design of a ppp strategy for korça and capital investment ... - LGPA

design of a ppp strategy for korça and capital investment ... - LGPA design of a ppp strategy for korça and capital investment ... - LGPA

16.12.2012 Views

DESIGN OF A PPP STRATEGY FOR KORÇA AND CAPITAL INVESTMENT PLANNING IN POGRADEC October 2009 This publication was financed by United States Agency for International Development (USAID). It was prepared by Urban Research Institute for the Local Governance Program in Albania (LGPA). Bashkia Korçë Bashkia Pogradec

DESIGN OF A PPP STRATEGY FOR KORÇA AND<br />

CAPITAL INVESTMENT PLANNING IN POGRADEC<br />

October 2009<br />

This publication was financed by United States Agency <strong>for</strong> International<br />

Development (USAID). It was prepared by Urban Research Institute <strong>for</strong> the Local<br />

Governance Program in Albania (<strong>LGPA</strong>).<br />

Bashkia<br />

Korçë<br />

Bashkia<br />

Pogradec


This work is per<strong>for</strong>med under the USAID contract: DFD-I-00-05-05-00121-00, Local<br />

Governance Program in Albania (<strong>LGPA</strong>).<br />

Services are provided by Urban Research Institute (URI) under a subcontract no. <strong>LGPA</strong> –<br />

09 – 008 with ARD, Inc. This document is prepared by:<br />

Edlir Vokopola / Asset Management Expert / URI<br />

Enea Hoti / Lawyer / URI<br />

Sokol Ngjelina / Architect / URI<br />

Fabjola Zeqiri / Finance Expert / URI<br />

2


DESIGN OF A PPP STRATEGY FOR KORCA<br />

AND CAPITAL INVESTMENT PLANNING IN<br />

POGRADEC<br />

October 2009<br />

The author’s views expressed in this publication do not necessarily<br />

reflect the views <strong>of</strong> United States Agency <strong>for</strong> International Development<br />

or the United States Government.<br />

3


Acknowledgement<br />

Design <strong>of</strong> the Public Private Partnership Project (DP4) in the municipality <strong>of</strong> Korca <strong>and</strong><br />

the Capital Investment Plan (CIP in Pogradec was financed by USAID in the framework<br />

<strong>of</strong> the Local Governing Program in Albania (<strong>LGPA</strong>).<br />

DP 4 <strong>and</strong> CIP were prepared by Urban Research Institute in collaboration with Working<br />

Groups <strong>of</strong> respective municipalities <strong>of</strong> Korca <strong>and</strong> POgradec. For the preparation <strong>of</strong> this<br />

study were involved Edlir Vokpola, Fabjola Zeqiri, Ene Hoti, Sokol Ngjelina, Lindita<br />

Oshafi dhe Zana Vokopola.<br />

This project was developed under continuous attention <strong>and</strong> support <strong>of</strong> the Mayor <strong>of</strong><br />

Korca Mr Niko Peleshi <strong>and</strong> the Mayor <strong>of</strong> Pogradec, Mr. Artan Shkembi<br />

For more in<strong>for</strong>mation about to DP 4 <strong>and</strong> PIK you can contact Mr. Edlir Vokopola at<br />

(evokopola@uri.org.al) at Urban Research Institute at (www.uri.org.al).<br />

4


Table <strong>of</strong> Contents<br />

Abbreviations ...................................................................................................................... 6<br />

Background ......................................................................................................................... 7<br />

Component 1: Design a Feasible PPP Strategy <strong>for</strong> Korca ............................................ 8<br />

1. The Context.............................................................................................................. 8<br />

2. Implementation <strong>of</strong> Tasks <strong>and</strong> Description <strong>of</strong> Activities .......................................... 9<br />

3. Immediate next activities ....................................................................................... 16<br />

4. Legislation consulted <strong>for</strong> the preparation <strong>of</strong> LDMP & SHP in Korca................... 18<br />

Component 2: Capital Investment Planning in Pogradec ............................................ 20<br />

1. The context............................................................................................................. 20<br />

2. Implementation <strong>of</strong> tasks <strong>and</strong> Description <strong>of</strong> activities........................................... 20<br />

3. Immediate next steps.............................................................................................. 25<br />

List <strong>of</strong> legislation consulted .............................................................................................. 26<br />

5


Abbreviations<br />

CIP Capital Investment Program<br />

CEB European Council Development Bank<br />

DCM Decision <strong>of</strong> Council <strong>of</strong> Ministers<br />

IPRO Immovable Property Registration Office<br />

LDMP&SHP L<strong>and</strong> Development <strong>for</strong> Marked Purpose <strong>and</strong> Social Housing<br />

Program<br />

<strong>LGPA</strong> Local Governance Program in Albania<br />

PPP Public Private Partnership<br />

SIDA Swedish Agency <strong>for</strong> International Development<br />

TAC Territory Adjustment Council<br />

URI Urban Research Institute<br />

USAID United States Agency <strong>for</strong> International Development<br />

WG Working Group<br />

6


DESIGN OF A PPP STRATEGY FOR KORÇA AND<br />

CAPITAL INVESTMENT PLANNING IN POGRADEC<br />

Background<br />

USAID’s Local Governance Program in Albania (<strong>LGPA</strong>) is working with ten<br />

municipalities throughout Albania to foster local economic growth, improve local<br />

governance, <strong>and</strong> strengthening civic <strong>and</strong> private sector engagement in local development.<br />

<strong>LGPA</strong> aims at encouraging <strong>and</strong> facilitating local economic growth in target<br />

municipalities through increase in <strong>investment</strong>, employment <strong>and</strong> income, ultimately<br />

exp<strong>and</strong>ing the local tax base. <strong>LGPA</strong> provides technical assistance <strong>and</strong> on-the job training<br />

to staff in these municipalities.<br />

USAID’s Local Governance Program in Albania (<strong>LGPA</strong>) is assisting the Municipalities<br />

<strong>of</strong> Korca <strong>and</strong> Pogradec to strengthen capacities to improve management <strong>of</strong> their own<br />

assets, <strong>and</strong> to enhance specific public services throughout a participatory process.<br />

The Municipality <strong>of</strong> Korca has chosen to increase public assets value <strong>for</strong> the purpose <strong>of</strong><br />

market development <strong>and</strong> improve housing conditions <strong>of</strong> families in need, through<br />

developing a Private – Public Partnership based L<strong>and</strong> Development <strong>for</strong> Marked Purpose<br />

