for offshore load-bearing structures.”<br />
Environmental Responsibility<br />
The fight against corrosion can be especially challenging<br />
when environmental restrictions add to the complexity of the<br />
task, as Horst Winterhoff from the German utility company<br />
RWE Dea showed in his report about the Mittelplate Drilling<br />
and Production Island. Located in a national park, the facility<br />
has to meet stringent environmental requirements. The production<br />
platform is protected by sheet piling. The structure re-<br />
12 energıze
sembles a steel tub, its design preventing both the ingress of<br />
seawater and the escape of <strong>oil</strong> or dirt. “Many aspects of the<br />
project were developed specifically to meet the requirements<br />
of this ecologically sensitive area,” Mr Winterhoff explained.<br />
The Never-Ending War Against Rust<br />
Corrosion-damaged surfaces of the steel superstructure are<br />
regularly mended. Loose rust and blisters are removed using<br />
needle hammers, then the affected areas are sanded and<br />
spot-repaired. Due to the exposure to salt, surfaces must<br />
be washed with fresh water before being worked on. When<br />
finished, the repaired surfaces resemble a patchwork. This<br />
makes it easier to track the quality of the repair works done,<br />
and to detect recurring corrosion in places still under warranty.<br />
Currently, works are underway to remove the entire tarbased<br />
coating of the sheet piles. Blasting off the old coating<br />
was not an option for environmental reasons. The design of<br />
the platform and the rough weather conditions did not allow<br />
the scaffolding to be covered by protective plastic sheeting. A<br />
method using electrical induction to remove the coating was<br />
<strong>01</strong>/2009<br />
Photos: XXXXXXXXXXXXXXXXXXX<br />
abandoned because the equipment was too bulky; and etching<br />
proved to be too time consuming. In the end, the traditional<br />
derusting method of hammering and needling turned<br />
out to be most effective.<br />
“Repair works on site are a challenge,” Mr Winterhoff confirmed.<br />
“Therefore it is essential to give due consideration to<br />
corrosion protection during the early planning stages of any<br />
project.” For example, bimetal corrosion can be avoided by<br />
selecting appropriate materials or by integrating other protective<br />
measures at the design stage. Covering special areas<br />
with suitable materials can prevent flash corrosion. “Due to<br />
the remote location, ongoing work cannot be monitored continuously.<br />
To ensure efficient corrosion protection you need an<br />
experienced and reliable team familiar with the unique conditions<br />
in the offshore environment.” NL<br />
Photos: RWE, KME<br />
<strong>GL</strong> NobLE DENToN ExpERT:<br />
Johann taferner<br />
Plants and Pipelines<br />
Phone: +49 40 36149-7739<br />
E-Mail: johnann.taferner@gl-group.com<br />
Challenge. The fight against<br />
corrosion is a complex issue:<br />
Located in a national park,<br />
the Mittelplate Drilling and<br />
production Island has to meet<br />
stringent environmental<br />
requirements.<br />
13
advanced engineering ultra-deepwater research<br />
Advances in<br />
Mooring Systems<br />
Evaluating the reliability of deepwater mooring lines is critical before floating<br />
systems can be deployed with confidence. An analytical truncation procedure<br />
allows a rapid assessment of line dynamics and opens up new possibilities for<br />
model testing<br />
Simulation.<br />
<strong>GL</strong> Noble Denton is<br />
funding a research<br />
programme at the<br />
University of<br />
Cambridge to<br />
consider effective<br />
modelling for<br />
ultra-deepwater<br />
mooring and riser<br />
developments in<br />
the <strong>oil</strong> and <strong>gas</strong><br />
industry.<br />
14 energıze
The move by the exploration and production<br />
sector toward working in water depths greater<br />
than 1,500 m creates significant challenges for<br />
the integrated modelling of deepwater systems, the floaters,<br />
moorings and risers. Ensuring the reliability of such lines is<br />
critical and is normally achieved by efficiently combining com-<br />
putational models and model testing.<br />
In the case of numerical simulations, the complete sys-<br />
tem dynamics are highly coupled and nonlinear, with simul-<br />
taneous responses at different time scales. For this reason<br />
the governing equations of motion are normally solved in the<br />
time domain, which is computationally intensive. For physi-<br />
cal model tests it is impossible to produce a scale model that<br />
accurately captures all aspects of the system, given the re-<br />
stricted water depth of testing tanks worldwide and the lack<br />
of environmental control in fjords and lakes.<br />
Software Developments<br />
These difficulties have driven a significant research effort over<br />
recent years, and a significant degree of progress has been<br />
made. The drive to improve numerical efficiency has led to a<br />
number of recent developments in commercial software. In<br />
particular, the use of a linearised frequency domain analysis<br />
can offer a reduction in computational cost of up to two orders<br />
of magnitude, although a fully coupled time domain analysis<br />
may still be necessary to check critical design cases and<br />
benchmark the more approximate frequency domain method.<br />
With regard to model tests, one approach to the limited<br />
depth problem has been to truncate the lines and employ either<br />
a passive or active system to simulate the remainder of<br />
the lines. This approach has been studied on one phase of<br />
the DeepStar joint industry research project, particularly in<br />
understanding detailed effects of individual physical process-<br />
<strong>01</strong>/2<strong>01</strong>0<br />
es in such complex systems. Research currently being carried<br />
out by the University of Cambridge and supported by <strong>GL</strong><br />
Noble Denton is further addressing this issue, with the aim of<br />
developing line truncation techniques for use in both computational<br />
(time and frequency domain) and physical models. As<br />
described in the following, the adopted approach exploits a<br />
number of physical features of the system dynamics.<br />
View on Upper Sections<br />
Firstly, the wave action zone typically extends to around 40 m<br />
below the water surface. Below this point, the lines can be<br />
considered to be oscillating in still water (or in a current),<br />
driven by a dynamic top motion. Secondly, the transverse<br />
elastic waves induced in the line by the<br />
AbstrAct<br />
top motion decay with depth due to the<br />
In deepwater drilling, the forces<br />
action of non-linear fluid drag forces.<br />
acting on the long mooring lines<br />
In deep water, the transverse elas- and risers are a major challenge.<br />
The length of the lines renders<br />
tic waves are likely to decay before they<br />
model testing near-impossible.<br />
are reflected from the seabed, and in this A new study aims to simplify<br />
case the line can be considered to be ef- mooring analysis through line<br />
truncation techniques.<br />
fectively infinite, at least with regard to<br />
the transverse dynamic response. It follows<br />
from these arguments that there is no need to model the<br />
detailed dynamics of the whole line. Rather it is feasible that<br />
only the upper sections of each line require detailed modelling,<br />
terminating in an approximate analytical model that aims<br />
to simulate the remainder of the line.<br />
A preliminary study of this approach has considered a taut<br />
string model of a mooring line, in which non-linear damping<br />
has been included, but bending and VIV effects have been neglected.<br />
The line is considered to be anchored at the seabed,<br />
and the top end is given either a harmonic or random displacement,<br />
representing the displacement at the bottom of the<br />
15
advanced engineering ultra-deepwater research<br />
VIV.<br />
Vortex-induced<br />
vibrations are<br />
motions induced on<br />
bodies facing an<br />
external flow by<br />
periodical irregularities<br />
on this flow.<br />
wave action zone (Fig. 1). The principal item of interest<br />
is the decay of vibration along the line, and this is measured<br />
by a parameter referred to as l 50 . This is the distance down the<br />
line (measured from the top) at which the vibration amplitude<br />
is half the input amplitude.<br />
Universal Curve<br />
This parameter is very useful in deciding whether a truncated<br />
line model is appropriate, and if so, at which point truncation<br />
might be applied. It might initially be thought that the calcula-<br />
tion of l 50 would need to be performed for each mooring line<br />
of interest and for each possible type of top motion.<br />
However, a dimensional analysis, supported by ex-<br />
act benchmark numerical solutions, has shown that<br />
it is possible to produce a “universal” curve for l 50<br />
which is suitable for any kind of line with any top<br />
motion.<br />
To be more precise, two such universal curves<br />
arise, one for the case of a harmonic top motion (Fig. 2), and<br />
one for the case of a random top motion (Fig. 3). For the har-<br />
monic case the horizontal axis involves a parameter , the<br />
non-dimensional ratio of drag to inertia forces; where F D is<br />
the damping coefficient as described by the drag term from<br />
Morison’s Equation, A 0 is the top end amplitude and M is the<br />
dry mass plus added mass per unit length of line.<br />
The vertical axis is a non-dimensional version of l 50 , giv-<br />
en by the product of l 50 and the undamped wave number of a<br />
string, k 0 , which is defined as forcing frequency, over elastic<br />
wave speed, c. The value of l 50 for any particular line can be<br />
read from this curve; typical “beta” ranges for chains and ropes<br />
are shown on the graph. Strictly speaking, the universal curve<br />
is rigorous and universal for the harmonic case, and approxi-<br />
mately so for the random case. However, even in the random<br />
Photo: Woodside<br />
case it has been found that predictions yielded by the curve<br />
are highly accurate for the type of top input spectrum likely to<br />
be found in practice. In this case the non-dimensional axes are<br />
defined by similar parameters, however substituting in for , k0 and A ; with 0 2 , being the mean frequency, k , the mean wave<br />
2<br />
number and the standard deviation of the top motion.<br />
Two Strategies<br />
Figure 1. Damped<br />
string vibrations.<br />
In a water depth of 3,000 m, a mooring line typical for a taut<br />
configuration deepwater system has an l 50 with order of mag-<br />
nitude 300 m for chain; less for rope. As such the transverse<br />
dynamics would decay significantly by the seabed; therefore<br />
the rationale for seeking a truncation procedure is verified and<br />
an infinite analytical approximation is feasible. Ongoing work<br />
is considering ways to produce a truncated model. It would<br />
16 energıze
