15.12.2012 Views

Project Requirements - Archaeological Survey of India

Project Requirements - Archaeological Survey of India

Project Requirements - Archaeological Survey of India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Request for Proposal for establishing e-Governance Systems<br />

(34) “Network” means the physical medium through which Data is transferred from<br />

source to destination.<br />

(35) “New Version” means a version <strong>of</strong> Licensed S<strong>of</strong>tware or hardware released as “New<br />

Version” by the OEM.<br />

(36) “OEM” or “Original Equipment Manufacturer” means the original manufacturer <strong>of</strong><br />

the s<strong>of</strong>tware or hardware that owns the original Intellectual Property rights to the<br />

s<strong>of</strong>tware or hardware to be used in the <strong>Project</strong> and to which the BUYER has been<br />

granted license to use.<br />

(37) “Operations and Maintenance Services” or “O&M” includes the activities covered<br />

during the period from “Go Live” till the expiry or termination <strong>of</strong> the Contract. Some<br />

<strong>of</strong> the key activities in this stage include but are not limited to the warranty for<br />

equipments, ATS for s<strong>of</strong>tware, handholding for the implemented s<strong>of</strong>tware solution,<br />

supporting the End Users in using the new system, maintenance <strong>of</strong> the entire<br />

Information Technology infrastructure, New Versions, Helpdesk services and AMC.<br />

(38) “Operative Period <strong>of</strong> Contract” or “Term”means the period <strong>of</strong> the Contract<br />

commencing from the Effective Date <strong>of</strong> <strong>Project</strong> Commencement and continuing till<br />

the last day <strong>of</strong> Operations and Maintenance Service, or the date <strong>of</strong> termination, in<br />

case <strong>of</strong> earlier termination <strong>of</strong> the Contract.<br />

(39) “<strong>Project</strong>” means the entire set <strong>of</strong> activities that include “System Integration<br />

Services” and “Operations & Maintenance Services”.<br />

(40) “<strong>Project</strong> Assets” means the assets (including hardware and s<strong>of</strong>tware), other than ASI<br />

Supplied Equipment, supplied for the purpose <strong>of</strong> the <strong>Project</strong>, pursuant to this<br />

Contract.<br />

(41) “<strong>Project</strong> Site” means all the sites that include Development Site, Implementation<br />

Sites, DataCenter and DisasterRecoveryCenter.<br />

(42) “Request for Proposal (RFP)” means the documents containing the general,<br />

technical, functional, commercial and legal specifications for the implementation <strong>of</strong><br />

the <strong>Project</strong> issued in different parts and as different Appendices and Annexure and<br />

includes the clarifications, explanations, minutes <strong>of</strong> the meetings and amendments<br />

issued from time to time during the bidding process.<br />

(43) "Replacement SI" means any third party that the BUYER may appoint to replace SI<br />

on or before the expiry <strong>of</strong> the Operative Period <strong>of</strong> Contract or on termination <strong>of</strong> this<br />

Contract to undertake the <strong>Project</strong> or part or extension there<strong>of</strong>.<br />

(44) "Service Level" means the level <strong>of</strong> service and the completeness <strong>of</strong> the services<br />

delivered, and other performance criteria which will apply to the services as set out<br />

in Article 3.<br />

RFP Volume 3: Draft Legal Contract Page 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!