<strong>and</strong> Social Housing Program, by using properly municipal assets that were recently<br />

transferred from the state to the ownership <strong>of</strong> the city.<br />

Pogradec has chosen to better address the needs <strong>for</strong> a Capital Investment Planning in<br />

infrastructure which will facilitate economic, tourism development <strong>and</strong> public services<br />

enhancement.<br />

Both components <strong>of</strong> the project have been identified as <strong>of</strong> high priority <strong>for</strong> each<br />

respective municipality. These projects were selected following intensive discussion that<br />

took place between the participating Municipalities <strong>and</strong> the combined team <strong>of</strong> ARD <strong>and</strong><br />

Urban Research Institute (URI).<br />

7


Component 1: Design a Feasible PPP Strategy <strong>for</strong> Korca<br />

1. The Context<br />

The city <strong>of</strong> Korca has selected to develop a Public – Private - Partners hip (PPP) on<br />

L<strong>and</strong> Development <strong>for</strong> M arket Purpose <strong>and</strong> Social Housing (LDM PSHP) as part <strong>of</strong><br />

an overall program that aims to address housing problems <strong>for</strong> some 738 homeless<br />

families which have been identified <strong>and</strong> registered as such by the municipality.<br />

The city has dedicated to the project a parcel <strong>of</strong> public l<strong>and</strong>, with a surface estimated at<br />

approximately 40,000 m2. This Parcel was recently transferred to the Municipality’s<br />

ownership under a special decree <strong>of</strong> the Council <strong>of</strong> Ministers.<br />

A partial urban development plan has also been <strong>design</strong>ed <strong>and</strong> approved by the municipal<br />

Territory Adjustment Council. With the assistance <strong>of</strong> URI, <strong>for</strong> the purpose <strong>of</strong> the project,<br />

some changes <strong>of</strong> the plan have been introduced <strong>and</strong> infrastructure cost estimates have<br />

also been re-evaluated <strong>and</strong> revised as well.<br />

Location <strong>of</strong> Project<br />

Parcel<br />

Fig 1: Zoning map <strong>of</strong> the City <strong>of</strong> Korca <strong>and</strong> the location <strong>of</strong> Project L<strong>and</strong> Parcel<br />

8


The parcel <strong>of</strong> l<strong>and</strong> dedicated to the project is located in the northern part <strong>of</strong> the city that is<br />

shown in the zoning map as above indicated. The proposed project area is situated along<br />

boulevard “Rilindja” one <strong>of</strong> the most important areas <strong>of</strong> the city, being this way very<br />

attractive to developers <strong>and</strong> future potential buyers <strong>of</strong> apartments <strong>and</strong> commercial space.<br />

The City has asked <strong>for</strong> URI expertise to help develop a Public – Private – Partnership<br />

project <strong>for</strong> the L<strong>and</strong> Development <strong>for</strong> M arket Purposes <strong>and</strong> Social Housing Program.<br />

The project in broad terms consists <strong>of</strong> an assessment <strong>and</strong> analysis <strong>of</strong> legal, technical<br />

financial viability <strong>and</strong> market analysis. It also provides assistance to the city <strong>of</strong> Korca <strong>for</strong><br />

the preparation <strong>of</strong> st<strong>and</strong>ard bidding documents <strong>for</strong> the selection <strong>of</strong> a private partner under<br />

an open <strong>and</strong> competitive bidding process.<br />

The whole process <strong>for</strong> the preparation <strong>of</strong> the feasibility study was developed through:<br />

1. Legal analysis, to ensure <strong>for</strong> the acceptability <strong>of</strong> the project;<br />

2. Financial study in terms <strong>of</strong> cost <strong>and</strong> benefit analysis;<br />

3. Engineering analysis in terms <strong>of</strong> layout assessment <strong>and</strong> definition <strong>of</strong> development<br />

conditions, infrastructure needs <strong>and</strong> related costs;<br />

4. Evaluate dem<strong>and</strong> <strong>and</strong> supply <strong>of</strong> apartment needs in the local market;<br />

5. Stakeholder consultations;<br />

6. Preparation <strong>of</strong> Terms <strong>of</strong> Reference <strong>and</strong> bidding documents, <strong>and</strong><br />

7. Assistance to the decision making process <strong>of</strong> municipal council.<br />

URI team involved with the implementation <strong>of</strong> the project includes three staff <strong>and</strong> one<br />

Peace Corp Volunteer who is based in Korca, each one <strong>of</strong> them assigned with a specific<br />

task <strong>of</strong> the overall project consistence. The URI team cooperates closely with a selected<br />

team <strong>of</strong> the municipality, which main task is to ensure in<strong>for</strong>mation needed <strong>and</strong> prepare<br />

<strong>for</strong> endorsing the implementation <strong>of</strong> the project.<br />

2. Implementation <strong>of</strong> Tasks <strong>and</strong> Description <strong>of</strong> Activities<br />

URI has completed all tasks that are defined by the Scope <strong>of</strong> Work under a Subcontract<br />

No. <strong>LGPA</strong> – 09 – 008 with ARD, Inc. A few activities under the second <strong>and</strong> fifth tasks<br />

may need to be updated should final in<strong>for</strong>mation to be provided from the municipal staff<br />

<strong>and</strong> the decision <strong>of</strong> the municipal council be different from the one which is contained in<br />

the final draft <strong>of</strong> the feasibility study. However, URI will assist the city to update the<br />

document, as needed, following the Council decision.<br />

Description <strong>of</strong> activities, achievements <strong>and</strong> referring documents are provided in the<br />

following paragraphs.<br />

9


2.1 Establish <strong>and</strong> cooperation with a Municipal Working Group<br />

As an initial step, URI introduced the project to the relevant city <strong>of</strong>ficials. The project<br />

presentation contained an introduction to the list <strong>of</strong> activities, timing <strong>and</strong> a brief<br />

introduction to the principles <strong>of</strong> PPP, including similar experiences in other countries.<br />

A joint Working Group (WG) was immediately established composed <strong>of</strong> specialized staff<br />

<strong>of</strong> the Municipality <strong>and</strong> URI Consultants. Since the initial stage <strong>of</strong> project development,<br />

the WG has been an effective <strong>and</strong> active squad by providing insights <strong>and</strong> in<strong>for</strong>mation to<br />

