Request for Proposal<br />

For establishing e-Governance Systems<br />

For<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

<strong>Project</strong> <strong>Requirements</strong><br />

November9, 2011


Request for Proposal for establishing e-Governance Systems<br />

Table <strong>of</strong> Contents<br />

1 INTRODUCTION AND BACKGROUND .................................................................................................... 8<br />

2 ABOUT ARCHEOLOGICAL SURVEY OF INDIA .......................................................................................... 9<br />

3 CURRENT STATUS AND VISION FOR E-GOVERNANCE .......................................................................... 10<br />

3.1 ELECTRONIC COMMUNICATION ................................................................................................................... 11<br />

3.2 E-TICKETING ........................................................................................................................................... 11<br />

3.3 FINANCIAL PLANNING AND BUDGETING SYSTEMS ........................................................................................... 12<br />

4 PROJECT VISION AND PHASES ............................................................................................................ 14<br />

5 SCOPE OF WORK FOR THE SYSTEM INTEGRATOR ................................................................................ 15<br />

5.2 PHASE 1: PROJECT PLANNING PROCESS ........................................................................................................ 15<br />

5.3 PHASE 2: REQUIREMENTS ANALYSIS ............................................................................................................ 15<br />

5.4 PHASE 3: SOLUTION DESIGN ...................................................................................................................... 16<br />

5.5 PHASE 4: SYSTEM DEVELOPMENT ............................................................................................................... 16<br />

5.6 PHASE 5: SOLUTION PROTOTYPE ................................................................................................................. 16<br />

5.7 PHASE 6: ENTRY OF HISTORICAL DATA ......................................................................................................... 17<br />

5.8 PHASE 7: TESTING AND ACCEPTANCE ........................................................................................................... 17<br />

5.9 PHASE 8: DOCUMENTATION ....................................................................................................................... 18<br />

5.10 PHASE 9: USER TRAINING, OPERATIONS, AND MAINTENANCE .......................................................................... 18<br />

6 IMPLEMENTATION MODEL................................................................................................................. 20<br />

7 KEY DELIVERABLES ............................................................................................................................. 21<br />

7.1 E-GOVERNANCE PROJECT APPLICATION DEVELOPMENT AND INFRASTRUCTURE DEPLOYMENT ................................. 21<br />

7.2 E-GOVERNANCE PROJECT APPLICATION AND INFRASTRUCTURE MAINTENANCE .................................................... 22<br />

7.3 E- TICKETING OPERATIONS ......................................................................................................................... 22<br />

8 FUNCTIONAL REQUIREMENTS ............................................................................................................ 24<br />

8.2 SYSTEM SECURITY REQUIREMENTS .............................................................................................................. 39<br />

8.3 GOVERNANCE STRUCTURE ......................................................................................................................... 40<br />

8.4 DOCUMENTATION STANDARDS AND REQUIREMENTS ....................................................................................... 40<br />

9 SERVICE LEVEL AGREEMENTS ............................................................................................................. 41<br />

9.1 SOFTWARE APPLICATION DEVELOPMENT AND DEPLOYMENT ............................................................................ 41<br />

9.2 SOFTWARE APPLICATION AND INFRASTRUCTURE MAINTENANCE ....................................................................... 43<br />

9.3 E-TICKETING OPERATIONS .......................................................................................................................... 43<br />

10 ANNEXURES ....................................................................................................................................... 45<br />

10.1 ANNEXURE 1: LIST OF CIRCLES .................................................................................................................... 45<br />

10.2 ANNEXURE 2: VISITOR HISTORY TO THE MONUMENTS .................................................................................... 46<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 1


Request for Proposal for establishing e-Governance Systems<br />

A & P Accounts and Pay<br />

List <strong>of</strong> Abbreviations<br />

ADG Additional Director General<br />

AMC Annual Maintenance Contract<br />

ASI <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

BE Budget Estimate<br />

BPEL Business Process Execution Language<br />

CAG Comptroller and Audit General<br />

CDDO Cheque Drawing and Disbursing Officer<br />

CDO Cheque Drawing Officer<br />

CGF Central Government Fund<br />

COTS Commercial Off the Shelf<br />

DDO Drawing and Disbursing Officer<br />

FRS Functional Requirement Specifications<br />

FTP Full Technical Proposal<br />

HLD High Level Design<br />

IEEE Institute <strong>of</strong> Electrical and Electronics Engineers<br />

IMAP Internet Message Access Protocol<br />

ISO International Standards Organization<br />

LLD Low Level Design<br />

MIME Multipurpose Internet Mail Extensions<br />

NIC National Informatics Centre<br />

NISG National Institute for Smart Government<br />

NOC No Objection Certificate<br />

PAO Pay and Account Offices<br />

PKI Public Key Infrastructure<br />

PMU <strong>Project</strong> Management Unit<br />

PoS Point <strong>of</strong> Sale<br />

RFP Request for Proposal<br />

SI System Integrator<br />

SLA Service Level Agreement<br />

SPOC Single Point <strong>of</strong> Contact<br />

SRS S<strong>of</strong>tware Requirement Specifications<br />

VPN Virtual Private Network<br />

WFMC Workflow Management Coalition<br />

SMTP Simple Mail Transfer Protocol<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 2


Request for Proposal for establishing e-Governance Systems<br />

About this Request for Proposal<br />

This document constitutes the Request for Proposal (RFP) for selection <strong>of</strong> System Integrators (SI) by<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong> (ASI). This RFP has been prepared to invite bidders to submit their<br />

proposals for services to assist in the development, automation and implementation <strong>of</strong> an egovernance<br />

system for ASI.<br />

Information used for the preparation <strong>of</strong> this RFP has been made available from relevant and<br />

published sources <strong>of</strong> information. Nonetheless, bidders are required to make their informed<br />

evaluation and decision based on their judgments.<br />

This RFP document contains the entire information that constitutes the requirement as proposed by<br />

ASI in order for qualified bidders to submit their proposals. Any queries or clarifications must be<br />

submitted in the prescribed format and will be addressed to all bidders simultaneously.<br />

This RFP also includes a standard Letter <strong>of</strong> Invitation, Standard Information to SIs, Terms <strong>of</strong><br />

Reference, and General Conditions <strong>of</strong> Contract.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 3


Request for Proposal for establishing e-Governance Systems<br />

Disclaimer<br />

The information contained in this Request for Proposal document (“RFP”) or subsequently provided to Bidders,<br />

whether verbally or in documentary or any other form by or on behalf <strong>of</strong> the <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>,<br />

Government <strong>of</strong> <strong>India</strong> (“ASI”) or any <strong>of</strong> its employees or advisers, is provided to Bidders on the Terms and<br />

Conditions set out in this RFP and such other terms and conditions subject to which such information is<br />

provided.<br />

This RFP is not an agreement and is neither an <strong>of</strong>fer nor invitation by ASI to the prospective Bidders or any<br />

other person. The purpose <strong>of</strong> this RFP is to provide interested parties with information that may be useful to<br />

them in the formulation <strong>of</strong> their Proposals pursuant to this RFP.<br />

This RFP may not be appropriate for all companies, and it is not possible for ASI, its employees or advisers to<br />

consider the objectives, technical expertise and particular needs <strong>of</strong> each party who reads or uses this RFP. The<br />

assumptions, assessments, statements and information contained in this RFP, may not be complete, accurate,<br />

adequate or correct. Each biddershould therefore conduct its own investigations and analysis and should<br />

check the accuracy, adequacy, correctness, reliability and completeness <strong>of</strong> the assumptions, assessments and<br />

information contained in this RFP and obtain independent advice from appropriate sources.<br />

Information provided in this RFP to the Bidders is on a wide range <strong>of</strong> matters, some <strong>of</strong> which depend upon<br />

interpretation <strong>of</strong> facts. The information given is not an exhaustive account <strong>of</strong> requirements and should not be<br />

regarded as a complete or authoritative statement <strong>of</strong> facts. The specifications laid out in this RFP are indicated<br />

as the minimum requirements whereas the bidders are expected to focus on the objectives <strong>of</strong> the project and<br />

formulate their solution <strong>of</strong>ferings in a manner that enables achieving those objectives in letter as well as spirit.<br />

ASI accepts no responsibility for the accuracy or otherwise for any interpretation or opinion expressed herein.<br />

ASI, its employees and advisers make no representation or warranty and shall have no liability to any person<br />

including any Bidderunder any law, statute, rules or regulations or tort, principles <strong>of</strong> restitution or unjust<br />

enrichment or otherwise for any loss, damages, cost or expense which may arise from or be incurred or<br />

suffered on account <strong>of</strong> anything contained in this RFP or otherwise, including the accuracy, adequacy,<br />

correctness, reliability or completeness <strong>of</strong> the RFP and any assessment, assumption, statement or information<br />

contained therein or deemed to form part <strong>of</strong> this RFP or arising in any way in this Selection Process.<br />

ASI also accepts no liability <strong>of</strong> any nature whether resulting from negligence or otherwise however caused<br />

arising from reliance <strong>of</strong> any Bidderupon the statements contained in this RFP.<br />

ASI may in its absolute discretion, but without being under any obligation to do so, update, amend or<br />

supplement the information, assessment or assumption contained in this RFP.<br />

The issue <strong>of</strong> this RFP does not imply that ASI is bound to select an Bidder or to appoint the Selected Bidder, as<br />

the case may be, for the e-governance project. ASI reserves the right to reject all or any <strong>of</strong> the Proposals<br />

without assigning any reasons whatsoever.<br />

The Bidder shall bear all its costs associated with or relating to the preparation and submission <strong>of</strong> its Proposal<br />

including but not limited to preparation, copying, postage, delivery fees, expenses associated with any<br />

demonstrations or presentations which may be required by ASI or any other costs incurred in connection with<br />

or relating to its Proposal. All such costs and expenses will remain with the Bidder and ASI shall not be liable in<br />

any manner whatsoever for the same or for any other costs or other expenses incurred by an Bidder in<br />

preparation or submission <strong>of</strong> the Proposal, regardless <strong>of</strong> the conduct or outcome <strong>of</strong> the Selection Process.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 4


Request for Proposal for establishing e-Governance Systems<br />

Contact Persons<br />

National institute <strong>of</strong> Smart Government (NISG) has been appointed as the Advisor to assist ASI in the<br />

preparation <strong>of</strong> this RFP, and the review <strong>of</strong> proposals received, and the selection <strong>of</strong> the eligible SI. All<br />

communication with regard to this RFP must be directed solely to the person and the address<br />

mentioned below. Any communication with a person other than the one mentioned below, would<br />

not be entertained and could result in the Application being considered as non-responsive.<br />

Table 1 Contact Details<br />

Contact Person Mr. B.B. Samaddar<br />

Address for Communication and Submission <strong>of</strong> bid Director – Administration<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

Janpath, New Delhi - 110011<br />

Phone: +91-11-23018614<br />

Fax: +91-11- 23010789<br />

websiteasi@gmail.com<br />

Bid document availability Bid document can be downloaded from ASI<br />

website :www.asi.nic.in<br />

: www.nisg.org<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 5


Request for Proposal for establishing e-Governance Systems<br />

Important Dates<br />

Following are the key dates for submission and selection process. Address for communication,<br />

collection and submission <strong>of</strong> bid forms are as given earlier.<br />

Table 2: Important Dates<br />

Release <strong>of</strong> RFP (Request for Proposal) Wednesday, 9-Nov-11<br />

Last date for submission <strong>of</strong> clarifications by bidders Wednesday, 16-Nov-11<br />

Pre-Bid Conference Friday, 18-Nov-11<br />

Response to bidder queries Monday, 21-Nov-11<br />

Last date for submission <strong>of</strong> Bids Monday, 12-Dec-11<br />

Pre Qualification Bid opening Monday, 12-Dec-11<br />

Date for opening <strong>of</strong> Technical Bids for qualified bidders Monday, 19-Dec-11<br />

Date for Technical Presentations or Pro<strong>of</strong> <strong>of</strong> Concept Monday, 26-Dec-11<br />

Date for opening <strong>of</strong> Commercial Bids for qualified bidders Monday, 2-Jan-12<br />

Award <strong>of</strong> Contract Monday, 16-Jan-12<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 6


Request for Proposal for establishing e-Governance Systems<br />

[insert: Location and Date]<br />

Dear [insert: Name <strong>of</strong> SI]:<br />

Dear Mr/Ms<br />

Request for Proposal<br />

The Archeological <strong>Survey</strong> <strong>of</strong> <strong>India</strong> (ASI) invites proposals to provide the following services:<br />

Development <strong>of</strong> automation systems as a part <strong>of</strong> the e-governance initiative <strong>of</strong> Archeological<br />

<strong>Survey</strong> <strong>of</strong> <strong>India</strong> (ASI) to include e-mailing systems, finance and budgeting systems, and eticketing<br />

solutions.<br />

This RFP has been addressed to the following shortlisted SIs:<br />

[Insert: List <strong>of</strong> Shortlisted SIs]<br />

ASI invites eligible System Integrators (SI) to indicate their interest in providing the services.<br />

Interested SIs must provide information indicating that they are qualified to perform the services<br />

(brochures, description <strong>of</strong> similar assignments, experience in similar conditions, availability <strong>of</strong><br />

appropriate skills among staff, etc.). SIs may associate to enhance their qualifications.<br />

An SI will be selected in accordance with the procedures set out in Volume 2 <strong>of</strong> this document.<br />

Interested SIs may obtain further information at the address mentioned below from 9:00 a.m. to<br />

6:00 p.m.<br />

Request for Proposal must be submittedto the address mentioned below by [insert date].<br />

It is not permissible to transfer this invitation to any other company.<br />

A company will be selected on the basis <strong>of</strong> evaluation <strong>of</strong> Quality <strong>of</strong> the proposal, as described in this<br />

RFP, in accordance with the rules set forth in the Guidelines.<br />

The RFP includes the following documents:<br />

• Volume 1: <strong>Project</strong> <strong>Requirements</strong><br />

• Volume 2: Commercial and bidding terms<br />

• Volume 3: Contractual and legal specifications<br />

Yours sincerely<br />

Archeological <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 7


Request for Proposal for establishing e-Governance Systems<br />

1 Introduction and Background<br />

The <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong> (ASI), is a well established organization for archaeological<br />

research under the Ministry <strong>of</strong> Culture, and plays a significant role in protecting the cultural heritage<br />

<strong>of</strong> the Country. Conservation <strong>of</strong> ancient monuments, archaeological sites and excavations remains<br />

<strong>of</strong> national importance and are the prime concerns <strong>of</strong> the ASI.<br />

Established in 1861, over the years, ASI’s scope has expanded to a large number <strong>of</strong> fields such as<br />

preservation, conservation, architectural studies, epigraphy, horticultural and environmental upgradation<br />

and underwater archaeology. ASI regulates all archaeological activities in the country as<br />

per the provisions <strong>of</strong> the Ancient Monuments and <strong>Archaeological</strong> Sites and Remains Act, 1958. ASI<br />

also regulates Antiquities and Art Treasure Act, 1972. At present, ASI protects 3,675 monuments<br />

including 18 World Heritage Cultural Properties besides, and also maintains 41 museums around the<br />

country.<br />

ASI has now envisioned the development <strong>of</strong> an integrated IT enabled e-governance system across<br />

the departments in ASI in order to ensure transparent, easy, efficient and accurate availability <strong>of</strong><br />

information, and facilitation <strong>of</strong> transactions.<br />

With anintent <strong>of</strong> providing a robust system, ASI has decided to revamp its current systems and core<br />

functions through e-governance solutions by leveraging Information and Communication Technology<br />

across various departments in the organization. In this context, ASI has engaged National Institute<br />

for Smart Government (NISG) for consulting services, which includea detailed study <strong>of</strong> existing ASI<br />

operations and to propose feasible solutions that can be adopted by ASI in the near future.The<br />

entire project is divided into three phases:<br />

Phase I: Consulting and RFP formulation (by NISG)<br />

Phase II: Implementation <strong>of</strong> <strong>Project</strong> (by SI)<br />

Phase III: <strong>Project</strong> Monitoring and Review by PMU to be established by ASI<br />

As a part <strong>of</strong> the first phase, ASI is floating this RFP to receive responses from eligible bidders, and<br />

evaluation and selection <strong>of</strong> the most appropriate SI.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 8


Request for Proposal for establishing e-Governance Systems<br />

2 About Archeological <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

ASI is divided into 24 Circles (refer Annexure1 for the Circle Details) for the maintenance <strong>of</strong> ancient<br />

monuments, archaeological sites which remains <strong>of</strong> national importance. ASI carries out elaborate<br />

surveys <strong>of</strong> antiquarian remains in the country and protects monuments and sites. The Organization<br />

has a large work force comprising <strong>of</strong> trained archaeologists, conservators, epigraphist, architects and<br />

scientists for conducting archaeological research projects through its Circles, Museums, Excavation<br />

Branches, Prehistory Branch, Epigraphy Branches, Science Branch, Horticulture Branch, Building<br />

<strong>Survey</strong> <strong>Project</strong>, Temple <strong>Survey</strong> <strong>Project</strong>s and Underwater Archaeology Wing.<br />

The Circles carry out archaeological fieldwork, research activities and implement various activities<br />

which include:<br />

Extensive survey <strong>of</strong> antiquarian remains in villages <strong>of</strong> <strong>India</strong>.<br />

Exploration <strong>of</strong> archaeological sites and documentation <strong>of</strong> sculptures.<br />

Excavation <strong>of</strong> archaeological sites.<br />

Conservation and day-to-day maintenance <strong>of</strong> protected monuments.<br />

Providing basic facilities at the monuments for tourists.<br />

Issuing <strong>of</strong> NOC for any sort <strong>of</strong> construction, additions and alterations to existing structures or<br />

new constructions within regulated area <strong>of</strong> the protected monuments.<br />

Issuing permission for filming, photography and cultural programs at the protected monuments.<br />

Organizing public awareness programs on various occasions like Word Heritage Day, World<br />

Heritage Week, Museum Day and other important occasions.<br />

Registration <strong>of</strong> antiquities and issuing non-antiquity certificates.<br />

Interaction with various universities and research institutions.<br />

Currently there are 116 ticketed monuments that exist in the 24 Circles. Based on available<br />

information for the year 2009, approximately 32 million visitors have visited these monuments. The<br />

visitor history for these monuments is provided in Annexure 2.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 9


Request for Proposal for establishing e-Governance Systems<br />

3 Current Status and Vision for e-Governance<br />

<strong>Project</strong> Vision<br />

ASI proposes e-Governance initiative to harness the power <strong>of</strong> ICT Platform for its vision<br />

”To ensure transparent, easy, efficient and accurate availability <strong>of</strong> information and facilitation <strong>of</strong><br />

transactions”<br />

In order to streamline its processes and increase efficiency and effectiveness <strong>of</strong> services, ASI has<br />

undertaken a comprehensive exercise to implement ICT based e-Governance across all the<br />

departments <strong>of</strong> the organization. The ICT based e-Governance is also aimed to bring in transparency<br />

and sustainability <strong>of</strong> the processes and systems.<br />

<strong>Project</strong> Objectives<br />

The key objectives <strong>of</strong> this e-governance initiative are:<br />

Design and implement processes and applications that help ASI achieve the project vision<br />

