15.12.2012 Views

Project Requirements - Archaeological Survey of India

Project Requirements - Archaeological Survey of India

Project Requirements - Archaeological Survey of India

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Request for Proposal for establishing e-Governance Systems<br />

Service Level<br />

Description<br />

Incident<br />

Management<br />

Computer downtime<br />

at PoS<br />

Measurement Minimum<br />

Service Level<br />

Cost Reference<br />

Percentage <strong>of</strong> incidents escalated 96.9% S<strong>of</strong>tware<br />

Applications<br />

Percentage <strong>of</strong> time that the<br />

computers functioning at the PoS<br />

either due to computer, internet, or<br />

power failure<br />

9.2 S<strong>of</strong>tware Application and Infrastructure Maintenance<br />

Table 4: SLA requirements for S<strong>of</strong>tware Application and infrastructure Maintenance<br />

ServiceLevelDescription Measurement Minimum<br />

ServiceLevel<br />

Application Down time Each planned down - time for<br />

application, database and<br />

operating system will not be<br />

more than 4 hours. This activity<br />

will not be carried out during<br />

business hours. However, such<br />

activities which require more<br />

than 4 hours or required to be<br />

carried out during business<br />

hours will be scheduled in<br />

consultation with the ASI. In<br />

case the downtime exceeds the<br />

planned hours the additional<br />

time taken for servicing will be<br />

considered for infrastructure or<br />

system downtime as per<br />

availability measurements table.<br />

Critical site<br />

infrastructure<br />

components<br />

9.3 E-ticketing Operations<br />

Availability <strong>of</strong> the critical site<br />

infrastructure components at<br />

all the implementation sites<br />

shall be at least<br />

Table 5: SLA requirements for e-ticketing Operations<br />

99% Hardware for Ticket<br />

Counters at PoS<br />

Cost Reference<br />

98% Application<br />

Hosting<br />

99% Hardware<br />

maintenance<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!