URI experts involved with project implementation.<br />

Working Group continuo to play an active role in the project implementation; its<br />

members have assisted with the preparation <strong>of</strong> an open discussion <strong>of</strong> the initial version <strong>of</strong><br />

the study in a meeting with representatives <strong>of</strong> local groups <strong>of</strong> interest <strong>and</strong> civic<br />

representatives. They have provided in<strong>for</strong>mation about several aspects <strong>of</strong> the study <strong>and</strong><br />

finally, in a close cooperation with URI consultants, they are preparing the study <strong>for</strong> the<br />

approval <strong>of</strong> the Municipal Council.<br />

2.2 Assemble <strong>and</strong> analyze available engineering <strong>and</strong> financial data <strong>for</strong> the<br />

selected PPP demonstration site<br />

URI has facilitated meetings with directors <strong>of</strong> other institutions, including, respectively<br />

the Immovable Property Registration Office <strong>and</strong> the Regional Property Restitution <strong>and</strong><br />

Compensation Agency, to collect in<strong>for</strong>mation on the local market <strong>for</strong> housing <strong>and</strong> l<strong>and</strong><br />

<strong>for</strong> construction that are located near to the <strong>design</strong>ated project site. In addition, <strong>of</strong>ficial<br />

letters that were drafted by URI were sent from the municipality to each respective<br />

institution, so that the in<strong>for</strong>mation collected is <strong>of</strong>ficial <strong>and</strong> supports project<br />

implementation.<br />

With the active participation <strong>of</strong> the Municipal WG members, URI collected all available<br />

in<strong>for</strong>mation regarding the proposed project site, including <strong>for</strong>mer <strong>and</strong> existing uses;<br />

planned future uses; <strong>and</strong> infrastructure services needed to support the future uses, housing<br />

needs etc..<br />

URI also verified that the property which is <strong>design</strong>ated to be used <strong>for</strong> the project has a<br />

secure ownership title. Although there are some families occupying some old buildings<br />

erected within the project l<strong>and</strong> parcel, URI has verified that there are no ownership<br />

claims from any third party. With the encouragement <strong>of</strong> URI, the city has already<br />

achieved an agreement with all tenants <strong>of</strong> the existing buildings <strong>and</strong> has ensured them<br />

that they will be receiving shelter once buildings that are under construction as part <strong>of</strong> the<br />

CEB project, will be finished.<br />

At the same time, to ensure full rights <strong>of</strong> ownership over the property, URI has helped the<br />

city to initiate the property registration process. For this purpose, several meetings were<br />

held with the Registrar <strong>of</strong> Korca, the Head <strong>of</strong> the Agency <strong>for</strong> Inventory <strong>and</strong> Transfer <strong>of</strong><br />

Properties, <strong>and</strong> <strong>of</strong>ficials at the Ministry <strong>of</strong> Interior in Tirana to help complete necessary<br />

documentation required <strong>for</strong> <strong>for</strong>mal registration <strong>of</strong> the property, which is finally carried<br />

out successfully.<br />

10


URI developed an Excel spreadsheet based housing needs methodology to calculate <strong>and</strong><br />

<strong>for</strong>ecast population, household <strong>for</strong>mation, <strong>and</strong> housing needs <strong>for</strong> homeless families over a<br />

10 year period. Calculations include an assessment <strong>of</strong> the number <strong>and</strong> structure <strong>of</strong><br />

apartments needed based on the structure <strong>of</strong> homeless family groups. All registered<br />

homeless families have been analyzed <strong>and</strong> classified based on their incomes <strong>and</strong> on the<br />

number <strong>of</strong> family members, as part <strong>of</strong> project justification chapter. In completing this<br />

task, URI was assisted by WG members who possess required in<strong>for</strong>mation <strong>and</strong> skills <strong>for</strong><br />

collecting the data in an appropriate reporting <strong>for</strong>mat.<br />

Fig. 2: Picture <strong>of</strong> the <strong>design</strong>ated area <strong>for</strong> the proposed project<br />

The housing needs spreadsheet contains various project parameters such as: plot surface,<br />

construction surface split into construction surface <strong>for</strong> housing purpose, <strong>and</strong> space<br />

dedicated to commercial <strong>and</strong> social services, roads, parking lots, greening space <strong>and</strong> play<br />

grounds. The assessment includes calculation <strong>of</strong> infrastructure costs, <strong>investment</strong> costs,<br />

allocation <strong>of</strong> construction <strong>and</strong> infrastructure costs over a phased out implementation<br />

approach <strong>for</strong> the project, <strong>and</strong> a cost - benefit analysis from the municipal point <strong>of</strong> view. A<br />

conceptual l<strong>and</strong> parceling plan <strong>and</strong> disposition schedule <strong>for</strong> the site was also prepared.<br />

URI has set up a successful working communication with the Ministry <strong>of</strong> Public Works,<br />

Transportation <strong>and</strong> Telecommunication. In cooperation with Ministry staff, URI assisted<br />

the drafting <strong>of</strong> an <strong>of</strong>ficial Instruction 1 that helped shape the relevant legal framework<br />

which constitutes the bases <strong>for</strong> implementation <strong>of</strong> the PPP project.<br />

1 Instruction no. 6, dated on 14.05.2009, “On some orientation methods <strong>for</strong> the calculation <strong>of</strong> the<br />

construction surface in regard with the selling <strong>of</strong> the l<strong>and</strong> parcels equipped with infrastructure”.<br />

11


The Instruction defines how to calculate the minimum or base percentage <strong>of</strong> construction<br />

surface that the municipality can receive in exchange <strong>for</strong> the l<strong>and</strong> surface it will<br />

contribute as part <strong>of</strong> a joint <strong>investment</strong> with the private investor to develop the project.<br />

In addition, URI has taken into consideration, <strong>of</strong>ficial documents 2 , as well as comments<br />

provided by participants during an open meeting that was held with representatives <strong>of</strong><br />

local groups <strong>of</strong> interest, <strong>and</strong> suggestions <strong>and</strong> specific requirements that were put <strong>for</strong>ward<br />

by the mayor <strong>and</strong> his close staff.<br />

Fig. 3: Partial urban development plan <strong>of</strong> l<strong>and</strong> parcel proposed <strong>for</strong> the project<br />

Based on the above inputs, URI has finalized the calculation <strong>of</strong> the exchange rate <strong>of</strong><br />

construction surface with the surface <strong>of</strong> l<strong>and</strong> <strong>design</strong>ated by the city in developing the<br />

Public – Private – Partnership project <strong>for</strong> the L<strong>and</strong> Development <strong>for</strong> Market<br />

Purposes <strong>and</strong> Social Housing Program.<br />

This final version <strong>of</strong> the report contains a complete <strong>and</strong> detailed legal analysis that<br />

addresses three basic questions that need to be answered in order to proceed with project<br />

development:<br />

2 The Map <strong>of</strong> L<strong>and</strong> Value approved with the DCM no. ___, date ________, “On the _________”.<br />