To increase the efficiency and better monitoring and administration for effective decision<br />

making<br />

Developing a single and integrated view <strong>of</strong> ASI’s information system across all departments<br />

and <strong>of</strong>fices<br />

Standards based approach to enable integration<br />

The following arekey components which would constitute envisioned e-governance ecosystem:<br />

<strong>Archaeological</strong>Data Management: ASI has vast amounts <strong>of</strong> data that has be processed and<br />

managed. Over the years, Data Management will acquire significance since huge amounts <strong>of</strong><br />

data are required to be acquired, digitized and maintained<br />

Electronic Communication: Proper communication between various departments plays a vital<br />

role in effective running <strong>of</strong> the organization. Communication continues to be mainly through<br />

paper, and no coherent means <strong>of</strong> faster electronic communication exist today, slowing down the<br />

process and ease <strong>of</strong> decision making and information dissemination.<br />

Computerized Financial Planning and Budgeting Systems: Budget planning and controls remain<br />

a vital part <strong>of</strong> the entire financial planning and accounts functions <strong>of</strong> ASI.While adequate<br />

processes exist, the planning, deployment and monitoring <strong>of</strong> funds remains a paper based<br />

system, lending it to inordinate delays in data collection, and decision making.<br />

Computerized system for management <strong>of</strong> Conservation & Excavation Works including various<br />

aspects <strong>of</strong> planning, approving, notification and monitoring with seamless integration <strong>of</strong> Funds<br />

management system.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 10


Request for Proposal for establishing e-Governance Systems<br />

ASI is interested in automating all its functions, and as a part <strong>of</strong> this process, has identified three<br />

prioritizedmodules <strong>of</strong> Electronic Communication, E-ticketing solutions, and Finance and Budgeting<br />

Systems as the areas to be automated. These will eventually be integrated with other systems that<br />

are proposed to be set up.<br />

The sections below detail the current state assessment <strong>of</strong> the processes being followed:<br />

3.1 Electronic Communication<br />

3.1.1 ASI has no common platform for messaging.Most <strong>of</strong> the communications is paper<br />

based. Although an email system hosted by NIC exists, it is not extensively used.<br />

Currently, ASI staff mainly use public email accounts such as Gmail, Yahoo, etc. for<br />

communication. Even where information is transmitted through emails, documents<br />

which are not received in physical format are not considered as authentic.<br />

3.2 E-Ticketing<br />

3.2.1 ASI currently has multiple means <strong>of</strong> issuing tickets for monuments, most <strong>of</strong> which are<br />

PoS based systems.Ticket issuance currently has the following typical characteristics:<br />

3.2.1.1 Tickets are typically printed centrally at <strong>India</strong> Security Press, Nashik, and<br />

issued to each circle based on indents received at the Headquarters.<br />

3.2.1.2 At each monument, the ticket issuing counters are usually separate from the<br />

ticket checking locations.<br />

3.2.1.3 Many monuments have multiple ticketing counters and multiple ticket<br />

checking entrances. A visitor could purchase a ticket from one counter and<br />

decide to enter from any <strong>of</strong> the ticket checking entrances, and vice versa.<br />

3.2.1.4 Tickets could be issued by multiple ticket issuers for the same monument,<br />

each <strong>of</strong> which could be a valid ticket format.<br />

3.2.1.5 Group bookings are possible, whereby a visitor could be issued multiple tickets<br />

for the same monument, each ticket being used for a separate visitor. A<br />

purchaser <strong>of</strong> ticket may therefore not necessarily be the end user <strong>of</strong> the ticket.<br />

3.2.1.6 Some tickets are available which provide a visitor access to multiple<br />

monuments on the same ticket.<br />

3.2.1.7 Usually, the ticket checking staff either collect the ticket altogether, or tear<br />

and retain a counterfoil with the stub being returned to the visitor.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 11


Request for Proposal for establishing e-Governance Systems<br />

3.2.1.8 No mechanism exists to identify a ticket with a ticket holder either at the<br />

issuing point or at the checking point.<br />

3.2.1.9 The ticket issuers as well as the ticket checkers are typically Class IV<br />

employees <strong>of</strong> ASI who are expected to perform this function in addition to<br />

their other routine functions. In many cases, this is not their primary job.<br />

3.2.1.10 There are no fool-pro<strong>of</strong> mechanisms to ensure that only ticket holders enter a<br />

monument site. Likewise, there is no tracking mechanism to see whether<br />

every issued ticket is used at a monument site.<br />

3.2.1.11 The reconciliation <strong>of</strong> payments for tickets to issuance <strong>of</strong> tickets is currently<br />

manual. In many instances, registers are maintained to tally the amounts.<br />

Payments are not recorded in a system, and all deposits are made manually at<br />

the end <strong>of</strong> the day, at the local branch <strong>of</strong> the bank.<br />

3.2.1.12 In some cases, receipts are split between ASI and the local civic body with<br />

separate submissions to each parties’ banks.<br />

3.3 Financial Planning and Budgeting Systems<br />

3.3.1 The Financial Planning and Budgeting systems currently in place are largely<br />

manual. Some <strong>of</strong> the reports are prepared in MS Excel for further collation and<br />

reporting. However, the process is laborious and manual. The key components <strong>of</strong><br />

the finance and budgeting process are as follows:<br />

3.3.2 Budget: Every year ASI submits Budget Estimate (BE) to the Ministry <strong>of</strong> Culture.<br />

The Circle Officer prepares Budget Estimatesthat are further broken down into<br />

plan and non-plan expenditure. Based on the BE and Last Expenditure Statement,<br />

the Ministry <strong>of</strong> Culture allocates funds for the current financial year to ASI. This<br />

fund is directly deposited to the bank <strong>of</strong> the concerned <strong>of</strong>fice.<br />

3.3.3 At the same time, the details <strong>of</strong> the fund allocation will be communicated to ASI<br />

Head Office. ASI Head Office in turn, communicates this information to the Branch<br />

Offices. Each <strong>of</strong>fice has one account (a/c number) with the bank. The booking<br />

amount is available in the respective account only during the current financial year.<br />

3.3.4 The ASI Head Office has the right to reallocate / shuffle funds between the Major<br />

Heads / Minor Heads / Sub Heads / Offices during the current financial year.<br />

3.3.5 Expenses:The expenses are maintained Major Head-wise, Minor Head-wise, Sub<br />

Head-wise and Detail Head-wise.The bill is prepared by Cashier and submitted to<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 12


Request for Proposal for establishing e-Governance Systems<br />

the Drawing and Disbursing Officer (DDO). There are approximately 120 DDO<br />

<strong>of</strong>fices all across the country. The DDO scrutinizes and approves the bill which is<br />

then forwarded to Cheque Drawing Officer (CDO) who sanctions and issues the<br />

Cheque against the bill. The Cheque is forwarded to the Cashier through the DDO.<br />

Cheques for third parties are handed over to the company / person.<br />

3.3.6 There are two Pay and Accounts Offices (PAO) working at ASI. One <strong>of</strong> the <strong>of</strong>fices<br />

islocated in Delhi and the other one is at Hyderabad. The <strong>of</strong>fice <strong>of</strong> the DDO and<br />

CDO may be located at different places. DDOs in the North <strong>of</strong> <strong>India</strong> sending the<br />

letter <strong>of</strong> account (periodical expense details) to PAO at Delhi while their<br />

counterparts in the South send the letter <strong>of</strong> account to Hyderabad.<br />

3.3.7 The DDO, CDO and PAO try to maintain the account for the expenses not to exceed<br />

the limit under each Head. All <strong>of</strong>fices submit Expenditure Statements periodically<br />

in prescribed formats.<br />

3.3.8 Revenue:Revenue yielding from ticketing, book publishing, etc. are collected by<br />

the cashier / counter clerk and deposited in the bank on the next working day.<br />

Revenue Accounting System encompasses various stages from recording the<br />

initial transactions in challans to the preparation <strong>of</strong> Annual Accounts. The<br />

monthly accounts are compiled by the Circle Offices on the basis <strong>of</strong> challans<br />

submitted by the Bank to ASI, and submitted to Principal Accounts Office. The<br />

Principal Accounts Office consolidates the Accounts received from all the Circle<br />

Offices and sends them to the Office <strong>of</strong> Controller General <strong>of</strong> Accounts.<br />

3.3.9 The overall financial planning process is described through this flow-chart:<br />

Individual<br />

Bill<br />

Preperation<br />

by Cashier<br />

Cheque<br />

If 3 rd Party<br />

Cheque<br />

Yes<br />

Cash<br />

Reaches to<br />

Concern Office /<br />

Person<br />

No<br />

Cash<br />

Bill<br />

Cash<br />

Checks Fund availability<br />

and approval <strong>of</strong> D.D.O.<br />

BANKS<br />

Is It Direct Cr.<br />

Ind. a/c/?<br />

EXPENDITURE PROCES<br />

Individual a/c<br />

Cheque<br />

Checks Fund availability<br />

and approval <strong>of</strong> C.D.O.<br />

If bill a amount exceeds<br />

the limit <strong>of</strong> D.D.O.<br />

Approval <strong>of</strong><br />

P.A.O.<br />

Expense<br />

Details<br />

Booking /<br />

accounting Head<br />

wise expenses<br />

details<br />

Bidders are required to make their own assessment as to the correctness or completeness <strong>of</strong> the<br />

above shown financial accounting process.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 13<br />

Period Expense Statement<br />

ASI HQ


Request for Proposal for establishing e-Governance Systems<br />

4 <strong>Project</strong> Vision and Phases<br />

4.1.1 ASI has planned for a phased implementation <strong>of</strong> e-governance initiatives across the<br />

Country. All e-governance initiatives have been categorized into 3 broad phases,<br />

each <strong>of</strong> which would be implemented in tandem, in order to achieve the overall<br />

objective <strong>of</strong> setting up an integrated e-governance mechanism.<br />

4.1.2 This RFP is mainly intended to elicit responses on the three areas <strong>of</strong> electronic<br />

communication, accounting, finance and budgeting systems, and e-ticketing<br />

solutions. ASI is currently conducting a separate initiative through a National<br />

Mission on Monuments and Antiquities for the creation <strong>of</strong> a comprehensive record<br />

in the form <strong>of</strong> database <strong>of</strong> archaeological resources in terms <strong>of</strong> built heritage, sites<br />

and antiquities that can be referred.<br />

4.1.3 For the e-ticketing solution, a staggeredimplementation is proposed at a select<br />

number <strong>of</strong> locations which would be followed by a larger geographical roll-out<br />

across the entire country. (Refer the scope <strong>of</strong> work for more details)<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 14


Request for Proposal for establishing e-Governance Systems<br />

5 Scope <strong>of</strong> Work for the System Integrator<br />

5.1.1 The Scope <strong>of</strong> Work for the e-governance systems proposed through this RFP<br />

requires the simultaneous solution design, project planning, process mapping,<br />

possible pro<strong>of</strong> <strong>of</strong> concept, system development, acceptance, documentation, and<br />

user training. A generic description <strong>of</strong> the requirements in each <strong>of</strong> these phases is<br />

as follows:<br />

5.2 Phase 1: <strong>Project</strong> Planning Process<br />

5.2.1 The implementation <strong>of</strong> the project modules shall be completed within 12 months<br />

from the date <strong>of</strong> the selection <strong>of</strong> the SI in order to ensure smooth implementation,<br />

a robust project planning process is expected to be set up by the SI. This would<br />

include dovetailing the three Modules required to be implemented by the SI,<br />

ensuring location-wise roll-outs being provided for, migration plans, and overall<br />

planning to ensure objectives <strong>of</strong> ASI are achieved. The project plan would be<br />

submitted to ASI for their approval, and would be the basis for continuous<br />

evaluation and monitoring <strong>of</strong> project health.<br />

5.2.2 For planning purposes, the SI would be expected to implement a project planning<br />

tool which would also enable review and reporting to ASI.<br />

5.3 Phase 2: <strong>Requirements</strong> Analysis<br />

5.3.1 This is the initial phase in the development <strong>of</strong> the project. The analysis part<br />

includes complete understanding <strong>of</strong> the project, gathering its requirements, logical<br />

dividing <strong>of</strong> the components involved and deciding the modules to which it is being<br />

split into. The timeline required for each module also needs to be defined in this<br />

phase. The gathering <strong>of</strong> requirements also includes gathering database table<br />

information. SI shall gather and prepare a S<strong>of</strong>tware <strong>Requirements</strong> Specifications<br />

(SRS) document based on the project requirements in a comprehensive manner. It<br />

is expected that SI shall make its own assessment in consultation with ASI and its<br />

representatives.<br />

5.3.2 By the end <strong>of</strong> this phase, documentation needs to be completed for the following:<br />

5.3.2.1 All clarifications that arise in the requirements analysis need to be<br />

documented. The answers that are obtained also need to be<br />

documented in this phase.<br />

5.3.2.2 <strong>Requirements</strong> specification shall contain all the gathered<br />

requirements that need to be well documented.By the end <strong>of</strong> this<br />

phaseSI would need to obtain a final sign-<strong>of</strong>f from ASI on the<br />

requirements gathered and SRS before proceeding with design and<br />

development <strong>of</strong> the solution.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 15


Request for Proposal for establishing e-Governance Systems<br />

It must be noted that the requirements and specifications provided as a part <strong>of</strong> this RFP are intended<br />

to describe salient aspects <strong>of</strong> the SI’s scope <strong>of</strong> work and provide sufficient understanding to the<br />

bidders for preparing proposals and should not be considered as exhaustive. The requirements will<br />

have to be detailed further as a part <strong>of</strong> SRS preparation.<br />

5.4 Phase 3: Solution Design<br />

5.4.1 The selected SI is required to study the existing systems and recommend the most<br />

suitable solution, taking into account the current state <strong>of</strong> automation <strong>of</strong> ASI and its<br />

future vision. This would, inter alia, entail the following:<br />

A review <strong>of</strong> existing systems<br />

Review <strong>of</strong> potential future technological changes, and their impact on any<br />

possible solution<br />

Examination <strong>of</strong> best possible alternative designs<br />

Preparation <strong>of</strong> a solutions document<br />

5.4.2 The database design which includes the structure <strong>of</strong> tables and also normalization<br />

<strong>of</strong> tables need to be prepared. The flow chart that shows involvement <strong>of</strong> tables<br />

and the integrity constraints on them also needs to be specified. All the database<br />

schema/tables should be created in this phase.<br />

5.4.3 The architectural design <strong>of</strong> the system and the way various systems/modules<br />

interact with each other need to be documented.After the detailed planning the<br />

initial pseudo-code and all possible test cases <strong>of</strong> various modules including<br />

designing <strong>of</strong> test strategy and test plan that need to be fulfilled should be<br />

documented. SI shall also be responsible for conducting the unit testing,<br />

integration testing, load testing and performance testing.<br />

5.5 Phase 4: System Development<br />

5.5.1 The SI shall be expected to develop some <strong>of</strong> the systems, or as necessary, s<strong>of</strong>tware<br />

or tools which could help in connecting <strong>of</strong>f-the-shelf third party s<strong>of</strong>tware that are<br />

proposed to be implemented. Where possible, the SI would be expected to use<br />

existing and tested code, in order to optimize the development process.<br />

This phase includes code development for the project.<br />

5.6 Phase 5: Solution Prototype<br />

5.6.1 The SI will be required to demonstrate a prototype prior to a full implementation,<br />

especially for solutions that require custom development for implementation at<br />

ASI locations. Every prototype must be demonstrated and approved by ASI prior to<br />

its implementation. The prototype phase would be used to evaluate whether the<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 16


Request for Proposal for establishing e-Governance Systems<br />

proposed solution meets all the requirements <strong>of</strong> the project. For proposed<br />

solutions which are implemented using <strong>of</strong>f-the-shelf solutions available from<br />

reputed vendors, a prototype may not be required.<br />

5.7 Phase 6: Entry <strong>of</strong> Historical Data<br />

5.7.1 SI shall be responsible for digitization and migration <strong>of</strong> data for financial planning<br />

and budgeting module from existing data sources to the ASI’s application being<br />

developed as a part <strong>of</strong> this project, to provide for availability <strong>of</strong> all data for the<br />

current financial year.<br />

5.8 Phase 7: Testing and Acceptance<br />

During this phase, SI shall conduct various types <strong>of</strong> testing including:<br />

5.8.1 Application Functional Testing<strong>of</strong> the e‐governance systems shall be carried out to<br />

validate whether the application meets the specified functional requirements<br />

covering the work flows, navigations, and business and data Validation rules for<br />

the defined user categories with access rights. The functional testing should be<br />

done following black box approach and using end‐to‐end user scenarios.<br />

5.8.2 Application Usability Testing shall include systematic observation under controlled<br />

conditions to determine how well users can use the application. The proposed<br />

systems are likely to be used by users <strong>of</strong> different levels <strong>of</strong> computer knowledge.<br />

Usability testing will ensure that the all types <strong>of</strong> users are comfortable to use the<br />

system. This shall be done by using defined international standards which<br />

recommend extensive user interaction and analysis <strong>of</strong> userbehavior for a defined<br />

task.<br />

5.8.1 Performance Testing <strong>of</strong> the system shall be done to ensure that system is capable<br />

<strong>of</strong> handling defined user as well as transactional load. The performance testing <strong>of</strong><br />

the e‐governance system will include measuring the response time <strong>of</strong> the system<br />

for defined scenarios. Also the manner/ trend in which performance changes with<br />

load will determine the scalability <strong>of</strong> the e‐governance systems.<br />

5.8.2 Application Security Testing conducted to unearth various application security<br />

vulnerabilities, weaknesses and concerns related to Data /Input Validation,<br />

Authentication, Authorization /Access Control, Session Management, Error<br />

Handling, Use <strong>of</strong> Cryptography, etc. Typical issues which may be discovered in an<br />

application security testing include Cross‐site scripting, Broken ACLs/Weak<br />

passwords, Weak session management, Buffer overflows, Forceful browsing,<br />

Form/hidden field manipulation, Command injection, SQL injection, Cookie<br />

poisoning, Insecure use <strong>of</strong> cryptography, Mis‐configurations, Well‐known platform<br />

vulnerabilities, Errors triggering sensitive information leak etc.<br />

5.8.3 Penetration Testing shall be done remotely from public domain (Internet) and also<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 17


Request for Proposal for establishing e-Governance Systems<br />

can be done from internal network to find out exploitable vulnerabilities. A series<br />

