18.12.2012 Views

Special Edition - LS telcom

Special Edition - LS telcom

Special Edition - LS telcom

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Spectrum<br />

<strong>LS</strong> <strong>telcom</strong> Customer News Magazine<br />

<strong>LS</strong> <strong>telcom</strong> Customer News Magazine<br />

Strong Presence at<br />

ITU Study Groups<br />

<strong>LS</strong> <strong>telcom</strong> has a long-standing commitment<br />

to regularly attending ITU<br />

Study Groups.<br />

<strong>LS</strong> <strong>telcom</strong> is currently attending 3<br />

Study groups: WP 3K (point-to-area<br />

propagation), WP 4A (effi cient orbit/<br />

spectrum utilisation for FSS and<br />

BSS) and WP 6A (terrestrial broadcasting).<br />

This way <strong>LS</strong> <strong>telcom</strong> receives<br />

the information at fi rst hand<br />

and is thus able to provide its customers<br />

with the very latest knowhow.<br />

Besides, <strong>LS</strong> <strong>telcom</strong> also<br />

participates regularly at CEPT and<br />

ABU conferences. �<br />

<strong>Special</strong> <strong>Edition</strong><br />

<strong>Special</strong> <strong>Edition</strong> Broadcast <strong>Edition</strong> 01 l 2011<br />

Latest<br />

Excellence in Software, Strategic Consulting & Training<br />

and Radio Engineering<br />

New CHIRplus_BC v. 5.6.0 Release includes DVB-T2 and ISDB-T Planning Functions<br />

The new CHIRplus_BC version 5.6.0<br />

for broadcast planning and coordination<br />

now covers DVB-T2 as well as<br />

ISDB-T planning functions, whereas<br />

the last major release 5.4.0 concerned<br />

multi-core calculations.<br />

The new version has already been<br />

delivered to customers under<br />

maintenance.<br />

DVB-T2, which is also subject to ITU’s<br />

Recommendation BT.1877, “Error-correction,<br />

data framing, modulation and<br />

emission methods for second generation<br />

of digital terrestrial television<br />

broadcasting systems”, offers enhanced<br />

fl exibility to broadcasters,<br />

ranging from physical layer pipes<br />

(PLPs) to MISO (Multiple-Input Single<br />

Output). The advantage of MISO is that<br />

two variants of the signal can be transmitted<br />

from different sites, offering<br />

more network gain than the SFN operation<br />

known from DVB-T.<br />

Many countries – especially developing<br />

countries – are considering adopting<br />

this second-generation system<br />

immediately after their future analogue<br />

switch-off (ASO). South Africa<br />

and Mozambique in Africa and Serbia<br />

in Europe have decided to take a short<br />

cut and change directly from analogue<br />

technology to DVB-T2.<br />

CHIRplus_BC takes into consideration<br />

the higher complexity which comes<br />

with the DVB-T2 system, with more<br />

parameters than the classical DVB-T,<br />

and offers enhanced confi guration<br />

possibilities and pre-sets for the various<br />

T2-constellations and reception<br />

modes.<br />

As not all combinations of pilot pattern,<br />

constellation and guard interval,<br />

etc, are possible<br />

according to the<br />

DVB-T2 specifi cation,<br />

the user is<br />

only able to select<br />

valid combinations<br />

in CHIRplus_BC.<br />

The “pilot pattern”<br />

selection shows<br />

only those in green<br />

that result in a valid<br />

combination.<br />

The 5.6.0 version of<br />

CHIRplus_BC also<br />

We provide you with everything you<br />

need in broadcast. Our portfolio includes<br />

software, consulting, engineering<br />

and measurement services for the<br />

design, planning and optimisation of<br />

broadcast networks. Training on technologies,<br />

standards and regulations as<br />

well as transmission container commissioning<br />

complete our area of<br />

expertise. We even offer antenna<br />

measurements via a remote controlled<br />

miniature helicopter – an unprecedented<br />

service for cost-effective and<br />

accurate measurements. �<br />

includes the ISDB-T network processor<br />

for all customers with DTV option.<br />

This system, originally developed in<br />

and for Japan, has been adopted<br />

(with slight modifi cation) in Brazil and<br />

from there spread throughout South<br />

America. �


<strong>Edition</strong> 01l 2011 I <strong>Special</strong> <strong>Edition</strong> Broadcast 02<br />

Service Portfolio for Broadcast Operators and Regulators<br />

Vendor independent, on schedule and in line with your budget<br />

A broadcast network that is optimised in terms of technology, quality of service, capital expenditure, and long-term cost effi ciency, needs to be well-planned.<br />

