5.1.6 <strong>Site</strong> Inspection<br />

A site inspection <strong>of</strong> each property in the project area must be conducted, regardless <strong>of</strong> current land<br />

use, for features that indicate the potential for contamination by hazardous substances. This level<br />

<strong>of</strong> inspection does not require the investigator to enter onto a property and may be done from the<br />

existing ROW for the majority <strong>of</strong> projects.<br />

The items that should be noted during the site inspection are evidence <strong>of</strong> staining, any part <strong>of</strong> a<br />

UST (Underground Storage Tank) system, soil disturbance (for suspected buried waste), drums,<br />

surface lagoons, distressed vegetation, or other features indicative <strong>of</strong> hazardous material handling,<br />

storage, or disposal. Photographic logs <strong>of</strong> the inspection are required and should be included in the<br />

appendices <strong>of</strong> the report. The photographic log must adequately document the project. Individual<br />

photographs shall be provided for all properties with current or historical commercial and/or<br />

industrial uses. It is recommended that the site inspection occur after the review <strong>of</strong> the regulatory<br />

database search and historical aerials since they may indicate a previous land use that may not be<br />

apparent during the site inspection.<br />

5.1.7 Special Circumstances<br />

Parcels identified as current or historic gasoline service stations or other parcels which contain<br />

petroleum USTs will typically be advanced for Phase I ESA. However, further investigation is<br />

usually not warranted when no new ROW acquisition is proposed and minimal construction<br />

involving shallow earth disturbing activities (i.e. new driveway, curb, sidewalk, etc.) is planned<br />

adjacent to the gasoline service station or parcel with a petroleum UST system.<br />

Featureless and open railroad track does not warrant more than an ESA Screening. However,<br />

where features are indicative <strong>of</strong> environmental concerns such as spills or releases, USTs, spurs,<br />

sidings, loading/unloading areas, buried cars and railroad yards along railroad right-<strong>of</strong>-way, Phase I<br />

and/or Phase II ESA may be warranted to determine potential impacts to the project (see Appendix<br />

C).<br />

Electrical equipment (i.e. transformers, capacitors, etc.) <strong>of</strong>ten contain PCBs (polychlorinated<br />

biphenyls). PCBs are compounds that are injurious to living organisms and have been used as<br />

lubricants, heat transfer fluids, and dielectric fluids. Electrical transformers (pole mounted or ground<br />

situated) owned by a utility company are not an environmental concern unless there is visual<br />