<strong>of</strong> tests should be conducted such as information gathering from public domain,<br />

port scanning, system fingerprinting, service probing, vulnerability scanning,<br />

manual testing, password cracking etc. using state‐<strong>of</strong>‐the‐art tools (commercial<br />

and open source) and other techniques shall be used with the objective <strong>of</strong><br />

unearthing vulnerabilities and weaknesses <strong>of</strong> the overall e‐governance systems and<br />

its underlying IT infrastructure.<br />

5.8.4 The test cases which were earlier designed during planning phase need to be<br />

executed in this phase. This phase includes Unit testing, Integration testing, and<br />

also testing for security. The SI should ensure that:<br />

The test results are documented<br />

Code review checklistsare filled up and the code is reviewed and verified. This<br />

ensures that all the coding conventions are followed correctly.<br />

Test cases and the results need to be documented and demonstrated.<br />

5.8.5 ASI may decide to appoint a third party audit agency to conduct an audit <strong>of</strong> the<br />

solution to review all aspects <strong>of</strong> the project and certify compliance with RFP before<br />

the system is rolled out. SI shall provide all necessary support, including setting up<br />

the required test environment, making seating arrangements and providing<br />

suitable access to computer & peripherals, to the agency for conducting<br />

acceptance testing.<br />

5.9 Phase 8: Documentation<br />

5.9.1 The SI is expected to deliver complete user documentation in the form <strong>of</strong><br />

electronic documents to enable users to understand and use the systems. The<br />

documents shall include user manual, administration manual, security manual,<br />

application support guide that would contain, inter alia, the screenshots and<br />

explanation indicating how the tool/s<strong>of</strong>tware is used and how the solution has<br />

been implemented. The entire documentation shall be as per industry best<br />

practices and acceptable standards (e.g. IEEE/ISO specifications for<br />

documentation).<br />

5.10 Phase 9: User Training, Operations, and Maintenance<br />

5.10.1 The SI is expected to provide extensive user training post implementation.<br />

5.10.2 Maintenance (AMC) : SI shall be fully responsible for maintenance <strong>of</strong> the ASI’s<br />

application, data center and other IT related infrastructure being established by SI<br />

as a part <strong>of</strong> this project. SI shall also deploy adequate staff for the preventive<br />

maintenance on a regular basis or a pre-defined frequency as mutually decided<br />

between ASI and the SI.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 18


Request for Proposal for establishing e-Governance Systems<br />

5.10.3 In the case <strong>of</strong> the e-ticketing solution, the SI would be required to handle the<br />

ticketing solution by providing adequate manpower during the first six months<br />

post-implementation.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 19


Request for Proposal for establishing e-Governance Systems<br />

6 Implementation model<br />

In the case <strong>of</strong> the e-ticketing solution, the SI would be required to handle the ticketing solution by<br />

providing adequate manpower during the first six months post-implementation. At the end <strong>of</strong> this<br />

period, ASI would decide whether to continue with the SIs staff on a new contract, or hire fresh<br />

persons who would provide the ticketing solution. However such a model will allow ASI to address<br />

important factors such as ASI’s ownership <strong>of</strong> the e-governance solution and to benefit from<br />

specialized expertise <strong>of</strong> private sector.<br />

In any event, the SI would be responsible for both training as well as ensuring that the persons who<br />

are recruited for this purpose are adequately trained, as a part <strong>of</strong> the capacity building<br />

requirements.<br />

The following responsibility matrix depicts the broad aspects <strong>of</strong> the implementation model:<br />

Sl.No. Aspect<br />

1. Implementation,<br />

deployment and operation<br />

<strong>of</strong> the project<br />

2. Testing <strong>of</strong> application<br />

modules<br />

3. Ownership <strong>of</strong> all IT<br />

infrastructure, application,<br />

system s<strong>of</strong>tware and all<br />

related components<br />

4. Audit& Certification <strong>of</strong> the<br />

application prior to go-live<br />

Responsibility /Ownership<br />

SI ASI<br />

Yes -<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 20<br />

Yes<br />

Server Side<br />

Client Side<br />

5. Program Governance Yes (through the Program<br />

Manager)<br />

6. Procurement and setup <strong>of</strong><br />

client end hardware,<br />

s<strong>of</strong>tware and LAN<br />

- Yes (through a third party<br />

audit agency)<br />

Yes<br />

Yes (through a PMU)


Request for Proposal for establishing e-Governance Systems<br />

7 Key Deliverables<br />

The details with regard to the key deliverables<strong>of</strong> electronic communication systems, e-ticketing<br />

solutions and computerized financial planning and budgeting solutions, the following section<br />

provides greater details about each <strong>of</strong> the modules.<br />

7.1 E-Governance <strong>Project</strong> Application Development and Infrastructure Deployment<br />

The Key Deliverables consist <strong>of</strong> the following:<br />

7.1.1 E-Governance <strong>Project</strong> Application Development<br />

i. Requirement gathering and Study <strong>of</strong> existing applications<br />

ii. The SI will be required to carry out a preliminary study <strong>of</strong> the requirements, before<br />

drafting the systems requirements and specifications<br />

iii. System Design and preparation <strong>of</strong> S<strong>of</strong>tware <strong>Requirements</strong> Specifications<br />

iv. The System design and SRS shall contain the objectives and scope <strong>of</strong> the system, the<br />

various levels <strong>of</strong> requirements, the process model, data model, data dictionary, etc<br />

v. Creation and maintenance <strong>of</strong> <strong>Requirements</strong> Traceability Matrix<br />

vi. Development <strong>of</strong> Prototype and Functional acceptance on Prototype<br />

vii. Development <strong>of</strong> High Level Design (HLD)<br />

viii. Develop a logical view <strong>of</strong> the solution to meet the user requirements, comprising <strong>of</strong><br />

functional architecture <strong>of</strong> the application and the changes/new database design.<br />

ix. Development <strong>of</strong> Detailed Design (Low Level Design – LLD)<br />

x. Creation <strong>of</strong> Test Plans based on the FRS (Functional Requirement Specifications) and<br />

SRS documents<br />

xi. Development <strong>of</strong> User Acceptance Test Plans<br />

xii. Full-Scale Development / Procurement, Implementation, Customization <strong>of</strong> S<strong>of</strong>tware<br />

Applications<br />

xiii. Data Migration from legacy applications<br />

xiv. Development <strong>of</strong> Testing and User Acceptance<br />

7.1.2 E-Governance <strong>Project</strong> Application related trainings<br />

i. Training Need Analysis<br />

ii. Training Content Development<br />

iii. Conducting Training<br />

iv. Conducting Executive Workshops<br />

v. Evaluating Training Feedback and tuning training content / methodology<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 21


Request for Proposal for establishing e-Governance Systems<br />

7.2 E-Governance <strong>Project</strong> Application and Infrastructure Maintenance<br />

The key deliverables consist <strong>of</strong> the following:<br />

7.2.1 E-Governance <strong>Project</strong> Application Maintenance<br />

i. System Administration and AMC (Annual Maintenance Contract) administration<br />

ii. Monitoring, maintenance and management <strong>of</strong> all IT applications<br />

iii. Performance Management and tuning <strong>of</strong> the applications, Infrastructure and<br />

environment<br />

iv. Development / customization / fixes <strong>of</strong> additional requirements, change requests and<br />

incidents reported by ASI users.<br />

7.2.2 IT infrastructure management<br />

i. Supply, Installation, Integration and Commissioning <strong>of</strong> enabling infrastructure<br />

comprising <strong>of</strong> Servers.<br />

ii. Complete management <strong>of</strong> enabling infrastructure <strong>of</strong> Servers, Storage and Security<br />

equipment along with associated peripherals, accessories and services at sites.<br />

iii. Incident Management, Problem management, Root Cause Analysis (RCA), Business<br />

continuity management, availability management, backup management, security<br />

management, disaster recovery etc.<br />

7.2.3 Technical Support and Helpdesk Service<br />

i. Provision <strong>of</strong> On-site technical support<br />

7.3 E- Ticketing Operations<br />

7.3.1 The SI is required to operate the manned e-ticketing solution for a minimum period<br />

<strong>of</strong> 6 months from the date <strong>of</strong> Go Live. Such operations will be required across all<br />

the 10 proposed monuments where e-ticketing is proposed in the pilot program.<br />

7.3.2 During this period, SI will be required to train existing staff at the counters, if<br />

required, with the primary responsibility for ticket issuance with the SI.<br />

7.3.3 At the end <strong>of</strong> the six month period, or any time during this period, ASI may decide<br />

to retain the existing ticketing staff <strong>of</strong> the SI for a limited period <strong>of</strong> time in order to<br />

transition to the new staff, and subsequently either request for a contract<br />

extension <strong>of</strong> the SI, or call for new staffing at the ticket counters. In such an event,<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 22


Request for Proposal for establishing e-Governance Systems<br />

the SI will be responsible for training and handholding <strong>of</strong> this solution.<br />

7.3.4 The responsibility for management <strong>of</strong> the hardware, the s<strong>of</strong>tware and the<br />

infrastructure would also be with the SI.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 23


Request for Proposal for establishing e-Governance Systems<br />

8 Functional <strong>Requirements</strong><br />

The e-governance project application development and infrastructure deployment is required across<br />

three Modules: Electronic Communication Systems, E-ticketing Solutions, and Financial Planning and<br />

Budgeting Systems. The functional requirement for each <strong>of</strong> these systems is detailed below:<br />

8.1.1 Electronic Communication Systems<br />

8.1.1.1 Functional requirements<br />

Electronic Communication solutions have to fulfill the basic<br />

capability <strong>of</strong> messaging solution with good backup solutions, security<br />

solutions, administrator solutions, archiving solution, with efficient<br />

anti spam and antivirus solution. It should also contain feature rich<br />

messaging solutions. The messaging solution should be reliable,<br />

efficient and scalable. E-mailing shall be the main communication<br />

tool for the various departments within ASI.<br />

The solution will be hosted by the SI either out <strong>of</strong> a third party<br />

solution or out <strong>of</strong> its own servers. In any event, the solution must be<br />

secure, and must contain adequate features to prevent loss <strong>of</strong><br />

information, leakage <strong>of</strong> confidential information, and fraud.<br />

The main functional requirements are as follows:<br />

1. Client side requirements:<br />

Client/Server based solution: A process running on the client and an<br />

associated process running on the server system which does not<br />

require that the client establish a remote file system on the server.<br />

The client and server communicate using a mail access protocol<br />

(e.g., IMAP) instead <strong>of</strong> a file sharing access protocol in order to<br />

maximize efficient communication between the client and server<br />

and to minimize system demand on the client, server, and the<br />

network between them.<br />

Client configuration which supports multiple users in public access<br />

environment. Individual users mail should be the same (same<br />

interface, same configuration, same mail) from any machine used to<br />

access that mail.<br />

Should support access <strong>of</strong> email from various interfaces like email<br />

client (e.g. Outlook); browser (web access) or mobile phones (using<br />

Activesync/ IMAP etc.) without any additional third party<br />

components.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 24


Request for Proposal for establishing e-Governance Systems<br />

Should use standard operating system network s<strong>of</strong>tware (standard<br />

TCP/IP protocol implementations) for each client platform<br />

Quality <strong>of</strong> the user interface must include:<br />

o Functionality, flexibility, and ease <strong>of</strong> use<br />

o Minimal training requirements for end users<br />

o Spell checking<br />

o Drag and drop enclosures<br />

Standard mail functions must include:<br />

o Printing capabilities<br />

o Auto-response features for vacation periods, including the<br />

ability to retain mail received during this period<br />

o Aut<strong>of</strong>orwarding<br />

Reasonably effective authentication for outgoing mail.<br />

Client mailbox management tools which include the ability to search<br />

and browse stored messages.<br />

User can change his/her own password.<br />

Reasonable network performance with minimal network impact.<br />

This should include reasonable performance when accessed<br />

remotely.<br />

Reasonable use <strong>of</strong> resources, such as memory and disk space, on<br />

different platforms.<br />

Ability to download email and enclosures to workstation or hard<br />

disks.<br />

Should have capability for filtering/scripting/rules-based mail<br />

handling, e.g., ability to easily filter incoming mail to separate<br />

mailboxes by subject or by sender.<br />

Should have capability for return receipt (delivery notification<br />

options should be available, e.g., delivery, open, etc. on the same<br />

system.<br />

Should permit recall <strong>of</strong> sent but unopened messages on local<br />

system.<br />

2. Server side requirements:<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 25


Request for Proposal for establishing e-Governance Systems<br />

Should accommodate accounts for all employees at ASI (total =<br />

2,000).<br />

Should have the capability to be scaled up to support 10,000 users.<br />

Should have efficient administrative tools for handling large<br />

numbers <strong>of</strong> accounts (e.g., automated account generation, mass<br />

account terminations, ability to customize tools).<br />

Should have features and options which enhance system reliability.<br />

Must be able to backup and restore system data.<br />

Mail/mailboxes are stored and managed on separate storage like<br />

DAS/ NAS for fault tolerance and availability.<br />

Tool to transfer stored messages from current email systems to the<br />

new system.<br />

Limits by user ID on server storage space; ability to monitor amount<br />

<strong>of</strong> storage used by individual users.<br />

Audit trail. Ability to audit administrative tasks, standard flow <strong>of</strong><br />

email, patterns <strong>of</strong> connections, records <strong>of</strong> mail transmissions.<br />

Facilities for investigation <strong>of</strong> connections and mailbox contents<br />

when appropriate.<br />

Tools to limit or manage message size to avoid catastrophic system<br />

impact.<br />

Aliases (nicknames), user/administrator created mailing lists, and<br />

automated mailing lists are supported on the server.<br />

Speed - minimal time needed to establish connection and rapid<br />

processing for all mail operations.<br />

Minimal impact on system resources with standard email gateways.<br />

Reasonable recovery from lost connections, requiring no<br />

intervention on server and minimal work loss on client end.<br />

Ability to send email from within other standard s<strong>of</strong>tware.<br />

Ability to use a centralized LDAP based directory service like Active<br />

Directory for identity storage and authentication.<br />

Should be able to be installed on a Virtual Server environment.<br />

8.1.1.2 Technical requirements<br />

The core technical requirements for an electronic communication<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 26


Request for Proposal for establishing e-Governance Systems<br />

solution are as follows:<br />

Enable the deployment <strong>of</strong> the solution with multiple interfaces<br />

including mixed PCs, mobile and web.<br />

Minimum storage for emails to be provided on each desktop.<br />

Automatic password expiry and renewal.<br />

Periodic back-up <strong>of</strong> e-mails preferably through the deployment<br />

<strong>of</strong> an exchange server.<br />

Multiple browser support including Internet Explorer, Google<br />

Chrome, Mozilla Firefox, etc.<br />

Multiple Operating System support on client, including MS<br />

Windows, and other OS.<br />

8.1.1.3 In addition, the following Protocols are preferred:<br />

TCP/IP. Transport Control Protocol/Internet Protocol. IPV6<br />

compatibility is desired.<br />

Open standards, including generally accepted Internet protocols,<br />

that allows for interoperability <strong>of</strong> various messaging<br />

components. For example, such a scheme allows for different<br />

clients, exchanging mail between systems, etc.<br />

SMTP(ESMTP). Simple Mail Transport Protocol, and Extended<br />

Simple Mail Transport Protocol. The standard way <strong>of</strong> sending<br />

and receiving email between computer systems on the Internet.<br />

Client authentication based on directory service. User has to log<br />

on with a unique user ID and password to use mail.<br />

MIME Support. Multipurpose Internet Mail Extensions is a<br />

standardized way <strong>of</strong> attaching to an email message documents<br />

that were created in other programs, so that the document is<br />

received in the same format that it was sent.<br />

IMAP Version 4. The advantage <strong>of</strong> the IMAP protocol is that it<br />

allows email to be stored and managed on the server, rather<br />

than the client, which facilitates users accessing mail from<br />

multiple locations.<br />

Encrypted client authentication. No clear text passwords are<br />

sent across any networks.<br />

8.1.1.4 Non-functional requirements (Operational requirements):The<br />

solution should be deployed by the SI for each staff member at ASI,<br />

currently estimated at about 5,000 persons. Initial set up would<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 27


Request for Proposal for establishing e-Governance Systems<br />

include the creation <strong>of</strong> user accounts, the creation <strong>of</strong><br />

administrator(s), the set-up <strong>of</strong> address book, the set up <strong>of</strong> initial<br />

work flows as defined by current processes, and initial training and<br />

familiarization.<br />

8.1.1.5 Interfacing requirements:Ability to interface with work flow<br />

automation tools using electronic communication. It should be<br />

possible to provide interfacing with electronic archiving solutions,<br />

financial reporting and budgeting solutions; in other words all<br />

business applications envisaged in this tender should be able to<br />

communicate using the messaging backbone.<br />

8.1.1.6 Business model:The electronic communication solution will be<br />

owned by ASI and deployed by the SI. The SI may deploy a COTS<br />

(Commercial <strong>of</strong>f the Shelf) solution, which is customized for use for<br />

ASI. In the event <strong>of</strong> a COTS solution being deployed, the licenses will<br />

be with ASI.<br />

The servers must be dedicated hosted servers, provided by the SI,<br />

with access to ASI administrators. The SI must ensure that the<br />

servers are set up as secure servers in line with the e-governance<br />

security standards framework.<br />

The SI will also assess the requirement for local desktops and any<br />

other peripherals, including networking, switches, routers, internet<br />

connectivity, printers, and scanners, at each location, and procure<br />

and deploy them. These will be owned by ASI. An indicative Bill <strong>of</strong><br />

Materialis provided in Annexure 3 to enable the SI in preparing their<br />

bid documents.<br />

8.1.1.7 Implementation model:The entire implementation would consist <strong>of</strong><br />

acquisition <strong>of</strong> a proven electronic communication s<strong>of</strong>tware, and<br />

customization to the needs <strong>of</strong> ASI. Implementation is expected to be<br />

completed within 30 days from the date <strong>of</strong> selection <strong>of</strong> the SI.<br />

8.1.2 E-ticketing Solution<br />

8.1.2.1 Functional <strong>Requirements</strong>:The proposed e-ticketing solution will<br />

meet the requirements <strong>of</strong> online booking by tourists and providing<br />

them ease <strong>of</strong> convenience. The e-ticketing solution will also<br />

integrate with Point <strong>of</strong> Sale (PoS) solutions which will be integrated<br />

so as to create an instantaneous record <strong>of</strong> tickets issued, and<br />

ensuring monitoring <strong>of</strong> the tourist traffic. The key functionalities <strong>of</strong><br />

an e-ticketing solution include:<br />

Issuance <strong>of</strong> secure, identifiable and authenticated electronic tickets<br />

Provision for booking tickets electronically on the web<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 28


Request for Proposal for establishing e-Governance Systems<br />

Provision for multiple payment options through cash, credit or debit<br />

cards, using various payment methods such as online payments,<br />

payment at unmanned or manned ticket dispending counters, or<br />

payments through agents. This should include the establishment <strong>of</strong><br />

secure payment gateways as required.<br />

Generation <strong>of</strong> printed tickets at the convenience <strong>of</strong> the visitor<br />

Verification <strong>of</strong> tickets at the ticket checking counters at monument<br />

sites.<br />

Recording and reconciliation <strong>of</strong> tickets issued, and collections made<br />

against the tickets on a periodic basis<br />

Integration with existing websites <strong>of</strong> ASI with capabilities for<br />

possible future integration with websites <strong>of</strong> travel and tourist sites.<br />