At <strong>LS</strong> <strong>telcom</strong>, we cover the entire Broadcast Network Life cycle from Design and Planning through Procurement, to Implementation and Optimisation.<br />

Network<br />

Design<br />

■ Network Design<br />

• Feasibility studies<br />

• Technical and fi nancial audits<br />

• Migration concepts<br />

• Business case set up or evaluation<br />

• Cost assignment and estimations<br />

■ Network Planning<br />

• Spectrum strategy planning<br />

and coordination<br />

• Broadcast network planning<br />

• Examination of most suitable<br />

transmitter sites<br />

• Reuse of existing infrastructure<br />

• ERP and Antenna design<br />

• Protection of existing services<br />

• Transmission network planning<br />

• Capacity planning<br />

• Topology planning<br />

• Microwave / Satellite / Fibre<br />

Nationwide Hybrid TV DVB-T2 Network Study in Asian Country<br />

A private broadcasting<br />

company in an Asian country<br />

asked <strong>LS</strong> <strong>telcom</strong> to carry<br />

out a nationwide DVB-T2<br />

study in order to offer<br />

hybrid TV to its customers.<br />

<strong>LS</strong> <strong>telcom</strong> designed several nationwide<br />

single frequency networks (SFN)<br />

based on the required data capacity<br />

and reception mode. The objective<br />

was to optimise the system in terms<br />

of the number of sites used and the<br />

targeted coverage area and population.<br />

The study included the selection<br />

of the most suitable DVB-T2 system<br />

technology.<br />

<strong>LS</strong> <strong>telcom</strong> also carried out interference<br />

analyses with respect to analogue<br />

TV in the country, analogue and<br />

digital TV on borders and with respect<br />

to non-broadcasting services.<br />

This went along with measures to<br />

reduce or avoid interference.<br />

At the end of the study <strong>LS</strong> <strong>telcom</strong> set<br />

up the Request for Information (RFI)<br />

DVB-T/T2 countrywide network design for Montenegro<br />

On behalf of the public broadcaster<br />

RDC an initial planning<br />

study was performed analysing<br />

the level of DVB-T nationwide<br />

multiplex coverage for Montenegro.<br />

Network<br />

Procurement<br />

and Project<br />

Management<br />

As part of this work <strong>LS</strong> <strong>telcom</strong> performed<br />

a Conformity Check (in<br />

accordance with GE06 procedure),<br />

Network Optimisation and SFN Delay<br />

Optimisation. The planning result<br />

showed coverage for fi xed reception<br />

for more than 95 % of the population in<br />

each sub-area and overall for Monte-<br />

Implementation<br />

and<br />

Installation<br />

PlanningOptimisation<br />

■ Procurement and Project Management<br />

• Preparation and evaluation of your<br />

procurement documents<br />

• Development of vendor evaluation<br />

model<br />

• Vendor Evaluation<br />

• Integration of components from different<br />

vendors to one comprehensive<br />

system<br />

• Vendor Pre-Selection<br />

■ Implementation and Installation<br />

• DTT container installation<br />

• In depth Monitoring throughout<br />

the Process<br />

• Delivery to Key Milestones<br />

• Cost Control<br />

• Risk Management<br />

• Performance Reporting<br />

negro, exceeding the performance<br />

requirement of the customer. This was<br />

based on 119 transmitter sites in 4<br />

sub-areas.<br />

In the meantime <strong>LS</strong> <strong>telcom</strong> was asked<br />

to plan a county-wide DVB-T2 network<br />

with the same coverage requirements<br />

given for the fi rst planning task. �<br />

• Commissioning and Acceptance<br />

Testing<br />

• Coverage Measurements<br />

• Human Exposure Measurement<br />

• Antenna System Measurements<br />

• Monitoring Measurements<br />

• Documentation and Training<br />

■ Optimisation<br />

A broadcast network in operation needs to<br />

be optimised and maintained to guarantee<br />

continuous quality of service and careful<br />

use of network resources over time.<br />

We optimise your existing network with<br />

regards to<br />

• quality of service<br />

• coverage<br />

• technology cost<br />

• operational expenditure<br />

• or any other parameter that you<br />

would like us to check<br />

including all the engineering and system<br />

details necessary to build the<br />

system. The RFI was sent to the<br />

potential suppliers. Finally the submitted<br />

DVB-T2 proposals were analysed<br />

and evaluated based on several<br />

criteria like equipment, price quote,<br />

schedule, customer service plan and<br />

reputation. �


<strong>Edition</strong> 01 l 2011 I <strong>Special</strong> <strong>Edition</strong> Broadcast 03<br />

