GOBIERNO REGIONAL DE APURIMAC FORMATO FE - 03 GERENCIA SUB REGIONAL CHANKA<br />

FORMATO FF-15<br />

<strong>CRONOGRAMA</strong> VALORIZADO DE EJECUCION DEL PROYECTO<br />

ITEN DESCRIPCIÓN Und. COSTO UNITARIO Parcial INICIO: 01/OCTUBRE/ 2018 NOV<br />

FIN 31/DIC/ 2018<br />

PRESUPUESTO TOTAL<br />

FINANCIERO FISICO FINANCIERO FISICO FINANCIERO FISICO<br />

01 SISTEMA DE RIEGO SECTOR LL<br />

01.05 LINEA MATRIZ Y DE DISTRIBUCION DEL SISTEMA DE RIEGO (35416.29 ml)<br />

01.05.01 TRABAJOS PRELIMINARES S/. 33,398.19<br />

01.05.01.01 LIMPIEZA DE TERRENO Y DESBROCE m 2,853.71 2,853.71 2,853.71 100% 2,853.71<br />

01.05.01.02 TRAZO Y REPLANTEO DE ZANJA m 207.69 207.69 207.69 100% 207.69<br />

01.05.02 MOVIMIENTO DE TIERRAS<br />

01.05.02.01 EXCAVACION MANUAL DE ZANJA EN MATERIAL SUELTO m3 1,004.47 1,004.47 1,004.47 100% 1,004.47<br />

01.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA PARA TUBERIA m 5,249.23 5,249.23 5,249.23 100% 5,249.23<br />

01.05.02.03 CAMA DE APOYO PARA TUBERIA PVC m 374.03 374.03 374.03 100% 374.03<br />

01.05.02.04 RELLENO DE ZANJA CON MATERIAL SELECCIONADO m3 457.67 457.67 457.67 100% 457.67<br />

01.05.02.05 RELLENO CON MATERIAL PROPIO m3 737.24 737.24 737.24 100% 737.24<br />

01.05.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 817.88 817.88 817.88 100% 817.88<br />