Figure 2. Universal curve for harmonic vibrations. Figure 3. Universal curve for random vibrations.<br />
start below the wave action zone consisting of a semi-infinite<br />
line, coupled to the end of the detailed model. Seeking an<br />
analytical description necessitates first a linearization of the<br />
drag force using a least-squares Borgman approximation. The<br />
length scale l is a useful means to compare the accuracy of<br />
50<br />
the different solution procedures. It is found that a linearised<br />
numerical solution matches very closely the exact benchmark.<br />
Using then a frequency domain analysis, such an approximate<br />
description can be implemented in a computational model.<br />
Conjointly the truncated segment of the line, represented<br />
accurately by a dynamic boundary condition, can improve the<br />
computational efficiency of a numerical time domain simulation.This<br />
can subsequently be applied to physical modelling.<br />
In the current study two strategies will be considered. The<br />
first will use actuators to replicate the behaviour of the lower<br />
<strong>01</strong>/2<strong>01</strong>0<br />
FpSo. The vessel must be anchored reliably.<br />
both, turret and spread moored systems<br />
are used depending on directionality of<br />
the environment.<br />
sections using the type of model developed for the computational<br />
work. The second will use dynamic similitude to develop<br />
a passive shallow water line that has the same vibrational<br />
characteristics as the full line.<br />
These theories, if tested successfully, have the potential to<br />
make fundamental advances in model testing of ultra-deepwater<br />
concepts and in improving the efficiency of computational<br />
models. AA/rSL/rVA<br />
AUTHorS A. Argyros and R.S. Langley, University of Cambridge, UK, and R.V. Ahilan, Noble<br />
Denton. This article previously appeared in “Scandinavian Oil & Gas”.<br />
<strong>GL</strong> NobLe DeNToN experT:<br />
r.V. Ahilan, Managing Director<br />
Advanced Engineering consulting <strong>GL</strong> Noble Denton<br />
Phone: +44 20 78128713<br />
E-Mail: ahilan@nobledenton.com<br />
17
advanced engineering production<br />
The Peak Oil Mystery<br />
Tens of millions of barrels of <strong>oil</strong> are produced and consumed every day. The balance<br />
between supply and demand demand underlying this gigantic gigantic industry is is surprisingly<br />
delicate. For now, it it seems to be favouring the supply supply side – but but for how long?<br />
1973<br />
Yom Kippur War<br />
1st <strong>oil</strong> crisis<br />
1970<br />
Climate change, geopolitics and human ambition<br />
World <strong>oil</strong><br />
are all factors in one of the great debates of<br />
supply at<br />
our time – when will the world run out of <strong>oil</strong>?<br />
48.941 Million<br />
barrels/day<br />
Or, more to the point: when will the demand for fossil fuels<br />
exceed the supply?<br />
During the late 1930s, U.S. geologists warned that the<br />
country’s <strong>oil</strong> reserves would be exhausted within 30 years.<br />
Today, some 70 years later, the world consumes<br />
PEAK OIL<br />
CONCEPT. around 85 million barrels of <strong>oil</strong> each day (bpd),<br />
Based on <strong>oil</strong> production with reserves for decades still underground. So<br />
statistics of individual<br />
much for past prophecies of doom.<br />
<strong>oil</strong> wells as well as<br />
entire <strong>oil</strong> fields.<br />
But just how long the earth’s remaining <strong>oil</strong><br />
reserves will last remains the subject of heated<br />
discussion. A key term this debate revolves around is “peak<br />
<strong>oil</strong>” – the point in time at which the global <strong>oil</strong> and <strong>gas</strong> produc-<br />
1979<br />
Iranian<br />
Revolution<br />
2nd <strong>oil</strong> crisis<br />
tion will hit its all-time maximum before beginning a slow but<br />
steady decline while demand continues to rise.<br />
A Matter of Interpretation<br />
The concept we refer to as peak <strong>oil</strong> <strong>oil</strong> today first emerged in<br />
the 1950s when M. King Hubbert, an American geologist<br />
working for Shell Oil, pointed out that the world’s <strong>oil</strong> reserves<br />
are finite, and that the rate rate of discovery, following<br />
an exponential increase, will eventually reach a climax and<br />
then decline.<br />
The actual term peak <strong>oil</strong> was first used in 20<strong>01</strong> by former<br />
Royal Dutch/Shell geologist Colin Campbell in a newsletter for<br />
the newly-founded Association for the Study of Peak Oil and<br />
Gas, and was quickly picked up by the media. There are two<br />
opposing factions in the peak <strong>oil</strong> debate. They differ in their<br />
18 energıze
Photo: Photo: Stat<strong>oil</strong><br />
Uncertain future. While worldwide energy demand continues to climb, the global <strong>oil</strong> and <strong>gas</strong> production peak is nearing.<br />
interpretation of the available data. Critics of the Peak Oil<br />
theory believe the global <strong>oil</strong> and <strong>gas</strong> reserves are sufficient<br />
to sustain industrialised and and developing developing economies for for over over<br />
a century. They claim that countries such as Russia, Saudi<br />
Arabia and Iraq are under-explored, sitting on billions of<br />
barrels of untapped resources. Sceptics contend that the<br />
accessible <strong>oil</strong> reserves will be depleted soon, and neither<br />
new technologies nor alternative energy sources will be able<br />
to satisfy the energy demand. They predict huge economic<br />
and social upheavals.<br />
The Search Continues<br />
Fatih Birol, chief economist of the influential Paris-based<br />
International Energy Agency (IEA), believes that unless<br />
major new discoveries are made, “the output of conven-<br />
<strong>01</strong>/2<strong>01</strong>0<br />
1997<br />
Asian financial<br />
crisis<br />
tional <strong>oil</strong> will peak in 2020 if <strong>oil</strong> demand grows on a business-as-usual<br />
basis.” According to the IEA, conventional <strong>oil</strong><br />
(as opposed to hard-to-extract sources<br />
like Canada’s tar sands) is “projected ABSTRACT<br />
to reach a plateau sometime before The world’s petroleum reserves are<br />
limited. The big question is, where<br />
2030”.<br />
is the limit?<br />
Based on an analysis of histori- Some experts say there is enough<br />
cal production data from 800 <strong>oil</strong>fields, <strong>oil</strong> and <strong>gas</strong> for well over a century.<br />
the IEA recently concluded that the Others forecast the <strong>oil</strong> production<br />
peak within the next few years or<br />
decline in annual output from mature decades.<br />
fields could average 8.6 per cent in<br />
2030. “Even if <strong>oil</strong> demand were to remain<br />
flat, the world would need to find more than 40 million<br />
bpd of new capacity – equal to four new Saudi Arabias –<br />
just to offset this decline,” says Mr Birol.<br />
19
advanced engineering production<br />
2000<br />
Thoughts From Davos<br />
dot-com<br />
bubble burst During the 2<strong>01</strong>0 World Economic Forum in Davos, Switzerland<br />
Thierry Desmarest, chairman of the French <strong>oil</strong> major company<br />
Total, said <strong>oil</strong> production will never exceed 95 million bpd. “Peak<br />
<strong>oil</strong> is still a problem; it will be reached in about 10 years, but<br />
not today.” But Khalid Al Falih, president of Saudi Arabian Oil<br />
Co. (Aramco), disagrees, saying that fears over future supplies<br />
are overstated: “There is too much rhetoric in the<br />
OUTLOOK. public domain about moving away from <strong>oil</strong>... This<br />
IEA statistics issue of peak <strong>oil</strong> has been pushed behind. There<br />
predict the decline<br />
are plenty of resources out there.”<br />
in output at<br />
existing fields to<br />
drop by almost So What About Climate Change?<br />
two-thirds by 2030.<br />
The topic of climate change as reflected in the<br />
Copenhagen talks of early 2<strong>01</strong>0 plays a major role in the<br />
peak-<strong>oil</strong> debate. The IEA believes that coordinated efforts<br />
to limit the global temperature increase to 2 ºC will cut the<br />
worldwide <strong>oil</strong> demand to 89 million barrels per day in 2030,<br />
Nothing Lasts Forever<br />
THE THEORY OF PEAKING IS A SIMPLE CONCEPT. The<br />
exploitation of natural resources by man, begun centuries<br />
ago, evolves in a bell-shaped curve, with the rate of<br />
extraction increasing over time. It will eventually reach<br />
a peak, followed by a period of gradual decline until the<br />
natural resources have been depleted.<br />
PEAK OIL IS NOT ABOUT “RUNNING OUT OF OIL”,<br />
rather, the term denotes the point in time where <strong>oil</strong> production<br />
reaches its all-time maximum. The peak in the<br />
supply of base commodities is usually reached when the<br />
2009<br />
World <strong>oil</strong><br />
supply at<br />
84.159 Million<br />
barrels/day<br />
compared to 105 million barrels per day if no action is taken.<br />
That, the IEA’s Birol says, “could push back the peak of production,<br />
as it would take longer to produce the lower-cost <strong>oil</strong><br />
that remains to be developed.”<br />
Peter Davies, former chief economist of BP, believes<br />
glob al <strong>oil</strong> production could peak within the next generation<br />
as a result of a drop in demand induced by climate policies,<br />
rather than by a supply peak.<br />
So the Peak Oil question remains wide open. Yet, as the<br />
debate continues, there can be no doubt that the age of easy<br />
and cheap <strong>oil</strong> will come to an end before long; hopefully it will<br />
be a gradual and measured decline. BM<br />
<strong>GL</strong> NOBLE DENTON EXPERT:<br />
Lutz Wittenberg<br />
Executive Vice President, Europe<br />
Phone: +49 40 36149-313<br />
E-Mail: lutz.wittenberg@gl-group.com<br />
resources become too challenging to extract or too expensive,<br />
or are replaced by something cheaper, better or<br />
more plentiful.<br />
OIL PRODUCTION IS EXPECTED TO GO INTO DE-<br />
CLINE from around 2<strong>01</strong>2 as the biggest and most productive<br />
fields are nearing depletion while new discoveries are<br />
generally recorded as being progressively smaller and of<br />
lower quality. Discovery of new <strong>oil</strong> peaked over 40 years<br />
ago and has been declining ever since, despite extensive<br />
drilling activities and high prices.<br />
20 energıze
advanced engineering <strong>gas</strong>ification<br />
Volatile Coal<br />
Today’s approaches of <strong>gas</strong>ification are<br />
high-tech – making this technology ideal<br />
for countries with rich coal deposits<br />
Between 1945 and the mid-1950s, motor vehicles<br />
powered by wood <strong>gas</strong>ifiers were a common<br />
sight on Europe’s streets. Producing <strong>gas</strong> to generate<br />
useful energy has once again moved into focus. While<br />
the basic principle hasn’t changed, the smoking <strong>gas</strong>ifiers of<br />