<strong>LS</strong> <strong>telcom</strong> lectures<br />

at ABU and MBT<br />

conferences<br />

<strong>LS</strong> <strong>telcom</strong> gave presentations in<br />

front of 120 experts from all over<br />

Europe at the 9th Meeting of Regional<br />

Broadcasting Organisations<br />

and Transmitting Equipment Manufacturers<br />

(MBT) taking place from<br />

18th - 20th May 2011 in Munich and<br />

which was hosted by Rohde &<br />

Schwarz.<br />

<strong>LS</strong> <strong>telcom</strong> was also present at the<br />

ABU (Asia-Pacifi c Broadcasting<br />

Union) conference in Bangalore,<br />

India, from 12th - 14th July. More<br />

than 60 broadcast experts from<br />

mainly Asian countries attended<br />

this conference.<br />

During both conferences <strong>LS</strong> <strong>telcom</strong><br />

contributed with presentations<br />

and workshops regarding “DVB-T2optimised<br />

design and planning<br />

of second generation DTT netnetworks”. ��<br />

Measurements with Unmanned Airborne Vehicles (UAV)<br />

Colibrex - a subsidiary of<br />

<strong>LS</strong> <strong>telcom</strong> AG - provides payloads<br />

on Unmanned Airborne<br />

Vehicles (UAV) for a variety of<br />

applications, such as measurements,<br />

surveillance and<br />

monitoring.<br />

<strong>LS</strong> of South Africa establishes Facility and Capacity for<br />

Pre-Built Transmission Container Installations<br />

<strong>LS</strong> of South Africa now provides<br />

high power digital broadcast<br />

transmitter turnkey installations.<br />

The facility and capacity ranges<br />

from container installation to<br />

testing and build-up through to<br />

commissioning to the point<br />

where the containers are ready<br />

to operate.<br />

Planning of DVB-T2 Networks (White Paper)<br />

The White Paper provides an<br />

overview of major techniques<br />

used in DVB-T2 and their impact<br />

on service planning and operation<br />

of this new transmission technology.<br />

It outlines the increase in capacity<br />

through robustness gain achieved<br />

by rotated constellations and<br />

Q-delay.<br />

UHF Television Spectrum Audit - Nigeria<br />

<strong>LS</strong> of South Africa recently performed<br />

a spectrum audit of UHF television<br />

frequency usage in Nigeria.<br />

The idea behind this was to create an<br />

accurate frequency database to<br />

determine which frequencies will be<br />

avail-able for DTT implementation.<br />

The sources of information used<br />

during the investigation included the<br />

Geneva 06 analogue and digital frequency<br />

lists, the National Broadcasting<br />

Commission (NBC) list of<br />

frequency assignments and the information<br />

obtained during our national<br />

frequency meas-urements.<br />

The measurements were done using a<br />

Rohde & Schwarz EB200 receiver<br />

In parallel to recent innovations in the<br />

area of fl ight control and embedded<br />

electronics of UAV, there has been<br />

important progress in data transmission<br />

and storage of measurement<br />

devices. We have identifi ed that combining<br />

the two; there are numerous<br />

new market opportunities.<br />

Our pioneer product HELI-Mon, a<br />

During the past three years <strong>LS</strong> of<br />

South Africa has increased its staff so<br />

that four installation teams are available<br />

for installation projects at all times.<br />

The containers, which are pre-manufactured<br />

or modifi ed to house telecommunication<br />

equipment, are<br />

delivered to the new assembly facility<br />

in Johannesburg.<br />

There, the <strong>LS</strong> team fi ts out the container<br />

units with transmission equipment<br />

and all electrical wiring, RF cabling<br />

and control wiring. Once all equipment<br />

is installed and interconnected, it is<br />

exposed to a range of tests as part of<br />

A study using the broadcast planning<br />

tool CHIRplus_BC illustrates<br />

the feasibility of large scale SFNs<br />

(Single Frequency Networks). Based<br />

on the DVB-T network in Southern<br />

Germany the coverage for a fixed<br />

reception scenario and for a portable<br />

reception scenario is evaluated.<br />

This definitely makes it the first<br />

choice when introducing DTT or<br />

adding HD services to the terrestrial<br />

platform. However, accurate<br />

definition of the key parameters of<br />

together with the <strong>LS</strong> <strong>telcom</strong><br />

MONITORplus v4660 product installed<br />

on a Laptop with an external<br />

GPS. The measurements included the<br />

FM band (87.6 to 107.9 MHz), VHF<br />

television band (174 to 238 MHz and<br />