12


1. Does the Municipality have full <strong>and</strong> clear ownership <strong>of</strong> the l<strong>and</strong> that they have<br />

dedicated to the project?<br />

2. Are there any legal obstacles that would impede the municipality to develop a<br />

PPP based social housing program?<br />

3. Are there any legal path <strong>and</strong> procedures identified <strong>for</strong> implementation <strong>of</strong> the<br />

project, <strong>and</strong> has it been confirmed that there are no other obstacles to impede the<br />

municipality on the way <strong>of</strong> project development?<br />

Following requirements <strong>of</strong> the Council <strong>of</strong> Minister’s Decision (DCM) no. 35, which<br />

constitutes the legal bases <strong>for</strong> the development <strong>of</strong> the project, upon a special request, the<br />

city has received already an <strong>of</strong>ficial respond from the local Immovable Property<br />

Registration Office (IPRO), which certifies the l<strong>and</strong> value per square meter. The respond<br />

<strong>of</strong> IPRO confirms the value <strong>of</strong> l<strong>and</strong> at the price per square meter equal the one which is<br />

used in the final version <strong>of</strong> the feasibility study prepared by URI. Under these conditions,<br />

the mayor can now take the study <strong>for</strong> the consideration <strong>of</strong> the municipal council, which<br />

approval shall open the green light to the implementation <strong>of</strong> the project.<br />

All above delineated is assembled in a final Project Study document that is already<br />

submitted <strong>for</strong> being consideration <strong>and</strong> comment by the municipal team. The comments <strong>of</strong><br />

the municipal staff are taken into consideration <strong>and</strong> integrated in a final draft Project<br />

Study <strong>and</strong> the document is submitted <strong>for</strong> approval <strong>of</strong> the Municipal Council.<br />

Nevertheless, URI shall continue to assist the city, if changes <strong>of</strong> the project data will<br />

occur, because <strong>of</strong> any potential municipal council decision.<br />

2.3 Prepare a set <strong>of</strong> documents that can be used by the city to conduct a<br />

competition-based PPP selection <strong>and</strong> disposition process<br />

URI has prepared a set <strong>of</strong> concession st<strong>and</strong>ard documents based on a model used by the<br />

Ministry <strong>of</strong> Economy, Trade <strong>and</strong> Energy <strong>for</strong> the concession <strong>of</strong> Hydro Power Plant <strong>of</strong><br />

ASHTA (Bushat) in Shkoder district.<br />

In addition, URI has prepared a set <strong>of</strong> public auction st<strong>and</strong>ard documents that shall be<br />

used by the city to conduct a competition based PPP selection <strong>and</strong> disposition process.<br />

The set <strong>of</strong> documents contains:<br />

- Draft decision <strong>of</strong> the Municipal Council that approves the:<br />

o Project Study,<br />

o Public auction st<strong>and</strong>ard documents,<br />

o Technical specifications, <strong>and</strong><br />

o Authorizes the mayor to go on with public bid opening;<br />

- Model <strong>of</strong> work orders, authorizations <strong>and</strong> instructions <strong>for</strong> the preparation <strong>of</strong> a<br />

concession <strong>and</strong>/or a public auction case;<br />

13


- St<strong>and</strong>ard documents, to include: the <strong>for</strong>m <strong>of</strong> call <strong>for</strong> proposal to the general<br />

conditions <strong>of</strong> a concession contract <strong>and</strong> selling <strong>of</strong> public assets under public<br />

auction procedures.<br />

A full package <strong>of</strong> the st<strong>and</strong>ard documents is prepared <strong>and</strong> become available to the city <strong>of</strong><br />

Korca both, in electronic <strong>and</strong> a hard copy.<br />

2.4 Presentation <strong>of</strong> an implementable model <strong>of</strong> PPP <strong>for</strong> the selected<br />

demonstration site<br />

Based on the engineering, financial <strong>and</strong> legal analysis, URI has prepared a model <strong>of</strong> a<br />

PPP <strong>for</strong> implementation <strong>of</strong> the municipal L<strong>and</strong> Development <strong>for</strong> Market Purposes <strong>and</strong><br />

Social Housing Program in Korca. The model shows how the city can use <strong>and</strong> improve<br />

the management <strong>of</strong> its own assets <strong>for</strong> social purpose to address housing needs <strong>of</strong><br />

homeless families living in the municipality <strong>of</strong> Korca. The following flowchart shows<br />

how the PPP model is <strong>design</strong>ed<br />

The proposed project shall ensure construction <strong>of</strong> 437 apartment units <strong>for</strong> a total cost <strong>of</strong><br />

around 15 million EURO. The city will receive title to some 97 apartment units <strong>of</strong><br />

different size, which constitute 13 % <strong>of</strong> housing needs as compared to a total <strong>of</strong> 738<br />

families registered as homeless based on some strict legal requirements. Project data are<br />

summarized in the following table:<br />

14


Table 1: General data<br />

Nr. General data Uni t Amount<br />

1 Project l<strong>and</strong> surfa ce<br />

m2 35.000<br />

2 Total cons tructi on surfa ce over whi ch % <strong>of</strong> exchange is applied m2 53.200<br />

3 Basement cons tructi on surface m2 8.535<br />

4 Total cons truci ton cos t Leke 1.489.600.000<br />

5 Total infras tructure cos t financied with pri vate funds Leke 44.600.000<br />

6 Total infras tructure cos t financed wi th muni cipal funds<br />

Leke 17.145.800<br />

7 Infa rstructure cos t financed with municipal <strong>and</strong> donor funds Leke 38.700.000<br />

8 Cos t <strong>of</strong> the pa rtial urban study to be financed with pri va te funds Leke 43.844.488<br />

9<br />

Cos t <strong>of</strong> supervision to be financed wi th municipal funds<br />

Leke 5.000.000<br />

10 Pri ce per m2 <strong>of</strong> the l<strong>and</strong> as <strong>of</strong> the <strong>of</strong>ficial 2008 map <strong>of</strong> l<strong>and</strong> value<br />