the old days are now being replaced by highly sophisticated,<br />
high-tech systems. The basic fuel is no longer wood or organic<br />
waste but coal. In recent decades, scientists and engineers<br />
have developed numerous methods of turning coal into<br />
<strong>gas</strong>. The raw <strong>gas</strong> produced can be purified and used directly<br />
as a fuel for generating electricity or as a raw material for<br />
chemical processes.<br />
High Efficiency, Low Environmental Impact<br />
<strong>GL</strong> Noble Denton is joint licensor with the German company<br />
Envirotherm of the B<strong>GL</strong> Gasification Technology. “The process<br />
is highly efficient – it converts nearly 94 per cent of the<br />
energy content of coal into useable <strong>gas</strong>,” says Mike Pritchard,<br />
<strong>gas</strong>ification expert at <strong>GL</strong> Noble Denton. The German-British<br />
cooperation in the B<strong>GL</strong> process has a long tradition. The<br />
process is the result of a joint research programme launched<br />
in the 1970s by British Gas and Lurgi GmbH in response to<br />
the crisis on the <strong>oil</strong> market at the time.<br />
The development project produced a <strong>gas</strong>ifier only 120<br />
cm in diameter, yet capable of processing 200 tonnes of coal<br />
per day. This delivered proof that a combined <strong>gas</strong> and steam<br />
turbine power plant with integrated coal <strong>gas</strong>ification can be<br />
operated very flexibly and economically. This result can be<br />
put to use immediately: “The B<strong>GL</strong> technology has been proposed<br />
for a coal <strong>gas</strong>ification plant in North Dakota/USA, India<br />
and China with discussions ongoing for further plants in Chi-<br />
<strong>01</strong>/2<strong>01</strong>0<br />
Photo: iStockphoto<br />
demand. the <strong>gas</strong> produced in the <strong>gas</strong>ification process can<br />
also be used for many chemical applications.<br />
na,” Pritchard explains. “We are technical consultants for the<br />
project.” The plant will produce electricity and capture carbon<br />
dioxide, an option that will boost further development of the<br />
technology in the USA. A demonstration<br />
absTracT<br />
plant operated in China in 2006/2007,<br />
Coal <strong>gas</strong>ification methods<br />
and two large scale plants are currently<br />
are experiencing a revival.<br />
under construction.<br />
<strong>GL</strong> Noble Denton has the<br />
The technology is especially attrac- expertise to model various<br />
<strong>gas</strong>ification processes for<br />
tive for countries that are rich in coal use in power plants.<br />
but poor in natural <strong>gas</strong> reserves. It will<br />
be used primarily by the chemical industry to provide feed<br />
<strong>gas</strong> for processes such as methanol synthesis, rather than<br />
for generating power. <strong>GL</strong> Noble Denton not only has technology<br />
of its own, it also has the expertise to model various<br />
<strong>gas</strong>ification processes and to evaluate their comparative<br />
efficiency. JI<br />
<strong>GL</strong> nobLE dEnton ExpErt:<br />
Dr Michael Pritchard<br />
Head of Gasification<br />
Phone: + 44 1509 282452<br />
E-Mail: michael.pritchard@gl-group.com<br />
21
advanced engineering safety<br />
The Human Factor<br />
Do we control technology, or does it control us?<br />
Human Factors Engineering helps improve the interaction between humans<br />
and machines to prevent catastrophic accidents<br />
The offshore <strong>oil</strong> and <strong>gas</strong> industry is continuously<br />
striving to make the offshore environment a safer<br />
place to work. Most serious offshore accidents (a<br />
generally accepted figure is 80%) have been primarily attributed<br />
to “human error”. Detailed investigations, however, indicate<br />
that human errors are most often caused by a mismatch between<br />
human and machine behaviour. The “human factor” thus<br />
needs to be given much more serious consideration to avoid<br />
accidents. The offshore industry has begun to acknowledge<br />
the role that Human Factors Engineering can play in the design<br />
of offshore facilities.<br />
abstract<br />
Human Factors Engineer-<br />
Human factors need to be<br />
ing (HFE) addresses the need<br />
given much more serious<br />
consideration.<br />
for an effective interaction be-<br />
<strong>GL</strong> Noble Denton offers services tween humans, the technology<br />
such as human error identifica-<br />
they use and the environment in<br />
tion and analysis using accepted<br />
methodologies.<br />
which both must operate (human-<br />
<strong>GL</strong> Noble Denton develops guid- machine-environment, or “ergoance<br />
documents/specifications for<br />
various HFE and HSE activities. system”). HFE also ensures that<br />
all factors that can influence humans<br />
and their behaviour (workplace<br />
organization, physical work environment, workspace<br />
design, job factors and individual characteristics) are taken<br />
into account to create beneficial and efficient working conditions,<br />
thus reducing the potential for human error whilst<br />
improving safety and overall system performance.<br />
Unfortunately, HFE has traditionally not received the<br />
same practical emphasis as industrial engineering and occupational<br />
medicine. However, considering the advancement<br />
of technology in the 20th and 21st centuries, all reasonable<br />
efforts to mitigate the risks inherent in this technology should<br />
be given the same emphasis.<br />
Complex Technical Systems<br />
It is considered the “duty” of HFE to question engineering<br />
concepts. Wherever a task is designed, all requirements, including<br />
those relating to human performance, must be accounted<br />
for. In operator training programmes intended to<br />
minimize risk, the underlying assumptions and procedures<br />
must be challenged. Detailed investigations of serious largescale<br />
industrial accidents – such as Three Mile Island, Bhopal,<br />
Chernobyl and Piper Alpha – have shown that so-called<br />
“human error” needs to be viewed in the wider context of the<br />
circumstances created by organisational and management<br />
structures.<br />
HFE recognises that the causes of errors and accidents<br />
are usually to be found in the way the engineered and human<br />
systems fit together and interact. It promotes an approach<br />
in the design of systems and equipment that minimises the<br />
potential for human error. This is particularly important in today’s<br />
complex and large-scale technological systems that<br />
confront human operators with new demands. On many oc-<br />
22 energıze
Safety. Optimising the<br />
performance and effectiveness<br />
of the working<br />
BP<br />
system, including the<br />
human element. Photo:<br />
casions, the error and resultant failures can be attributed to<br />
factors such as:<br />
<strong>01</strong>/2<strong>01</strong>0<br />
complicated operational processes<br />
ineffective training<br />
non-responsive managerial systems<br />
non-adaptive organizational designs<br />
haphazard response systems and<br />
sudden environmental<br />
disturbances.<br />
It is obvious that it would be irresponsible for the offshore<br />
<strong>oil</strong> and <strong>gas</strong> industry not to give due consideration to human<br />
performance factors in its efforts to mitigate the risks to people<br />
and assets in the offshore environment.<br />
Understanding Human Nature<br />
With all this in mind, <strong>GL</strong> Noble Denton has expanded its<br />
Safety and Risk services to include Human Factors Engineering.<br />
The company’s expertise in this field covers many<br />
23
advanced engineering safety<br />
different industry sectors and is<br />
transferable to any domain. <strong>GL</strong> Noble<br />
Denton’s head HFE specialist has over<br />
13 years experience in Human Factors<br />
Engineering and Ergonomics. <strong>GL</strong> of-<br />
fers a diverse range of HFE services<br />
to the <strong>oil</strong> and <strong>gas</strong> industry:<br />
IntEgratIon oF HFE Into tra-<br />
DItIonal saFEty casEs – Dur-<br />
ing the formal safety assessment,<br />
<strong>GL</strong> Noble Denton accounts for<br />
human factors to ensure that op-<br />
erators can handle “non-design”<br />
emergencies.<br />
HFE HazarD analysIs anD<br />
scrEEnIng stuDIEs – In the in-<br />
itial stages of a project cycle for<br />
a new facility, <strong>GL</strong> Noble Denton<br />
determines where HFE could add<br />
value by improving human efficien-<br />
cy or reliability and/or by reducing<br />
HSE risk during maintenance and<br />
operational tasks. The result is an HFE Issue Register.<br />
HFE ImplEmEntatIon plans – Define the HFE organisa-<br />
tional structure, responsibilities, scope of work, schedule<br />
and integration plan within the engineering project organi-<br />
zation.<br />
HFE DEsIgn stanDarDs – Aids for the design of hardware<br />
and software that provide quick and easy access to project-<br />
specific criteria for certain HFE design requirements.<br />
Front-EnD Human Factors EngInEErIng analysEs<br />
(FEHFEa) – A high-level task analysis performed early on<br />
during FEED to “think through” the activity sequences a<br />
person would need to go through to use the equipment<br />
Photo: iStockphoto<br />
and to verify whether the capabilities and limitations of the<br />
persons who will operate and maintain the equipment have<br />
been accounted for.<br />
assIstancE wItH Epc contractor sElEctIon anD<br />
awarDs – Ensures that bidding EPC contractors include<br />
in the bid packages their own HFE Plan (HFEP) describ-<br />
ing the scope of HFE measures, the deliverables and other<br />
relevant details. <strong>GL</strong> Noble Denton will help in the assess-<br />
ment of the HFE information presented in the bid packages.<br />
HFE awarEnEss traInIng – Specific HFE training for all<br />
technical personnel involved in detailed design work before<br />
the actual detailed design begins.<br />
24 energıze
<strong>01</strong>/2<strong>01</strong>0<br />
Accuracy. When handling safety-critical<br />
equipment, every movement by the<br />
operator must be well controlled.<br />
HFE spEcIalIst stuDIEs – Valve Analysis Studies, Skid-<br />
packaged Unit Analysis and Control Room Studies assess-<br />
ing these items in terms of HFE criteria.<br />
DEtaIlED control systEm IntErFacE<br />
DEsIgn/moDIFIcatIons:<br />
worKloaD analysIs: Determines optimal staffing<br />
numbers over all shifts and covers all operating modes<br />
(normal, degraded and emergency).<br />
rEvIEw oF tHE alarm managEmEnt systEm: Alarm<br />
systems are often a contributing factor in accidents.<br />
Human Error analysIs stuDIEs – Identify potential op-<br />
erator errors during human-machine interaction in complex<br />
systems, such as control room monitoring.<br />
3D moDEl DEsIgn rEvIEws – Ensure efficient mainte-<br />
nance of equipment, safe movement of staff and equipment,<br />
sufficient clearances, safe access to critical items,<br />
