9.1.5.7 Conclusions and Recommendations<br />

Conclusions and recommendations should be based on the data evaluation and interpretation<br />

and details <strong>of</strong> the proposed transportation improvement. If the analytical test results identify<br />

hazardous substances, then the potential risks associated with the proposed ROW and<br />

construction involving earth disturbing activities must be discussed. Conclusions and<br />

recommendations may involve no further work, additional sampling and testing, the<br />

development <strong>of</strong> a plan note, or the development <strong>of</strong> remedial alternatives.<br />

If additional sampling and testing is required, then specific recommendations must be provided<br />

such as sampling and field-screening methods, proposed number and locations <strong>of</strong><br />

environmental samples, analytical parameters for chemical analysis, and terminal depth <strong>of</strong> soil<br />

borings.<br />

9.1.6 Parcel Diagrams<br />

A diagram for each parcel investigated should be included. The diagram should indicate the<br />

sampling locations and potential contamination sources (USTs, drums, sumps, lagoons, etc.) in<br />

relation to the proposed and/or existing ROW limits and proposed work involving earth disturbing<br />

activities (installation <strong>of</strong> storm/sanitary sewers, foundations for signal poles, catch basins, etc.).<br />

Diagrams are not required to be drawn to scale; however, approximate distances <strong>of</strong> sampling<br />

locations and potential contamination sources in relation to the transportation project should be<br />

provided (see Appendix H).<br />

There will be situations where a whole take <strong>of</strong> a site is involved. If this is the case, and if applicable,<br />

a separate map should be included which indicates well elevations, groundwater elevations, bench<br />

marks, and the groundwater flow and potentiometric lines <strong>of</strong> the groundwater. If soil and/or<br />

groundwater contamination is identified, mapping should be provided which indicates the area and<br />

extent <strong>of</strong> known contamination, direction <strong>of</strong> contaminant and/or groundwater flow, and the media<br />

affected based on the data obtained. ODOT will conduct any coordination with the appropriate<br />

regulatory agency as necessary.<br />

9.1.7 <strong>Site</strong> Specific Health and Safety Plan<br />

It is the consultant's responsibility to determine if a SSHSP (<strong>Site</strong> Specific Health and Safety Plan)<br />

for Phase II ESA field activities as per 29 CFR 1910.120 is required. The SSHSP is not required to<br />

be included in the Phase II ESA report.<br />