Leke/m2 14.500<br />

11 Total l<strong>and</strong> value Leke 123.757.500<br />

11 Pri ce <strong>of</strong> construction per m2 Leke/m2 28.000<br />

12 Total inves tment cost Leke 1.762.647.788<br />

12 Average pri ce per m2 <strong>of</strong> appa rtments in the ma rket leke/m2 45.000<br />

Table 2: Method <strong>for</strong> calculation <strong>of</strong> % <strong>of</strong> exchange, based on the Instruction nr. 6<br />

as <strong>of</strong> 14.05.2009<br />

II.1 Municipal <strong>investment</strong> 184.603.300<br />

L<strong>and</strong> value based on the uni t pri ce per squa re meter as i t is defined by the<br />

2008 l<strong>and</strong> map value<br />

123.757.500<br />

Value <strong>of</strong> municipal inves tments including supervision <strong>and</strong> infras tructure 60.845.800<br />

II.2 Private Investment 1.578.044.488<br />

II.3<br />

II.4<br />

Cons truction cos t<br />

1.489.600.000<br />

Infras tructure cos t<br />

Cos t <strong>for</strong> urban study <strong>and</strong><br />

44.600.000<br />

implementa tion desi gn<br />

Total <strong>investment</strong> (muncipality +<br />

5.000.000<br />

private) 1.762.647.788<br />

Minimum % <strong>of</strong> exchange rate as the ratio among municipal invet, to the<br />

total invest. 11%<br />

Table 3: Summary <strong>of</strong> PPP L<strong>and</strong> Development <strong>for</strong> Market Purpose <strong>and</strong> Social Housing Project<br />

Project<br />

Sip <strong>of</strong><br />

L<strong>and</strong><br />

Nr. <strong>of</strong><br />

buildings<br />

Phases baze Construction<br />

Base sip <strong>of</strong><br />

Nr. Nr.<br />

construction Total Sip <strong>of</strong> Allocation <strong>of</strong> construction surface<br />

apart apart<br />

Municipality Municip private private<br />

housing commercial housing commercial munic Private<br />

(m2) (nr) (m2) (m2) (m2) (m2) (m2) (m2) (nr) (nr)<br />

Phase 1 2.290 6,0 2.290 13.930,0 1.288 484 8.528 3.846 20 75<br />

Commercial block 755 3 755 2525 0 280 0 2.245 0 0<br />

Phase 2 2.456 9,0 2.456,0 16.102 1.669 129 13.277 1027 33 117<br />

15


Phase 3 3.034 11 3.034 20.643 2.112 193,6 16.797 1540 44 148<br />

Summary 8.535 29 8.535 53.200 5.068 1.086 38.602 8.659 97 340<br />

Total no. <strong>of</strong> appartaments<br />

437<br />

% l<strong>and</strong> use (coverage ) 25%<br />

2.5 Assist in structuring the administrative/institutional parameters <strong>of</strong> a<br />

Competition-based PPP selection <strong>and</strong> disposition process<br />

Under this task, URI has prepared a set <strong>of</strong> draft st<strong>and</strong>ard bidding documents to facilitate<br />

the city <strong>for</strong> conducting a competition-based PPP selection <strong>and</strong> disposition process. The<br />

procurement <strong>of</strong> the project will be based on the Public Auction law 3 that regulates the<br />

activity <strong>of</strong> local government entities to sell out pieces <strong>of</strong> property they own <strong>for</strong> the<br />

purpose <strong>of</strong> addressing community social needs <strong>and</strong> improving delivery <strong>of</strong> public services.<br />

The set <strong>of</strong> documents also includes draft decision <strong>for</strong>mats that the city can use <strong>for</strong><br />

establishing:<br />

- The Commission <strong>for</strong> L<strong>and</strong> Evaluation, <strong>and</strong><br />

- The Evaluation Commission <strong>for</strong> a competition-based PPP implementation.<br />

All documents are provided to the municipality <strong>of</strong> Korca in both electronic <strong>and</strong> a hard<br />

copy.<br />

3. Immediate next activities<br />

Further development <strong>of</strong> the project requires some actions to be carried out by the<br />

municipality <strong>of</strong> Korca. These actions are stipulated by DCM no 35, dated 24.01.2007,<br />

“On the procedures <strong>and</strong> <strong>for</strong>ms <strong>for</strong> selling <strong>of</strong> construction plots equipped with<br />

infrastructure, <strong>for</strong> market purpose”, <strong>and</strong> the related Instruction nr. 6 as <strong>of</strong> 14.05.2009.<br />

Both documents facilitate implementation <strong>of</strong> the law no. 9232 as <strong>of</strong> 13.05.2004. Now that<br />

the municipality has registered the property, has received a ownership certificate <strong>and</strong><br />

confirmation about the l<strong>and</strong> price per square meter, the following needs to be carried out<br />

by the city as soon as practicable:<br />

1. Municipal Council approval <strong>of</strong> the study <strong>and</strong> the permit <strong>for</strong> selling the l<strong>and</strong> parcel<br />

in exchange <strong>of</strong> a construction surface as defined in the study, <strong>and</strong> along with it,<br />

the approval <strong>of</strong> st<strong>and</strong>ard public auction documents <strong>and</strong> the authorization <strong>of</strong> the<br />

mayor to start with public auction procedures;<br />

3 Law no. 9874, date 14.2.2008 “On public auction” <strong>and</strong> DCM no.1719, date 17.12.2008 “On the<br />

approval <strong>of</strong> the regulation <strong>of</strong> public auction”.<br />

16


2. Establishment <strong>of</strong> a Public Auction Unit <strong>and</strong> Evaluation Commission <strong>for</strong> the<br />

assessment <strong>of</strong> proposals <strong>and</strong> selection <strong>of</strong> the PPP implementation company.<br />

Approval <strong>of</strong> the Council is an essential step that must be completed be<strong>for</strong>e a public<br />

procurement process can be started.<br />

All steps delineated above are the main responsibilities <strong>of</strong> the Municipality to conduct.<br />

To facilitate these actions, URI has prepared all necessary paper work <strong>for</strong> an easy<br />

approval <strong>of</strong> the council <strong>and</strong> procurement process that the municipality can conduct at any<br />

appropriate time.<br />

3. Once all above is accomplished, the mayor <strong>of</strong> Korca will have the green light <strong>and</strong><br />

full authority to issue a call <strong>for</strong> “Expression <strong>of</strong> Interest”. The city would allow <strong>for</strong><br />

not less than 20 days up to a time span as it is judged by the municipal Public<br />

Auction Unit, to all interested firms <strong>for</strong> preparing <strong>and</strong> submitting their proposals;<br />

4. Meanwhile, as it is above indicated, an Evaluation Commission (Public Auction<br />

Unit) should have been established at the city level. The commission will be in<br />

charge to short list interested companies <strong>and</strong> chose the best proposal based on<br />

some general <strong>and</strong> specific qualification criteria as set <strong>for</strong>th in the Terms <strong>of</strong><br />