adequate pathways and egresses for escape, evacuation<br />
and rescue, and other items.<br />
rEvIEw oF vEnDor pacKagEs – Review of proposed designs<br />
for compliance with project HFE requirements, speci-<br />
fications and standards, and assistance in incorporating<br />
improvements to the package.<br />
HFE InspEctIons – For details not included on drawings,<br />
<strong>GL</strong> Noble Denton HFE Consultants can audit compliance<br />
with HFE design requirements.<br />
support DurIng tHE InstallatIon of “field run” equipment<br />
– Ensures compliance with project HFE design requirements.<br />
Input Into crItIcal opEratIng procEDurEs, opEratIons<br />
anD maIntEnancE DocumEntatIon – Serves<br />
to identify potential human error during critical operations<br />
as a result of poorly written operating procedures.<br />
Man as a risk factor will never be eliminated entirely but<br />
needs to be managed professionally. KJ<br />
<strong>GL</strong> NObLe DeNTON experT:<br />
Karen Jacka<br />
principle consultant Human Factors Engineering<br />
phone: +603 21 61 00 88<br />
Minor Defect, Major Accident Accident.<br />
cHErnobyl 1986 – the worst nuclear power plant disaster in history. 56 direct deaths were<br />
recorded, but it is estimated that there were 4,000 additional cancer deaths. The incident resulted<br />
in the evacuation of 336,000 people. Investigations indicated that besides inadequate<br />
safety features, an unstable reactor design and lack of containment, opErators wErE InsuFFIcIEntly<br />
traInED, tHErE was a lacK oF communIcatIon about the emergency<br />
core cooling test that was being performed, and at the time of the incident all control had been<br />
transferred from the process computer to inadequately trained operators.<br />
E-mail: karen-louise.jacka@gl-group.com<br />
The Chernobyl<br />
nuclear power<br />
plant.<br />
25
marine<br />
<strong>oil</strong> asiatridentconsulting<br />
& <strong>gas</strong> merger<br />
operations<br />
26<br />
Photo: iStockphoto<br />
energıze
<strong>GL</strong> Noble Denton leads the<br />
way in the field of marine<br />
consulting and operations.<br />
Working on behalf of<br />
insurance underwriters, our<br />
expertise in marine warranty<br />
and consulting can provide<br />
exemplary independent<br />
assessment.<br />
<strong>01</strong>/2<strong>01</strong>0 27
marine operations guidelines<br />
Following in<br />
Captain Noble’s Footsteps<br />
Transporting and operating huge, awkwardly shaped structures in rough seas involves<br />
risks that can only be mitigated by adhering to rigorous codes and stan dards.<br />
With a new update of key rules, <strong>GL</strong> Noble Denton stays abreast of technology<br />
When a Marine Warranty Surveyor (MWS) conducts<br />
an approval process for an operation on<br />
behalf of insurance underwriters, he usually<br />
verifies compliance with “industry best practice”. The specific<br />
requirements must be clear at the tender and early design<br />
stages of a project so that the implications can be allowed<br />
for and priced. Changing a design at a later stage is much<br />
more expensive.<br />
For well established operations, approval may require<br />
comparison with industry codes of practice, such as IMO,<br />
API codes or classification soci-<br />
absTracT<br />
ety rules. However, many of these<br />
Many codes merely represent the codes are developed by indus-<br />
most basic requirements. <strong>GL</strong> Noble try “consensus”. This may not be<br />
Denton wrote guidelines with<br />
specific added variations.<br />
acceptable to underwriters who<br />
The very first general guideline was are interested in stricter rules to<br />
released in 1976.<br />
reduce the loss rate. <strong>GL</strong> Noble<br />
<strong>GL</strong> Noble Denton operates a<br />
helpline to assist clients in finding Denton may use these codes as<br />
or interpreting criteria.<br />
a basis for writing its own guidelines<br />
with specific variations added.<br />
This approach has been taken in 0009/ND “Self Elevating<br />
Platforms – Guidelines for Elevated Operations”, which refers<br />
to SNAME T&R 5-5A.<br />
Offshore. Many assessments<br />
are based on <strong>GL</strong><br />
Noble Denton's Technical<br />
Guidelines.<br />
For innovative projects, setting standards may require<br />
comparisons with similar past operations, making allowances<br />
for differences in scale and scope. In the early days of North<br />
Sea development (1960s and 1970s) this usually meant early<br />
discussions between the MWS, designers and contractors to<br />
agree on design criteria and associated operating limits for<br />
critical operations. These criteria often had to be developed<br />
28 energıze
Photo: Dragon<strong>oil</strong><br />
Condeep.<br />
Specific recom-<br />
mendations for<br />
construction,<br />
towage and<br />
installation<br />
were trans-<br />
formed into<br />
general guide-<br />
lines.<br />
using model testing since even the best computer simulations<br />
were very unreliable. In particular it was, and still is, impor-<br />
tant to learn from past mistakes or near misses.<br />
Pioneering Safety<br />
Much of <strong>GL</strong> Noble Denton’s present work originated with<br />
Capt. Noble in the early 1960s when North Sea drilling be-<br />
gan and he was asked by marine underwriters to help reduce<br />
the industry’s loss rate of jack-up drilling rigs when moving.<br />
Initially as high as 13 per cent p.a., this rate is now down to<br />
about 0.07 per cent (1 total loss in the 1,400 operating rig-<br />
years from 2006 to 2009).<br />
Drawing on his personal experience towing dredgers,<br />
scrap vessels and other unusual objects, Capt. Noble would<br />
write recommendations for each tow once he had studied its<br />
challenges. Many of the criteria he developed empirically are<br />
still in use as industry standards today, if with slight modifi-<br />
cations. He also insisted on damage stability, something that<br />
was considered as normal for ships but not for jack-ups.<br />
In 1976, Noble Denton in London began amalgamating<br />
these specific recommendations into general guidelines. The<br />
very first guideline addressed the construction, towage and<br />
installation of concrete gravity platforms, drawing on expe-<br />
rience gathered with the Norwegian Ekofisk tank and early<br />
Condeeps, as well as the Scottish Seatank units. This<br />
<strong>GL</strong> Noble Denton Technical Guidelines<br />
revised and reissued in March 2<strong>01</strong>0<br />
0009/ND rev 5 (31 March 2<strong>01</strong>0) –<br />
seLf-eLevaTiNG PLaTforMs – GuiDe-<br />
LiNes for eLevaTeD oPeraTioNs<br />
These guidelines are used by <strong>GL</strong> Noble<br />
Denton for the assessment of self-ele-<br />
vating platforms in the elevated condition.<br />
They address:<br />
general feasibility studies, including<br />
optional checks for punch-through<br />
resistance and fatigue; such studies<br />
may result in a Statement of Compli-<br />
ance<br />
assessment for specific locations;<br />
such studies may result in a Certifi-<br />
cate of Approval.<br />
Photo: Swinsto1<strong>01</strong><br />
0<strong>01</strong>3/ND rev 5 (31 March 2<strong>01</strong>0) –<br />
GuiDeLiNes for LoaDouTs<br />
These guidelines were developed for the<br />
loadout of items including offshore jack-<br />
ets, SPAR sections, modules, bridges and<br />
components from the shore onto floating<br />
or grounded barges and ships.<br />
0<strong>01</strong>5/ND rev 2 (31 March 2<strong>01</strong>0) – coN-<br />
creTe offshore GraviTy sTrucTures<br />
These guidelines were developed by <strong>GL</strong><br />
Noble Denton for the marine aspects of<br />
construction, towage and installation of<br />
offshore concrete Gravity Base Structures<br />
(GBS) with a deck. They apply to deep<br />
draft structures where much of the con-<br />
struction work is carried out afloat, as well<br />
as to shallower draft structures where the<br />
construction of the GBS can be essentially<br />
completed in dry dock.<br />
0<strong>01</strong>6/ND rev 5 (31 March 2<strong>01</strong>0) – sea-<br />
beD aND sub-seabeD DaTa for aP-<br />
ProvaLs of MobiLe offshore uNiTs<br />
These guidelines describe the seabed and<br />
sub-seabed data required by <strong>GL</strong> Noble<br />
Denton to assess the suitability of loca-<br />
tions for self-elevating (jack-up) platforms,<br />
anchor installation and performance as-<br />
sessments.<br />
<strong>01</strong>/2<strong>01</strong>0 29
marine operations guidelines<br />
guideline has since been developed into 0<strong>01</strong>5/ND.<br />
The next guidelines focussed on marine heavy lifts (1977).<br />
Lifting criteria were adapted from those used in the more benign<br />
environment prevailing in the Gulf of Mexico. The latest<br />
version, 0027/ND, has been revised extensively to account for<br />
increased crane capacities and expanded operat-<br />
TPb.<br />
The Technical ing practices. It also supports an extended range<br />
Policy Board of equipment.<br />
commissions and<br />
authorises all<br />
Going Global<br />
technical guidelines,<br />
internal Since then, <strong>GL</strong> Noble Denton gradually devel-<br />
procedures and oped its TPB. The board now includes 15 world-<br />
guidance notes.<br />
wide Technical Authorities, assisted by over 60<br />
Technical Correspondents who contribute their expertise and<br />
knowledge acquired in different areas of the world.<br />
The TPB operates an internal technical helpline to assist<br />
clients in finding or interpreting criteria, or in complying<br />
with them. It also reviews reports of accidents and near miss-<br />
0021/ND rev 8 (31 March 2<strong>01</strong>0)<br />
– GuiDeLiNes for The aPProvaL of<br />
ToWiNG vesseLs<br />
These guidelines are intended to lead to<br />
an approval by <strong>GL</strong> Noble Denton for entry<br />
into the Towing Vessel Approvability<br />
Scheme. They also provide guidance for<br />
the approval of towing vessels for specific<br />
tow and bollard pull tests. They do not<br />
cover the towage of specific vessels or<br />
barges, guidance for which may be found<br />
in 0030/ND.<br />
0027/ND rev 9 (31 March 2<strong>01</strong>0) –<br />
GuiDeLiNes for MariNe LifTiNG<br />
oPeraTioNs<br />
Provides guidelines for the design and approval<br />
of marine lifting operations.<br />
0028/ND rev 4 (31 March 2<strong>01</strong>0) –<br />
GuiDeLiNes for The TraNsPorTaTioN<br />
aND iNsTaLLaTioN of sTeeL JackeTs<br />
This report sets out guidelines for the<br />
approval of the transportation and installation<br />
of steel offshore jacket structures.<br />
0030/NDi rev 4 (31 March 2<strong>01</strong>0) –<br />
GuiDeLiNe for MariNe<br />
TraNsPorTaTioN<br />
These guidelines are used by <strong>GL</strong> Noble<br />
Denton for the approval of specialised<br />
marine transports, including:<br />
cargo on ships or towed barges<br />
towage of self-floating marine and<br />
<strong>oil</strong>field equipment, civil engineering<br />
structures and ships.<br />
es. These activities support the constant efforts of <strong>GL</strong> Noble<br />