01.05.03 SUMINISTRO E INSTALCION DE TUBERIAS<br />

01.05.03.01 INSTALACION DE TUBERIA PVC SAP 200 mm C-5 m 719.06 719.06 719.06 100% 719.06<br />

01.05.03.02 INSTALACION DE TUBERIA PVC SAP 160 mm C-5 m 1,126.81 1,126.81 1,126.81 100% 1,126.81<br />

01.05.03.03 INSTALACION DE TUBERIA PVC SAP 160 mm C-7.5 m 1,256.22 1,256.22 1,256.22 100% 1,256.22<br />

01.05.03.04 INSTALACION DE TUBERIA PVC SAP 160 mm C-10 m 1,920.46 1,920.46 1,920.46 100% 1,920.46<br />

01.05.03.05 INSTALACION DE TUBERIA PVC SAP 140 mm C-5 m 472.48 472.48 472.48 100% 472.48<br />

01.05.03.06 INSTALACION DE TUBERIA PVC SAP 140 mm C-7.5 m 5,070.94 5,070.94 5,070.94 100% 5,070.94<br />

01.05.03.07 INSTALACION DE TUBERIA PVC SAP 140 mm C-10 m 865.88 865.88 865.88 100% 865.88<br />

01.05.03.08 INSTALACION DE TUBERIA PVC SAP 110 mm C-5 m 270.70 270.70 270.70 100% 270.70<br />

01.05.03.09 INSTALACION DE TUBERIA PVC SAP 110 mm C-7.5 m 549.72 549.72 549.72 100% 549.72<br />

01.05.03.10 INSTALACION DE TUBERIA PVC SAP 110 mm C-10 m 107.88 107.88 107.88 100% 107.88<br />

01.05.03.11 INSTALACION DE TUBERIA PVC SAP 90 mm C-5 m 546.29 546.29 546.29 100% 546.29<br />

01.05.03.12 INSTALACION DE TUBERIA PVC SAP 90 mm C-7.5 m 769.57 769.57 769.57 100% 769.57<br />

01.05.03.13 INSTALACION DE TUBERIA PVC SAP 90 mm C-10 m 372.69 372.69 372.69 100% 372.69<br />

01.05.03.14 INSTALACION DE TUBERIA PVC SAP 75 mm C-5 m 183.69 183.69 183.69 100% 183.69<br />

01.05.03.15 INSTALACION DE TUBERIA PVC SAP 75 mm C-7.5 m 563.93 563.93 563.93 100% 563.93<br />

01.05.03.16 INSTALACION DE TUBERIA PVC SAP 75 mm C-10 m 546.80 546.80 546.80 100% 546.80<br />

01.05.03.17 INSTALACION DE TUBERIA PVC SAP 63 mm C-5 m 826.73 826.73 826.73 100% 826.73<br />

01.05.03.18 INSTALACION DE TUBERIA PVC SAP 63 mm C-7.5 m 278.93 278.93 278.93 100% 278.93<br />

01.05.03.19 INSTALACION DE TUBERIA PVC SAP 63 mm C-10 m 941.22 941.22 941.22 100% 941.22<br />

01.05.04 SUMINISTRO E INSTALCION DE ACCESORIOS<br />

01.05.04.01 SUM. Y COLOCACION DE ACCESORIOS PVC DE 200mm GLB 847.25 847.25 847.25 100% 847.25<br />

01.05.04.02 SUM. Y COLOCACION DE ACCESORIOS PVC DE 160mm GLB 521.67 521.67 521.67 100% 521.67<br />

01.05.04.03 SUM. Y COLOCACION DE ACCESORIOS PVC DE 140mm GLB 502.67 502.67 502.67 100% 502.67<br />

01.05.04.04 SUM. Y COLOCACION DE ACCESORIOS PVC DE 110mm GLB 763.70 763.70 763.70 100% 763.70<br />

01.05.04.05 SUM. Y COLOCACION DE ACCESORIOS PVC DE 90mm GLB 523.76 523.76 523.76 100% 523.76<br />

01.05.04.06 SUM. Y COLOCACION DE ACCESORIOS PVC DE 75mm GLB 368.61 368.61 368.61 100% 368.61<br />

01.05.04.07 SUM. Y COLOCACION DE ACCESORIOS PVC DE 63mm GLB 549.61 549.61 549.61 100% 549.61<br />

01.05.05 PRUEBA HIDRAULICA<br />

01.05.05.01 PRUEBA HIDRAULICA DE TUBERIAS m 229.00 229.00 229.00 100% 229.00<br />

02 SISTEMA DE RIEGO SECTOR PO S/. 19,645.34<br />

02.05 LINEA MATRIZ Y DE DISTRIBUCION DEL SISTEMA DE RIEGO (5333.90 ml)<br />

02.05.01 TRABAJOS PRELIMINARES<br />

02.05.01.01 LIMPIEZA DE TERRENO Y DESBROCE m 454.02 454.02 454.02 100% 454.02<br />

02.05.01.02 TRAZO Y REPLANTEO DE ZANJA m 167.63 167.63 167.63 100% 167.63<br />

02.05.02 MOVIMIENTO DE TIERRAS<br />

02.05.02.01 EXCAVACION MANUAL DE ZANJA EN MATERIAL SUELTO m3 5,176.63 5,176.63 5,176.63 100% 5,176.63<br />

02.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA PARA TUBERIA m 881.16 881.16 881.16 100% 881.16<br />

02.05.02.03 CAMA DE APOYO PARA TUBERIA PVC m 761.46 761.46 761.46 100% 761.46<br />

1/6<br />

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)


GOBIERNO REGIONAL DE APURIMAC FORMATO FE - 03 GERENCIA SUB REGIONAL CHANKA<br />

ITEN DESCRIPCIÓN Und. COSTO UNITARIO Parcial INICIO: 01/OCTUBRE/ 2018 NOV<br />

FIN 31/DIC/ 2018<br />

PRESUPUESTO TOTAL<br />

FINANCIERO FISICO FINANCIERO FISICO FINANCIERO FISICO<br />

02.05.02.04 RELLENO DE ZANJA CON MATERIAL SELECCIONADO m3 707.70 707.70 707.70 100% 707.70<br />

02.05.02.05 RELLENO CON MATERIAL PROPIO m3 424.39 424.39 424.39 100% 424.39<br />

02.05.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 569.30 569.30 569.30 100% 569.30<br />

