15.12.2012 Views

Project Requirements - Archaeological Survey of India

Project Requirements - Archaeological Survey of India

Project Requirements - Archaeological Survey of India

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Request for Proposal for establishing e-Governance Systems<br />

ServiceLevelDescription Measurement Minimum<br />

Service<br />

PoS Counter operations Percentage <strong>of</strong> time for which the PoS<br />

is not functioning to required timings<br />

Level<br />

Cost Reference<br />

95% PoS Counter<br />

Operations<br />

If service level for any <strong>of</strong> the metrics is measured and scored at a level lower than the expected<br />

in two months consecutively then ASI shall have the right to invoke penalty <strong>of</strong> 3% <strong>of</strong> total<br />

monthly amount payable to SI for a score <strong>of</strong> 100%.<br />

In case <strong>of</strong> a continued breach in the SLA beyond two months, ASI shall have the right to invoke<br />

penalty <strong>of</strong> 10% <strong>of</strong> total monthly amount payable to SI for a score <strong>of</strong> 100%.<br />

In case <strong>of</strong> two or more breaches in a month or breach <strong>of</strong> a particular SLA metric consecutively in<br />

two quarters, ASI shall have the right to invoke full PBG and/ or call for termination <strong>of</strong> contract.<br />

Penalty shall be adjusted to the final monthly amount payable to SI basis actual scores.<br />

If the overall penalty applicable in any month during the currency <strong>of</strong> the contract exceeds 20%;<br />

then ASI shall have the right to terminate the contract.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!