Request for Proposal for establishing e-Governance Systems<br />

5 Scope <strong>of</strong> Work for the System Integrator<br />

5.1.1 The Scope <strong>of</strong> Work for the e-governance systems proposed through this RFP<br />

requires the simultaneous solution design, project planning, process mapping,<br />

possible pro<strong>of</strong> <strong>of</strong> concept, system development, acceptance, documentation, and<br />

user training. A generic description <strong>of</strong> the requirements in each <strong>of</strong> these phases is<br />

as follows:<br />

5.2 Phase 1: <strong>Project</strong> Planning Process<br />

5.2.1 The implementation <strong>of</strong> the project modules shall be completed within 12 months<br />

from the date <strong>of</strong> the selection <strong>of</strong> the SI in order to ensure smooth implementation,<br />

a robust project planning process is expected to be set up by the SI. This would<br />

include dovetailing the three Modules required to be implemented by the SI,<br />

ensuring location-wise roll-outs being provided for, migration plans, and overall<br />

planning to ensure objectives <strong>of</strong> ASI are achieved. The project plan would be<br />

submitted to ASI for their approval, and would be the basis for continuous<br />

evaluation and monitoring <strong>of</strong> project health.<br />

5.2.2 For planning purposes, the SI would be expected to implement a project planning<br />

tool which would also enable review and reporting to ASI.<br />

5.3 Phase 2: <strong>Requirements</strong> Analysis<br />

5.3.1 This is the initial phase in the development <strong>of</strong> the project. The analysis part<br />

includes complete understanding <strong>of</strong> the project, gathering its requirements, logical<br />

dividing <strong>of</strong> the components involved and deciding the modules to which it is being<br />

split into. The timeline required for each module also needs to be defined in this<br />

phase. The gathering <strong>of</strong> requirements also includes gathering database table<br />

information. SI shall gather and prepare a S<strong>of</strong>tware <strong>Requirements</strong> Specifications<br />

(SRS) document based on the project requirements in a comprehensive manner. It<br />

is expected that SI shall make its own assessment in consultation with ASI and its<br />

representatives.<br />

5.3.2 By the end <strong>of</strong> this phase, documentation needs to be completed for the following:<br />

5.3.2.1 All clarifications that arise in the requirements analysis need to be<br />

documented. The answers that are obtained also need to be<br />

documented in this phase.<br />

5.3.2.2 <strong>Requirements</strong> specification shall contain all the gathered<br />

requirements that need to be well documented.By the end <strong>of</strong> this<br />

phaseSI would need to obtain a final sign-<strong>of</strong>f from ASI on the<br />

requirements gathered and SRS before proceeding with design and<br />

development <strong>of</strong> the solution.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 15