02.05.03 SUMINISTRO E INSTALCION DE TUBERIAS<br />

02.05.03.01 INSTALACION DE TUBERIA PVC SAP 160 mm C-5 m 1,254.31 1,254.31 1,254.31 100% 1,254.31<br />

02.05.03.02 INSTALACION DE TUBERIA PVC SAP 160 mm C-7.5 m 109.42 109.42 109.42 100% 109.42<br />

02.05.03.03 INSTALACION DE TUBERIA PVC SAP 160 mm C-10 m 1,693.78 1,693.78 1,693.78 100% 1,693.78<br />

02.05.03.04 INSTALACION DE TUBERIA PVC SAP 140 mm C-7.5 m 159.92 159.92 159.92 100% 159.92<br />

02.05.03.05 INSTALACION DE TUBERIA PVC SAP 140 mm C-10 m 690.01 690.01 690.01 100% 690.01<br />

02.05.03.06 INSTALACION DE TUBERIA PVC SAP 110 mm C-5 m 624.33 624.33 624.33 100% 624.33<br />

02.05.03.07 INSTALACION DE TUBERIA PVC SAP 110 mm C-7.5 m 123.97 123.97 123.97 100% 123.97<br />

02.05.03.08 INSTALACION DE TUBERIA PVC SAP 110 mm C-10 m 411.48 411.48 411.48 100% 411.48<br />

02.05.03.09 INSTALACION DE TUBERIA PVC SAP 90 mm C-7.5 m 577.80 577.80 577.80 100% 577.80<br />

02.05.03.10 INSTALACION DE TUBERIA PVC SAP 90 mm C-10 m 935.06 935.06 935.06 100% 935.06<br />

02.05.03.11 INSTALACION DE TUBERIA PVC SAP 75 mm C-7.5 m 497.20 497.20 497.20 100% 497.20<br />

02.05.03.12 INSTALACION DE TUBERIA PVC SAP 75 mm C-10 m 154.11 154.11 154.11 100% 154.11<br />

02.05.03.13 INSTALACION DE TUBERIA PVC SAP 63 mm C-7.5 m 593.48 593.48 593.48 100% 593.48<br />

02.05.03.14 INSTALACION DE TUBERIA PVC SAP 63 mm C-10 m 428.57 428.57 428.57 100% 428.57<br />

02.05.04 SUMINISTRO E INSTALCION DE ACCESORIOS<br />

02.05.04.01 SUM. Y COLOCACION DE ACCESORIOS PVC DE 160mm GLB 269.29 269.29 269.29 100% 269.29<br />

02.05.04.02 SUM. Y COLOCACION DE ACCESORIOS PVC DE 140mm GLB 466.67 466.67 466.67 100% 466.67<br />

02.05.04.03 SUM. Y COLOCACION DE ACCESORIOS PVC DE 110mm GLB 589.70 589.70 589.70 100% 589.70<br />

02.05.04.04 SUM. Y COLOCACION DE ACCESORIOS PVC DE 90mm GLB 457.76 457.76 457.76 100% 457.76<br />

02.05.04.05 SUM. Y COLOCACION DE ACCESORIOS PVC DE 75mm GLB 172.61 172.61 172.61 100% 172.61<br />

02.05.05 PRUEBA HIDRAULICA<br />

02.05.05.01 PRUEBA HIDRAULICA DE TUBERIAS m 293.58 293.58 293.58 100% 293.58<br />

03 SISTEMA DE RIEGO SECTOR N S/. 18,570.57<br />

03.05 LINEA MATRIZ Y DE DISTRIBUCION DEL SISTEMA DE RIEGO (5725.50 ml)<br />

03.05.01 TRABAJOS PRELIMINARES<br />

03.05.01.01 LIMPIEZA DE TERRENO Y DESBROCE m 771.14 771.14 771.14 100% 771.14<br />

03.05.01.02 TRAZO Y REPLANTEO DE ZANJA m 733.35 733.35 733.35 100% 733.35<br />

03.05.02 MOVIMIENTO DE TIERRAS<br />

03.05.02.01 EXCAVACION MANUAL DE ZANJA EN MATERIAL SUELTO m3 1,300.97 1,300.97 1,300.97 100% 1,300.97<br />

03.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA PARA TUBERIA m 1,680.02 1,680.02 1,680.02 100% 1,680.02<br />

03.05.02.03 CAMA DE APOYO PARA TUBERIA PVC m 771.79 771.79 771.79 100% 771.79<br />

03.05.02.04 RELLENO DE ZANJA CON MATERIAL SELECCIONADO m3 420.41 420.41 420.41 100% 420.41<br />

03.05.02.05 RELLENO CON MATERIAL PROPIO m3 675.79 675.79 675.79 100% 675.79<br />

03.05.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 418.68 418.68 418.68 100% 418.68<br />

03.05.03 SUMINISTRO E INSTALCION DE TUBERIAS<br />

03.05.03.01 INSTALACION DE TUBERIA PVC SAP 200 mm C-7.5 m 1,731.10 1,731.10 1,731.10 100% 1,731.10<br />

03.05.03.02 INSTALACION DE TUBERIA PVC SAP 160 mm C-7.5 m 1,174.28 1,174.28 1,174.28 100% 1,174.28<br />

03.05.03.03 INSTALACION DE TUBERIA PVC SAP 140 mm C-7.5 m 499.50 499.50 499.50 100% 499.50<br />

03.05.03.04 INSTALACION DE TUBERIA PVC SAP 140 mm C-10 m 428.75 428.75 428.75 100% 428.75<br />

03.05.03.05 INSTALACION DE TUBERIA PVC SAP 110 mm C-7.5 m 719.45 719.45 719.45 100% 719.45<br />

03.05.03.06 INSTALACION DE TUBERIA PVC SAP 110 mm C-10 m 977.00 977.00 977.00 100% 977.00<br />

03.05.03.07 INSTALACION DE TUBERIA PVC SAP 90 mm C-7.5 m 45.31 45.31 45.31 100% 45.31<br />

03.05.03.08 INSTALACION DE TUBERIA PVC SAP 90 mm C-10 m 507.93 507.93 507.93 100% 507.93<br />

03.05.03.09 INSTALACION DE TUBERIA PVC SAP 75 mm C-10 m 745.64 745.64 745.64 100% 745.64<br />

03.05.03.10 INSTALACION DE TUBERIA PVC SAP 63 mm C-7.5 m 581.72 581.72 581.72 100% 581.72<br />

03.05.03.11 INSTALACION DE TUBERIA PVC SAP 63 mm C-10 m 104.56 104.56 104.56 100% 104.56<br />

03.05.03.12 INSTALACION DE TUBERIA PVC SAP 48 mm C-10 m 293.55 293.55 293.55 100% 293.55<br />

03.05.04 SUMINISTRO E INSTALCION DE ACCESORIOS<br />

03.05.04.01 SUM. Y COLOCACION DE ACCESORIOS PVC DE 200mm GLB 847.25 847.25 847.25 100% 847.25<br />

03.05.04.02 SUM. Y COLOCACION DE ACCESORIOS PVC DE 160mm GLB 521.67 521.67 521.67 100% 521.67<br />

03.05.04.03 SUM. Y COLOCACION DE ACCESORIOS PVC DE 140mm GLB 502.67 502.67 502.67 100% 502.67<br />

03.05.04.04 SUM. Y COLOCACION DE ACCESORIOS PVC DE 110mm GLB 763.70 763.70 763.70 100% 763.70<br />

03.05.04.05 SUM. Y COLOCACION DE ACCESORIOS PVC DE 90mm GLB 523.76 523.76 523.76 100% 523.76<br />

2/6<br />

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)


