Project Requirements - Archaeological Survey of India
Project Requirements - Archaeological Survey of India
Project Requirements - Archaeological Survey of India
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Request for Proposal for establishing e-Governance Systems<br />
The proposed solution will also interface with financial planning and<br />
budgeting system.<br />
8.1.2.5 Business model:The e-ticketing solution will be hosted on a third<br />
party secured server, which will be for dedicated use by ASI based on<br />
the recommendation <strong>of</strong> the SI – the costs related to the server are<br />
part <strong>of</strong> the financial proposal to be provided by the SI. The third<br />
party solutions such as payment gateways will be procured by the SI;<br />
the transaction costs related to payments will be borne directly by<br />
ASI. All collections through the e-ticketing solution will directly be<br />
credited into ASI designated bank accounts.<br />
The SI will assess, recommend and procure the hardware at PoS site,<br />
including, but not limited to computers, networking, printers, and<br />
other peripherals. These will be owned by ASI.An indicative Bill <strong>of</strong><br />
Material is provided in Annexure 3 to enable the SI in preparing their<br />
bid documents.<br />
The SI will also procure the s<strong>of</strong>tware at PoS site which could include<br />
payment gateway interfaces, web ticketing services, and card<br />
reading s<strong>of</strong>tware. These would be part <strong>of</strong> the solution to be<br />
provided by the SI. If the S<strong>of</strong>tware is procured as a COTS solution,<br />
the license would be assigned to ASI. If the solution is a proprietary<br />
solution developed by the SI, the code for the s<strong>of</strong>tware must be<br />
made available to ASI.<br />
8.1.2.6 Implementation model:ASI has identified 116 monuments to<br />
implement e-ticketing solution; System Integrators will be required<br />
to conduct a phase-wise implementation <strong>of</strong> the e-ticketing solution.<br />
staggered implementationshall be conducted in select 10<br />
monuments which are <strong>of</strong> significance but not necessarily the highest<br />
traffic monuments. The proposed monuments where this staggered<br />
implementation shall be initiated are as follows:<br />
Circle Name <strong>of</strong> the Monument<br />
Agra Circle Taj Mahal, Agra<br />
Agra Circle Agra Fort<br />
Agra Circle Fatehpur Sikri Fort<br />
Agra Circle Sikandra<br />
Agra Circle Itimad-ud-Daula<br />
Aurangabad Circle Ajanta and Ellora<br />
Bhubaneswar Circle Sun Temple, Konark<br />
RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 31