database search firm is not an indication that there are no historical aerials for the project and does not release the consultant from obtaining historical aerials to satisfy this requirement. Aerials must be an interpretable scale (1"=1000' or less) for reviewing individual properties or small project areas. Larger scales may be acceptable when reviewing large project study areas or corridors with agricultural areas or other low density areas. A reviewable aerial photocopy must be provided. Unclear aerial photos will not be acceptable. Suspect parcels and the project area must be clearly marked on all the aerial photographs. Preliminary Project Mapping and/or Plans - Available project maps and/or preliminary project plan sheets must be included in the report. These materials can be obtained from the ODOT District Offices or, for locally sponsored projects, from the local sponsor (see Appendix C). Oil and Gas Well Mappinq - When oil and gas wells are located within the project study area or corridor, then mapping must indicate the locations of these wells. These maps are available through ODNR, Division of Oil and Gas. Fire Insurance Maps - Although obtaining and reviewing fire insurance maps is not required in this step, ODOT recognizes that this type of review may be an appropriate and prudent investigative tool for less typical projects or properties. Fire insurance maps are still a requirement of the Phase I ESA regardless of their presence in the ESA Screening. 5.1.4 Regulatory Database Review A review of regulatory database information should be conducted to identify environmental concerns within one-quarter mile of the project study area or corridor. Consultants must be cognizant of the project’s anticipated construction limits and undertake the search appropriate to these limits. Specifically, linear searches (rather than point searches) will be necessary for most projects to ensure the 0.25-mile search limit is met for the entire project corridor. The consultant is responsible for ground-truthing to provide accurate information on whether identified regulatory sites are located within and/or immediately adjacent to the project corridor. Several lists are available through the USEPA, OEPA, and BUSTR that provide database information related to hazardous substances. Several national database research service firms provide comprehensive environmental database searches which generally include mapping of the identified sites with respect to the project study area or corridor. At a minimum, the ESA Screening should include the 13
following regulatory databases: NPL National Priority List Proposed NPL Proposed National Priority List CERCLIS Comprehensive Environmental Response, Compensation & Liability Information System CERC-NFRAP CERCLIS No Further Remedial Action Planned CORRACTS Corrective Action Report MSL No Ohio Master Sites List RCRA-GEN Resource Conservation Recovery Act Information ERNS Emergency Response Notification System SWF/LF Licensed Solid Waste Facilities UST/LUST Registered and Leaking Underground Storage Tank File VAP Voluntary Action Program Sites NCL No Contact List (Fish Advisory) For a more extensive list of supplemental databases used for regulatory review see Appendix C. 5.1.5 GIS Database Search When ODOT conducts a GIS (Geographical Information Systems) database search for a project study area, as part of a Red Flag Summary, the information gathered during this database search shall be used in the ESA Screening, unless directed otherwise by the Office of Environmental Services or the District Environmental personnel. The ODOT GIS database search will be provided by either the Office of Environmental Services or District Environmental personnel. 14
- Page 1 and 2: ENVIRONMENTAL SITE ASSESSMENT GUIDE
- Page 3 and 4: 7. PHASE I ENVIRONMENTAL SITE ASSES
- Page 5 and 6: APPENDIX A Project Development Proc
- Page 7 and 8: Approval of NEPA documents is under
- Page 9 and 10: The Phase I ESA is a more detailed
- Page 11 and 12: Red Flag Summary No ROW ESA Screeni
- Page 13 and 14: The goal of this IOC is to alert th
- Page 15 and 16: 4. RED FLAG SUMMARY A Red Flag Summ
- Page 17: 5.1.2 Introduction An introduction
- Page 21 and 22: evidence of a release since the uti
- Page 23 and 24: 5.4 Reporting Requirements for ODOT
- Page 25 and 26: 6.1 Elements of the No ROW ESA Scre
- Page 27 and 28: 6.1.4 Regulatory Database Review A
- Page 29 and 30: 6.1.7 Site Inspection A site inspec
- Page 31 and 32: 6.3 Reporting Requirements for Cons
- Page 33 and 34: 7. PHASE I ENVIRONMENTAL SITE ASSES
- Page 35 and 36: A. Aerial Photographs B. Aerial pho
- Page 37 and 38: D. E. F. Property Tax Files These f
- Page 39 and 40: investigations for other environmen
- Page 41 and 42: 7.1.4.6 Proposed Right-of-Way and C
- Page 43 and 44: 7.2 Reporting Requirements The titl
- Page 45 and 46: 8. PHASE II ENVIRONMENTAL SITE ASSE
- Page 47 and 48: with the highest field reading shou
- Page 49 and 50: 8.2 Reporting Requirements The titl
- Page 51 and 52: 9.1.3 Background Information This s
- Page 53 and 54: It should be noted that there may b
- Page 55 and 56: 9.1.5.4 Quality Assurance/Quality C
- Page 57 and 58: 9.1.8 Environmental Plan Notes If t
- Page 59 and 60: Phase II ESA Report Requirements
- Page 62: APPENDIX B Real Estate Acquisition
- Page 67: viii
following regulatory databases:<br />
NPL National Priority List<br />
Proposed NPL Proposed National Priority List<br />
CERCLIS Comprehensive <strong>Environmental</strong> Response, Compensation & Liability Information System<br />
CERC-NFRAP CERCLIS No Further Remedial Action Planned<br />
CORRACTS Corrective Action Report<br />
MSL No <strong>Ohio</strong> Master <strong>Site</strong>s List<br />
RCRA-GEN Resource Conservation Recovery Act Information<br />
ERNS Emergency Response Notification System<br />
SWF/LF Licensed Solid Waste Facilities<br />
UST/LUST Registered and Leaking Underground Storage Tank File<br />
VAP Voluntary Action Program <strong>Site</strong>s<br />
NCL No Contact List (Fish Advisory)<br />
For a more extensive list <strong>of</strong> supplemental databases used for regulatory review see Appendix C.<br />
5.1.5 GIS Database Search<br />
When ODOT conducts a GIS (Geographical Information Systems) database search for a project<br />
study area, as part <strong>of</strong> a Red Flag Summary, the information gathered during this database search<br />
shall be used in the ESA Screening, unless directed otherwise by the Office <strong>of</strong> <strong>Environmental</strong><br />
Services or the District <strong>Environmental</strong> personnel. The ODOT GIS database search will be<br />
provided by either the Office <strong>of</strong> <strong>Environmental</strong> Services or District <strong>Environmental</strong> personnel.<br />
14