Reference that are already drafted by URI <strong>and</strong> previously approved by the<br />

council.<br />

The fourth step shall be carried out according to the procedures as set <strong>for</strong>th by the law on<br />

Public Auction, <strong>and</strong> shall develop within the time span <strong>of</strong> at least equal the time <strong>of</strong><br />

proposal’s eligibility time period (150 days). Selection <strong>of</strong> the best proposal will allow the<br />

mayor to organize <strong>and</strong> conduct negotiation <strong>and</strong> define terms <strong>and</strong> conditions <strong>of</strong> the<br />

contract with the awarded company or companies in a potential consortium.<br />

5. Contract negotiation <strong>and</strong> approval will be the final step <strong>of</strong> the project preparation<br />

phase.<br />

Once contractual terms <strong>and</strong> conditions among the city <strong>and</strong> the winner company have been<br />

set, the mayor will ask <strong>for</strong> the final approval <strong>of</strong> the municipal council, which by its<br />

decision will authorize the mayor to sign the contract, <strong>and</strong> there<strong>for</strong>e, open the way to<br />

project implementation.<br />

Other steps that follow the signature <strong>of</strong> the contract shall involve:<br />

6. Revision <strong>of</strong> the urban planning layout, issuance <strong>of</strong> the construction plot permit<br />

<strong>and</strong> the approval <strong>of</strong> the city Territory Adjustment Council (TAC). The city might<br />

involve the private investor into an international competitive bidding <strong>for</strong> the<br />

revision <strong>of</strong> the urban planning layout <strong>and</strong> the preparation <strong>of</strong> the detailed technical<br />

implementation <strong>design</strong> <strong>of</strong> the project.<br />

17


Fig. 4: A preliminary 3 D layout <strong>of</strong> the LDMP $ SHP in Korca.<br />

7. Following completion <strong>of</strong> the above step, the private investor shall prepare <strong>and</strong> ask<br />

<strong>for</strong> the construction permit from TAC. Once this permit is issued, the private<br />

investor can start with preparation <strong>of</strong> working site <strong>and</strong> commence <strong>of</strong> project<br />

implementation.<br />

8. Project implementation is phased out in three main time sections:<br />

a. 24 to 30 months <strong>for</strong> Phase 1, including construction <strong>of</strong> commercial block;<br />

b. 30 to 36 months <strong>for</strong> Phase 2, <strong>and</strong><br />

c. 30 to 36 months <strong>for</strong> Phase 3.<br />

Implementation <strong>of</strong> all phases <strong>of</strong> the Project <strong>for</strong> Development <strong>of</strong> L<strong>and</strong> <strong>for</strong> Marked<br />

Purpose <strong>and</strong> Social Housing Program is estimated to take up to 8 years including<br />

project preparation phase.<br />

4. Legislation consulted <strong>for</strong> the preparation <strong>of</strong> LDMP & SHP in<br />

Korca<br />

1. Constitution <strong>of</strong> the Republic <strong>of</strong> Albania<br />

2. Civil Code <strong>of</strong> the Republic <strong>of</strong> Albania<br />

18


3. Law no. 8652, date 31.07.2000, “On the organization <strong>and</strong> functioning <strong>of</strong> local<br />

government in Albania”<br />

4. Law no. 8744 dated 22.2.2001 “On the transfer <strong>of</strong> state immovable properties to<br />

local government units ”<br />

5. DCM no. 726, dated 28.05.2008, ”On the transfer from the Ministry <strong>of</strong> Interior to<br />

the ownership <strong>of</strong> the Municipality <strong>of</strong> Korca <strong>of</strong> the premises <strong>of</strong> Former Army<br />

Buildings no. 741”.<br />

6. DCM no. 1532, dated 19.11.2008, “On the approval <strong>of</strong> the final list <strong>of</strong> the state<br />

public immovable properties that transfers under the ownership <strong>of</strong> the<br />

municipality <strong>of</strong> Korca, <strong>of</strong> the Korca region”.<br />

7. Law no.9232 _2004 “On the housing social programs <strong>for</strong> homeless habitant <strong>of</strong><br />

urban areas”<br />

8. DCM no. 35, date 24.1.2007 “On the procedures <strong>and</strong> <strong>for</strong>ms <strong>of</strong> selling <strong>of</strong> l<strong>and</strong><br />

parcels equiped with infrastructure <strong>for</strong> market purpose ”<br />

9. Instruction no. 6, dated on 14.05.2009, “On some orientation methods <strong>for</strong> the<br />

calculation <strong>of</strong> the construction surface in regard with the selling <strong>of</strong> the l<strong>and</strong><br />

parcels equipped with infrastructure”.<br />

10. Map <strong>of</strong> L<strong>and</strong> Value, approved with the DCM no. ___, …<br />

11. Law no. 9874, date 14.2.2008, “On public auction” <strong>and</strong> DCM no.1719, date 17.12.2008,<br />

“On the approval <strong>of</strong> the regulation <strong>of</strong> public auction”.<br />

19


Component 2: Capital Investment Planning in Pogradec<br />

1. The context<br />

Pogradec Municipality has asked engineering <strong>and</strong> financial expertise <strong>for</strong> preparing a 4<br />

years period Capital Investment Plan (CIP) using as a baseline document the Local<br />

Action Plan <strong>for</strong> Environment Protection, prepared in 2005 with the SIDA support. CIP<br />

process ensures participation <strong>of</strong> the public so that the plan gains broad consensus.<br />

Main objective <strong>of</strong> the project is to prepare a <strong>capital</strong> plan <strong>for</strong> <strong>investment</strong>s, that will<br />

coordinate the local <strong>investment</strong> plan with the central one, resulting thus in a better<br />

management <strong>of</strong> financial sources with the final aim <strong>of</strong> improving local infrastructure <strong>and</strong><br />

related public services.<br />

CIP identifies all public local assets that will be rehabilitated, upgraded or reconstructed,<br />

schedule <strong>for</strong> the year in which they will be implemented <strong>and</strong> the amount <strong>of</strong> money<br />

needed <strong>for</strong> each project/intervention. Differently from other experiences in the country<br />

CIP in Pogradec contains a financial analysis, which identifies fiscal potential <strong>of</strong> the<br />

municipality <strong>for</strong> funding <strong>of</strong> CIP implementation, as well as the way this financing will be<br />

generated from.<br />

URI team involved with the implementation <strong>of</strong> the project includes 3 URI staff <strong>and</strong> 1<br />