Generation <strong>of</strong> reports including ticket use and usage status, nonissue,<br />

or incomplete transactions, etc.<br />

Ability to provide a contact center interface integrated with the eticketing<br />

solution to handle queries.<br />

In order to meet these requirements, an e-ticketing solution customized<br />

to meet the convenience <strong>of</strong> foreigners and <strong>India</strong>n tourists have to be<br />

developed. The e-ticketing solution must provide for the following<br />

components:<br />

1. A web ticketing solution which could enable prospective tourists to<br />

pre-book their tickets even when outside <strong>India</strong>. The solution should<br />

provide a method to authenticate foreign tourists from domestic<br />

tourists for differential ticket rates.<br />

2. An e-ticketing solution which would replace the current manual<br />

ticketing solutions available at the monuments. The solution would<br />

require the provision <strong>of</strong> computers, provision <strong>of</strong> back-up power,<br />

provision <strong>of</strong> ticket printing and issuing options.<br />

Each <strong>of</strong> these solutions should have a common back-end and integrate<br />

with a common solution. Further, the ticket available for verification at<br />

the Monument gates should have a common and easily recognizable<br />

format.<br />

8.1.2.2 Technical requirements:The e-ticketing solution will provide for the<br />

following technical requirements:<br />

Browser support on multiple browsers for external users.<br />

An interactive and easy to use GUI interface for <strong>of</strong>ficials.<br />

An integrated interface for the contact center interface.<br />

Remote server based system connected through web. For PoS<br />

locations, the solution should support low bandwidth and dial up<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 29


Request for Proposal for establishing e-Governance Systems<br />

connectivity. In certain cases, there might not be connectivity<br />

available always, hence the proposed solution should have ability to<br />

also work <strong>of</strong>fline and synch data as and when connectivity becomes<br />

available.<br />

For PoS locations, the solution should also support batch processing<br />

and uploads, as a contingency arrangement.<br />

Secure browsing using appropriate encryption solutions with digital<br />

signature for authentication. The application shall support advanced<br />

authentication techniques along with username and password, such<br />

as PKI with X.509 certificates or higher, wherever required.<br />

Secure electronic payment gateways integrated with the e-ticketing<br />

solution, which are enabled for most commonly used electronic<br />

payment options, including direct payment through bank accounts,<br />

credit and debit cards<br />

8.1.2.3 Non-functional requirements (Operational requirements):The eticketing<br />

solution should be built on scalable hardware and<br />

commercially available CRM and Portal solutions so that scalability<br />

can be achieved, in terms <strong>of</strong> the volume <strong>of</strong> users and services it can<br />

support concurrently, therefore it must have capabilities to operate<br />

with an estimated daily peak load <strong>of</strong> up to 300,000 purchases per<br />

day. The web-ticketing solutions must be able to authenticate<br />

whether the purchaser is <strong>India</strong>n or foreign and should issue tickets<br />

accordingly.<br />

The PoS component <strong>of</strong> the solution should consist <strong>of</strong> a manned<br />

counter, where tickets are issued by an issuer based on information<br />

provided verbally by a purchaser. Adequate authentication methods<br />

must be built in to prevent revenue leakages. At the PoS, tickets<br />

would be printed and issued by the ticket issuer. Payments would be<br />

accepted through cash in <strong>India</strong>n currency only, or credit cards.<br />

Power and internet connectivity: The PoS solutions would have<br />

adequate provision for back-up power to enable uninterrupted<br />

functioning for at least 8 hours in a day. Also, the solution should be<br />

able to dispense tickets even without internet connectivity, with a<br />

feature to store information locally and upload to the centralized<br />

database on availability <strong>of</strong> internet connection.<br />

8.1.2.4 Interfacing requirements:The e-ticketing solution should interface<br />

with the multiple payment gateways authorized by ASI. The solution<br />

shall support card payments using all the popular debit and credit<br />

cards (Visa, Master Card etc.) and Direct Debit. The solution must<br />

also have interface with electronic card reading solutions such as<br />

barcodes, or magnetic cards.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 30


Request for Proposal for establishing e-Governance Systems<br />

The proposed solution will also interface with financial planning and<br />

budgeting system.<br />

8.1.2.5 Business model:The e-ticketing solution will be hosted on a third<br />

party secured server, which will be for dedicated use by ASI based on<br />

the recommendation <strong>of</strong> the SI – the costs related to the server are<br />

part <strong>of</strong> the financial proposal to be provided by the SI. The third<br />

party solutions such as payment gateways will be procured by the SI;<br />

the transaction costs related to payments will be borne directly by<br />

ASI. All collections through the e-ticketing solution will directly be<br />

credited into ASI designated bank accounts.<br />

The SI will assess, recommend and procure the hardware at PoS site,<br />

including, but not limited to computers, networking, printers, and<br />

other peripherals. These will be owned by ASI.An indicative Bill <strong>of</strong><br />

Material is provided in Annexure 3 to enable the SI in preparing their<br />

bid documents.<br />

The SI will also procure the s<strong>of</strong>tware at PoS site which could include<br />

payment gateway interfaces, web ticketing services, and card<br />

reading s<strong>of</strong>tware. These would be part <strong>of</strong> the solution to be<br />

provided by the SI. If the S<strong>of</strong>tware is procured as a COTS solution,<br />

the license would be assigned to ASI. If the solution is a proprietary<br />

solution developed by the SI, the code for the s<strong>of</strong>tware must be<br />

made available to ASI.<br />

8.1.2.6 Implementation model:ASI has identified 116 monuments to<br />

implement e-ticketing solution; System Integrators will be required<br />

to conduct a phase-wise implementation <strong>of</strong> the e-ticketing solution.<br />

staggered implementationshall be conducted in select 10<br />

monuments which are <strong>of</strong> significance but not necessarily the highest<br />

traffic monuments. The proposed monuments where this staggered<br />

implementation shall be initiated are as follows:<br />

Circle Name <strong>of</strong> the Monument<br />

Agra Circle Taj Mahal, Agra<br />

Agra Circle Agra Fort<br />

Agra Circle Fatehpur Sikri Fort<br />

Agra Circle Sikandra<br />

Agra Circle Itimad-ud-Daula<br />

Aurangabad Circle Ajanta and Ellora<br />

Bhubaneswar Circle Sun Temple, Konark<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 31


Request for Proposal for establishing e-Governance Systems<br />

Chennai Circle Group <strong>of</strong> Monuments,Mamallapuram<br />

Delhi Circle Qutub Minar, New Delhi<br />

Patna Circle Nalanda Excavated Site<br />

Once successfully deployed, these solutions are proposed to be<br />

replicated across all the other identified monuments.<br />

It is expected that at the end <strong>of</strong> the project phase, the solution will<br />

be evaluated to determine whether any changes are required to be<br />

made to the solution, and the same solution, with modifications, if<br />

any, is expected to be rolled out across the rest <strong>of</strong> the monuments.<br />

This proposed roll-out is not a part <strong>of</strong> this RFP.<br />

8.1.3 Financial Planning and Budgeting System<br />

ASI currently manages its financial planning and budgeting systems manually.<br />

While the existing processes are robust, the fact that they are completely manually<br />

makes the systems cumbersome, and error prone. Additionally, the time taken to<br />

compile accounts, and reconciliation takes significant time and effort. The current<br />

accounting systems are single entry. The accounting books consist <strong>of</strong> cash register,<br />

check register, budget register, and payable register. Budget allocations are<br />

committed once a year. Revisions, if any, to the budget, are also done once a year,<br />

and funds could be reallocated. Unutilized funds during a year lapse, and revert to<br />

the CGF.<br />

8.1.3.1 Functional <strong>Requirements</strong>:The key functionalities <strong>of</strong> the proposed<br />

Financial Planning and Budgeting System include the following:<br />

Ability to record information relating to the budgets and budget<br />

allocations across various heads by the Accounts and Pay (A&P)<br />

department. The information should also be recorded at circle<br />

level, against allocated budgets. These should include plan and<br />

non-plan expenditures.The proposed system should be workflow<br />

based and web-enabled / online system. Further,<br />

o Electronic clearance/ online payment systemsshould be<br />

introduced wherever possible.<br />

o As far as possible, all reconciliation systems should<br />

online and real time system.<br />

Ability to record information related to release <strong>of</strong> payments by<br />

CDDOs<br />

Ability to reconcile payments against budgets<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 32


Request for Proposal for establishing e-Governance Systems<br />

Online reporting <strong>of</strong> financial transactions, including variances,<br />

under, and over-utilization <strong>of</strong> budgets, performance tracking and<br />

dashboarding for easy decision making at central level.<br />

Accounts / budgets will also cover the various departments at<br />

ASI such as, Conservation, Museums, etc. Provisions are<br />

required to integrate this for future Information System needs<br />

Interfaces and application logic is required to render the<br />

accounts in a manner and format compatible with and compliant<br />

to the requirements <strong>of</strong> the Comptroller and Audit General (CAG).<br />

CAG compliance requirements will be provided during SRS.<br />

The key functional requirements would include:<br />

Core Financial System Management Function<br />

General Ledger Management Function<br />

Funds Management Function<br />

Payment Management Function<br />

Receivables Management Function<br />

Cost Management Function<br />

Reporting Function<br />

The SI is expected to prepare a detailed FRS initially, in order to<br />

ensure that all specifications are accurately captured.<br />

8.1.3.2 Technical <strong>Requirements</strong>:The technical requirements <strong>of</strong> the solution<br />

must include:<br />

Solution must be web enabled, and developed/customized on<br />

COTS application platforms with ample flexibility <strong>of</strong><br />

customization based on ASI’s needs.<br />

Solution must use standard database.<br />

The solution must be on a dedicated server which is located at<br />

SIs premises.<br />

The detailed technical requirements are as follows:<br />

8.1.3.3 General Design/ Architecture:<br />

Core financial function should be modular in design.<br />

Should be built based on open system architecture.<br />

Should be easily customizable to accommodate changes in laws,<br />

regulations, best practices and new technology.<br />

Should have internal transaction processing controls , including the<br />

capability in the event <strong>of</strong> system failure, to automatically:<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 33


Request for Proposal for establishing e-Governance Systems<br />

o Roll Back option for incomplete transactions<br />

o Restore the system to its last consistent state before the<br />

failure occurred<br />

o Reapply all incomplete transactions previously submitted by<br />

the user<br />

Internal database consistency during all online and batch<br />

operations.<br />

Fully documented restart capabilities for online and batch<br />

processing capabilities.<br />

System include anintegrated relational, structured<br />

querylanguagecompliant database<br />

Should be capable <strong>of</strong> simultaneously process online transactions and<br />

transactions submitted via system interface.<br />

8.1.3.4 Infrastructure:<br />

Should utilize transaction control/Internet communications protocol<br />

for application, database, and workstation connectivity.<br />

Should support report spooling capability to enable online viewing,<br />

reprinting, and permanent archiving <strong>of</strong> requested reports.<br />

8.1.3.5 User interfaces:<br />

Should support consistent, Windows-compatible, online user<br />

interface to all modules and integrated subsystems.<br />

Should provide for common graphical interfaces such asmouseactivated<br />

icons, buttons, scroll bars, drop-down lists, check boxes,<br />

menu bars, text boxes, tool tips, resizable windows, andcut, copy,<br />

and paste functions<br />

Should reduce the amount <strong>of</strong> direct keying required to initiate<br />

transaction processing, such asthe use <strong>of</strong> default values, look-up<br />

tables, automatic data recall, single-function windows (e.g., one<br />

input screen per transaction), the ability to pass common data from<br />

screen to screen, highlighting <strong>of</strong> required fields, auto tabs, function<br />

keys (e.g., to retrieve previous data, invoke help facility, suspend<br />

transaction, or clear screen), disabling <strong>of</strong> non-supported function<br />

keys, menu mode and an expert mode <strong>of</strong> screen navigation, the<br />

ability to retrieve suspended transactions by user, document, circle,<br />

project, etc., transaction entry undo/redo, context-sensitive online<br />

help, andthe ability to select records from a listby scrolling or by<br />

typing in only part <strong>of</strong> an entry.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 34


Request for Proposal for establishing e-Governance Systems<br />

Should support desktop integration with other common workstation<br />

applications used for word processing, spreadsheets, data<br />

management, and graphics.<br />

8.1.3.6 Workflow/messaging:<br />

Workflow management shall allow configuration <strong>of</strong> various<br />

processes and management <strong>of</strong> multi stage process workflow.<br />

Should have workflow management capability, including generation<br />

and routing <strong>of</strong> internal forms, reports, and other financial<br />

documents, for online approval or subsequent processing.<br />

Should enableauthorized users to define workflowprocesses and<br />

business rules, includingapproval levels, and to modify<br />

workflow(e.g., assigning a proxy approvingauthority).<br />

Ability to establish multiple levels <strong>of</strong>document approvals based on<br />

user-definedcriteria, including amounts, types <strong>of</strong>items purchased,<br />

and document types.<br />

The workflow should be able to send notifications when manual<br />

intervention is required in a process<br />

Aninternal calendar or user-defined routingtables to generate rulebased<br />

or exceptionreports to support the generation <strong>of</strong>workflow<br />

messages.<br />

Ability to track approvals online bytransaction, including the time,<br />

date, andapproving party.<br />

Thecapability to automatically generateelectronic routing and status<br />

messages toindividuals or groups.<br />

Workflow design to consider W3C standards.<br />

The workflow should interface with email system supporting SMTP<br />

for sending out notifications.<br />

8.1.3.7 Document Management:<br />

Should supportOpen Document Management<br />

Architecturestandards.<br />

Should provide thecapability to electronically image, index,store,<br />

and facilitate quick retrieval<strong>of</strong> document referenceMaterial.<br />

The solution should have the ability to expire and retire content.<br />

Should incorporate a file tracking system to be able to store, and<br />

retrieve indexed documents.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 35


Request for Proposal for establishing e-Governance Systems<br />

System should allow the user to assign a note/annotation to a<br />

document.<br />

The solution should have the ability to migrate web-based content<br />

to a records-management system.<br />

System should allow the support <strong>of</strong> multiple, simultaneous indexing<br />

sessions. System performance should not degrade due to multiple<br />

indexing sessions.<br />

The solution should have the ability to search for objects by free text<br />

/ metadata / content attributes.<br />

The solution should have the ability to maintain and access previous<br />

versions <strong>of</strong> content when updated or changed(archiving and<br />

rollback).<br />

Should notify theuser <strong>of</strong> the presence <strong>of</strong> associateddocument<br />

images and allow an on-screendisplay <strong>of</strong> this material.<br />

The solution should allow users to upload multiple files at the same<br />

time.<br />

The solution should allow 'Drag-and drop' to upload multiple files.<br />

The solution should support WebDAV for <strong>of</strong>fice suite integration.<br />

The solution should allow multi-user, real-time editing on a<br />

document.<br />

The solution should support check In/check Out capabilities.<br />

The solution should support Web <strong>of</strong>fice (browser only) document<br />

version control, audit trails, visual version comparison, check in/out,<br />

per document access controls.<br />

The solution should also support document linking capabilities<br />

(static, dynamic, and/or other).<br />

The solution should have the ability to have the same repository<br />

used to store and manage documents also used for collaborative<br />

projects/objects.<br />

The solution should have the ability to have threaded discussions<br />

around documents/content.<br />

The solution should allow users to set up collaborative workspaces.<br />

Ability to search structured and unstructured information<br />

repositories, such as documents, images, audio and video.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 36


Request for Proposal for establishing e-Governance Systems<br />

Support structured searches driven by metadata.<br />

Ability to perform searches across multiple indexes.<br />

Should support attachment search.<br />

Should be able to support search on multiple repositories such as<br />

web sites, file shares, Messaging System and other data repositories.<br />

8.1.3.8 Operations and Computer Performance:<br />

System should be capable <strong>of</strong> process scheduling that enablesthe<br />

operator to initiate, monitor, and stopscheduled processes, such as<br />

onlineavailability, batch jobs, and systemmaintenance.<br />

System should provideonline status messages indicating job<br />

ortransaction type and name, when requestedprocessing starts and<br />

completes, and systemerrors.<br />

System should allow reportsto be produced in the background<br />

whileother system processing takes place.<br />

System should provide thesystem administrator the ability to<br />

controlthe archiving process, including archiving criteria such as<br />

date,accounting period, closed items, andvendors inactive for a<br />

specific time period.<br />

System should provide theability to selectively retrieve archived<br />

databased on user-defined criteria such as date,accounting period,<br />

circle, or project.<br />

System should maintain andreport on productivity statistics<br />

aboutapplication usage.<br />

System must provide audittrails to identify changes made to<br />

systemparameters and tables that would affect theprocessing or<br />

reprocessing <strong>of</strong> any financialtransactions.<br />

System must providecomputing performance metrics, forplatforms<br />

and systems environments onwhich the application is certified to<br />

run, including transaction processing throughputcapacity,expected<br />

workstation client response, time by transaction type,data storage<br />

capacity, andlimitations on concurrent userconnectivity.<br />

System should maintain thecurrent and historical financialdata.<br />

Should supportconcurrent access to functional modules for multiple<br />

user communities.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 37


Request for Proposal for establishing e-Governance Systems<br />

System should have the capability to process batched<br />

transactionsduring online hours and accept onlinetransactions from<br />

interfacing systems withno online performance degradation.<br />

8.1.3.9 Non-functional <strong>Requirements</strong> (Operational requirements):The<br />

solution must be built with a client-server module which permits<br />

entries by users at multiple locations with a review and acceptance<br />

feature. Each client would be enabled to make entries in ‘<strong>of</strong>f-line’<br />

mode which could be uploaded to the Server through batch<br />

processing when connected. Data would require to be periodically<br />

backed up on secure servers.<br />

8.1.3.10 Interfacing <strong>Requirements</strong>:The system should have capabilities for<br />

data to move effectivelybetween the core financial system and<br />

otherfinancial applications, which could include<br />

a. an application program interface (API)to accept and process<br />

financial datagenerated by external and otherinternal<br />

applications and<br />

b. the ability to export data required by other government<br />

systems<br />

the API should support the receipt and continued processing <strong>of</strong><br />

transactions for all core accounting components as well as project<br />

information updates.<br />

The API suspense process must include the ability to<br />

a. view, update, or delete suspended transactions and<br />

b. automatically reprocess suspended transactions.<br />

Should generate transaction editing error records in a standard<br />

format defined by the Circle Office for return to the originating<br />

feeder application.<br />

Should support XML-based specifications for the exchange <strong>of</strong><br />

financial data, such as Extensible Business Reporting Language.<br />

8.1.3.11 Business Model:The solution will be owned by ASI and will be set up<br />

on a server at ASI’s headquarters. Clients will be connected to the<br />

server through internet. The solution, the data and the hardware<br />

will all be owned by ASI with support being provided by the SI. The SI<br />

will assess the requirement <strong>of</strong> additional hardware including<br />

desktops, printers, scanners and network and internet connectivity,<br />

and procure and deploy them. These will be owned by ASI.<br />

8.1.3.12 Implementation Model:The entire implementation would consist <strong>of</strong><br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 38


