15.12.2012 Views

Project Requirements - Archaeological Survey of India

Project Requirements - Archaeological Survey of India

Project Requirements - Archaeological Survey of India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Request for Proposal for establishing e-Governance Systems<br />

7 Key Deliverables<br />

The details with regard to the key deliverables<strong>of</strong> electronic communication systems, e-ticketing<br />

solutions and computerized financial planning and budgeting solutions, the following section<br />

provides greater details about each <strong>of</strong> the modules.<br />

7.1 E-Governance <strong>Project</strong> Application Development and Infrastructure Deployment<br />

The Key Deliverables consist <strong>of</strong> the following:<br />

7.1.1 E-Governance <strong>Project</strong> Application Development<br />

i. Requirement gathering and Study <strong>of</strong> existing applications<br />

ii. The SI will be required to carry out a preliminary study <strong>of</strong> the requirements, before<br />

drafting the systems requirements and specifications<br />

iii. System Design and preparation <strong>of</strong> S<strong>of</strong>tware <strong>Requirements</strong> Specifications<br />

iv. The System design and SRS shall contain the objectives and scope <strong>of</strong> the system, the<br />

various levels <strong>of</strong> requirements, the process model, data model, data dictionary, etc<br />

v. Creation and maintenance <strong>of</strong> <strong>Requirements</strong> Traceability Matrix<br />

vi. Development <strong>of</strong> Prototype and Functional acceptance on Prototype<br />

vii. Development <strong>of</strong> High Level Design (HLD)<br />

viii. Develop a logical view <strong>of</strong> the solution to meet the user requirements, comprising <strong>of</strong><br />

functional architecture <strong>of</strong> the application and the changes/new database design.<br />

ix. Development <strong>of</strong> Detailed Design (Low Level Design – LLD)<br />

x. Creation <strong>of</strong> Test Plans based on the FRS (Functional Requirement Specifications) and<br />

SRS documents<br />

xi. Development <strong>of</strong> User Acceptance Test Plans<br />

xii. Full-Scale Development / Procurement, Implementation, Customization <strong>of</strong> S<strong>of</strong>tware<br />

Applications<br />

xiii. Data Migration from legacy applications<br />

xiv. Development <strong>of</strong> Testing and User Acceptance<br />

7.1.2 E-Governance <strong>Project</strong> Application related trainings<br />

i. Training Need Analysis<br />

ii. Training Content Development<br />

iii. Conducting Training<br />

iv. Conducting Executive Workshops<br />

v. Evaluating Training Feedback and tuning training content / methodology<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!