Denton to update guidelines, procedures or other guidance.<br />
Instead of writing “one-size-fits-all” rules, <strong>GL</strong> Noble Denton<br />
has always tried to be flexible and responsive, combining<br />
specific goals with practical marine and engineering advice on<br />
how to achieve them, and often giving alternative ways of doing<br />
so. Engaging in an active dialogue with clients, <strong>GL</strong> Noble<br />
Denton keeps an open mind for alternative ways of achieving<br />
an acceptable level of risk, and updates its guidelines periodically<br />
to reflect the lessons learned. bj<br />
<strong>GL</strong> NObLe DeNTON exPerTS:<br />
Mike hoyle<br />
Technical Policy board chairman<br />
Phone: +44 20 7812 8788<br />
e-Mail: mike.hoyle@nobledenton.com<br />
bob Jack<br />
Technical Policy board secretary<br />
e-Mail: bob.jack@nobledenton.com<br />
These guidelines are not intended to apply<br />
to “standard” cargo such as bulk liquids,<br />
bulk solids, refrigerated cargo, vehicles<br />
or containers.<br />
Upcoming<br />
0029/ND Guidelines for<br />
Pipeline Installation due 2<strong>01</strong>0<br />
0031/ND Guidelines for<br />
Float-over Installations due 2<strong>01</strong>0<br />
0032/ND Guidelines for<br />
Moorings due 2<strong>01</strong>0<br />
0033/ND Guidelines for<br />
Installing Subsea Equipment due 2<strong>01</strong>0<br />
30 energıze
marine operations interview<br />
“We Can Do the Job Immediately”<br />
Starting from 1 January 2<strong>01</strong>0, David Wells heads <strong>GL</strong> Noble Denton’s Global Business<br />
Stream “Marine Consulting & Operations”<br />
ENErGizE: David, what is “marine warranty”?<br />
WELLS: Marine warranty is a “third party” or in <strong>GL</strong><br />
terms a verification role, generally related to offshore<br />
projects where we are appointed by underwriters to ensure that<br />
risks are kept within acceptable levels. Essentially, with offshore<br />
projects, we verify the engineering calculations and ensure that the<br />
proposed installation procedures are adopted. So, for example, if<br />
we are involved with a 1,000-tonne module lift, we want to make<br />
sure that the contractor provides the right size of crane, the correct<br />
rigging arrangement, that the lift points have sufficient capacity,<br />
that the module itself has sufficient structural strength and that<br />
the contractor complies with the approved installation procedures.<br />
ENErGizE: Who is interested in “marine warranty”?<br />
WELLS: Marine warranty requirements are driven by the terms and<br />
conditions of the project insurance policy. They stipulate the extent<br />
of insurance coverage but require that certain high risk operations<br />
within the project must be approved, i.e. are subject to these being<br />
“warranted” by a third party. The “warranty clause” stipulates both<br />
what operations need to be third-party approved and gives the assured<br />
options of certain named companies who can be retained as<br />
warranty surveyors. These critical operations generally cover loadouts,<br />
towages, heavy lifts, pipeline beach pulls, etc. We act for most<br />
reputable international insurance companies.<br />
ENErGizE: You also do “marine operations”. That sounds like<br />
hands-on first party-work!<br />
WELLS: Yes, we offer our services to <strong>oil</strong> companies, contractors,<br />
or perhaps a shipowner, where we provide key people to supervise<br />
a particular operation or to actually do the operation generally<br />
working with the clients personnel or crew. Examples would be<br />
provision of a tow master to position and moor up a barge within<br />
an offshore field, or to undertake a rig move of a jack-up or semisubmersible<br />
drilling rig or drillship. The latter might involve either<br />
an ocean tow or an in-field move. We also provide ship’s pilotage<br />
<strong>01</strong>/2<strong>01</strong>0<br />
Photo: Bruce Bennett<br />
DaviD WELLS (54) is a Master Mariner who has<br />
served on various merchant ships including tankers,<br />
cargo ships, and offshore vessels where he achieved<br />
his firSt COMMaND aGED 27. In 1989, he joined<br />
the Noble Denton <strong>Group</strong> as a Principal Surveyor in the<br />
Abu Dhabi office. David subsequently SpECiaLiSED iN<br />
JaCk-up riG-MOviNG within the Middle East region<br />
and India. In 1996 he became General Manager of the<br />
Dubai office and was promoted to become Regional<br />
Managing Director Middle East in 2007.<br />
services on some offshore <strong>oil</strong> export terminals. These generally<br />
involve bringing a ship onto a single point mooring (SPM) buoy,<br />
where the cargo is loaded and then we take the ship off. We sometimes<br />
provide pilots for putting new FPSOs onto location and in<br />
hurricane zones, if a hurricane is forecast to come through, then<br />
we have, on occasions, been involved in taking the vessel off their<br />
moorings to a safe place and then to return back afterwards. We<br />
tend to look after the smaller operators or marginal fields on these<br />
occasions, where the operations are not big enough for our clients<br />
to have their own dedicated marine department.<br />
ENErGizE: Why should the <strong>oil</strong> and <strong>gas</strong> industry commission you?<br />
WELLS: The <strong>GL</strong> Noble Denton brand is strong in the market. It is<br />
made up of well known companies which are staffed by experienced,<br />
capable and well respected individuals. We are a people<br />
company and it is our people who provide our clients with the<br />
quality of service that they seek. Our clients trust and respect<br />
us and we pride ourselves on reliability. Our size helps, so there<br />
is a reasonable chance that we will have people available at<br />
short notice. This is essential in the offshore industry where the<br />
demands of day-to-day operations change very quickly. snb<br />
ContaCt.<br />
Phone:<br />
+ 971 4 3317952<br />
E-Mail:<br />
david.wells@<br />
nobledenton.com<br />
31
marine operations spadeadam<br />
The use of full-scale testing can prove to be im-<br />
practical or prohibitively expensive, so it has be-<br />
come standard practice to use computer model-<br />
ling based on theoretical predictions, mathematic calculations<br />
and laboratory scale experiments. Although this type of testing<br />
and hazard prediction has its place, it is still important from<br />
time to time to validate the predictions with full-scale testing.<br />
This is particularly important in new research and the long<br />
term development of theoretical modelling as many problems<br />
involve physical or chemical processes which are scale dependant.<br />
The purpose of the modelling and testing is to determine<br />
the material, component, assembly or process operational pa-<br />
rameters and so predict and protect against possible failures.<br />
This cannot be done without a full understanding of the haz-<br />
ards, the four principal stages being:<br />
the identification of possible failures through<br />
experience or foresight<br />
understanding the nature and mechanism of<br />
the failure and its potential consequences<br />
determining the probability and consequences<br />
of a failure<br />
establishing the means of preventing a failure<br />
as well as limiting and protecting against the<br />
consequences<br />
Pipe. Flexible risers<br />
connect subsea structures<br />
with surface production<br />
units.<br />
Although the probability of a failure can be managed and<br />
32 energıze
Photo: iStockphoto<br />
The Need for<br />
Full-scale Testing<br />
Computer modelling is the standard – but it is still important to validate the predictions<br />
with full-scale testing. A case for <strong>GL</strong> Noble Denton’s Spadeadam test site<br />
minimised by the use of modelling and testing, the combination<br />
of a failure probability and its consequences must not<br />
give rise to an unacceptable risk. This can only be truly understood<br />
by full-scale testing especially when working on new<br />
technologies and processes where there is little or no existing<br />
information. A good example of full-scale testing producing<br />
unexpected results and identifying unanticipated potential<br />
hazards is that of a <strong>gas</strong> explosion in a congested area, as<br />
conducted by Germanischer Lloyd at its Spadeadam test site<br />
in Cumbria, UK. These full-scale tests resulted in an overpressure<br />
substantially higher than that predicted by modelling.<br />
Wellstream (see page 37) have developed a modelling<br />
system called PipeMaker TM to predict the burst pressure for a<br />
given flexible pipe type. They have used this successfully for<br />
a number of years and have now confirmed that the data from<br />
testing at full-scale at Spadeadam is providing them with the<br />
confidence that their model predictions remain valid for their<br />
new range of flexible pipes.<br />
Factory Acceptance Testing and Burst Testing<br />
As part of their quality control system, Wellstream carry out<br />
Factory Acceptance Testing (FAT) on all production runs and<br />
a burst test on a type test basis. This is to verify the quality<br />
of the product plus to acquire data to verify their PipeMaker TM<br />
software. The software is used to establish pipe mechanical<br />
properties based on analytical formulae supported by com-<br />
<strong>01</strong>/2<strong>01</strong>0<br />
prehensive empirical test data.<br />
A test sample is taken from the end of a production run and<br />
fitted with standard production end fitting for use in a type test.<br />
This sample is then firstly subjected to a<br />
normal hydrostatic test or FAT. Upon suc- AbStrACt<br />
cessful completion of the FAT the same Failure probability can only be truly<br />
understood by full-scale testing.<br />
test sample is then taken through 10 pres-<br />
Wellstream have developed a<br />
sure cycles before finally being hydrostati- modelling system called PipeMaker<br />
cally burst tested.<br />
to predict the burst pressure for a<br />
given flexible pipe type.<br />
For the FAT, the pipe is pressurised to<br />
They validate the results in the<br />
the design pressure x 1.5 x 1.04 and held Spadeadam test site.<br />
for a period of 24 hours. After successfully<br />
completing the FAT, the same test sample is taken through 10<br />
pressurization cycles to the working pressure of the pipe. The<br />
pressurisation and depressurisation rates are controlled<br />
Fountain. Underwater burst tests show weak spots.<br />
33
marine operations spadeadam<br />
KNowLeDGe.<br />
The team of<br />
scientists and<br />
engineers at<br />
Spadeadam<br />
possess a wealth<br />
of experience in<br />
carrying out<br />
full-scale testing.<br />
with a 10-minute hold period at the elevated pressure. As<br />
soon as the final pressurisation cycle has been successfully com-<br />
pleted the test sample enters into a hydrostatic burst test. Again<br />
the pressurisation rate is controlled but this time the pressure is<br />
continually increased until a pipe failure is detected by the rapid<br />
depressurisation of the test sample. After complet-<br />
