Project Requirements - Archaeological Survey of India
Project Requirements - Archaeological Survey of India
Project Requirements - Archaeological Survey of India
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Request for Proposal for establishing e-Governance Systems<br />
Service Level<br />
Description<br />
Incident<br />
Management<br />
Computer downtime<br />
at PoS<br />
Measurement Minimum<br />
Service Level<br />
Cost Reference<br />
Percentage <strong>of</strong> incidents escalated 96.9% S<strong>of</strong>tware<br />
Applications<br />
Percentage <strong>of</strong> time that the<br />
computers functioning at the PoS<br />
either due to computer, internet, or<br />
power failure<br />
9.2 S<strong>of</strong>tware Application and Infrastructure Maintenance<br />
Table 4: SLA requirements for S<strong>of</strong>tware Application and infrastructure Maintenance<br />
ServiceLevelDescription Measurement Minimum<br />
ServiceLevel<br />
Application Down time Each planned down - time for<br />
application, database and<br />
operating system will not be<br />
more than 4 hours. This activity<br />
will not be carried out during<br />
business hours. However, such<br />
activities which require more<br />
than 4 hours or required to be<br />
carried out during business<br />
hours will be scheduled in<br />
consultation with the ASI. In<br />
case the downtime exceeds the<br />
planned hours the additional<br />
time taken for servicing will be<br />
considered for infrastructure or<br />
system downtime as per<br />
availability measurements table.<br />
Critical site<br />
infrastructure<br />
components<br />
9.3 E-ticketing Operations<br />
Availability <strong>of</strong> the critical site<br />
infrastructure components at<br />
all the implementation sites<br />
shall be at least<br />
Table 5: SLA requirements for e-ticketing Operations<br />
99% Hardware for Ticket<br />
Counters at PoS<br />
Cost Reference<br />
98% Application<br />
Hosting<br />
99% Hardware<br />
maintenance<br />
RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 43