Request for Proposal for establishing e-Governance Systems<br />

8.2 System Security <strong>Requirements</strong><br />

development <strong>of</strong> a system based on previously developed<br />

government accounts s<strong>of</strong>tware, and customization to the needs <strong>of</strong><br />

ASI. Implementation is expected to be completed within 6 months<br />

from the date <strong>of</strong> selection <strong>of</strong> the SI.<br />

It is expected that the solution implemented by the SI will be run in<br />

parallel with the existing systems for a period <strong>of</strong> at least 6 months in<br />

order to ensure that the output is the same in either case. The SI<br />

will also be required to migrate data from the existing systems to the<br />

new systems.<br />

8.2.1 Security features should be compliant withthe e-Governance Security Standards<br />

Framework.<br />

8.2.2 All systems should have integrated security features that areconfigurable by the<br />

system administrator tocontrol access to the application, functionalmodules,<br />

transactions, and data.<br />

8.2.3 Public key verificationmethods should be followed for verifying that the contents<br />

<strong>of</strong> a document have not been tampered with, and allowing the receiver to confirm<br />

the identity <strong>of</strong> the sender.<br />

8.2.4 The applications should require theuse <strong>of</strong> unique user IDs and passwords<br />

forauthentication purposes.<br />

8.2.5 The application should allow for the following:<br />

a. the enforcement <strong>of</strong> password standards<br />

b. the establishment <strong>of</strong> a specified periodfor password expiration, and<br />

c. the prohibition <strong>of</strong> recent passwordreuse<br />

8.2.6 System administrator should be able to define functional access rights and data<br />

access rights byassigned user ID, functional role, andowner organization.<br />

8.2.7 The systems should permit thesystem administrator to assign multiplelevels <strong>of</strong><br />

approval to a single user.<br />

8.2.8 System administrator should be able to restrict access tosensitive data elementsby<br />

named user, groups <strong>of</strong> users, orfunctional role.<br />

8.2.9 System should have audit logging capability to record accessactivity, including the<br />

following:<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 39


Request for Proposal for establishing e-Governance Systems<br />

a. all log-in/log-out attempts by user andworkstation;<br />

b. user-submitted transactions;<br />

c. initiated processes;<br />

d. system override events; and<br />

e. direct additions, changes, or deletionsto application-maintained data<br />

8.2.10 System should provide theability to query the audit log by type <strong>of</strong>access, date and<br />

time stamp range, user ID,or terminal ID.<br />

8.3 Governance Structure<br />

8.3.1 Overall responsibility for the implementation <strong>of</strong> all three modules will remain with<br />

the SI. Supervision and reporting during implementation will be to NISG. <strong>Project</strong><br />

progress review and monitoring will be the responsibility <strong>of</strong> NISG during project<br />

implementation phase. ASI will appoint a Single Point <strong>of</strong> Contact (SPOC) for IT<br />

Administration. Escalation <strong>of</strong> all issues related to the three modules will be<br />

through this SPOC, who will also be responsible for reviewing the SLAs being met.<br />

8.3.2 The e-ticketing solution will be owned by ASI and developed, operated and<br />

maintained by the SI. The SI will be responsible for end-to-end deployment<br />

including ticket issuance, verification, collections and deposit with ASI’s bankers on<br />

a daily basis, in line with current practices. The SIs staff will be directly responsible<br />

to the respective Circle Heads in each <strong>of</strong> the Circles where the PoS are located.<br />

For the project implementation phase, supervision and reporting during<br />

implementation will be to NISG. <strong>Project</strong> progress review and monitoring will be<br />

the responsibility <strong>of</strong> NISG during project implementation phase. ASI will appoint a<br />

SPOC for IT Administration. Escalation <strong>of</strong> all issues related to e-ticketing solution<br />

will be through this SPOC, who will also be responsible for reviewing the SLAs being<br />

met.<br />

8.4 Documentation Standards and <strong>Requirements</strong><br />

8.4.1 Documentation: Documentation must include complete installation, operating,<br />

and systemmaintenance documentation covering thefollowing:<br />

product installation and configurationsteps;<br />

application access procedures;<br />

user screen layout and content;<br />

transaction entry procedures;<br />

batch job setup, processing, andrecovery/restart procedures;<br />

error codes with full descriptions andrecovery steps;<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 40


Request for Proposal for establishing e-Governance Systems<br />

standard report layout and content;<br />

internal processing controls;<br />

application security;<br />

operating specifications and systemflowcharts;<br />

database entity relationships, tableformats, and data elementdescriptions; and<br />

program module descriptions<br />

9 Service Level Agreements<br />

Service Levels will include Availability measurements and Performance parameters. The Vendor<br />

shall provide Availability Report on a monthly basis and a review shall be conducted based on this<br />

report. A monthly report shall be provided to the ASI at the end <strong>of</strong> every month containing the<br />

summary <strong>of</strong> all incidents reported and associated Vendor performance measurement for that<br />

period.<br />

Performance measurements would be accessed through audits or reports, as appropriate to be<br />

provided by the Vendor e.g. utilization reports, response time measurements reports, etc. The tools<br />

to perform the audit will need to be provided by the Vendor. Audits will normally be done on<br />

regular basis or as required by ASI and will be performed by ASI or ASI appointed third party<br />

agencies.<br />

The following SLAs apply to the proposed solutions for each <strong>of</strong> the three deliverables.<br />

9.1 S<strong>of</strong>tware Application Development and Deployment<br />

Table 3: SLA requirements for Application Development and Infrastructure Deployment<br />

Service Level<br />

Description<br />

Measurement Minimum<br />

Service Level<br />

Gap Resolution All gaps observed in the functional<br />

specifications, current system<br />

study, training, business process reengineering,<br />

parameterization,<br />

testing and Launch<br />

Implementation shall be resolved<br />

within defined and mutually agreed<br />

time frames.<br />

Bug Reporting The Bidder shall ensure that all<br />

bugs reported by the users / testing<br />

team will be duly logged and<br />

Cost Reference<br />

98% S<strong>of</strong>tware<br />

Applications,<br />

Customization,<br />

Implementation<br />

97% Implementation<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 41


Request for Proposal for establishing e-Governance Systems<br />

Service Level<br />

Description<br />

Measurement Minimum<br />

Service Level<br />

assigned a unique ID for reference<br />

purposes.<br />

Bug Resolution The Bidder shall ensure that all<br />

bugs reported by the users / testing<br />

team will be duly resolved<br />

maximum within 3 calendar days.<br />

Modification/<br />

Enhancements<br />

resolution<br />

System Response<br />

Time<br />

System Response<br />

Time<br />

Disaster Recovery<br />

Site Availability<br />

The Bidder shall ensure that all<br />

modifications, enhancements<br />

reported by the ASI will be duly<br />

sized, agreed with the ASI and<br />

resolved as per the agreed<br />

timeframes<br />

End to end response time should be<br />

2 seconds (end user to core<br />

application and back)<br />

Support concurrent users as<br />

specified for each module<br />

Business operations to resume<br />

fromDisaster Recovery Site within<br />

60 minutes <strong>of</strong> the Data Server<br />

failing.<br />

Backup Success Rate Backup success rate for the<br />

Comprehensive Insurance Solution,<br />

other 3rd party solutions/Support<br />

applications and delivery channels.<br />

S<strong>of</strong>tware Service<br />

Requests<br />

IT Policies &<br />

Procedures<br />

Management<br />

Percentage <strong>of</strong> S<strong>of</strong>tware Service<br />

Requests concluded (patches, bug<br />

fixes, errors) within defined<br />

response resolution window.<br />

Compliance <strong>of</strong> the IT infrastructure<br />

to the ASI’s Policies & Procedures<br />

Cost Reference<br />

99.9% Implementation,<br />

S<strong>of</strong>tware<br />

Applications,<br />

Customization<br />

98% Implementation,<br />

S<strong>of</strong>tware<br />

Applications,<br />

Customization<br />

96.9% S<strong>of</strong>tware<br />

Applications,<br />

Database, Security<br />

Components,<br />

96% S<strong>of</strong>tware application<br />

for Internet costs for<br />

Internet, Security<br />

Components.<br />

98% S<strong>of</strong>tware<br />

Applications<br />

98% S<strong>of</strong>tware<br />

Applications<br />

98% S<strong>of</strong>tware<br />

Applications<br />

98% Network & Security<br />

Components, Facility<br />

Management<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 42


Request for Proposal for establishing e-Governance Systems<br />

Service Level<br />

Description<br />

Incident<br />

Management<br />

Computer downtime<br />

at PoS<br />

Measurement Minimum<br />

Service Level<br />

Cost Reference<br />

Percentage <strong>of</strong> incidents escalated 96.9% S<strong>of</strong>tware<br />

Applications<br />

Percentage <strong>of</strong> time that the<br />

computers functioning at the PoS<br />

either due to computer, internet, or<br />

power failure<br />

9.2 S<strong>of</strong>tware Application and Infrastructure Maintenance<br />

Table 4: SLA requirements for S<strong>of</strong>tware Application and infrastructure Maintenance<br />

ServiceLevelDescription Measurement Minimum<br />

ServiceLevel<br />

Application Down time Each planned down - time for<br />

application, database and<br />

operating system will not be<br />

more than 4 hours. This activity<br />

will not be carried out during<br />

business hours. However, such<br />

activities which require more<br />

than 4 hours or required to be<br />

carried out during business<br />

hours will be scheduled in<br />

consultation with the ASI. In<br />

case the downtime exceeds the<br />

planned hours the additional<br />

time taken for servicing will be<br />

considered for infrastructure or<br />

system downtime as per<br />

availability measurements table.<br />

Critical site<br />

infrastructure<br />

components<br />

9.3 E-ticketing Operations<br />

Availability <strong>of</strong> the critical site<br />

infrastructure components at<br />

all the implementation sites<br />

shall be at least<br />

Table 5: SLA requirements for e-ticketing Operations<br />

99% Hardware for Ticket<br />

Counters at PoS<br />

Cost Reference<br />

98% Application<br />

Hosting<br />

99% Hardware<br />

maintenance<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 43


Request for Proposal for establishing e-Governance Systems<br />

ServiceLevelDescription Measurement Minimum<br />

Service<br />

PoS Counter operations Percentage <strong>of</strong> time for which the PoS<br />

is not functioning to required timings<br />

Level<br />

Cost Reference<br />

95% PoS Counter<br />

Operations<br />

If service level for any <strong>of</strong> the metrics is measured and scored at a level lower than the expected<br />

in two months consecutively then ASI shall have the right to invoke penalty <strong>of</strong> 3% <strong>of</strong> total<br />

monthly amount payable to SI for a score <strong>of</strong> 100%.<br />

In case <strong>of</strong> a continued breach in the SLA beyond two months, ASI shall have the right to invoke<br />

penalty <strong>of</strong> 10% <strong>of</strong> total monthly amount payable to SI for a score <strong>of</strong> 100%.<br />

In case <strong>of</strong> two or more breaches in a month or breach <strong>of</strong> a particular SLA metric consecutively in<br />

two quarters, ASI shall have the right to invoke full PBG and/ or call for termination <strong>of</strong> contract.<br />

Penalty shall be adjusted to the final monthly amount payable to SI basis actual scores.<br />

If the overall penalty applicable in any month during the currency <strong>of</strong> the contract exceeds 20%;<br />

then ASI shall have the right to terminate the contract.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 44


Request for Proposal for establishing e-Governance Systems<br />

10 Annexures<br />

10.1 Annexure 1: List <strong>of</strong> Circles<br />

Agra Aurangabad Bangalore<br />

Bhopal Bhubaneswar Chandigarh<br />

Chennai Dehradun Delhi<br />

Dharwad Goa Guwahati<br />

Hyderabad Jaipur Kolkata<br />

Lucknow Mumbai Patna<br />

Raipur Ranchi Shimla<br />

Srinagar Thrissur Vadodara<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 45


Request for Proposal for establishing e-Governance Systems<br />

10.2 Annexure 2: Visitor History to the Monuments<br />

Monument Name 2007 2008 2009<br />

Taj Mahal 3,210,190 3,226,843 3,077,114<br />

Agra Fort 1,534,703 1,675,507 1,713,006<br />

Fatehpur Sikri 461,672 483,725 453,988<br />

Akbar's Tomb 347,393 334,305 335,974<br />

Mariam's Tomb, Agra 9,473 12,291 10,054<br />

Itimad-ud-Daula, Agra 102,550 104,518 97,651<br />

Ram Bagh, Agra 35,040 32,406 27,623<br />

Mahtab Bagh, Agra 22,149 22,096 32,152<br />

Ajanta Caves 335,866 319,427 370,982<br />

Ellora 471,772 592,661 757,787<br />

Pandavlena Caves, Pathardi 112,676 103,192 108,131<br />

Daulatabad Fort 301,523 447,943 402,299<br />

Bibi-Ka-Maqbara, Aurangabad 893,121 983,867 1,033,185<br />

Aurangabad Caves 37,773 39,362 37,679<br />

Elephanta Caves, Gharaphuri, Mumbai 254,557 256,966 318,820<br />

Kanheri Caves, Mumbai (Suburban) 82,201 107,096 110,462<br />

Karla Caves, Karla 94,863 77,826 112,140<br />

Caves, Temples & Inscription, Junnar 254,071 302,793 323,893<br />

Raigad Fort 81,055 414,442 170,054<br />

Shaniwarwada, Pune 314,200 329,932 382,577<br />

Hirakota Old Fort, Alibagh 35,273 43,000 57,023<br />

Old Fort Sholapur 19,593 36,994 25,435<br />

Caves, Temples & Inscription, Bhaja 24,606 22,127 25,023<br />

AgaKhan Palace, Pune 77,338 129,698 90,957<br />

Group <strong>of</strong> Monuments, Hampi, Distt. Bellary 343,505 512,158 439,333<br />

Daria Daaulat Bagh,Srirangapatnam 706,015 731,472 804,434<br />

Keshva Temple, Somnathpura 141,209 145,736 176,399<br />

Tipu Sultan Palace, Bangalore 119,851 108,086 117,756<br />

Chitradurga Fort, Chitradurga 208,826 210,635 256,008<br />

Bellary Fort, Bellary 10,074 7,700 7,235<br />

Vihal Temple Venkatatapuram - 272,205 -<br />

Zanana Enclosure, Kamalapur - 239,953 -<br />

Western Group <strong>of</strong> Temples, Khajuraho 278,651 290,527 294,363<br />

Shahi Quila at Burthanpur 50,922 54,744 67,183<br />

Bagh Caves, Bagh 15,692 20,987 22,779<br />

Royal Complex, Mandu 161,751 198,821 242,655<br />

Rani Roopmati Pavilion, Mandu 159,704 206,067 252,693<br />

Hoshang Shah's Tomb Mandu 89,826 117,758 139,554<br />

Bhojshala Dhar Moula Mosque 13,572 - 14,393<br />

Bhuddhist Monuments at Sanchi 127,766 151,936 172,869<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 46


Request for Proposal for establishing e-Governance Systems<br />

Monument Name 2007 2008 2009<br />

Gwalior Fort, Gwalior 168,978 213,672 212,988<br />

Sun Temple, Konark 1,357,390 1,480,149 1,746,609<br />

Raja Rani Temple, Bhubaneswar 25,619 47,097 28,127<br />

Udaigiri & Kandagiri Caves 265,521 291,526 362,802<br />

Excavated Site, Ratnagiri 16,051 8,728 22,762<br />

Excavated Site, Lalitagiri 7,027 - 10,091<br />

Sheikh Chillis Tomb Thanesar 44,146 59,788 135,180<br />

Suraj Kund Monastery, Lakarpur 24,295 13,228 36,761<br />

Group <strong>of</strong> Monuments,Mamallapuram 873,055 277,683 1,013,889<br />

Rajgiri & Krishangiri Fort, Gingee 160,889 162,231 175,161<br />

Fort Dindigul 38,894 39,563 39,734<br />

Muvar Koil Kalumbalur 548 386 476<br />

Rock Cut-Jain Temple, Sittanvasal 15,322 14,660 13,894<br />

Natural Cavem, Eladipattanam 14,428 10,721 13,720<br />

Fort Thirumayan 39,500 40,289 58,756<br />

St. George Fort, Gennai 30,327 - 33,936<br />

Jantar Mantar 277,978 269,598 317,434<br />

Rahim-Khane-Khanam Tomb, Delhi 5,688 7,976 8,878<br />

Purana Quila 599,780 586,931 630,095<br />

Sultangahri Tomb 582 350 241<br />

Tughluqabad Fort 15,031 16,966 24,661<br />

Kotla Feroz Shah 55,892 51,657 55,742<br />

Safdarjung Tomb 112,722 59,416 53,358<br />

Red Fort 2,219,376 2,330,315 2,498,058<br />

Humayun's Tomb 440,952 483,310 478,768<br />

Qutab Minar 2,301,904 2,398,877 2,373,300<br />

Durga Temple Complex, Aihole 181,732 189,732 193,125<br />

Jaina & Vaishnava Caves, Badami 299,881 309,580 361,023<br />

Group <strong>of</strong> Monuments (WH), Pattadakal 205,233 224,309 246,921<br />

Gol-Gumbaz, Bijapur 779,534 841,949 958,499<br />

Ibrahim Rouza, Bijapur 136,211 151,658 162,654<br />

Temple and Sculpture Shed, Lakkundi 8,645 9,919 12,457<br />

Ahom Raja's Palace, Gurgaon 8,615 266,649 35,106<br />

Karenghar Palace, Jaysagar 34,439 88,932 119,558<br />

Ranghar Pavillion, Jaysagar 12,627 32,213 53,450<br />

Vishudol, Joysagar 2,371 5,646 8,447<br />

Group <strong>of</strong> Maidan, Cheraideo 4,448 21,008 25,456<br />

Golkonda Fort, Golkonda 270,131 1,259,659 1,238,140<br />

Charminar, Hyderabad 296,472 1,413,473 1,329,058<br />

Fort, Raja & Rani Mahal Chandragiri 24,961 85,857 83,563<br />

Ruined Buddhist Stupa & Remains Amarvati 5,367 18,410 15,497<br />

Hill <strong>of</strong> Nagarjunakonda with ancient remains 30,086 116,993 77,522<br />

Group <strong>of</strong> Buddhist monuments, Guntupali 2,358 18,252 20,255<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 47