ing the above tests the test sample is finally dis-<br />
sected to verify the condition of the internal layers<br />
post burst failure.<br />
Tensile Testing<br />
<strong>GL</strong> Spadeadam has recently installed a 10,000<br />
kN dynamic tension - tension testing rig for test-<br />
ing subsea pipes and other equipment on behalf of Well-<br />
stream. The test rig is capable of housing pipes up to 24" in<br />
diameter and 12 m in length. The tests are fully automated al-<br />
lowing for 600 mm of extension on the sample and in excess<br />
of 2,000,000 cycles per test. A data acquisition system is set<br />
up to record 130 instruments although this can be increased<br />
if required.<br />
Along with the dynamic tension - tension testing the facil-<br />
ity can simultaneously hydrostatically pressurise or burst the<br />
test sample with up to 60,000 psi. The test pressure is con-<br />
Widget. <strong>GL</strong> Spadeadam has<br />
installed a 10,000 kN dynamic<br />
tension – tension testing<br />
rig for testing subsea pipes.<br />
trolled via a PLC allowing pressurisation and depressurisation<br />
rates to be pre-programmed into the system.<br />
The test rig building was completed in 16 weeks from<br />
concept to commissioning including the design and manufac-<br />
ture of the test rig itself. Within that time scale the site was<br />
cleared with the construction of a roadway, parking together<br />
with a floating foundation allowing a further two rigs to be<br />
built if required. The facility has been designed to enable the<br />
test samples to be installed through the roof of the building<br />
with the entire operations run through a remote control room<br />
over 60 m away. Wellstream are also able to monitor their<br />
tests from the comfort of their offices in Newcastle with all<br />
Location. The facilities at the <strong>GL</strong> Spadeadam Test Site.<br />
34 energıze
the data and CCTV systems streamed live over the Internet.<br />
Wellstream are developing new products to work in ever more<br />
demanding environments where operating parameters such<br />
as pressure, water depth, temperature and fluid character-<br />
istics become even more challenging. As these new designs<br />
mature, the tailored facilities at the <strong>GL</strong> Spadeadam test site<br />
are ideally placed to carry out the necessary development<br />
and proof testing.<br />
Looking to the Future<br />
The permanent team of scientists and engineers at Spadeadam<br />
possess a wealth of experience in carrying out full-scale testing<br />
and this knowledge along with the large investment in equipment<br />
and services has provided <strong>GL</strong> Spadeadam with the infrastructure<br />
to successfully complete full-scale testing for many of the major<br />
<strong>oil</strong> and <strong>gas</strong> companies including Wellstream.<br />
As technology and innovation moves forward, <strong>GL</strong> will con-<br />
tinue to design and develop the means to test the resulting<br />
products on a full-scale basis. This will ensure that the haz-<br />
ards and risks continue to be identified and managed suc-<br />
cessfully. The <strong>GL</strong> Spadeadam team are now investigating the<br />
feasibility of installing a larger tensile testing rig to compli-<br />
ment the range of tests required for subsea pipes and other<br />
equipment. The machine is to be rated to 16,000 kN capable<br />
of housing a 20 m test sample with the added features of<br />
torque measurement and application. The entire facility will<br />
allow a pipe sample to be tested under tensile and torsional<br />
loadings whilst being hydrostatically pressurised at elevated<br />
temperatures. This will capture data which will more accu-<br />
rately represent the increasingly challenging operational con-<br />
ditions found in the field. dB<br />
<strong>01</strong>/2<strong>01</strong>0<br />
<strong>GL</strong> NOBLe deNTON exPerT:<br />
David brown, General manager<br />
Spadeadam test Site & <strong>GL</strong> flow Centre<br />
phone: +44 1697 749138<br />
e-mail: david.brown@gl-group.com<br />
Wellstream: A Profile<br />
Wellstream was founded in 1983 in Panama City, Florida (USA),<br />
where they established themselves as a niche market manufacturer<br />
supplying products to the global offshore <strong>oil</strong> and <strong>gas</strong> industry.<br />
In 1995 Wellstream was acquired by Dresser Industries and began<br />
to emerge as a SiGNifiCANt mArKet pLAyer, securing the larg-<br />
est flexible pipe contract ever awarded to that date from Norsk Hy-<br />
dro in 1995 as part of the Troll Ojle and Gas development offshore<br />
Norway. This was followed by the opening of a state-of-the-art man-<br />
ufacturing facility in Newcastle upon Tyne, UK, in 1997.<br />
Wellstream became a part of Halliburton in 1998, and continued<br />
to improve its position with continued product development; Well-<br />
stream becoming the first company to qualify products to operate in<br />
2,000-m water depth following many years of technical cooperation<br />
with Petrobras in Brazil. In 2003 the company was acquired by Can-<br />
dover Investment Partners together with a management buy-in, this<br />
led to the commercialization of FlexSteelTM onshore systems and<br />
the decision to site a second manufacturing facility in Brazil, con-<br />
firming Wellstream’s position as a world leader for these products.<br />
Offshore Products<br />
Wellstream’s uNboNDeD DyNAmiC fLexibLe riSerS AND StAtiC<br />
fLowLiNeS are a key integrating technology in connecting subsea<br />
structures with the surface. Working alongside installation compa-<br />
nies, Wellstream ensures that its increasing product envelope fits<br />
well with new offshore systems as they develop, including hybrid<br />
riser systems. HiGH preSSure/HiGH temperAture proDuCtS:<br />
1,034 bar (15,000 psi)/54 ˚C (130 ˚F) are stock items for well servic-<br />
ing applications and deliverable worldwide. Their spoolable deploy-<br />
ment, improved pumping efficiency and longevity are ideal for the<br />
extreme operating environments of the drilling industry.<br />
Onshore Products<br />
fLexSteeL tm – Wellstream’s latest innovation, FlexSteelTM, chal-<br />
lenges the dominance of onshore rigid steel solutions. This product<br />
brings together the advantages of rigid and flexible pipe technolo-<br />
gies. Major Canadian onshore operators have already adopted Flex-<br />
SteelTM for fluid transfer and pipeline rehabilitation: its ease of<br />
installation being just one advantage over other solutions in harsh<br />
tundra conditions.<br />
35
10:50<br />
–<br />
11:45<br />
marine operations dynamic positioning<br />
“Tai An Kou” starts approaching and eventually<br />
the docking guide enters the jacket.<br />
Faster Than Ever<br />
Floatover installations are the platform installation method of choice. Using DP for<br />
high-precision navigation makes floatover installations much cheaper and faster<br />
About 180 km north of Doha lies the Al Shaheen<br />
<strong>oil</strong> field, Qatar’s largest offshore <strong>oil</strong> reservoir.<br />
Under the Al Shaheen Field Development Plan,<br />
Maersk Oil Qatar (MOQ) and Qatar Petroleum have been<br />
jointly developing this field, applying cutting-edge technology<br />
to overcome geological challenges once believed insurmountable.<br />
Among the 15 new platforms built under the plan are the<br />
BE Process Platform and the BG Utilities Platform. Their topsides,<br />
fabricated by Sime Darby Engineering (SDE) in Pasir<br />
12:00<br />
–<br />
13:10<br />
Gudang, Malaysia, had to be transported 3,650 nm from the<br />
fabrication yard to the installation site. <strong>GL</strong> Noble Denton was<br />
contracted to perform the detailed engineering for the loadout,<br />
transportation and floatover installation of both units.<br />
New Record<br />
“Tai An Kou” at final position and starts ballasting.<br />
Undocking starts after completion of load transfer.<br />
In September and December 2009, respectively, the fully assembled<br />
BG and BE topsides, each weighing approximately<br />
10,000 tonnes, were transported to the installation site on<br />
board the COSCOL semi-submersible heavy lift vessel “Tai<br />
13:20<br />
“Tai An Kou” exits from jacket after 2.5 hours<br />
setting a new time record.<br />
36 energıze
Transportation. The “Tai An Kou” shipped the topsides about 3,650 nm from Malaysia to the Al Shaheen <strong>oil</strong> field.<br />
An Kou”. For the transportation phase, <strong>GL</strong> Noble Dentons’s<br />
responsibilities included load-out engineering, vessel stabili-<br />
ty and motion analyses as well as grillage, stability box and<br />
seafastening design. The self-propelled vessel required 14<br />
days to arrive at the site, travelling at an average speed of 11<br />
knots.<br />
In preparation of the floatover installation, <strong>GL</strong> Noble<br />
Denton performed mating, ballasting and stability analyses<br />
as well as fendering and mooring design, and defined the<br />
offshore procedures. Once a suitable weather window for in-<br />
Floatover Log<br />
the DYNaMIc PosItIoNINg (DP) MethoD for floatover<br />
installations, pioneered by <strong>GL</strong> Noble Denton, allows the<br />
semi-submersible vessel carrying the topside to find its posi-<br />
tion inside the jacket without the help of expensive mooring<br />
systems that take time to deploy onsite. The BG topside<br />
was installed within a record time of only 2.5 hours using DP.<br />
The period of greatest risk, when the vessel is restrained<br />
within the jacket slot, was limited to only 95 minutes.<br />
<strong>01</strong>/2<strong>01</strong>0<br />
stallation had been determined, <strong>GL</strong> Noble Denton’s offshore<br />
teams worked closely with MOQ, SDE and the crew of the<br />
“Tai An Kou” to ensure smooth installation<br />
operations.<br />
The “Tai An Kou” is equipped with a<br />
Class II Dynamic Positioning (DP) system<br />
which was used to precisely manoeuvre<br />
the vessel into the jacket slot and re-<br />
strain it during ballasting. The use of DP<br />
removed the need for a costly conven-<br />
tional mooring spread, significantly reducing the time and re-<br />
sources required to perform the floatover, thereby minimising<br />
the exposure to the environment.<br />
The BG topside was successfully installed on 13 October<br />
2009. The entire operation, including vessel approach and<br />
exit, was completed within a record time of only 2.5 hours<br />
(refer to box) – an impressive demonstration of the power of<br />
DP technology. Rp<br />
<strong>GL</strong> NobLE DENToN ExpERT:<br />
richard Palmer<br />
abstract<br />
<strong>GL</strong> Noble Denton played a key<br />
part in the loadout, transportation<br />
and floatover installations.<br />
DP reduces the time and<br />
resources required to perform<br />
floatover installations.<br />
group Director, transportation & Installation, gL Noble Denton<br />
Phone: +44 20 7812 8748<br />
e-Mail: richard.palmer@nobledenton.com<br />
37
software<br />
<strong>oil</strong> asiatridentconsulting<br />
& <strong>gas</strong> merger<br />