Peace Corp Volunteer who is based in Pogradec. Since the start up <strong>of</strong> Project, URI has<br />

conducted several <strong>and</strong> continuous field <strong>and</strong> <strong>of</strong>fice activates which have led to a<br />

satisfactory level <strong>of</strong> project progress <strong>and</strong> timely completion <strong>of</strong> all tasks, thus producing a<br />

qualitative final output, the Capital Improvement Plan <strong>of</strong> the Municipality <strong>of</strong> Pogradec. .<br />

2. Implementation <strong>of</strong> tasks <strong>and</strong> Description <strong>of</strong> activities<br />

For the implementation <strong>of</strong> this component URI has carried out all 4 steps that are defined<br />

as such by the subcontract no. <strong>LGPA</strong> – 09 – 008 with ARD, Inc., under USAID Local<br />

Government Project in Albania.<br />

2.1 Establishing the Working Group<br />

URI introduced the project in an initially meeting that was held in Pogradec with a broad<br />

participation <strong>of</strong> city <strong>of</strong>ficials. The project presentation contains an introduction to the list<br />

<strong>of</strong> activities, timing <strong>and</strong> brief content <strong>of</strong> the principles <strong>and</strong> the benefits from CIP <strong>for</strong><br />

better management <strong>of</strong> city assets <strong>and</strong> improving infrastructure.<br />

A city Working Group (WG) compound <strong>of</strong> representatives from various departments <strong>of</strong><br />

the municipality was established <strong>and</strong> remains functional since the beginning to the end <strong>of</strong><br />

the project development.<br />

20


A city Discussion Working Group (WG) with a broad participation <strong>of</strong> heads <strong>of</strong> main city<br />

departments <strong>and</strong> representatives <strong>of</strong> various groups <strong>of</strong> interest, including civil society,<br />

business <strong>and</strong> citizens was also established <strong>and</strong> has remained functional until the end <strong>of</strong><br />

the project development in contributing to a successful CIP analysis.<br />

Representatives <strong>of</strong> main municipal departments have actively provided insight <strong>and</strong><br />

in<strong>for</strong>mation to URI experts involved with project implementation.<br />

2.2 Revaluate <strong>and</strong> Restate the Municipality’s Capital Investment Plans<br />

In addition <strong>of</strong> what was evidenced by the <strong>for</strong>mer Local Action Plan <strong>for</strong> Environment<br />

Protection that was prepared in 2005, <strong>and</strong> an initial structure <strong>of</strong> the local urban plan that<br />

seems to be underway, URI has collected <strong>and</strong> consulted all available documents that<br />

contains various lists <strong>of</strong> priority infrastructure projects, list <strong>of</strong> <strong>capital</strong> <strong>investment</strong>s planned<br />

<strong>for</strong> financing under 2009 budget, the list <strong>of</strong> inventory <strong>of</strong> all local assets, all<br />

complemented with site seeing <strong>and</strong> meetings with all departments <strong>of</strong> the municipality, so<br />

that other in<strong>for</strong>mation was ensured <strong>for</strong> the <strong>for</strong>mulation <strong>of</strong> a broad list <strong>of</strong> a Capital<br />

Investments.<br />

Several meetings with the municipal WG have been conducted to consider a preliminary<br />

list <strong>of</strong> <strong>capital</strong> <strong>investment</strong>s, so that an initial broad list is created. URI has <strong>design</strong>ed <strong>and</strong><br />

provided the WG with an assessment system that is used from them to prioritize the<br />

needs, so that an initial broad inventory <strong>of</strong> priority <strong>capital</strong> <strong>investment</strong>s is also prepared.<br />

2.3 Prepare <strong>and</strong> Review Draft CIP<br />

URI has <strong>design</strong>ed <strong>and</strong> provided a template <strong>and</strong> has guided the WG to conducting a more<br />

thorough physical inventory <strong>and</strong> evaluation <strong>of</strong> various indicators <strong>of</strong> each one <strong>of</strong> the<br />

proposed infrastructure projects as part <strong>of</strong> the <strong>capital</strong> <strong>investment</strong> plan.<br />

While a broad list that constitutes a <strong>capital</strong> inventory is <strong>for</strong>mulated <strong>and</strong> discussed with the<br />

Working Group, URI has provide guidance to city departments in defining rehabilitation<br />

costs, physical parameters <strong>of</strong> each project <strong>and</strong> expected outcomes that would derive from<br />

their implementation.<br />

To ensure a broad public participation in the preparation <strong>of</strong> CIP, under continuous URI<br />

suggestion <strong>and</strong> guidance, the municipality has printed out over 100 copies <strong>of</strong> the initial<br />

Capital Inventory <strong>and</strong> disseminated it to the citizen’s using the municipal In<strong>for</strong>mation<br />

Center as a distribution point. Citizens are required to provide comments <strong>and</strong> point out<br />

their priorities <strong>for</strong> infrastructure <strong>and</strong> public service they mostly need.<br />

21


Fig. 4: Preparation process <strong>of</strong> Capital Investment Planning<br />

The initial broad inventory <strong>of</strong> priority <strong>capital</strong> <strong>investment</strong>s was discussed in two open<br />

meetings with the Discussion Working Group that involved the participation <strong>of</strong> city<br />

<strong>of</strong>ficials, members <strong>of</strong> civil society, business representatives <strong>and</strong> selected citizens.<br />

Fig 5: Pictures showing the open public discussion <strong>of</strong> the CIP in Pogradec<br />

Following the first two meetings, a preliminary final list <strong>of</strong> <strong>capital</strong> improvements was<br />

discussed in a third open meeting that took place in the movie theater <strong>of</strong> the city. Over<br />

100 citizens <strong>and</strong> representatives <strong>of</strong> various groups <strong>of</strong> interest from Pogradec participated<br />

in the CIP open meeting. Assisted by URI staff, the deputy mayor <strong>of</strong> the municipality<br />

introduced to a broad public the proposed 2010 – 2014 <strong>capital</strong> improvement plan <strong>for</strong> the<br />

city <strong>of</strong> Pogradec. Discussions <strong>and</strong> comments that were generated from the participants to<br />

the open meeting were collected by URI experts <strong>and</strong> reflected to the final draft <strong>of</strong> CIP<br />

document.<br />

22


URI has also conducted an assessment <strong>of</strong> municipal fiscal capacity <strong>for</strong> financing <strong>of</strong> the<br />

