1:1 <strong>Project</strong> 2014/2015<br />

Bar; Disassemble<br />

A <strong>Project</strong> by<br />

Studio 1.4<br />

Semester 2<br />

A.Y. 2014-2015<br />

School of Architecture and Landscape<br />

Kingston University London


Brief: 1:1 <strong>Project</strong><br />

Location: Knights Park campus<br />

Every year, first year students design and<br />

build a structure as a studio to be exhibited<br />

on the week of school assembly. This year,<br />

wood is the main material.<br />

Our studio decided to use the morning to<br />

host a design charrette where two students<br />

will design as a group and make a model<br />

of their proposal which will then compete<br />

with the other’s proposed structure for the<br />

studio’s 1:1 project. Meanwhile, the afternoon<br />

session was used as a time for allocation<br />

of responsibility.


Design iteration<br />

We decided to build a bar like structure that<br />

has a flexible and repetitive design element<br />

which can be easily assemble and disassemble<br />

while also studying its future use. Our<br />

project consists of elements that heavily<br />

rely on the joints and repetitions to induce<br />

stability. Each “set” is made up of four 2.5<br />

meter soft wood ’legs’ and an orb plank that<br />

acts as a joint. Each set mimics a singular<br />

regular triangular polyhedron. A singular<br />

structure is then made up three inverted<br />

sets. But since the measurement should be<br />

finalised in order to estimate the amount<br />

of materials we need for the structure, we<br />

listed quite a few restrictions in regards to<br />

the design.<br />

Things to consider:<br />

Location - How much space can we occupy<br />

determines how much sets we need to<br />

produce. If we decide to occupy an exterior<br />

space, how will the weather affect the structure?<br />

Layout - Depending on the location, we can<br />

alter the design to be able to fit the space.<br />

Accessible space - Is the structure going to<br />

be an active part of the assembly? Do we<br />

want the structure to be responsive with the<br />

needs of the users passersby?<br />

Assembly space - Do we have enough space<br />

to assemble the structure onsite or do we<br />

need to pre-assemble it then transport it?<br />

Lighting - How will the structure be lit? Will<br />

it obstruct interior lightings on site?


Storage space - Do we have enough storage<br />

space for the materials before, during and<br />

after the project?<br />

Height - How much available height space<br />

do we have determines the angle cut of the<br />

soft wood.<br />

Health and Safety - Does it pass the standard<br />

health and safety of the site? e.g. original<br />

function of the space is a lobby; Will it obstruct<br />

fire exits?<br />

Time - How much time do we need to spend<br />

for the project can also determine how<br />

much people should work different roles.<br />

Transportability - if pre-assembled, will it<br />

be easy to transport it on site?<br />

Weight - How many people are need to<br />

transport the structure?<br />

Stability - Is the design and measurement<br />

integrity enough for the set to be safely<br />

placed on its own or does it need another<br />

element as a stabiliser?


Observation<br />

Repetition of elements made it easier to<br />

produce.<br />

Designing according to standard material<br />

size helps to decide on the structure’s height.<br />

Amount of materials available was easy to<br />

determine due to the designation of “sets”.


Assembling phase<br />

The assembling phase only took less than a<br />

week due to the structure’s design guideline<br />

making it easier to cut the materials and assemble<br />

it in the studios. It also helped when<br />

we produced a model for both the site and<br />

the proposal which was used to test and finalised<br />

the layout of the structures and as<br />

well as during the meeting with the health<br />

and safety staff. When the first sample<br />

structure was made, we decided to add the<br />

planks to be able to use the structure as a<br />

temporary bar.<br />

https://vimeo.com/295717523


Finalisation and re-use<br />

It was on exhibit until the end of the school<br />

assembly and was reused as a bar for the<br />

summer degree show.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!