solutıons<br />
For over forty years, <strong>GL</strong> Noble Denton<br />
has led the way in the use of advanced<br />
software solutions to enhance operations.<br />
We offer a comprehensive portfolio of<br />
world-class software suites across the <strong>oil</strong><br />
and <strong>gas</strong> sector, which enhance the safety,<br />
performance and integrity of assets<br />
across their lifecycle.<br />
38<br />
Photo: iStockphoto<br />
energıze
<strong>01</strong>/2<strong>01</strong>0 39
software synergee<br />
abstract<br />
Refinery. <strong>GL</strong> Noble Denton offers a comprehensive portfolio of software solutions across the <strong>oil</strong> and <strong>gas</strong> sector.<br />
SynerGEE optimises the operational<br />
costs of transporting petroleum<br />
products through a pipeline.<br />
The software allows users to view<br />
past, present and future results of<br />
the simulation.<br />
Pipeline operators can now reduce two main<br />
cost factors with <strong>GL</strong> Noble Denton’s new soft-<br />
ware product “SynerGEE Liquid Transmission”.<br />
The two main cost factors in operating a pipeline are the<br />
cost of drag-reducing agents (DRA) and the energy used to<br />
pump the liquid. SynerGEE pro-<br />
vides short-term operational cost<br />
optimisation by optimizing flow<br />
rate, pump station operation and/<br />
or DRA concentration injection per<br />
batch at pump stations. “It is the<br />
only product on the market that<br />
can optimize these variables simultaneously,” says Shelly<br />
Young, Vice President of Software Solutions Practice for <strong>GL</strong><br />
Noble Denton. A steady state analysis engine simulates the<br />
hydraulics in the pipeline and determines an optimum, also<br />
allowing for model calibration and simulation of what-if sce-<br />
narios. “This development project was based on clear indus-<br />
try requirements and advanced through strong client engage-<br />
ment,” said Ms Young.<br />
Information for Operational Planning<br />
SynerGEE’s user interface provides a schematic of the<br />
batches and the pipeline, allowing users to view past, present<br />
and future results of the simulation. Variables such as pres-<br />
sure, flow rate, power consumption and DRA injection rates<br />
are selected by the user for display on the results screen.<br />
Time and distance charts can also be used to view the re-<br />
40 energıze
Photo: BP<br />
SynerGEE Affects Energy Costs<br />
<strong>GL</strong> Noble Denton introduces new software technology to the <strong>oil</strong> & <strong>gas</strong> industry.<br />
synerGEE provides short-term operational cost optimisation at pump stations<br />
sults. Standard reporting provides the information needed for<br />
operational planning, with set points and equipment change<br />
strategies for upcoming hours of operation.<br />
Combining years of pipeline experience and expertise<br />
with advanced mathematical modelling techniques, SynerGEE<br />
Liquid Transmission optimizes the operational cost of trans-<br />
porting petroleum products through a pipeline. “The introduc-<br />
tion of SynerGEE Liquid Transmission further complements<br />
our comprehensive suite of software products and marks an-<br />
<strong>01</strong>/2<strong>01</strong>0<br />
Information. Pressure,<br />
flow rate, power consumption<br />
and DRA<br />
injection: the user can<br />
select all relevant variables<br />
for display on the<br />
results screen.<br />
other major milestone in our delivery of software based solu-<br />
tions that provide accurate, short term liquid pipeline opera-<br />
tions and planning optimization,” said Shelly Young. “Our vi-<br />
sion is to develop innovative software solutions for our clients<br />
that improve their asset and business performance. Syner-<br />
GEE will highlight operating plans that result in energy and<br />
DRA savings that will positively impact the bottom line.” <strong>GL</strong><br />
Noble Denton offers a comprehensive portfolio of software<br />
solutions across the <strong>oil</strong> and <strong>gas</strong> sector.<br />
Part of an Expanding Portfolio<br />
SynerGEE Liquid Transmission is the latest addition to a prod-<br />
uct portfolio that addresses the engineering, operations and<br />
data management requirements for simulation and asset in-<br />
tegrity management for the pipeline and utility industries. Our<br />
software solutions blend high fidelity analytics, sophisticated<br />
mapping functionality and robust data management to provide<br />
decision support to reduce opex, capex and manpower while<br />
increasing the safety and reliability of assets. Sy<br />
<strong>GL</strong> NObLE DENtON ExPERtS:<br />
John akujobi<br />
Director, business Development Usa<br />
Phone: +1 71 77 24 19 00<br />
E-Mail: john.akujobi@gl-group.com<br />
John scrivener<br />
business Development Manager outside of the U.s.<br />
Phone: +44 7768 10 37 98<br />
E-Mail: jon.scrivener@gl-group.com<br />
41
software awards<br />
Burstfinder. The technology helps to<br />
identify anomalies in water networks<br />
such as possible burst locations.<br />
Better Leakage Detection<br />
For their “Burstfinder” technology, the <strong>GL</strong> <strong>Group</strong> won the Pipeline Industries Guild<br />
Award. It was given for significant contribution to utility pipeline technology<br />
The prestigious Pipeline Industries Guild (PIG)<br />
Award was given to Germanischer Lloyd (<strong>GL</strong>) for<br />
significant contribution to utility pipeline technology<br />
for their Burstfinder technology at the 53rd annual<br />
awards ceremony in London.<br />
“Burstfinder” is <strong>GL</strong>’s leakage and demand location technique<br />
and is provided as a service to water utilities and leakage<br />
contractors to help identify “hotspots” of anomalies in water<br />
networks such as non-revenue water, boundary breaches<br />
and possible burst locations.<br />
Up to Four Times More Efficient<br />
The Burstfinder Technology has helped many water utility<br />
companies to focus better on leakage detection and repair<br />
activities, resolution of “problem” networks and location of<br />
Photo: iStockphoto<br />
leakage, and other forms of unaccounted for water. <strong>GL</strong> has<br />
worked with many water utilities and contractors in the last 12<br />
months with results demonstrating that a Burstfinder-enabled<br />
detection programme is up to four times more efficient than<br />
traditional approaches<br />
Antony Green, <strong>GL</strong>’s Vice President, Water, and Arthur<br />
Stoddart, <strong>GL</strong> Managing Director Midstream/Downstream UK,<br />
accepted the PIG award on the night. NS/SNB<br />
<strong>GL</strong> NoBLE DENToN ExpErT:<br />
Antony Green<br />
Vice President Water<br />
Phone: +44 1509 28 21 03<br />
E-Mail: antony.green.@gl-group.com<br />
42 energıze
Efficient Net<br />
European Commission Award for the<br />
Beywatch collaborative project<br />
The collaborative European project “Beywatch”<br />
has received the European Commission’s best<br />
information and communication technology (ICT)<br />
for energy efficiency project award. Beywatch was selected for<br />
its contribution towards development of energy efficiency.<br />
After a competition involving 39 EU-funded projects focusing<br />
on ICT for energy efficiency, Beywatch has been selected<br />
as the “best ICT4EE project” on the occasion of the ICT4EE<br />
international conference, organized in Brussels by the European<br />
Commission. The award is shared<br />
ABstrACt<br />
with the OLED100.eu project. This com-<br />
Beywatch is developing petition, launched by the European Com-<br />
smart networking<br />
technology.<br />
mission, is aimed at promoting innovation<br />
One main objective is in ICT that will contribute to substantial<br />
power demand balancing.<br />
and measurable improvements in energy<br />
efficiency, and that have the potential to<br />
provide visible and convincing showcases for investment by<br />
businesses, individuals or both.<br />
<strong>01</strong>/2<strong>01</strong>0<br />
Intelligent Energy Control<br />
The Building Energy Watcher (Beywatch) project is developing<br />
smart networking technology that will be able to provide<br />
intelligent energy control and power demand balancing across<br />
energy networks. The Beywatch project partners are <strong>GL</strong> Noble<br />
Denton, EDF, Fagor, Gorenje, Sigma Orionis, Synelixis, Telefonica<br />
and the University of Palermo. <strong>GL</strong> Noble Denton’s team<br />
has provided specialist support in the development of energy<br />
and network models that demonstrate the impact of new and<br />
renewable technologies on future <strong>gas</strong> and electricity networks.<br />
<strong>GL</strong> Noble Denton is also making a contribution to the development<br />
of networking technology that will allow future energy<br />
appliances to optimise energy and cost savings.<br />
Photo: iStockphoto<br />
City. Substantial progres in energy efficiency.<br />
Beywatch is a European project aiming at information and<br />
communication technology for energy efficiency through ultralow-power<br />
white goods, intelligent control of electrical devices<br />
in smart homes, hot water and electricity generation from renewable<br />
energy sources, and enhanced consumer awareness<br />
towards less CO emissions. To achieve its objective and to<br />
2<br />
support the European Commission’s proposals to save 20%<br />
of the EU’s energy consumption through improved energy efficiency<br />
by 2020, Beywatch has established a consortium of<br />
eight key players in the field, including major service companies,<br />
manufacturers, technology companies, universities as<br />
well as small and medium sized enterprises. ML<br />
www.beywatch.eu<br />
<strong>GL</strong> NoBLE DENToN ExpErT:<br />
Ian Freeman<br />
Manager, Commercial systems<br />
Phone: +44 1509 28 24 17<br />
E-Mail: ian.freeman@gl-group.com<br />
43
<strong>oil</strong>&<strong>gas</strong>xxxxxxxxxxxxxxxxxx<br />
around the world<br />
projects in brief<br />
Luk<strong>oil</strong> Warranty and Classification for Oil Platforms<br />
russia In the Yuri Korchagin <strong>oil</strong> field in<br />
the Russian sector of the North Caspian<br />
Sea, <strong>GL</strong> Noble Denton assisted in the<br />
transportation and installation of two<br />
ice-resistant fixed offshore platforms.<br />
The marine warranty experts, collaborating<br />
with Crane Marine Contractor<br />
Ltd. (CMC), had been requested by<br />
Luk<strong>oil</strong> to provide technical expertise for<br />
the operation.<br />
Platform LSP-1, built at the Astrakhansky<br />
Korabel shipyard in Kaliningrad,<br />
will be used to drill and operate<br />
wells and to collect and pretreat reservoir<br />
content. It carries a 560-tonne rig<br />
capable of drilling up to 7,400-metre<br />
wells. LSP-1 will be equipped with<br />
living quarters for up to 105 employ-<br />
ees. LSP-2 accommodates the health<br />
care area, service quarters, the galley,<br />
pantry and a helipad. The two platforms<br />
will be joined by a 74.2-m bridge.<br />