GOBIERNO REGIONAL DE APURIMAC FORMATO FE - 03 GERENCIA SUB REGIONAL CHANKA<br />

ITEN DESCRIPCIÓN Und. COSTO UNITARIO Parcial INICIO: 01/OCTUBRE/ 2018 NOV<br />

FIN 31/DIC/ 2018<br />

PRESUPUESTO TOTAL<br />

FINANCIERO FISICO FINANCIERO FISICO FINANCIERO FISICO<br />

03.05.04.06 SUM. Y COLOCACION DE ACCESORIOS PVC DE 75mm GLB 368.61 368.61 368.61 100% 368.61<br />

03.05.05 PRUEBA HIDRAULICA 0.00<br />

03.05.05.01 PRUEBA HIDRAULICA DE TUBERIAS m 461.97 461.97 461.97 100% 461.97<br />

04 SISTEMA DE RIEGO SECTOR S S/. 16,229.32<br />

04.05 LINEA MATRIZ Y DE DISTRIBUCION DEL SISTEMA DE RIEGO (2292.00 ml)<br />

04.05.01 TRABAJOS PRELIMINARES<br />

04.05.01.01 LIMPIEZA DE TERRENO Y DESBROCE m 773.32 773.32 773.32 100% 773.32<br />

04.05.01.02 TRAZO Y REPLANTEO DE ZANJA m 896.40 896.40 896.40 100% 896.40<br />

04.05.02 MOVIMIENTO DE TIERRAS<br />

04.05.02.01 EXCAVACION MANUAL DE ZANJA EN MATERIAL SUELTO m3 139.34 139.34 139.34 100% 139.34<br />

04.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA PARA TUBERIA m 675.68 675.68 675.68 100% 675.68<br />

04.05.02.03 CAMA DE APOYO PARA TUBERIA PVC m 913.36 913.36 913.36 100% 913.36<br />

04.05.02.04 RELLENO DE ZANJA CON MATERIAL SELECCIONADO m3 171.44 171.44 171.44 100% 171.44<br />

04.05.02.05 RELLENO CON MATERIAL PROPIO m3 471.46 471.46 471.46 100% 471.46<br />

04.05.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 971.35 971.35 971.35 100% 971.35<br />

04.05.03 SUMINISTRO E INSTALCION DE TUBERIAS<br />

04.05.03.01 INSTALACION DE TUBERIA PVC SAP 160 mm C-5 m 1,953.46 1,953.46 1,953.46 100% 1,953.46<br />

04.05.03.02 INSTALACION DE TUBERIA PVC SAP 160 mm C-7.5 m 1,870.67 1,870.67 1,870.67 100% 1,870.67<br />

04.05.03.03 INSTALACION DE TUBERIA PVC SAP 160 mm C-10 m 929.83 929.83 929.83 100% 929.83<br />

04.05.03.04 INSTALACION DE TUBERIA PVC SAP 140 mm C-10 m 745.87 745.87 745.87 100% 745.87<br />

04.05.03.05 INSTALACION DE TUBERIA PVC SAP 110 mm C-7.5 m 365.72 365.72 365.72 100% 365.72<br />

04.05.03.06 INSTALACION DE TUBERIA PVC SAP 110 mm C-10 m 857.85 857.85 857.85 100% 857.85<br />

04.05.03.07 INSTALACION DE TUBERIA PVC SAP 90 mm C-10 m 810.96 810.96 810.96 100% 810.96<br />

04.05.03.08 INSTALACION DE TUBERIA PVC SAP 75 mm C-10 m 364.61 364.61 364.61 100% 364.61<br />

04.05.03.09 INSTALACION DE TUBERIA PVC SAP 63 mm C-10 m 260.37 260.37 260.37 100% 260.37<br />

04.05.03.10 INSTALACION DE TUBERIA PVC SAP 48 mm C-10 m 619.05 619.05 619.05 100% 619.05<br />

04.05.04 SUMINISTRO E INSTALCION DE ACCESORIOS<br />

04.05.04.01 SUM. Y COLOCACION DE ACCESORIOS PVC DE 160mm GLB 558.67 558.67 558.67 100% 558.67<br />

04.05.04.02 SUM. Y COLOCACION DE ACCESORIOS PVC DE 140mm GLB 368.67 368.67 368.67 100% 368.67<br />

04.05.04.03 SUM. Y COLOCACION DE ACCESORIOS PVC DE 110mm GLB 237.70 237.70 237.70 100% 237.70<br />

04.05.04.04 SUM. Y COLOCACION DE ACCESORIOS PVC DE 90mm GLB 182.76 182.76 182.76 100% 182.76<br />

04.05.04.05 SUM. Y COLOCACION DE ACCESORIOS PVC DE 75mm GLB 62.61 62.61 62.61 100% 62.61<br />

04.05.04.06 SUM. Y COLOCACION DE ACCESORIOS PVC DE 48mm GLB 42.61 42.61 42.61 100% 42.61<br />

04.05.05 PRUEBA HIDRAULICA<br />

04.05.05.01 PRUEBA HIDRAULICA DE TUBERIAS m 985.56 985.56 985.56 100% 985.56<br />

05 SISTEMA DE RIEGO SECTOR L S/. 18,231.96<br />

05.05 LINEA MATRIZ Y DE DISTRIBUCION DEL SISTEMA DE RIEGO (11355.61 ml)<br />

05.05.01 TRABAJOS PRELIMINARES<br />

05.05.01.01 LIMPIEZA DE TERRENO Y DESBROCE m 1,740.29 1,740.29 1,740.29 100% 1,740.29<br />

05.05.01.02 TRAZO Y REPLANTEO DE ZANJA m 304.54 304.54 304.54 100% 304.54<br />

05.05.02 MOVIMIENTO DE TIERRAS<br />

05.05.02.01 EXCAVACION MANUAL DE ZANJA EN MATERIAL SUELTO m3 193.33 193.33 193.33 100% 193.33<br />

05.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA PARA TUBERIA m 165.44 165.44 165.44 100% 165.44<br />