Request for Proposal for establishing e-Governance Systems<br />

Monument Name 2007 2008 2009<br />

Four Storeyed Rock-Cut Hindu Temple, Undavalli 8,365 29,329 38,906<br />

Warangal Fort, Warangal 4,631 92,000 151,973<br />

Deeg Palaces, Deeg 19,263 20,939 27,875<br />

Kumbhalgath Fort 97,672 116,374 152,057<br />

Chittaurgath Fort 317,857 334,298 362,996<br />

Kooch Bihar Palace 260,579 272,212 341,427<br />

Hazarduari Palace Museum Murshidabad 412,773 496,638 617,622<br />

Bishnupur Group <strong>of</strong> Temples 75,830 86,962 93,138<br />

Rani Jhansi Mahal, Jhansi 6,935 8,163 5,955<br />

Sahet <strong>of</strong> Shravasti Monument 86,804 84,674 69,924<br />

Rani Jhansi Kla, Jhansi 139,603 128,168 123,598<br />

Residency, Lucknow 146,496 139,846 133,601<br />

Site <strong>of</strong> Mayuran Palace, Kumarhar, Patna 53,719 76,032 91,088<br />

Ancient Remain, Vaishali 49,668 76,419 100,072<br />

Sarnath Excavated Site 221,460 238,874 250,258<br />

Jaunpur Fort 92,723 96,575 114,812<br />

Man Singh Observatory, Varanasi 2,700 3,353 5,027<br />

Nalanda Excavated Site 267,158 532,673 363,967<br />

Sasaram Shershah Suri Tomb 117,652 131,849 151,082<br />

Lort Cornwalls Tomb, Gazipur 5,209 6,345 9,127<br />

Excavated Site Vikramshila, Aritichak 19,830 18,323 31,841<br />

Laxman Temple, Sirpur 33,389 32,919 36,017<br />

Bekal Fort Pallikkare 146,567 173,894 59,528<br />

Mattancherry Palace Museum, Kochi - 319,263 92,115<br />

Sun Temple, Modhera 119,630 185,969 194,845<br />

Rani-ki-Vav, Patan 152,662 213,230 215,418<br />

Monuments at Champaner 82,829 89,397 101,150<br />

Buddhist Caves, Junagadh 47,636 57,299 51,125<br />

Ashokan Rock Edict, Junagadh 45,334 44,106 45,569<br />

Baba Pyare and Khapra Kodiya Caves, Junagadh 219 127 236<br />

Ram Nagar Palace, Ramnagar 1,940 2,000 2,580<br />

Group <strong>of</strong> Temple, Kiramchi 854 793 1,424<br />

Avanti Swami Temple, A antipura 7,322 6,153 7,817<br />

Leh Palace, Leh 3,287 4,696 8,760<br />

Kangra Fort, Kangra 48,344 47,618 54,004<br />

Rock Cut Caves, Masoor 11,705 11,703 14,578<br />

Total Tourists 26,064,673 31,466,371 32,489,327<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 48


Request for Proposal for establishing e-Governance Systems<br />

10.3 Annexure 3: Indicative Bill <strong>of</strong> Materials<br />

Sl.<br />

No.<br />

Modules Hardware –<br />

Server side<br />

1 Electronic<br />

Communication<br />

Hosted<br />

Server based<br />

on technical<br />

specifications<br />

Location Hardware- client<br />

side<br />

At vendor<br />

location<br />

Minimum<br />

Quantity<br />

Maximum<br />

Quantity<br />

Networking 1 24 24 Circle<br />

Offices<br />

Desktop<br />

Computers with<br />

monitors<br />

Scanner-cumprinter<br />

Modem and Switch 1 24<br />

24 24 x 10 24 Circle<br />

Offices<br />

24 24 24 Circle<br />

Offices<br />

Location S<strong>of</strong>tware Ownership<br />

and payments<br />

Third party<br />

s<strong>of</strong>tware<br />

licenses<br />

Server<br />

ownership<br />

with SI.<br />

Client Side<br />

Hardware and<br />

peripherals to<br />

be procured by<br />

SI based on<br />

specifications<br />

by SI and<br />

owned by ASI.<br />

Third party<br />

licenses to be<br />

procured by SI<br />

in the name <strong>of</strong><br />

ASI<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 49


Request for Proposal for establishing e-Governance Systems<br />

Sl.<br />

No.<br />

Modules Hardware –<br />

Server side<br />

2 E-ticketing<br />

solution<br />

Hosted<br />

Server(s)<br />

based on<br />

technical<br />

specifications<br />

Location Hardware- client<br />

side<br />

At vendor<br />

location<br />

Minimum<br />

Quantity<br />

Maximum<br />

Quantity<br />

Networking 10 10 10<br />

Monuments<br />

Desktop<br />

Computers with<br />

monitors<br />

10 x 2 10 x 3 10<br />

Monuments<br />

Printers 10 x 1 10 x 1 10<br />

Monuments<br />

Modem and Switch 10 x 1 10 x 1 10<br />

Monuments<br />

UPS for Back-up<br />

power<br />

10 x 1 10 x 1 10<br />

Monuments<br />

Location S<strong>of</strong>tware Ownership<br />

and payments<br />

Customized<br />

s<strong>of</strong>tware, and<br />

where<br />

applicable,<br />

third party<br />

licenses.<br />

Server<br />

ownership<br />

with SI.<br />

Hardware and<br />

peripherals to<br />

be procured by<br />

SI based on<br />

specifications<br />

by SI and<br />

owned by ASI.<br />

Source code <strong>of</strong><br />

s<strong>of</strong>tware, and<br />

licenses, if any,<br />

to be owned<br />

by ASI. Refer<br />

RFP Volume 3.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 50


Request for Proposal for establishing e-Governance Systems<br />

Sl.<br />

No.<br />

Modules Hardware –<br />

Server side<br />

3 Financial<br />

planning and<br />

Budgeting<br />

Solution<br />

Hosted<br />

Server based<br />

on technical<br />

specifications<br />

Location Hardware- client<br />

side<br />

At vendor<br />

location<br />

Minimum<br />

Quantity<br />

Maximum<br />

Quantity<br />

Networking 24 x 1 (120+24) x 2 24 Circles<br />

and 120<br />

locations<br />

Scanner-cumprinter<br />

Desktop<br />

Computers with<br />

monitors<br />

24 x 1 (120+24) x 2 24 Circles<br />

and 120<br />

locations<br />

24 x 1 (120+24) x 2 24 Circles<br />

and 120<br />

locations<br />

Location S<strong>of</strong>tware Ownership<br />

and payments<br />

Customized<br />

s<strong>of</strong>tware, and<br />

where<br />

applicable,<br />

third party<br />

licenses.<br />

Server<br />

ownership<br />

with SI.<br />

Hardware and<br />

peripherals to<br />

be procured by<br />

SI based on<br />

specifications<br />

by SI and<br />

owned by ASI.<br />

Source code <strong>of</strong><br />

s<strong>of</strong>tware, and<br />

licenses, if any,<br />

to be owned<br />

by ASI. Refer<br />

RFP Volume 3.<br />

RFP Volume 1:<strong>Project</strong> <strong>Requirements</strong> P a g e | 51


Request for Proposal<br />

For establishing e-Governance Systems<br />

For<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

Commercial and Bidding Terms<br />

November 2011


Request for Proposal for establishing e-Governance Systems<br />

Volume 2: Commercial and Bidding Terms<br />

1 INTRODUCTION ..................................................................................................................... 4<br />

1.1 PARTICULARS OF RFP .................................................................................................................... 4<br />

2 SCOPE OF WORK FOR IMPLEMENTATION AGENCY (SI) ........................................................... 5<br />

2.1 OVERVIEW OF SCOPE OF WORK ....................................................................................................... 5<br />

3 CONSTITUTION OF THE TEAM ................................................................................................ 6<br />

4 PROJECT IMPLEMENTATION ................................................................................................ 14<br />

4.1 APPROACH & METHODOLOGY FOR IMPLEMENTATION OF TECHNICAL SOLUTION ................................... 14<br />

4.2 PROJECT TIMELINES ..................................................................................................................... 15<br />

5 IMPLEMENTATION MODEL .................................................................................................. 19<br />

5.1 OPERATION MODEL .................................................................................................................... 19<br />

6 PAYMENT TERMS & SCHEDULE ............................................................................................ 20<br />

6.1 PAYMENT TERMS ........................................................................................................................ 20<br />

6.2 PAYMENT SCHEDULE ................................................................................................................... 20<br />

7 BIDDING PROCESS DETAILS .................................................................................................. 22<br />

7.1 BIDDING SCHEDULE ..................................................................................................................... 22<br />

7.2 GENERAL INSTRUCTION TO BIDDERS ............................................................................................... 23<br />

7.3 BID SUBMISSION INSTRUCTIONS .................................................................................................... 29<br />

7.4 CLARIFICATION ON RFP DOCUMENT .............................................................................................. 32<br />

7.5 BID OPENING & EVALUATION PROCESS .......................................................................................... 33<br />

8 AWARD OF CONTRACT ........................................................................................................ 38<br />

8.1 POST QUALIFICATION AND AWARD CRITERIA ................................................................................... 38<br />

8.2 PURCHASER'S RIGHT TO VARY SCOPE OF CONTRACT ......................................................................... 38<br />

8.3 PURCHASER'S RIGHT TO ACCEPT AND REJECT BIDS............................................................................ 38<br />

8.4 NOTIFICATION OF AWARD ............................................................................................................ 39<br />

8.5 NEGOTIATIONS WITH THE SUCCESSFUL BIDDER ................................................................................. 39<br />

8.6 SIGNING OF CONTRACT ................................................................................................................ 39<br />

8.7 PERFORMANCE SECURITY ............................................................................................................. 39<br />

9 ANNEXURE 1: BID FORMATS ................................................................................................ 40<br />

9.1 COVER LETTER ............................................................................................................................ 40<br />

9.2 PRE QUALIFICATION .................................................................................................................... 43<br />

9.3 TECHNICAL BID FORMATS ............................................................................................................. 48<br />

9.4 COMMERCIAL BID ....................................................................................................................... 54<br />

10 ANNEXURE 2: PRE-QUALIFICATION AND TECHNICAL BID EVALUATION CRITERIA ................. 58<br />

10.1 PRE-QUALIFICATION EVALUATION CRITERIA .................................................................................... 58<br />

10.2 EVALUATION OF TECHNICAL BIDS ................................................................................................... 60<br />

11 ANNEXURE 3: STATEMENT OF DEVIATION FORMAT ............................................................. 61<br />

11.1 STATEMENT OF DEVIATIONS FROM SCHEDULE OF REQUIREMENTS ....................................................... 61<br />

12 ANNEXURE 4: REQUEST FOR CLARIFICATION FORMAT ......................................................... 62<br />

12.1 FORMAT FOR CLARIFICATIONS ....................................................................................................... 62<br />

12.2 CLARIFICATION ON RFP DOCUMENT .............................................................................................. 63<br />

RFP Volume 2: Commercial and Bidding Terms Page 1


Request for Proposal for establishing e-Governance Systems<br />

RFP Volume 2: Commercial and Bidding Terms Page 2


Request for Proposal for establishing e-Governance Systems<br />

A & P Accounts and Pay<br />

List <strong>of</strong> Abbreviations<br />

ADG Additional Director General<br />

AMC Annual Maintenance Contract<br />

ASI <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

BE Budget Estimate<br />

CDDO Cheque Drawing and Disbursing Officer<br />

CDO Cheque Drawing Officer<br />

CGF Central Government Fund<br />

COTS Commercial Off the Shelf<br />

DDO Drawing and Disbursing Officer<br />

FRS Functional Requirement Specifications<br />

FTP Full Technical Proposal<br />

HLD High Level Design<br />

IMAP Internet Message Access Protocol<br />

ISO International Standards Organization<br />

LLD Low Level Design<br />

MIME Multipurpose Internet Mail Extensions<br />

NIC National Informatics Centre<br />

NISG National Institute for Smart Government<br />

NOC No Objection Certificate<br />

PAO Pay and Account Offices<br />

PKI Public Key Infrastructure<br />

PoS Point <strong>of</strong> Sale<br />

RFP Request for Proposal<br />

SI System Integrator<br />

SLA Service Level Agreement<br />

SPOC Single Point <strong>of</strong> Contact<br />

SRS S<strong>of</strong>tware Requirement Specifications<br />

VPN Virtual Private Network<br />

SMTP Simple Mail Transfer Protocol<br />

RFP Volume 2: Commercial and Bidding Terms Page 3


Request for Proposal for establishing e-Governance Systems<br />

1 Introduction<br />

1.1 Particulars <strong>of</strong> RFP<br />

1.1.1 This invitation to Tender is for “Establishing e-Governance Systems”for <strong>Archaeological</strong><br />

<strong>Survey</strong> <strong>of</strong> <strong>India</strong> (ASI).<br />

1.1.2 Bidders are advised to study the RFP Document carefully. Submission <strong>of</strong> Tender shall be<br />

deemed to have been done after careful study and examination <strong>of</strong> the Tender Document<br />

with full understanding <strong>of</strong> its implications. Sealed <strong>of</strong>fers prepared in accordance with the<br />

procedures enumerated in Section 8.3 should be submitted to the Director – Administration,<br />

at ASI, not later than the date and time laid down, at his/her address given in the Section<br />

8.1.2.<br />

1.1.3 The tender document can be obtained during working hours on all working days at the <strong>of</strong>fice<br />

address (as prescribed in Section 8.1.2) from the start date <strong>of</strong> sale <strong>of</strong> tender till the last date.<br />

The tender document can also be downloaded from ASI website (www.asi.nic.in).<br />

1.1.4 Tender fee <strong>of</strong> ` 10,000 (Rupees Ten Thousand Only) has to be paid at the time <strong>of</strong> purchasing<br />

the tender from the <strong>of</strong>fice address or if the document is downloaded, should be submitted<br />

along with the Bid Security at the time <strong>of</strong> Bid Submission. Tender fee should be in form <strong>of</strong><br />

Demand Draft drawn in favor <strong>of</strong> “Director – Administration, <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong><br />

<strong>India</strong>”payable at New Delhi. Tender fee submitted by the bidder shall be non-refundable.<br />

1.1.5 This Tender document is not transferable.<br />

1.1.6 Bid Security<br />

All bids must be accompanied by Bid Security <strong>of</strong> ` 10,00,000 (Rupees Ten Lakhs Only).Bid<br />

Security is to be submitted in the form <strong>of</strong> Demand Draft issued valid for at least 180 days<br />

from the date <strong>of</strong> opening <strong>of</strong> Technical Bid. The Demand Draft should be in favor <strong>of</strong> “Director<br />

– Administration, <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>” and payable at New Delhi.<br />

RFP Volume 2: Commercial and Bidding Terms Page 4


Request for Proposal for establishing e-Governance Systems<br />

2 Scope <strong>of</strong> Work for Implementation Agency (SI)<br />

2.1 Overview <strong>of</strong> Scope <strong>of</strong> Work<br />

The Scope <strong>of</strong> Work for the e-governance systems proposed through this RFP requires the following:<br />

1. Electronic Communication Solutions Module<br />

2. E-ticketing Solutions Module<br />

3. Financial Planning and budgeting Solutions Module<br />

For details, please refer to Volume 1 on <strong>Project</strong> <strong>Requirements</strong>.<br />

Each <strong>of</strong> the three modules would entail the phases <strong>of</strong>:<br />

<strong>Project</strong> Planning Process<br />

<strong>Requirements</strong> Analysis<br />

Solution Design<br />

System Development<br />

Solution Prototype, where required<br />

Entry <strong>of</strong> Historical Data<br />

Testing and Acceptance<br />

Documentation<br />

User Training, Operations and Maintenance<br />

RFP Volume 2: Commercial and Bidding Terms Page 5


Request for Proposal for establishing e-Governance Systems<br />

3 Constitution <strong>of</strong> the Team<br />

3.1 Overview<br />

3.1.1 Given the scale <strong>of</strong> the project, it is required that bidder proposes personnel that<br />

are highly dedicated and experienced in their fields.<br />

3.1.2 Bidder must note the minimum requisite positions which shall be used for<br />

technical evaluation are given below.<br />

3.1.3 Bidder is required to make an independent evaluation <strong>of</strong> all positions that are<br />

3.2 Team Structure<br />

<strong>Project</strong> Management Team<br />

required to be filled in order to meet the requirements <strong>of</strong> the project.<br />

Electronic<br />

Communication<br />

Module<br />

E-ticketing Module Financial Planning<br />

and Budgeting<br />

Module<br />

ProgramManager One Program Manager with at least 10-12 years <strong>of</strong> experience in<br />

similar implementations.<br />

<strong>Project</strong> Manager One <strong>Project</strong><br />

Manager with at<br />

least 10 years<br />

experience with email<br />

implementations.<br />

<strong>Project</strong> Implementation Team<br />

Business Analyst At least 8 years<br />

experience<br />

Solution Architect (Infrastructure and<br />

Hardware)<br />

Solution Architect (Network and<br />

Security)<br />

Solution Architect<br />

(Application/S<strong>of</strong>tware)<br />

Operations Team<br />

One <strong>Project</strong><br />

Manager with at<br />

least 10 years<br />

experience, with at<br />

least one e-ticketing<br />

implementation.<br />

At least 8 years<br />

experience<br />

Not required At least 5 years<br />

experience<br />

At least 5 years<br />

experience<br />

At least 5 years<br />

experience<br />

Not required At least 5 years<br />

experience<br />

Module Leader - post implementation One person with at least 6-8 years experience<br />

One <strong>Project</strong><br />

Manager with at<br />

least 10 years<br />

experience, with at<br />

least one Finance<br />

and Accounts<br />

s<strong>of</strong>tware module<br />

implementation.<br />

At least 8 years<br />

experience<br />

At least 5 years<br />

experience<br />

At least 5 years<br />

experience<br />

At least 5 years<br />

experience<br />

RFP Volume 2: Commercial and Bidding Terms Page 6


Request for Proposal for establishing e-Governance Systems<br />

3.3 Personnel Pr<strong>of</strong>ile<br />

The required pr<strong>of</strong>ile <strong>of</strong> the personnel mentioned above is as follows:<br />

3.3.1 Program Manager<br />

3.3.1.1 Pr<strong>of</strong>ile<br />

3.3.2 <strong>Project</strong> Manager<br />

(S)He must have a minimum <strong>of</strong> 10-12 years experience in IT with a<br />

minimum <strong>of</strong> 8 years in Program Management.<br />

(S)He must preferably have qualifications in <strong>Project</strong> Management<br />