246 to 254 MHz) as well as UHF television<br />

band (470 to 854 MHz).<br />

The results were analysed with the<br />

<strong>LS</strong> <strong>telcom</strong> software CHIRplus_BC<br />

v560. Our investigation included the<br />

following:<br />

■ Licensed operational frequencies<br />

■ Licensed, not operational frequencies<br />

■ Unlicensed operational frequencies<br />

■ Spare frequencies available for<br />

DTT implementation<br />

remote controlled miniature helicopter<br />

with the monitoring device <strong>LS</strong>X Sensor<br />

is the result of our long-term experience<br />

and expertise in radio monitoring<br />

and frequency management. We take<br />

radio monitoring one step further: you<br />

can now carry out 3D antenna pattern<br />

measurements and EMC analyses in a<br />

way it was never possible before. �<br />

the pre-commissioning. The container<br />

is then transported to the transmission<br />

site, where it is connected to the<br />

transmission network and to the<br />

external power supply.<br />

The fi nal commissioning “on-site”<br />

ensures that the equipment can be put<br />

into operation.<br />

This facility provides the <strong>LS</strong> <strong>telcom</strong><br />

group with the capability to confi gure<br />

and install mobile and transportable<br />

radio systems. These can be shipped<br />

from South Africa to any destination<br />

around the globe. �<br />

the DVB-T2 system is more critical<br />

in planning DVB-T2 networks than it<br />

is for DVB-T.<br />

<strong>LS</strong> <strong>telcom</strong> offers consulting services<br />

to find the right parameter set<br />

to optimally match your business<br />

case.<br />

The White Paper can be downloaded<br />

from our website www.<strong>LS</strong><strong>telcom</strong>.com<br />

in the section download/white<br />

papers. �<br />

We also identifi ed new frequencies for<br />

coordination in order to increase frequency<br />

availability especially during<br />

the dual illumination period.<br />

See our site survey team below:


<strong>Edition</strong> 01 l 2011 I <strong>Special</strong> <strong>Edition</strong> Broadcast 04<br />

Visit us at<br />

our Booth.....<br />

IBC 2011<br />

Amsterdam,<br />

Netherlands<br />

09 th - 13 th Sept 2011<br />

ITU Telecom World<br />

Geneva, Switzerland<br />

24th - 27th Oct 2011<br />

PMRExpo 2011<br />

Cologne, Germany<br />

22 nd - 24 th Nov 2011<br />

A softcopy of the complete<br />

Training Calendar can be<br />

downloaded from our website :<br />

www.<strong>LS</strong><strong>telcom</strong>.com<br />

Training Calendar<br />

July 2010-December 2011<br />

<strong>LS</strong> Training & Competence Centre –<br />

Training, Seminars & Best Practice Education.<br />

www.<strong>LS</strong><strong>telcom</strong>.com<br />

Alternatively you may contact<br />

Ms Sandra Lahm by email<br />

on SLahm@<strong>LS</strong><strong>telcom</strong>.com or<br />

on tel: +49 7227 9535 482<br />

for further information on our<br />

seminars or for our customised<br />

training programmes<br />

<strong>LS</strong> <strong>telcom</strong> AG<br />

Amtsgericht Mannheim,<br />

HRB 211164<br />

Board: Dr. Manfred Lebherz,<br />

Dr. Georg Schöne,<br />

Dipl.-Ing. Roland Götz<br />

USt-IdNr.: DE211251018<br />

EMF Measurements and computer based<br />

EMF Simulation and Prediction<br />

<strong>LS</strong> <strong>telcom</strong> offers the performance of<br />

scientifi c and technical EMF Studies<br />

according to ICNIRP (International<br />

Commission for Non-Ionizing Radiation<br />

Protection), EU recommendations<br />

or other standards either by<br />

computer based EMF predictions<br />

and/or EMF measurements.<br />

The predictions are based on site<br />

parameters like power and antenna<br />

type etc. and evaluate the EMF level in<br />

terms of E-fi eld (V/m), power density<br />

(W/m2), fraction of exposure limits (%)<br />

or determines the safety distance for<br />

occupational and general public exposure<br />

per site. Apart from the sitebased<br />

analysis it is also possible to<br />

perform a network-wide analysis of<br />

exposure including all relevant sites<br />

and services in an area considering<br />

Upcoming Training Courses and Seminars<br />

Broadcast<br />

Broadcast Antennas<br />

24 th October 2011<br />

Broadcast Planning Basic<br />

25 th - 26 th October 2011<br />

Broadcast Planning Advanced<br />

27 th - 28 th October 2011<br />

DVB-T2 - 2 nd Generation Digital<br />

Video Broadcast<br />

29 th - 30 th November 2011<br />

Impressum<br />

© 2011 for all photos and texts: <strong>LS</strong> <strong>telcom</strong> Group if not stated otherwise<br />