05.05.02.03 CAMA DE APOYO PARA TUBERIA PVC m 297.47 297.47 297.47 100% 297.47<br />

05.05.02.04 RELLENO DE ZANJA CON MATERIAL SELECCIONADO m3 667.19 667.19 667.19 100% 667.19<br />

05.05.02.05 RELLENO CON MATERIAL PROPIO m3 290.30 290.30 290.30 100% 290.30<br />

05.05.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 628.85 628.85 628.85 100% 628.85<br />

05.05.03 SUMINISTRO E INSTALCION DE TUBERIAS<br />

05.05.03.01 INSTALACION DE TUBERIA PVC SAP 160 mm C-5 m 1,124.39 1,124.39 1,124.39 100% 1,124.39<br />

05.05.03.02 INSTALACION DE TUBERIA PVC SAP 160 mm C-7.5 m 1,932.62 1,932.62 1,932.62 100% 1,932.62<br />

05.05.03.03 INSTALACION DE TUBERIA PVC SAP 160 mm C-10 m 186.85 186.85 186.85 100% 186.85<br />

05.05.03.04 INSTALACION DE TUBERIA PVC SAP 140 mm C-5 m 712.49 712.49 712.49 100% 712.49<br />

05.05.03.05 INSTALACION DE TUBERIA PVC SAP 140 mm C-7.5 m 635.02 635.02 635.02 100% 635.02<br />

05.05.03.06 INSTALACION DE TUBERIA PVC SAP 140 mm C-10 m 296.97 296.97 296.97 100% 296.97<br />

05.05.03.07 INSTALACION DE TUBERIA PVC SAP 110 mm C-7.5 m 307.11 307.11 307.11 100% 307.11<br />

05.05.03.08 INSTALACION DE TUBERIA PVC SAP 110 mm C-10 m 1,317.50 1,317.50 1,317.50 100% 1,317.50<br />

05.05.03.09 INSTALACION DE TUBERIA PVC SAP 90 mm C-7.5 m 388.20 388.20 388.20 100% 388.20<br />

3/6<br />

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)


GOBIERNO REGIONAL DE APURIMAC FORMATO FE - 03 GERENCIA SUB REGIONAL CHANKA<br />

ITEN DESCRIPCIÓN Und. COSTO UNITARIO Parcial INICIO: 01/OCTUBRE/ 2018 NOV<br />

FIN 31/DIC/ 2018<br />

PRESUPUESTO TOTAL<br />

FINANCIERO FISICO FINANCIERO FISICO FINANCIERO FISICO<br />

05.05.03.10 INSTALACION DE TUBERIA PVC SAP 90 mm C-10 m 138.93 138.93 138.93 100% 138.93<br />

05.05.03.11 INSTALACION DE TUBERIA PVC SAP 75 mm C-7.5 m 734.90 734.90 734.90 100% 734.90<br />

05.05.03.12 INSTALACION DE TUBERIA PVC SAP 75 mm C-10 m 352.74 352.74 352.74 100% 352.74<br />

05.05.03.13 INSTALACION DE TUBERIA PVC SAP 63 mm C-7.5 m 621.17 621.17 621.17 100% 621.17<br />

05.05.03.14 INSTALACION DE TUBERIA PVC SAP 63 mm C-10 m 135.13 135.13 135.13 100% 135.13<br />

05.05.03.15 INSTALACION DE TUBERIA PVC SAP 48 mm C-10 m 903.98 903.98 903.98 100% 903.98<br />

05.05.04 SUMINISTRO E INSTALCION DE ACCESORIOS<br />

05.05.04.01 SUM. Y COLOCACION DE ACCESORIOS PVC DE 160mm GLB 601.29 601.29 601.29 100% 601.29<br />

05.05.04.02 SUM. Y COLOCACION DE ACCESORIOS PVC DE 140mm GLB 624.67 624.67 624.67 100% 624.67<br />

05.05.04.03 SUM. Y COLOCACION DE ACCESORIOS PVC DE 110mm GLB 111.70 111.70 111.70 100% 111.70<br />

05.05.04.04 SUM. Y COLOCACION DE ACCESORIOS PVC DE 90mm GLB 987.76 987.76 987.76 100% 987.76<br />

05.05.04.05 SUM. Y COLOCACION DE ACCESORIOS PVC DE 75mm GLB 398.61 398.61 398.61 100% 398.61<br />

05.05.04.06 SUM. Y COLOCACION DE ACCESORIOS PVC DE 63mm GLB 549.61 549.61 549.61 100% 549.61<br />

05.05.05 PRUEBA HIDRAULICA<br />

05.05.05.01 PRUEBA HIDRAULICA DE TUBERIAS m 882.91 882.91 882.91 100% 882.91<br />

06 SISTEMA DE RIEGO SECTOR PA S/. 28,179.72<br />

06.05 LINEA MATRIZ Y DE DISTRIBUCION DEL SISTEMA DE RIEGO (10600.80 ml)<br />

06.05.01 TRABAJOS PRELIMINARES<br />

06.05.01.01 LIMPIEZA DE TERRENO Y DESBROCE m 283.57 283.57 283.57 100% 283.57<br />

06.05.01.02 TRAZO Y REPLANTEO DE ZANJA m 821.36 821.36 821.36 100% 821.36<br />

06.05.02 MOVIMIENTO DE TIERRAS<br />

06.05.02.01 EXCAVACION MANUAL DE ZANJA EN MATERIAL SUELTO m3 647.63 647.63 647.63 100% 647.63<br />

06.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA PARA TUBERIA m 1,625.63 1,625.63 1,625.63 100% 1,625.63<br />