(e.g., PMP certified).<br />

(S)He should have extensive experience and proven expertise in<br />

managing similar multi module contracts <strong>of</strong> this type and<br />

complexity.<br />

3.3.1.2 Responsibility<br />

(S)He should be responsible for organizing, planning, directing, and<br />

coordinating the overall program effort.<br />

(S)He should be responsible for allocating resources to the project<br />

modules.<br />

3.3.2.1 Pr<strong>of</strong>ile<br />

(S)He should be responsible for conflict management, issue and<br />

dispute resolution.<br />

(S)He should participate in all fortnightly / monthly project<br />

meetings and project review meetings.<br />

(S)He should review quality <strong>of</strong> project deliverables to ensure<br />

compliance with the agreed quality measures and standards.<br />

(S)He should ensure compliance with the Terms and Conditions <strong>of</strong><br />

the Contract and NDA signed with ASI.<br />

(S)He must have a graduation degree in Engineering.<br />

(S)He must have a minimum <strong>of</strong> 10 years experience in IT with<br />

minimum 5 years in senior managerial positions.<br />

(S)He must have PMP or an equivalent certification.<br />

3.3.2.2 Responsibility<br />

RFP Volume 2: Commercial and Bidding Terms Page 7


Request for Proposal for establishing e-Governance Systems<br />

3.3.3 Business Analyst<br />

(S)He should be responsible for the overall module performance<br />

for the entire duration <strong>of</strong> the contract and should be dedicated to<br />

this project for the entire duration <strong>of</strong> this contract.<br />

(S)He should be responsible for organizing, planning, directing, and<br />

coordinating the module effort.<br />

(S)He should participate in the Module related meetings.<br />

(S)He should be responsible for managing the module team<br />

resources and ensuring their optimum allocation.<br />

(S)He should review the integration test plan for completeness and<br />

correctness.<br />

3.3.3.1 Pr<strong>of</strong>ile<br />

(S)He should manage integration testing along with Solution<br />

Architect (S<strong>of</strong>tware) and Testing Engineers.<br />

(S)He should prepare Performance Test Plan which would specify<br />

the business transactions that would be tested for performance.<br />

(S)He should be responsible for organizing, planning, directing, and<br />

coordinating the efforts for the module.<br />

(S)He should have a thorough understanding and knowledge <strong>of</strong> the<br />

principles and methodologies associated with program<br />

management, vendor management, quality assurance metrics and<br />

techniques, and configuration management tools.<br />

(S)He must have an overall IT experience <strong>of</strong> not less than 8 years<br />

as Business Analyst in IT industry.<br />

(S)He shall be atleast a B Tech or B.E or have a Masters degree in<br />

Business Administration<br />

3.3.3.2 Responsibility<br />

(S)He should be the key resource for studying all redesigned<br />

workflows/ processes and identifying the critical workflows for the<br />

envisaged solution.<br />

RFP Volume 2: Commercial and Bidding Terms Page 8


Request for Proposal for establishing e-Governance Systems<br />

(S)He should lead the requirement gathering exercise by<br />

conducting meetings with the various process owners and the<br />

<strong>Project</strong> Management Team.<br />

(S)He should have the ability to intelligently probe department<br />

personnel and study the processes to understand the challenges<br />

that need to be addressed through the application<br />

(S)He should work in collaboration with the <strong>Project</strong> Manager to<br />

ensure that the gathered requirements are in line with the <strong>Project</strong><br />

Vision.<br />

(S)He should be able to identify the use cases for all processes<br />

(S)He should be most visible in the initial requirement gathering<br />

stage <strong>of</strong> the project<br />

3.3.4 Solution Architect (Infrastructure and Hardware)<br />

3.3.4.1 Pr<strong>of</strong>ile<br />

(S)He must have a minimum <strong>of</strong> 5 years experience in designing and<br />

implementation <strong>of</strong> similar infrastructure.<br />

(S)He must be qualified as a B.E., or M.C.A from a reputed<br />

university.<br />

3.3.4.2 Responsibility<br />

The Infrastructure Architect should have the capability to design<br />

platform solutions to support applications, including their<br />

integration with database, network, and storage solutions.<br />

(S)He should possess extensive detailed working knowledge and<br />

acumen in the enterprise architecture best practices, including, but<br />

not limited to, logical and physical data architectures, network<br />

communications, operating systems, applications, data base<br />

servers, application servers, web servers, server consolidation,<br />

server performance, middleware, etc.<br />

(S)He should have the ability to address specialized and complex<br />

infrastructure architectural issues. (S)He should have extensive<br />

experience in infrastructure architecture discipline(s) <strong>of</strong> similar<br />

complexity as described in the RFP.<br />

RFP Volume 2: Commercial and Bidding Terms Page 9


Request for Proposal for establishing e-Governance Systems<br />

3.3.5 Solution Architect (Network & Security)<br />

3.3.5.1 Pr<strong>of</strong>ile<br />

(S)He should have extensive experience in Implementation specific<br />

network architectures <strong>of</strong> similar complexity as described in the<br />

RFP.<br />

(S)He should be BE/B.Tech and preferably M.Tech<br />

Diploma / Relevant certification in networking would be preferred.<br />

(S)He should have a minimum <strong>of</strong> 5 years experience in designing<br />

and implementation <strong>of</strong> similar network infrastructure.<br />

3.3.5.2 Responsibility<br />

The Solution Architect should have the capability to address key<br />

security and privacy requirements <strong>of</strong> the network. (S)He should<br />

implement using appropriate technologies and thereby design<br />

secure network solutions.<br />

(S)He should have specialization on a range <strong>of</strong> solutions, including,<br />

but not limited to, making appropriate use <strong>of</strong> Public Key<br />

Infrastructure (PKI), intrusion detection / prevention, Virtual<br />

Private Network (VPN), single sign-on, firewalls, and all elements <strong>of</strong><br />

network-level security.<br />

(S)He should possess extensive knowledge and experience in<br />

network technology, network design, operations, encryption,<br />

information access, and authentication processes.<br />

(S)He should provide solutions to complex security-related<br />

architectural issues.<br />

3.3.6 Solution Architect (Application / S<strong>of</strong>tware)<br />

3.3.6.1 Pr<strong>of</strong>ile<br />

(S)He must have a graduation degree in Engineering with MCA or<br />

M. Tech.<br />

(S)He must have a minimum 5 years experience in Solution Design<br />

3.3.6.2 Responsibility<br />

(S)He should be responsible for creating or selecting the most<br />

appropriate architecture for a system (or systems), such that it<br />

RFP Volume 2: Commercial and Bidding Terms Page 10


Request for Proposal for establishing e-Governance Systems<br />

suits the business needs, satisfies user requirements, and achieves<br />

the desired results under given constraints.<br />

(S)He should create Overall technical design (System Design<br />

Document - SDD) <strong>of</strong> the system consisting <strong>of</strong> project standards, the<br />

functional design and the database design.<br />

(S)He should facilitate High level planning for the development -<br />

overall steps for creation <strong>of</strong> the solution (Low Level Design – LLD)<br />

from the blueprints.<br />

(S)He should develop integration test cases and include these in<br />

integration test plan. These test cases should focus primarily on<br />

testing the interfaces <strong>of</strong> the modules. Each test case should be<br />

described along with the input and output data, and the results<br />

expected after each test case.<br />

(S)He should have a thorough understanding <strong>of</strong> the technical and<br />

quality standards and ensure adherence to those in order to<br />

maximize the future investment value and minimizing costs.<br />

(S)He should be most visible during the requirements and design<br />

stages <strong>of</strong> a project lifecycle, but should proactively monitor the<br />

adherence <strong>of</strong> the implementation to the chosen architecture<br />

during all iterations.<br />

3.3.7 Module Leader - Post Implementation<br />

3.3.7.1 Pr<strong>of</strong>ile<br />

(S)He should have an experience <strong>of</strong> over 6-8 years in the<br />

application falling under the module and at least 5 years <strong>of</strong> team<br />

leader experience <strong>of</strong> application maintenance and management<br />

(S)He must be qualified as a B.E./B.Tech, M.C.A, M.E./M.Tech from<br />

a reputed university.<br />

3.3.7.2 Responsibility<br />

(S)He should be responsible for planning and scheduling <strong>of</strong> the<br />

module related activities along with <strong>Project</strong> Manager.<br />

(S)He should have a thorough understanding <strong>of</strong> the complexity <strong>of</strong><br />

the module to be implemented along with the dependencies on<br />

other modules.<br />

RFP Volume 2: Commercial and Bidding Terms Page 11


Request for Proposal for establishing e-Governance Systems<br />

(S)He should manage the flow <strong>of</strong> work within the team and ensure<br />

optimum allocation <strong>of</strong> work amongst team members.<br />

(S)He should be responsible for controlling the overall maintenance<br />

<strong>of</strong> the applications in the module.<br />

(S)He should coordinate with ASI team for regular updates on the<br />

application<br />

3.4 General instructions for proposing the team<br />

(S)He should coordinate with the relevant Programmers, Business<br />

Analysts and Testing Engineers for Unit & System Testing.<br />

(S)He should be able to assist ASI personnel in ensuring proper<br />

maintenance and regular backup <strong>of</strong> application data<br />

(S)He should have an understanding <strong>of</strong> all the applications and<br />

business requirements <strong>of</strong> the module.<br />

3.4.1 Bidder should provide adequate number <strong>of</strong> personnel each responsible for a<br />

specific role within the system. Bidder must provide clear definition <strong>of</strong> the role<br />

and responsibility <strong>of</strong> each individual personnel.<br />

3.4.2 Bidder should have a defined hierarchy and reporting structure for various teams<br />

that would be part <strong>of</strong> the project.<br />

3.4.3 Bidder should ensure that all the personnel identified for this project have high<br />

level <strong>of</strong> integrity. Bidder should undertake necessary due diligence to ensure that<br />

the personnel have high standard <strong>of</strong> trustworthiness. Bidder should obtain an<br />

undertaking from each <strong>of</strong> the personnel assigned and the same should be<br />

submitted to ASIas and when demanded by ASI. Any information needed for this<br />

activity by ASI should be provided immediately by Bidder.<br />

3.4.4 Bidder must ensure that the minimum number and type <strong>of</strong> Key Personnel are<br />

proposed, failing which the proposal would be considered as non-responsive.<br />

Bidder can provide additional manpower on the basis <strong>of</strong> their estimate <strong>of</strong> effort<br />

required to complete the terms <strong>of</strong> reference given in the RFP.<br />

3.4.5 Bidder can <strong>of</strong>fer more than one key personnel for a role to improve the quality <strong>of</strong><br />

key personnel keeping in mind the terms <strong>of</strong> reference given in the RFP.<br />

3.5 Expected effort from Key Personnel deployed by Bidder<br />

RFP Volume 2: Commercial and Bidding Terms Page 12


Request for Proposal for establishing e-Governance Systems<br />

Sr. No. Role<br />

Number <strong>of</strong><br />

personnel<br />

Minimum number <strong>of</strong> person-months<br />

expected<br />

1. Program Manager 1 At least 1 full day per month<br />

2. <strong>Project</strong> Manager 3* Full time till project implementation<br />

3. Solution Architect<br />

(S<strong>of</strong>tware)<br />

4. Solution Architect<br />

(Infrastructure and<br />

Hardware)<br />

5. Solution Architect<br />

(Network & Security)<br />

At least 1 full day per week post go-live<br />

during contract period<br />

2* 6 person-months per person<br />

2* 6 person months per person<br />

3* 6 person months per person for e-<br />

ticketing and Financial Planning and<br />

Budgeting, and 1 person month for<br />

Electronic Communication<br />

6. Business Analyst 3 6 person months per person for e-<br />

ticketing and Financial Planning and<br />

Budgeting, and 1 person month for<br />

Electronic Communication<br />

* Roles could be combined across modules, provided the Bidder can ensure adequate availability as<br />

required for implementation.<br />

RFP Volume 2: Commercial and Bidding Terms Page 13


Request for Proposal for establishing e-Governance Systems<br />

4 <strong>Project</strong> Implementation<br />

4.1 Approach & Methodology for Implementation <strong>of</strong> Technical Solution<br />

The implementation <strong>of</strong> the Modules would be in four phases. These phases are based on<br />

the criticality <strong>of</strong> the solutions to be provided by the Bidder. Approach for Implementation<br />

<strong>of</strong> technical Solution is provided below for better understanding <strong>of</strong> the Bidder.<br />

The application architecture has been classified based on the criticality <strong>of</strong> the functions<br />

into the following four phases <strong>of</strong> Go-Live with the corresponding tentative timelines:<br />

Sr.<br />

No.<br />

GO-Live phases Application modules Go-live timeline<br />

1 Go-Live<br />

(Module1)<br />

2 Go-Live<br />

(Module 2)<br />

3 Go-Live<br />

(Module 3)<br />

4 Go-Live<br />

(Counter Management)<br />

Electronic Communication Module T + 8 weeks<br />

E-ticketing Module T + 20 weeks<br />

Financial Planning and Budgeting<br />

Module<br />

T + 16 weeks<br />

E-ticketing Counter Management T + 22 weeks<br />

Bidders are advised to study the implementation approach carefully and propose the<br />

technical solution based on the implementation approach. It is expected that for “go-live”<br />

<strong>of</strong> each phase, Bidder would provide application prototype (if required), use cases,<br />

application hosting, and training to ASI’s personnel.<br />

All the modules presented above are defined in Volume 1 <strong>of</strong> this RFP document.<br />

Strategy for IT infrastructure for end-user:The SI will assess existing IT infrastructure,<br />

procure, deploy and maintain the necessary hardware, networking and peripherals in order<br />

to meet the project requirements.An indicative Bill <strong>of</strong> Materials has been provided in RFP<br />

Volume 1, Annexure 3 These will be owned by ASI.<br />

RFP Volume 2: Commercial and Bidding Terms Page 14


Request for Proposal for establishing e-Governance Systems<br />

4.2 <strong>Project</strong> Timelines<br />

Bidder is expected to follow the schedule as mentioned in the table below. Each <strong>of</strong> the milestones should be accompanied with a presentation on the<br />

deliverables by the bidder, related to that milestone. The submission <strong>of</strong> deliverable will be deemed complete after the submission <strong>of</strong> the hard / s<strong>of</strong>t copy <strong>of</strong><br />

the deliverable and the presentation by the bidder.<br />

The “Expected Date <strong>of</strong> Completion” as mentioned in the table below is the date by which the deliverable shall be submitted to the ASI. The Bidder shall<br />

ensure that the deliverable is accepted by the ASI as per schedule mentioned in the table below post review.<br />

Table 1: Timelines and Deliverables <strong>of</strong> the <strong>Project</strong><br />

Sr.<br />

No.<br />

1. <strong>Project</strong> Planning and submission<br />

<strong>of</strong> project plan<br />

2. Requirement study gathering and<br />

review <strong>of</strong> existing applications<br />

3. Preparation <strong>of</strong> S<strong>of</strong>tware<br />

<strong>Requirements</strong> Specification,<br />

Item Expected Date <strong>of</strong><br />

Submission from ‘T’<br />

Final<br />

acceptance<br />

post review<br />

T + 1 weeks Within 1 week<br />

post review<br />

T + 1 weeks for Electronic<br />

Communication Module<br />

T + 2 weeks for E-ticketing<br />

and Financial Planning and<br />

Budgeting Modules<br />

T + 1 week for Electronic<br />

Communication Module<br />

Payment<br />

Milestone<br />

RFP Volume 2: Commercial and Bidding Terms Page 15<br />

Deliverables<br />

[M0] <strong>Project</strong> Management services and<br />

Preparation <strong>of</strong> <strong>Project</strong> Plan<br />

Within 1 week None<br />

<strong>Project</strong> Management, Configuration<br />

Management and Issue Tracker tools<br />

<strong>Project</strong> performance reports formats<br />

Within 2 weeks System Requirement Specifications (SRS)<br />

Document (including customizations, if


Request for Proposal for establishing e-Governance Systems<br />

Sr.<br />

No.<br />

Item Expected Date <strong>of</strong><br />

Submission from ‘T’<br />

System design T + 3 weeks for E-ticketing<br />

and Financial Planning and<br />

Budgeting Modules<br />

4. Training for Go-Live for Electronic<br />

Communication Module<br />

5. Go-Live for Electronic<br />

Communication Module<br />

6. Preparation <strong>of</strong> User Acceptance<br />

test cases and test plan for<br />

Modules 2 and 3<br />

7. Commissioning <strong>of</strong> environment<br />

for Prototype Development for eticketing<br />

Module<br />

8. Sign-<strong>of</strong>f from stakeholders after<br />

Prototype demonstration<br />

9. Data Migration Plan for Financial<br />

Planning and Budgeting Module<br />

10. Procurement and deployment <strong>of</strong><br />

datacenter and IT infrastructure<br />

11. Preparation for User Acceptance<br />

Test for Financial Planning and<br />

Budgeting Module<br />

Final<br />

acceptance<br />

post review<br />

Payment<br />

Milestone<br />

RFP Volume 2: Commercial and Bidding Terms Page 16<br />

any)<br />

Deliverables<br />

System Design document (SDD)<br />

T+ 3 weeks Within 1 week Evaluating Training Feedback and<br />

training content / methodology<br />

T + 6 weeks Within 2 week [M 1] Roll-out checklist and plan<br />

T + 6 weeks Within 2 weeks User Acceptance Test Cases<br />

T + 6 weeks Within 2 weeks<br />

post review<br />

User Acceptance Plan<br />

Development <strong>of</strong> Prototype and Functional<br />

acceptance on Prototype<br />

T + 8 weeks Within 1 week Workshop for review and sign-<strong>of</strong>f<br />

T + 12 weeks Within 1 week Detailed Plan for Data Migration<br />

T + 14 weeks Within 2 weeks Certifications <strong>of</strong> deployment completion<br />

at each site given to bidder by concerned<br />

ASI <strong>of</strong>ficial / third party<br />

T + 12 weeks Within 1 week User Acceptance Test Cases<br />

User Acceptance Plan


Request for Proposal for establishing e-Governance Systems<br />

Sr.<br />

No.<br />

12. Data Migration for Financial<br />

Planning and Budgeting Module<br />

13. Training for Go-Live for Financial<br />

Planning and Budgeting Module<br />

14. User Acceptance Testing before<br />

Go-Live for Financial Planning<br />

and Budgeting Module<br />

15. Go-Live for Financial Planning<br />

and Budgeting Module<br />

16. Transition <strong>of</strong> existing ticketing<br />

Counters at each <strong>of</strong> the 10 pilot<br />

ASI monuments<br />

17. Preparation for User Acceptance<br />

Test for e-ticketing Module<br />

18. Training for Go-Live fore-ticketing<br />

Module<br />

19. User Acceptance Testing before<br />

for e-ticketing Module<br />

Item Expected Date <strong>of</strong><br />

Submission from ‘T’<br />

Final<br />

acceptance<br />

post review<br />

Payment<br />

Milestone<br />

RFP Volume 2: Commercial and Bidding Terms Page 17<br />

Deliverables<br />

T + 14 weeks Within 1 week Data Migration Completion Report<br />

T + 15 weeks<br />

T + 14 weeks Within 1 week<br />

post review<br />

Within 1 week Evaluating Training Feedback and<br />

tuning training content / methodology<br />

Testing report with fail / pass results<br />

and plan to fix the defects<br />

Test cases<br />

T + 16 weeks Within 2 week [M 2] Roll-out checklist and plan<br />

T + 18 weeks Within 1 week Transition completion report<br />

T + 16 weeks Within 1 week User Acceptance Test Cases<br />

T + 16 weeks for eticketing<br />

Module<br />

T + 16 weeks Within 1 week<br />

post review<br />

User Acceptance Plan<br />

Within 1 week Evaluating Training Feedback and<br />

tuning training content / methodology<br />

Testing report with fail / pass results<br />

and plan to fix the defects<br />

Test cases<br />

20. Go-Livefor e-ticketing Module T + 18 weeks Within 2 week [M 3] Roll-out checklist and plan<br />

21. Transition <strong>of</strong> Counters T + 20 weeks Within 2 weeks Transition completion report


Request for Proposal for establishing e-Governance Systems<br />

Sr.<br />

No.<br />

22. Training for e-ticketing counter<br />

Management<br />

Item Expected Date <strong>of</strong><br />

Submission from ‘T’<br />

Final<br />

acceptance<br />

post review<br />

Payment<br />

Milestone<br />

RFP Volume 2: Commercial and Bidding Terms Page 18<br />

Deliverables<br />

T + 20 weeks Within 1 week Evaluating Training Feedback and<br />

tuning training content / methodology<br />

Till end <strong>of</strong> Contract period NA installments,<br />

Quarterly performance appraisal<br />

reports<br />

For each year <strong>of</strong> support and<br />

based on the<br />

SLAs<br />

maintenance phase:<br />

Monthly log <strong>of</strong> service calls and<br />

problem resolution reports for Helpdesk<br />

23. Operation <strong>of</strong> the Counters 6 months NA Equated<br />

quarterly<br />

24. Maintenance and Technical<br />

Support for all the Systems<br />

T indicates the project kick-<strong>of</strong>f date<br />

Quarterly Performance Monitoring<br />

Reports for the system<br />

Updated system design documents,<br />

specifications for every change request<br />

Latest source code, application<br />

deployment files, configuration files for<br />

entire solution<br />

Updated user manuals, administration<br />

manuals, training manuals etc<br />

S<strong>of</strong>tware change logs


Request for Proposal for establishing e-Governance Systems<br />

5 Implementation Model<br />

5.1 Operation Model<br />

SI will propose an operation model commensurate with the requirements <strong>of</strong> ASI. It is proposed that<br />

the SI will take into consideration the following objectives <strong>of</strong> ASI:<br />

