12.10.2018 Views

My Reading on ASQ CQA HB Part V Part 2

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Charlie Ch<strong>on</strong>g/ Fi<strong>on</strong> Zhang<br />

<strong>Part</strong> VD1<br />

Types of Variati<strong>on</strong><br />

Walter Shewhart, the father of modern quality c<strong>on</strong>trol, was c<strong>on</strong>cerned with the low- cost reducti<strong>on</strong> of variati<strong>on</strong>.<br />

Shewhart distinguished two kinds of processes:<br />

(1) a stable process with ―inevitable chance variati<strong>on</strong>‖ and<br />

(2) an unstable process with ―assignable cause variati<strong>on</strong>.‖<br />

Walter Andrew Shewhart.March 18, 1891 – March 11, 1967) was an<br />

American physicist, engineer and statistician, sometimes known as the<br />

father of statistical quality c<strong>on</strong>trol and also related to the Shewhart cycle.<br />

W. Edwards Deming said of him:<br />

As a statistician, he was, like so many of the rest of us, self-taught, <strong>on</strong> a<br />

good background of physics and mathematics.<br />

Born in New Cant<strong>on</strong>, Illinois to Ant<strong>on</strong> and Esta Barney Shewhart, he<br />

attended the University of Illinois at Urbana–Champaign before being<br />

awarded his doctorate in physics from the University of California,<br />

Berkeley in 1917. He married Edna Elizabeth Hart, daughter of William<br />

Nathaniel and Isabelle "Ibie" Lippencott Hart <strong>on</strong> August 4, 1914 in Pike<br />

County, Illinois.<br />

• If the limits of process variati<strong>on</strong> are well within the band of customer<br />

tolerance (specificati<strong>on</strong>), then the product can be made and shipped<br />

with reas<strong>on</strong>able assurance that the customer will be satisfied.<br />

• If the limits of process variati<strong>on</strong> just match the band of customer<br />

tolerance, then the process should be m<strong>on</strong>itored closely and<br />

adjusted when necessary to maximize the amount of satisfactory<br />

output.<br />

• If the limits of process variati<strong>on</strong> extend bey<strong>on</strong>d the band of customer<br />

tolerance, output should be inspected to determine whether it meets<br />

customer requirements.<br />

State of Statistical C<strong>on</strong>trol (Stable)<br />

When the amount of variati<strong>on</strong> can be predicted with c<strong>on</strong>fidence, the<br />

process is said to be in a state of statistical c<strong>on</strong>trol (stable). Although a<br />

singular value cannot be predicted exactly, it can be anticipated to fall<br />

within certain limits. Similarly, the l<strong>on</strong>g- term average value can be<br />

predicted.<br />

In an unstable process every batch of product is a source of excitement!<br />

It is impossible to predict how much, if any, of the product will fall within<br />

the band of customer tolerance.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!