06.05.02.03 CAMA DE APOYO PARA TUBERIA PVC m 350.06 350.06 350.06 100% 350.06<br />

06.05.02.04 RELLENO DE ZANJA CON MATERIAL SELECCIONADO m3 293.46 293.46 293.46 100% 293.46<br />

06.05.02.05 RELLENO CON MATERIAL PROPIO m3 805.71 805.71 805.71 100% 805.71<br />

06.05.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 993.14 993.14 993.14 100% 993.14<br />

06.05.03 SUMINISTRO E INSTALCION DE TUBERIAS<br />

06.05.03.01 INSTALACION DE TUBERIA PVC SAP 200 mm C-5 m 948.35 948.35 948.35 100% 948.35<br />

06.05.03.02 INSTALACION DE TUBERIA PVC SAP 160 mm C-5 m 429.51 429.51 429.51 100% 429.51<br />

06.05.03.03 INSTALACION DE TUBERIA PVC SAP 160 mm C-7.5 m 948.86 948.86 948.86 100% 948.86<br />

06.05.03.04 INSTALACION DE TUBERIA PVC SAP 160 mm C-10 m 709.62 709.62 709.62 100% 709.62<br />

06.05.03.05 INSTALACION DE TUBERIA PVC SAP 140 mm C-7.5 m 1,138.40 1,138.40 1,138.40 100% 1,138.40<br />

06.05.03.06 INSTALACION DE TUBERIA PVC SAP 140 mm C-10 m 527.08 527.08 527.08 100% 527.08<br />

06.05.03.07 INSTALACION DE TUBERIA PVC SAP 110 mm C-5 m 618.19 618.19 618.19 100% 618.19<br />

06.05.03.08 INSTALACION DE TUBERIA PVC SAP 110 mm C-7.5 m 1,654.41 1,654.41 1,654.41 100% 1,654.41<br />

06.05.03.09 INSTALACION DE TUBERIA PVC SAP 110 mm C-10 m 519.00 519.00 519.00 100% 519.00<br />

06.05.03.10 INSTALACION DE TUBERIA PVC SAP 90 mm C-7.5 m 980.03 980.03 980.03 100% 980.03<br />

06.05.03.11 INSTALACION DE TUBERIA PVC SAP 90 mm C-10 m 1,874.44 1,874.44 1,874.44 100% 1,874.44<br />

06.05.03.12 INSTALACION DE TUBERIA PVC SAP 75 mm C-7.5 m 865.29 865.29 865.29 100% 865.29<br />

06.05.03.13 INSTALACION DE TUBERIA PVC SAP 75 mm C-10 m 763.84 763.84 763.84 100% 763.84<br />

06.05.03.14 INSTALACION DE TUBERIA PVC SAP 63 mm C-7.5 m 829.08 829.08 829.08 100% 829.08<br />

06.05.03.15 INSTALACION DE TUBERIA PVC SAP 63 mm C-10 m 1,901.36 1,901.36 1,901.36 100% 1,901.36<br />

06.05.03.16 INSTALACION DE TUBERIA PVC SAP 48 mm C-7.5 m 396.85 396.85 396.85 100% 396.85<br />

06.05.03.17 INSTALACION DE TUBERIA PVC SAP 48 mm C-10 m 1,669.24 1,669.24 1,669.24 1,669.24<br />

06.05.04 SUMINISTRO E INSTALCION DE ACCESORIOS<br />

06.05.04.01 SUM. Y COLOCACION DE ACCESORIOS PVC DE 200mm GLB 905.25 905.25 905.25 100% 905.25<br />

06.05.04.02 SUM. Y COLOCACION DE ACCESORIOS PVC DE 160mm GLB 842.67 842.67 842.67 100% 842.67<br />

06.05.04.03 SUM. Y COLOCACION DE ACCESORIOS PVC DE 140mm GLB 676.67 676.67 676.67 100% 676.67<br />

06.05.04.04 SUM. Y COLOCACION DE ACCESORIOS PVC DE 110mm GLB 741.70 741.70 741.70 100% 741.70<br />

06.05.04.05 SUM. Y COLOCACION DE ACCESORIOS PVC DE 90mm GLB 887.76 887.76 887.76 100% 887.76<br />

06.05.04.06 SUM. Y COLOCACION DE ACCESORIOS PVC DE 75mm GLB 423.61 423.61 423.61 100% 423.61<br />

06.05.04.07 SUM. Y COLOCACION DE ACCESORIOS PVC DE 63mm GLB 549.61 549.61 549.61 100% 549.61<br />

06.05.05 PRUEBA HIDRAULICA<br />

06.05.05.01 PRUEBA HIDRAULICA DE TUBERIAS m 558.34 558.34 558.34 100% 558.34<br />

07 SISTEMA DE RIEGO SECTOR A S/. 58,143.42<br />

07.05 LINEA MATRIZ Y DE DISTRIBUCION DEL SISTEMA DE RIEGO (5326.10 ml)<br />

4/6<br />

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)