CIP, as well as the identification <strong>of</strong> other current <strong>and</strong> future financial sources necessary<br />

<strong>for</strong> implementing the project.<br />

Fig 6: Selection <strong>of</strong> some particular projects as part <strong>of</strong> the 2010 – 2014 CIP.<br />

The initial draft <strong>of</strong> 2010 – 2014 CIP document, includes 71 projects out <strong>of</strong> which 15 %<br />

represent improvement <strong>of</strong> roads <strong>and</strong> sidewalks, 14 % compound tourism development<br />

projects, culture <strong>and</strong> sport related projects, <strong>and</strong> the rest represents various other priorities.<br />

2.4 Prepare <strong>and</strong> review Draft CIP<br />

Following a step by step CIP development process, URI <strong>and</strong> municipal WG have<br />

prepared a Final Draft Capital Improvement Plan <strong>for</strong> the municipality <strong>of</strong> Pogradec. The<br />

CIP document is verified as compared to expectations <strong>and</strong> policies <strong>of</strong> the Mayor be<strong>for</strong>e it<br />

was sent <strong>for</strong> the final approval <strong>of</strong> the municipal council.<br />

The final CIP document contains 57 projects that are expected to be financed under<br />

various financial resources such as:<br />

- Own municipal revenues;<br />

- State budget transfers, <strong>and</strong><br />

- Donor funding.<br />

The final CIP document represents the <strong>capital</strong> improvement path guidance to the city<br />

<strong>of</strong>ficials <strong>and</strong> citizens that have taken an active role in the preparation process. For each<br />

one <strong>of</strong> the projects that are included in the CIP, one will find the following in<strong>for</strong>mation:<br />

- Layout <strong>of</strong> project localtion;<br />

- Phots showing location <strong>and</strong> exicting consditions;<br />

- Name <strong>of</strong> the project, desription <strong>of</strong> expected imrpovements;<br />

23


- Total cost<br />

- Field <strong>of</strong> development program<br />

Fig 7: Illustration <strong>of</strong> proposed projects as shown in the final CIP document<br />

A description <strong>of</strong> the implementation schedule follows the above in<strong>for</strong>mation. This section<br />

aims at matching costs versus resources <strong>for</strong> funding implementation <strong>of</strong> the projects.<br />

Fig 8: Demonstration <strong>of</strong> project description <strong>and</strong> implementation phasing out<br />

In<strong>for</strong>mation contained in this section details main construction items <strong>of</strong> projects, costs<br />

<strong>and</strong> allocation <strong>of</strong> financing, i.e., whether it is financed from own or other resources.<br />

The document is completed with a financial analysis that shall allow the city to assess<br />

revenue <strong>and</strong> expenses <strong>for</strong>ecast along the same time span <strong>of</strong> CIP implementation, in order<br />

24


to calculate the surplus <strong>for</strong> <strong>capital</strong> financing <strong>and</strong> identify other financial resources need at<br />

the right time <strong>and</strong> <strong>for</strong> a specific projects, there<strong>for</strong>e to make the CIP implementable.<br />

Tab. 1: Allocation <strong>of</strong> <strong>capital</strong> costs <strong>and</strong> funding resources <strong>for</strong> the CIP 2010 - 2014<br />

Item Total 2010 2011 2012 2013 2014<br />

Es timated total <strong>capital</strong><br />

cost 855.600.000 183.500.000 182.100.000 164.000.000 150.000.000 176.000.000<br />

Total financing <strong>of</strong><br />

<strong>capital</strong> cost s plit<br />

according to resource 842.700.000 170.600.000 182.100.000 164.000.000 150.000.000 176.000.000<br />

Own mun icipal budget 121.600.000 110.000.000 120.000.000 119.000.000 134.000.000<br />

State conditional budget 48.000.000 71.100.000 25.000.000 20.000.000 26.000.000<br />

Partnership<br />

1.000.000 1.000.000 19.000.000 11.000.000 16.000.000<br />

Capital surplus/deficit 12.900.000 12.900.000 0 0 0 0<br />

The above table shows that total <strong>capital</strong> <strong>investment</strong> cost <strong>for</strong> the duration <strong>of</strong> the CIP is<br />

estimated at approximately 855, 6 million Leke, 70% <strong>of</strong> which shall be financed by own<br />

municipal budget, while the rest from other sources. The above table does not count <strong>for</strong><br />

an ongoing KfW funded project <strong>for</strong> the reconstruction <strong>of</strong> water <strong>and</strong> wastewater system at<br />

the amount <strong>of</strong> 12,9 million Euro.<br />

3. Immediate next steps<br />

At the end <strong>of</strong> the process, in a meeting that took place in the city hall <strong>of</strong> Pogradec on<br />

August 7, 2009, the municipal council approved the Capital Improvement Plan <strong>for</strong> 2010 -<br />

2014.<br />

Actually the city <strong>of</strong> Pogradec is preparing to print out the document at B5 <strong>for</strong>mat<br />

appropriate <strong>for</strong> printing from a specialized printing house. As such, the CIP book shall be<br />

distributed to donor organizations <strong>and</strong> other potential financial resources. City<br />

departments will also use it <strong>for</strong> planning purpose, while the municipal council will have it<br />

as an indicator to measure the per<strong>for</strong>mance <strong>of</strong> the mayor <strong>and</strong> his staff.<br />

25


List <strong>of</strong> legislation consulted<br />

1. DMC nr. 726, date 28.05.2008,<br />

2. DMC nr. 1532, date 19.11.2008,<br />

3. Law Nr. 8652 dt. 31.7.2000 “Functioning <strong>and</strong> organization <strong>of</strong> local government”,<br />

4. Law Nr. 9232 dt.13.5.2004 ‘”Social programs <strong>for</strong> housing <strong>of</strong> people in urban<br />

areas”.<br />

a. DMC nr. 35, date 24.012007, “For procedures <strong>and</strong> <strong>for</strong>ms <strong>of</strong> selling the<br />

l<strong>and</strong> equipped with infrastructure <strong>for</strong> market purposes”;<br />

b. Instruction nr. 6, date 14.05.2009, “Orienting methods <strong>for</strong> calculation <strong>of</strong><br />

living areas <strong>for</strong> effect <strong>of</strong> selling the l<strong>and</strong> equipped with infrastructure”.<br />

5. Law Nr. 8744 dt. 22.2.2001 “Transferring the ownership <strong>of</strong> immovable properties<br />

from state to LGUs”.<br />

6. Civil Code <strong>of</strong> RA.<br />

26