Editor: Stephan Wenz, Christiane Labitzke Set-up: Sabrina Scheck<br />

Headquarters<br />

<strong>LS</strong> <strong>telcom</strong> AG,<br />

Germany<br />

Im Gewerbegebiet 31-33<br />

D-77839 Lichtenau<br />

Germany<br />

+49 (0) 7227 9535 600<br />

+49 (0) 7227 9535 605<br />

Subsidiaries<br />

<strong>LS</strong> <strong>telcom</strong> Limited,<br />

Canada<br />

1 Antares Drive, Suite 510<br />

CDN-Ottawa, ON, K2E 8C4<br />

Canada<br />

+1 (0) 613 228 4112<br />

+1 (0) 613 228 4113<br />

Info@<strong>LS</strong><strong>telcom</strong>.com www.<strong>LS</strong><strong>telcom</strong>.com<br />

the thermal and induced current<br />

effects to the human body. The results<br />

of both types of investigation will be<br />

shown in a customer tailored detailed<br />

report containing the vertical and horizontal<br />

cut plane as well as the visualisation<br />

as a 3D pattern overlaid on a<br />

simple map or in Google earth. The<br />

performance of reliable wideband and<br />

narrowband measurements are based<br />

on proven measurement procedures<br />

with measurement equipment from<br />

NARDA, a company specialised in<br />

measurement equipment.<br />

A comprehensive measurement report<br />

will show all relevant information<br />

regarding measurements points,<br />

measurement procedure and equipment<br />

as well as the measurement<br />

results and analyses. �<br />

Spectrum Management<br />

Spectrum Monitoring Measurements &<br />

Techniques 25 th - 26 th October 2011<br />

Practical Spectrum Monitoring<br />

Measurements 27 th - 28 th October 2011<br />

Technical Issues of Radio Spectrum<br />

Management 7 h - 11 th Novmber 2011<br />

Measurements of Human Exposure to<br />

RF Electromagnetic Fields (incl. practical<br />

measurements) 14 th - 16 th November 2011<br />

Introduction to <strong>LS</strong> Spectrum<br />

Management Tool Family<br />

21 st - 25 th November 2011<br />

<strong>LS</strong> <strong>telcom</strong> SAS,<br />

France<br />

4, av Morane-Saulnier, Bât. A<br />

F-78140 Vélizy<br />

France<br />

+33 (0) 1 3926 8585<br />

+33 (0) 1 3926 8586<br />

High Demand for<br />

CHIRplus_BC<br />

The digitisation of broadcasting is<br />

keeping the demand for broadcast<br />

planning and coordination tools at a<br />

high level. Recent implementations at<br />

customers in Vietnam, Oman, Bahrain<br />

and Russia prove CHIRplus_BC’s<br />

leading role in its market. �<br />

Wave Propagation<br />

Model Calibration -<br />

Zambia<br />

<strong>LS</strong> of South Africa was recently<br />

requested by a client to perform wave<br />

propagation model calibration for a<br />

client in Zambia.<br />

The calibration was done for CHIRplus_BC<br />

and more specifi cally for<br />

DVB-T2 coverage predictions.<br />

A FSH6 Spectrum Analyser from<br />

Rohde & Schwarz with a GP600<br />

antenna was used together with a GPS<br />

and a laptop for the data logging. The<br />

antenna pattern and gain were analysed,<br />

cable losses were measured<br />

and the complete measuring system<br />

was calibrated. The measurements<br />

included all morpho classes over a<br />

large coverage area.<br />

The results were analysed with<br />

CHIRplus_BC v560 and all the<br />

measurements were then divided<br />

into the different morpho classes.<br />

Our wave propagation prediction<br />

model was then calibrated against<br />

the measured values. A sample of<br />

such results is included below. �<br />

<strong>LS</strong> of South Africa Radio<br />

Communications (Pty) Ltd.<br />

131 Gelding Ave, Ruimsig,<br />

Roodepoort, 1724 Johannesburg<br />

South Africa<br />

+27 (0) 11 958 5153<br />

+27 (0) 86 569 1419

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!