GOBIERNO REGIONAL DE APURIMAC FORMATO FE - 03 GERENCIA SUB REGIONAL CHANKA<br />

ITEN DESCRIPCIÓN Und. COSTO UNITARIO Parcial INICIO: 01/OCTUBRE/ 2018 NOV<br />

FIN 31/DIC/ 2018<br />

PRESUPUESTO TOTAL<br />

07.05.01 TRABAJOS PRELIMINARES<br />

FINANCIERO FISICO FINANCIERO FISICO FINANCIERO FISICO<br />

07.05.01.01 LIMPIEZA DE TERRENO Y DESBROCE m 1,444.58 1,444.58 1,444.58 100% 1,444.58<br />

07.05.01.02 TRAZO Y REPLANTEO DE ZANJA m 1,054.37 1,054.37 1,054.37 100% 1,054.37<br />

07.05.02 MOVIMIENTO DE TIERRAS<br />

07.05.02.01 EXCAVACION MANUAL DE ZANJA EN MATERIAL SUELTO m3 1,094.49 1,094.49 1,094.49 100% 1,094.49<br />

07.05.02.02 CAMA DE APOYO PARA TUBERIA PVC m 3,741.34 3,741.34 3,741.34 100% 3,741.34<br />

07.05.02.05 REFINE Y NIVELACION DE FONDO DE ZANJA PARA TUBERIA m 1,865.24 1,865.24 1,865.24 100% 1,865.24<br />

07.05.02.03 RELLENO DE ZANJA CON MATERIAL SELECCIONADO m3 2,693.50 2,693.50 2,693.50 100% 2,693.50<br />

07.05.02.04 RELLENO CON MATERIAL PROPIO m3 3,419.38 3,419.38 3,419.38 100% 3,419.38<br />

07.05.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 1,552.38 1,552.38 1,552.38 100% 1,552.38<br />