Upon completion in Astrakhan, the<br />
platform modules were taken on barges<br />
from the Volga Delta seaport and<br />
installed using CMC’s sheerleg crane.<br />
LSP-1 was towed down the Volga Caspian<br />
Canal under the guidance of marine<br />
specialists from CMC and Noble<br />
Denton.<br />
Among the challenges the experts<br />
tackled successfully were a draught<br />
problem on the canal, low power lines,<br />
and identifying overnight “parking”<br />
locations during the tow. After installation,<br />
platform LSP-1 was connected<br />
via a pipeline to a floating storage unit,<br />
which in turn feeds the Transneft pipeline<br />
system.<br />
Installation. Towing, aligning, joining:<br />
<strong>GL</strong> Noble Denton provided engineering<br />
support for the transport and installation<br />
of the ice-resistant offshore platform<br />
LSP-1 and its connection to the<br />
service platform, LSP-2.<br />
Amposta reservoir<br />
Redevelopment. The Amposta reservoir<br />
will become a back-up <strong>gas</strong> storage.<br />
ACS Cobra Gas Storage Contract<br />
spain In May 2009, Spanish ACS Cobra<br />
Castor UTE contracted <strong>GL</strong> Noble Denton to<br />
provide project management and support<br />
services for an underground <strong>gas</strong> storage<br />
development initiative. The project involves<br />
the redevelopment of the abandoned Am-<br />
posta reservoir as a back-up <strong>gas</strong> storage for<br />
the Mediterranean coast of Spain during<br />
periods of high <strong>gas</strong> demand.<br />
Barcelona<br />
The technical specification of the work<br />
will comprise a wellhead platform bridge<br />
linked to a production, utilities and quar-<br />
ters platform in approximately 60 m of<br />
water. The platform will support <strong>gas</strong> injec-<br />
tion into the reservoir at flow rates of up<br />
to 8 MMSCMD and <strong>gas</strong> withdrawal and<br />
transfer to shore at up to 25 MMSCMD.<br />
44 energıze<br />
Photo: NASA
Photo: Nepenthes<br />
Talisman Malaysia Ltd. Dynamic Positioning – Major Floatover Project<br />
malaysia The floatover method is an attractive,<br />
relatively low-cost option for topside<br />
installation but poses a number of<br />
technical and operational challenges. Dynamic<br />
Positioning (DP) is a leading-edge<br />
navigation method allowing transport and<br />
installation vessels to install topsides on<br />
their supporting jackets without the use of<br />
costly mooring systems.<br />
The heaviest topside installations using<br />
DP to date were performed in the northern<br />
Gulf of Thailand’s Joint Development Area,<br />
with <strong>GL</strong> Noble Denton providing all associated<br />
engineering and monitoring services<br />
for load out, transport and installation of<br />
the topside module.<br />
ADCOP Inspection and Certification of a Crude Oil Pipeline<br />
abu dhabi The Abu Dhabi Crude Oil<br />
Pipeline (ADCOP) project is receiving<br />
technical assurance and certification by<br />
<strong>GL</strong>. The contract on technical assurance,<br />
risk and safety, asset management and<br />
industrial inspection was awarded by<br />
China Petroleum Engineering and Construction<br />
Corporation (CPECC), the main<br />
EPC contractor, and signed by Mr Hassan<br />
Fahim, <strong>GL</strong> Noble Denton’s Country Manager<br />
United Arab Emirates, and Mr Liu<br />
Xihui, CPECC Project Director. The 400 km<br />
pipeline from Habshan in Abu Dhabi to<br />
<strong>01</strong>/2<strong>01</strong>0<br />
The Bunga Orkid A topside for operator<br />
Talisman Malaysia Limited weighed 13,300<br />
tonnes, and was transported on board a<br />
specialised semi-submersible HLV, one of a<br />
small number of vessels capable of carrying<br />
out floatover operations of this magnitude.<br />
Noble Denton also advised Talisman and<br />
Aker during the project pre-feed and feed<br />
stages on installation issues, including vessel<br />
selection.<br />
The project was successfully completed,<br />
despite a number of challenges. The topsides<br />
were at the vessel limit for draught,<br />
stability and strength. Furthermore, the<br />
installation took place during the monsoon<br />
season, so the time window was small.<br />
Abu Dhabi. The<br />
new pipeline<br />
will transport<br />
crude <strong>oil</strong> to<br />
Fujairah.<br />
the Main Oil Terminal (MOT) in Fujairah,<br />
United Arab Emirates, will transport 1.0–<br />
1.5 million barrels per day (bpd) of crude<br />
<strong>oil</strong>. It will develop a reliable export capability<br />
on the eastern seaboard of UAE,<br />
which can accommodate larger vessels.<br />
The project includes the construction of<br />
12 million barrels of storage tanks in the<br />
Main Oil Terminal facilities (MOT) in the<br />
Emirate of Fujairah for crude exports.<br />
Construction started earlier in 2008<br />
and is scheduled to be completed by<br />
August 2<strong>01</strong>1.<br />
Photo: Ali Badri<br />
Thanks to DP, the installation<br />
was completed within an exceptionally<br />
short time span.<br />
GUPCO Asset Integrity<br />
and Risks Assessment<br />
Services<br />
egypt In a mega project begun in 2005<br />
and scheduled to be completed in 2<strong>01</strong>1,<br />
GUPCO, the Gulf of Suez Petroleum Company,<br />
has been overhauling its entire<br />
infrastructure of platforms, pipelines and<br />
other facilities.<br />
<strong>GL</strong> Noble Denton Egypt has won a<br />
major contract to provide inspection, assessment<br />
and other expert services associated<br />
with the rehabilitation of GUPCO <strong>oil</strong><br />
platforms in the Badri GS315, July 10, July<br />
4 and Ramadan R6 complexes located in<br />
the Gulf of Suez.<br />
The engineers of <strong>GL</strong> Noble Denton<br />
deliver procedures, examination schemes<br />
and maintenance schedules and perform<br />
extensive inspection and monitoring of<br />
<strong>oil</strong>, water and <strong>gas</strong> risers, topside piping<br />
and platform supply vessels (PSV).<br />
Platform.<br />
Overhauls<br />
of the entire<br />
infrastructure.<br />
45
service<br />
dates & rules<br />
Conferences & Fairs<br />
MAy<br />
03. – 06.05.2<strong>01</strong>0<br />
Offshore Technology<br />
Conference (OTC)<br />
Houston, USA<br />
<strong>GL</strong> Noble Denton: booth 2241 (Hall A)<br />
26. – 27.05.2<strong>01</strong>0<br />
The 2nd European Dynamic<br />
Positioning Conference 2<strong>01</strong>0<br />
London, UK<br />
JUNE<br />
08. – 10.06.2<strong>01</strong>0<br />
Global Petroleum Show<br />
Calgary, Canada<br />
<strong>GL</strong> Noble Denton: booth 5230<br />
(Lower Big 4)<br />
08. – 10.06.2<strong>01</strong>0<br />
IOGCEC 2<strong>01</strong>0<br />
Beijing, China<br />
<strong>GL</strong> Noble Denton: booth 73/74<br />
20. – 24.06.2<strong>01</strong>0<br />
ACE (American Water<br />
Works Association)<br />
Chicago, USA<br />
23. – 26.06.2<strong>01</strong>0<br />
IGEM Annual Conference<br />
and Exhibition<br />
Loughborough, UK<br />
AUGUST<br />
24. – 27.08.10<br />
Exhibition & Conference ONS<br />
Stavanger, Norway<br />
<strong>GL</strong> Noble Denton Guidelines<br />
Ref Title Rev<br />
0009/ND Self-Elevation Platforms – Guidelines for Elevated Operations 5<br />
0<strong>01</strong>3/ND Guidelines for Loadouts 5<br />
0<strong>01</strong>5/ND Concrete Offshore Gravity Structures – Guidelines for Approval of<br />
Construction, Towage and Installation<br />
2<br />
0<strong>01</strong>6/ND Seabed and Sub-Seabed Data Required for Approvals of Mobile<br />
Offshore Units (MOU)<br />
5<br />
0021/ND Guidelines for the Approval of Towing Vessels 8<br />
0027/ND Guidelines for Marine Lifting Operations 9<br />
0028/ND Guidelines for the Transportation and Installation of Steel Jackets 4<br />
0030/ND Guidelines for Marine Transportations 4<br />
IMPRINT<br />
<strong>energize</strong> <strong>oil</strong> & <strong>gas</strong>, issue No. <strong>01</strong>/2<strong>01</strong>0,<br />
May 2<strong>01</strong>0 Frequency <strong>energize</strong> <strong>oil</strong> & <strong>gas</strong><br />
is published twice a year Published by<br />
Germanischer Lloyd Aktiengesellschaft,<br />
Hamburg Editorial Director Dr Olaf<br />
Mager (OM), Corporate Communications<br />
Managing Editor Stefanie Normann-<br />
Birkholz (SNB) Authors of this issue<br />
RV Ahilan (RVA), A. Argyros (AA), David<br />
Brown (DB), Martin William Hay (MWH),<br />
Jörn Iken (JI), Bob Jack (BJ), Karen Jacka<br />
(KJ), R.S. Langley (RSL), Martin Layfield<br />
(ML), Nora Luttmer (NL), Christopher<br />
Mayer (CM), Bruce McMichael (BM),<br />
Francis Minah (FM), Richard Palmer<br />
(RP), Neil Slater (NS), Shelly Young (SY)<br />
Cover photo Stat<strong>oil</strong> Design and<br />
production printprojekt, Schulterblatt<br />
58, D-20357 Hamburg Layout Oliver<br />
Lohrengel Translations Andreas Kühner<br />
Prepress Fire Department Printed by<br />
Media Cologne Kommunikationsmedien<br />
GmbH, Luxemburger Straße 96, D-50354<br />
Hürth Reprint © Germanischer Lloyd<br />
Aktiengesellschaft 2<strong>01</strong>0. Reprinting<br />
permitted on explicit request – copy<br />
requested. All information is correct to the<br />
best of our knowledge. Contributions by<br />
external authors do not necessarily reflect<br />
the views of the editors or of Germanischer<br />
Lloyd Enquiries to: Germanischer<br />
Lloyd AG, Corporate Communications,<br />
Brooktorkai 18, D-20457 Hamburg, Phone:<br />
+49 40 36149-4509, Fax: +49 40 36149-<br />
250, E-Mail: pr@gl-group.com<br />
Subscription service: for address<br />
changes and orders please send an<br />
e-mail to publications@gl-group.com<br />
This product was<br />
printed on FSC<br />
Certified Paper<br />
46 energıze
Photo: Fotolia
0E713 2<strong>01</strong>0-26-04<br />
<strong>GL</strong> <strong>Group</strong><br />
Head Office<br />
Brooktorkai 18<br />
20457 Hamburg<br />
Germany<br />
Phone: +49 40 36149-0<br />
Fax: +49 40 36149-200<br />
E-Mail: headoffice@gl-group.com<br />
Houston<br />
<strong>GL</strong> Noble Denton<br />
Region Americas<br />
Suite 900<br />
5177 Richmond Avenue<br />
Houston, TX 77056<br />
USA<br />
Phone: +1 713 586 7000<br />
Fax: +1 713 586 7007<br />
E-Mail: glnobledenton@gl-group.com<br />
www.gl-group.com<br />
www.gl-nobledenton.com<br />
www.gl-garradhassan.com<br />
www.gl-maritime-software.com<br />
www.friendship-systems.com<br />
www.futureship.net<br />
Aberdeen<br />
Region europe<br />
Brooktorkai 18<br />
20457 Hamburg<br />
Germany<br />
Phone: +49 40 36149-7700<br />
Fax: +49 40 36149-1781<br />
E-Mail: glis@gl-group.com<br />
Hamburg<br />
London<br />
Cairo<br />
Abu Dhabi<br />
singapore<br />
Region Middle east/<br />
Africa<br />
Zahret El-Maadi Tower<br />
66, Cornich El-Nile, El-Maadi<br />
35th Floor, Apartment 2<br />
11431 Cairo<br />
Arab Republic of Egypt<br />
Phone: +20 2 25287295<br />
Fax: +20 2 25287294<br />
E-Mail: glnobledenton@gl-group.com<br />
Kuala Lumpur<br />
Region Asia/Pacific<br />
Level 39, Menara Ambank<br />
No. 8, Jalan Yap Kwan Seng<br />
50450 Kuala Lumpur<br />
Malaysia<br />
Phone: +60 3 2160 1088<br />
Fax: +60 3 2160 1099<br />
E-Mail: glnobledenton@gl-group.com