07.05.03 SUMINISTRO E INSTALCION DE TUBERIAS<br />

07.05.03.01 INSTALACION DE TUBERIA PVC SAP 160 mm C-5 m 582.00 582.00 582.00 100% 582.00<br />

07.05.03.02 INSTALACION DE TUBERIA PVC SAP 160 mm C-7.5 m 255.92 255.92 255.92 100% 255.92<br />

07.05.03.03 INSTALACION DE TUBERIA PVC SAP 160 mm C-10 m 869.95 869.95 869.95 100% 869.95<br />

07.05.03.04 INSTALACION DE TUBERIA PVC SAP 140 mm C-7.5 m 4,380.45 4,380.45 4,380.45 100% 4,380.45<br />

07.05.03.05 INSTALACION DE TUBERIA PVC SAP 140 mm C-10 m 5,208.21 5,208.21 5,208.21 100% 5,208.21<br />

07.05.03.06 INSTALACION DE TUBERIA PVC SAP 110 mm C-5 m 2,777.54 2,777.54 2,777.54 100% 2,777.54<br />

07.05.03.07 INSTALACION DE TUBERIA PVC SAP 110 mm C-7.5 m 2,041.10 2,041.10 2,041.10 100% 2,041.10<br />

07.05.03.08 INSTALACION DE TUBERIA PVC SAP 110 mm C-10 m 970.50 970.50 970.50 100% 970.50<br />

07.05.03.09 INSTALACION DE TUBERIA PVC SAP 90 mm C-7.5 m 459.42 459.42 459.42 100% 459.42<br />

07.05.03.10 INSTALACION DE TUBERIA PVC SAP 90 mm C-10 m 1,311.68 1,311.68 1,311.68 100% 1,311.68<br />

07.05.03.11 INSTALACION DE TUBERIA PVC SAP 75 mm C-7.5 m 1,484.34 1,484.34 1,484.34 100% 1,484.34<br />

07.05.03.12 INSTALACION DE TUBERIA PVC SAP 75 mm C-10 m 9,457.86 9,457.86 9,457.86 100% 9,457.86<br />

07.05.03.13 INSTALACION DE TUBERIA PVC SAP 63 mm C-10 m 4,752.54 4,752.54 4,752.54 100% 4,752.54<br />

07.05.04 SUMINISTRO E INSTALCION DE ACCESORIOS<br />

07.05.04.01 SUM. Y COLOCACION DE ACCESORIOS PVC DE 160mm GLB 1,686.67 1,686.67 1,686.67 100% 1,686.67<br />

07.05.04.02 SUM. Y COLOCACION DE ACCESORIOS PVC DE 140mm GLB 1,392.67 1,392.67 1,392.67 100% 1,392.67<br />

07.05.04.03 SUM. Y COLOCACION DE ACCESORIOS PVC DE 110mm GLB 1,915.70 1,915.70 1,915.70 100% 1,915.70<br />

07.05.04.04 SUM. Y COLOCACION DE ACCESORIOS PVC DE 90mm GLB 244.76 244.76 244.76 100% 244.76<br />

07.05.04.05 SUM. Y COLOCACION DE ACCESORIOS PVC DE 75mm GLB 196.61 196.61 196.61 100% 196.61<br />

07.05.05 PRUEBA HIDRAULICA<br />

07.05.05.01 PRUEBA HIDRAULICA DE TUBERIAS m 1,290.22 1,290.22 1,290.22 100% 1,290.22<br />

08 SISTEMA DE RIEGO SECTOR P S/. 55,217.63<br />

08.05 LINEA MATRIZ Y DE DISTRIBUCION DEL SISTEMA DE RIEGO (3051.30 ml)<br />

08.05.01 TRABAJOS PRELIMINARES<br />

08.05.01.01 LIMPIEZA DE TERRENO Y DESBROCE m 3692.07 3692.07 3692.07 100% 3,692.07<br />

08.05.01.02 TRAZO Y REPLANTEO DE ZANJA m 5187.21 5187.21 5187.21 100% 5,187.21<br />

08.05.02 MOVIMIENTO DE TIERRAS<br />

08.05.02.01 EXCAVACION MANUAL DE ZANJA EN MATERIAL SUELTO m3 2136.29 2136.29 2136.29 100% 2,136.29<br />

08.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA PARA TUBERIA m 6224.65 6224.65 6224.65 100% 6,224.65<br />

08.05.02.03 CAMA DE APOYO PARA TUBERIA PVC m 7872.35 7872.35 7872.35 100% 7,872.35<br />

08.05.02.04 RELLENO DE ZANJA CON MATERIAL SELECCIONADO m3 5553.37 5553.37 5553.37 100% 5,553.37<br />

08.05.02.05 RELLENO CON MATERIAL PROPIO m3 1958.96 1958.96 1958.96 100% 1,958.96<br />

08.05.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 6618.34 6618.34 6618.34 100% 6,618.34<br />

08.05.03 SUMINISTRO E INSTALCION DE TUBERIAS<br />

08.05.03.01 INSTALACION DE TUBERIA PVC SAP 160 mm C-5 m 912.26 912.26 912.26 100% 912.26<br />

08.05.03.02 INSTALACION DE TUBERIA PVC SAP 140 mm C-5 m 277.89 277.89 277.89 100% 277.89<br />

08.05.03.03 INSTALACION DE TUBERIA PVC SAP 110 mm C-5 m 1179.84 1179.84 1179.84 100% 1,179.84<br />

08.05.03.04 INSTALACION DE TUBERIA PVC SAP 110 mm C-7.5 m 972.59 972.59 972.59 100% 972.59<br />

08.05.03.05 INSTALACION DE TUBERIA PVC SAP 90 mm C-7.5 m 736.91 736.91 736.91 100% 736.91<br />

08.05.03.06 INSTALACION DE TUBERIA PVC SAP 90 mm C-10 m 2206.35 2206.35 2206.35 100% 2,206.35<br />

08.05.03.07 INSTALACION DE TUBERIA PVC SAP 75 mm C-7.5 m 996.48 996.48 996.48 100% 996.48<br />

08.05.03.08 INSTALACION DE TUBERIA PVC SAP 75 mm C-10 m 986.63 986.63 986.63 100% 986.63<br />

08.05.03.09 INSTALACION DE TUBERIA PVC SAP 63 mm C-7.5 m 1333.58 1333.58 1333.58 100% 1,333.58<br />

08.05.03.10 INSTALACION DE TUBERIA PVC SAP 63 mm C-10 m 2207.09 2207.09 2207.09 100% 2,207.09<br />

08.05.03.11 INSTALACION DE TUBERIA PVC SAP 48 mm C-10 m 415.23 415.23 415.23 100% 415.23<br />

08.05.04 SUMINISTRO E INSTALCION DE ACCESORIOS<br />

5/6<br />

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)


GOBIERNO REGIONAL DE APURIMAC FORMATO FE - 03 GERENCIA SUB REGIONAL CHANKA<br />

ITEN DESCRIPCIÓN Und. COSTO UNITARIO Parcial INICIO: 01/OCTUBRE/ 2018 NOV<br />

FIN 31/DIC/ 2018<br />

PRESUPUESTO TOTAL<br />

FINANCIERO FISICO FINANCIERO FISICO FINANCIERO FISICO<br />

08.05.04.01 SUM. Y COLOCACION DE ACCESORIOS PVC DE 160mm GLB 1317.29 1317.29 1317.29 100% 1,317.29<br />

08.05.04.02 SUM. Y COLOCACION DE ACCESORIOS PVC DE 140mm GLB 298.67 298.67 298.67 100% 298.67<br />

08.05.04.03 SUM. Y COLOCACION DE ACCESORIOS PVC DE 110mm GLB 385.7 385.7 385.7 100% 385.70<br />

08.05.04.04 SUM. Y COLOCACION DE ACCESORIOS PVC DE 90mm GLB 297.76 297.76 297.76 100% 297.76<br />

08.05.04.05 SUM. Y COLOCACION DE ACCESORIOS PVC DE 75mm GLB 138.06 138.06 138.06 100% 138.06<br />

08.05.05 PRUEBA HIDRAULICA<br />

08.05.05.01 PRUEBA HIDRAULICA DE TUBERIAS m 1312.06 1312.06 1312.06 100% 1,312.06<br />

COSTO DIRECTO DE OBRA 247,616.15 79,809.87 32% 167,806.28 68% 247,616.15<br />

GASTOS GENERALES (9%) 22,285.45 7182.8883 32% 15,102.57 68% 22,285.45<br />

COSTO TOTAL DEL COMPONENTE RIEGO POR ASPERSION 269,901.60 86,992.76 182,908.85 269,901.60<br />

PORCENTAJE DE AVANCE DE OBRA MENSUAL<br />

PORCENTAJE DE AVANCE DE OBRA ACUMULADO MENSUAL<br />

32% 68% 100%<br />

32% 100%<br />

6/6<br />

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!