1. Enhancement <strong>of</strong> service delivery with respect to customer interface<br />

2. Increased efficiency <strong>of</strong> internal communication<br />

3. Reduced effort and time for generating financial reports<br />

For specific operations models for each <strong>of</strong> the modules, refer to Volume 1 <strong>of</strong> the RFP.<br />

RFP Volume 2: Commercial and Bidding Terms Page 19


Request for Proposal for establishing e-Governance Systems<br />

6 Payment Terms & Schedule<br />

6.1 Payment Terms<br />

6.1.1 ASI shall make payments to the Bidder at the times and in the manner set out in the Payment<br />

schedule as specified in Section 7.2 below. ASI will make all efforts to make payments to the<br />

Bidder within 30 days <strong>of</strong> receipt <strong>of</strong> invoice(s) and all necessary supporting documents.<br />

6.1.2 All payments agreed to be made by ASI to the Bidder in accordance with the Bid shall be<br />

inclusive <strong>of</strong> all statutory levies, duties, taxes and other charges whenever levied/applicable, if<br />

any, and ASI shall not be liable to pay any such levies/ other charges under or in relation to<br />

this Contract and/or the Services.<br />

6.1.3 No invoice for extra work/ change order on account <strong>of</strong> change order will be submitted by the<br />

Bidder unless said extra work /change order has been authorized/approved by the ASI in<br />

writing in accordance with Change Control Schedule.<br />

6.1.4 Contract would be signed for 3 years. Based on the performance <strong>of</strong> the Implementation<br />

Agency, ASI may decide to extend the period <strong>of</strong> contract by 2 years.Contract rates for the<br />

extended 2 years would be based on the rates <strong>of</strong> AMC for 3 rd year and would be negotiable<br />

between the Bidder and the ASI. ASI is not bound to extend the contract period by two<br />

years.<br />

6.1.5 Bidder needs to provide rationale for the commercial quotes provided. ASI holds the right to<br />

ask for an explanation <strong>of</strong> the rationale from the Bidder<br />

6.1.6 In the event <strong>of</strong> ASI noticing at any time that any amount has been disbursed wrongly to the<br />

Bidder or any other amount is due from the Bidder to the ASI, the ASI may without prejudice<br />

to its rights recover such amounts by other means after notifying the Bidder or deduct such<br />

amount from any payment falling due to the Bidder. The details <strong>of</strong> such recovery, if any, will<br />

be intimated to the Bidder. The Bidder shall receive the payment <strong>of</strong> undisputed amount<br />

under subsequent invoice for any amount that has been omitted in previous invoice by<br />

mistake on the part <strong>of</strong> the ASI or the Bidder.<br />

6.1.7 All payments to the Bidder shall be subject to the deductions <strong>of</strong> tax at source under Income<br />

Tax Act and other taxes, and deductions as provided for under any law, rule or regulation. All<br />

costs, damages or expenses which ASI may have paid or incurred, for which under the<br />

provisions <strong>of</strong> the Contract, the Bidder is liable, the same shall be deducted by ASI from any<br />

dues to the Bidder. All payments to the Bidder shall be made after making necessary<br />

deductions as per terms <strong>of</strong> the Contract and recoveries towards facilities, if any, provided by<br />

the ASI to the Bidder on chargeable basis.<br />

6.2 Payment Schedule<br />

Total Contract Value is the total value mentioned by the Bidder in Section 10.4.2 in this<br />

volume <strong>of</strong> RFP.<br />

RFP Volume 2: Commercial and Bidding Terms Page 20


Request for Proposal for establishing e-Governance Systems<br />

S.<br />

No.<br />

<strong>Project</strong> Milestone<br />

1. Commencement <strong>of</strong> the project 10%<br />

2.<br />

3.<br />

4.<br />

5.<br />

Acceptance <strong>of</strong> System - Solution Go-Live<br />

Module 1<br />

Acceptance <strong>of</strong> System - Solution Go-Live<br />

Module 2<br />

Acceptance <strong>of</strong> System – Solution Go-Live<br />

Module 3<br />

Total Operation & Maintenance Support<br />

Post Implementation Phase including:<br />

<strong>Project</strong> Management<br />

Technical Support & Helpdesk<br />

Operations <strong>of</strong> -POS Counters and Call<br />

Center<br />

A Year 2 Operation & Maintenance Support<br />

B Year 3 Operation & Maintenance Support<br />

Payment (percentage <strong>of</strong> total<br />

Contract value)<br />

RFP Volume 2: Commercial and Bidding Terms Page 21<br />

10%<br />

20%<br />

20%<br />

40%<br />

Operation & maintenance cost<br />

would be paid in equated<br />

quarterly installments <strong>of</strong> each<br />

year’s payout as mentioned<br />

below<br />

5% <strong>of</strong> total contract value<br />

would be paid per quarter<br />

(5%*4=20% <strong>of</strong> total annual<br />

contract value would be paid in<br />

year 2)<br />

5% <strong>of</strong> total contract value<br />

would be paid per quarter<br />

(5%*4=20% <strong>of</strong> total annual<br />

contract value would be paid in<br />

year 3)


Request for Proposal for establishing e-Governance Systems<br />

7 Bidding Process Details<br />

7.1 Bidding Schedule<br />

7.1.1 Name <strong>of</strong> the Purchaser:<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

7.1.2 Addressee and Address at which RFPs to be submitted:<br />

Director – Administration<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

Janpath, New Delhi - 110011<br />

Phone: +91-11-23018614<br />

Fax: +91-11- 23010789<br />

websiteasi@gmail.com<br />

7.1.3 Latest time and date for receipt <strong>of</strong> RFP<br />

On or before 1500 hours on Monday, 12 December 2011<br />

7.1.4 Date till which the response to the RFP should be valid:<br />

7.1.5 Important dates:<br />

180 days from the date <strong>of</strong> opening <strong>of</strong> the Technical Bids<br />

The following table provides information regarding the important dates <strong>of</strong> the bid<br />

process for this RFP:<br />

RFP Volume 2: Commercial and Bidding Terms Page 22


Request for Proposal for establishing e-Governance Systems<br />

Activity Date<br />

Release <strong>of</strong> RFP (Request for Proposal) Wednesday, 9-Nov-11<br />

Last date for submission <strong>of</strong> clarifications by bidders Wednesday, 16-Nov-11<br />

Pre-Bid Conference Saturday, 19-Nov-11<br />

Response to bidder queries Monday, 21-Nov-11<br />

Last date for submission <strong>of</strong> Bids Monday, 12-Dec-11<br />

Pre Qualification Bid opening Monday, 12-Dec-11<br />

Date for opening <strong>of</strong> Technical Bids for qualified bidders Monday, 19-Dec-11<br />

Date for Technical Presentations or Pro<strong>of</strong> <strong>of</strong> Concept Monday, 26-Dec-11<br />

Date for opening <strong>of</strong> Commercial Bids for qualified bidders Monday, 2-Jan-12<br />

Award <strong>of</strong> Contract Monday, 16-Jan-12<br />

7.1.6 Bidders must note that bids received after due date and time shall be rejected. The bids shall<br />

be submitted in the sealed box kept in the <strong>of</strong>fice <strong>of</strong> the ADG at the address mentioned in<br />

Section 8.1.2 above.<br />

7.2 General Instruction to Bidders<br />

7.2.1 Cost <strong>of</strong> Bidding Process<br />

7.2.1.1 The Bidder shall bear all costs associated with the preparation and<br />

submission <strong>of</strong> its bid, including cost <strong>of</strong> presentation for the purposes <strong>of</strong><br />

clarification <strong>of</strong> the bid, if so desired by ASI.<br />

7.2.1.2 ASI will in no case be responsible or liable for the above mentioned costs,<br />

7.2.2 Bid Prices<br />

regardless <strong>of</strong> the conduct or outcome <strong>of</strong> the Tendering process.<br />

7.2.2.1 The Bidder shall indicate in the pr<strong>of</strong>orma prescribed at Section 10.4.2 <strong>of</strong><br />

Volume 2, the unit rates and total Bid Prices <strong>of</strong> the goods and services, it<br />

proposes to provide under the Contract. Prices should be shown separately<br />

for each item as detailed in Bid Documents.<br />

7.2.2.2 In absence <strong>of</strong> information as requested in Section 8.2.2.1 above, a bid shall<br />

be considered incomplete and summarily rejected.<br />

7.2.2.3 The Bidder shall prepare the bid based on details provided in the RFP<br />

documents. The Bidder shall carry out all the tasks in accordance with the<br />

RFP Volume 2: Commercial and Bidding Terms Page 23


Request for Proposal for establishing e-Governance Systems<br />

requirement <strong>of</strong> the RFP documents and it shall be the responsibility <strong>of</strong> the<br />

Bidder to fully meet all the requirements <strong>of</strong> the RFP documents.<br />

7.2.2.4 The Bidder as part <strong>of</strong> its Commercial Bid should account for all out <strong>of</strong> pocket<br />

and other expenses that the Bidder shall incur during the contract period.<br />

7.2.2.5 It is mandatory that Unit rates should be indicated in the Table as per the<br />

7.2.3 Firm Prices<br />

pr<strong>of</strong>orma prescribed at Section 10.4.2 <strong>of</strong> Volume 2 <strong>of</strong> this RFP. This may be<br />

used by ASI for any changes to scope.<br />

7.2.3.1 Prices quoted must be firm and final and shall remain constant throughout<br />

the period <strong>of</strong> the contract and shall not be subject to any upward<br />

modifications, on any account whatsoever. The Bidder shall, therefore,<br />

indicate the prices in Section 10.4.2 <strong>of</strong> Volume 2 enclosed with the Bid. The<br />

Bid Prices shall be indicated in <strong>India</strong>n Rupees (INR) only.<br />

7.2.3.2 The Commercial bid should clearly indicate the price to be charged without<br />

any qualifications whatsoever and should include all taxes (sales, service,<br />

etc.), duties (excise & customs, etc), Octroi, fees, levies, works contract tax<br />

and other charges as may be applicable in relation to the activities proposed<br />

to be carried out. It is mandatory that such charges wherever<br />

applicable/payable should be indicated separately in Section 10.4.2 <strong>of</strong><br />

Volume 2.<br />

7.2.3.3 A proposal submitted with an adjustable price quotation or conditional<br />

7.2.4 Discount<br />

proposal shall be treated as non-responsive and the bid shall be rejected<br />

summarily.<br />

7.2.4.1 The Bidders are advised not to indicate any separate discount. Discount, if<br />

7.2.5 Bidder Authorization<br />

any, should be merged with the quoted prices. Discount <strong>of</strong> any type,<br />

indicated separately, will not be taken into account for evaluation purpose.<br />

RFP Volume 2: Commercial and Bidding Terms Page 24


Request for Proposal for establishing e-Governance Systems<br />

7.2.5.1 The "Bidder" shall mean the one who has signed the RFP Form. The Bidder<br />

may be either the Principal Officeror his/her duly Authorized Representative,<br />

in which case he/she shall submit a power <strong>of</strong> attorney with the RFP<br />

response. All certificates and documents (including any clarifications sought<br />

and any subsequent correspondences) received hereby, shall, as far as<br />

possible, be furnished and signed by the representative.<br />

7.2.5.2 It is further clarified that the individual signing the tender or other<br />

documents in connection with the RFP must certify whether he/she signs as :<br />

Constituted attorney <strong>of</strong> the firm, if it is a company<br />

RFP Volume 2: Commercial and Bidding Terms Page 25<br />

OR<br />

The Principal <strong>of</strong>ficer or his/her duly Authorized Representative <strong>of</strong> the Bidder<br />

7.2.5.3 The authorization shall be indicated by power-<strong>of</strong>-attorney accompanying the<br />

bid.<br />

7.2.6 Particulars for Bid Security<br />

7.2.6.1 The Bidder shall furnish, as part <strong>of</strong> its bid, a bid security <strong>of</strong> the amount<br />

mentioned in Section 1.1.6 <strong>of</strong> this volume <strong>of</strong> RFP.<br />

7.2.6.2 The bid security is required to protect ASI against the risk <strong>of</strong> Bidder’s conduct<br />

which would warrant the security's forfeiture, pursuant to Section 8.2.6.7<br />

7.2.6.3 The bid security shall be denominated in <strong>India</strong>n Rupees, and shall be in the<br />

form <strong>of</strong> a demand draft issued by a Nationalized / Scheduled Bank<br />

7.2.6.4 No Bidder is exempted from furnishing <strong>of</strong> bid security.<br />

7.2.6.5 Unsuccessful Bidder’s bid security will be discharged/ returned after award<br />

<strong>of</strong> contract to the successful Bidder. No interest will be paid by ASI on the<br />

Bid security amount.<br />

7.2.6.6 The successful Bidder’s bid security will be discharged upon the Bidder<br />

executing the Contract, pursuant to Section 9.6 <strong>of</strong> Volume 2 <strong>of</strong> this RFP and


Request for Proposal for establishing e-Governance Systems<br />

furnishing the performance security, pursuant to Section 9.7 <strong>of</strong> Volume 2 <strong>of</strong><br />

this RFP.<br />

7.2.6.7 The bid security may be forfeited:<br />

a. if a Bidder withdraws its bid during the period <strong>of</strong> bid validity specified by the<br />

Bidder in the Bid; or<br />

7.2.7 Period <strong>of</strong> Validity <strong>of</strong> Bids<br />

b. in the case <strong>of</strong> a successful Bidder, if the Bidder fails:<br />

to sign the Contract or<br />

to furnish performance security in accordance<br />

7.2.7.1 Bids shall remain valid for period as stated in Section 8.1.4 <strong>of</strong> Volume 2 <strong>of</strong><br />

this RFP. A bid valid for a shorter period shall be rejected by ASI as non-<br />

responsive and shall not be taken up for evaluation purposes.<br />

7.2.7.2 ASI may request the Bidder(s) for an extension <strong>of</strong> the period <strong>of</strong> validity. The<br />

7.2.8 Revelation <strong>of</strong> Prices<br />

request and the responses thereto shall be made in writing (or by e-mail or<br />

fax). The validity <strong>of</strong> bid security provided under Section 1.1 in Volume 2 <strong>of</strong><br />

this RFP shall also be suitably extended.<br />

7.2.8.1 Prices in any form or by any reason before opening the Commercial Bid<br />

should not be revealed. If price change is envisaged due to any clarification,<br />

revised Bids in a separate sealed cover can be called from all the Bidders by<br />

ASI.<br />

7.2.9 Terms and Conditions <strong>of</strong> Bidders<br />

7.2.9.1 Printed terms and conditions (General Conditions) <strong>of</strong> the Bidder will not be<br />

considered as forming part <strong>of</strong> their Bids. In case terms and conditions <strong>of</strong> the<br />

contract applicable to this Invitation to bid are not acceptable to any Bidder,<br />

he should clearly specify deviation in his Technical Bid, Section 12, Annexure<br />

3 <strong>of</strong> Volume 2 <strong>of</strong> this RFP. Similarly in case the Services being <strong>of</strong>fered have<br />

RFP Volume 2: Commercial and Bidding Terms Page 26


Request for Proposal for establishing e-Governance Systems<br />

deviations from the requirements/specifications laid down in this RFP, the<br />

Bidder shall describe in what respects and to what extent the Services being<br />

<strong>of</strong>fered differ/deviate from the requirements, even though the deviations<br />

may not be very material. The Bidder must state categorically whether or<br />

not his <strong>of</strong>fer conforms to RFP requirements / specifications and indicate<br />

deviations, if any, in his Technical Bid (Section 12, Annexure 3 <strong>of</strong> Volume 2 <strong>of</strong><br />

this RFP).<br />

7.2.9.2 Any deviations / assumptions mentioned elsewhere in the Bid, other than<br />

the formats (Section 12, Annexure 3 <strong>of</strong> this volume) will not be considered<br />

by ASI.<br />

7.2.10 Local Conditions<br />

7.2.10.1 It will be imperative on each Bidder to fully acquaint himself with the local<br />

conditions and factors at the respective locations, sites and <strong>of</strong>fices which<br />

would have any effect on the performance <strong>of</strong> the contract and / or the cost.<br />

7.2.10.2 The Bidder is expected to obtain for himself on his own responsibility all<br />

information that may be necessary for preparing the bid and entering into<br />

contract. Obtaining such information shall be at Bidder’s own cost.<br />

7.2.10.3 Failure to obtain the information necessary for preparing the bid and/or<br />

failure to perform activities that may be necessary for designing an optimal<br />

solution before entering into contract will in no way relieve the successful<br />

Bidder from performing any work in accordance with the contract entered<br />

into.<br />

7.2.10.4 It will be imperative for each Bidder to fully inform themselves <strong>of</strong> all legal<br />

conditions and factors which may have any effect on the execution <strong>of</strong> the<br />

contract as described in the bidding documents.<br />

7.2.10.5 It is the responsibility <strong>of</strong> the Bidder that such factors have properly been<br />

investigated and considered while submitting the bid proposals and that no<br />

claim whatsoever including those for financial adjustment to the contract<br />

awarded under the bidding documents will be entertained by ASI and that<br />

neither any change in the time schedule <strong>of</strong> the contract nor any financial<br />

RFP Volume 2: Commercial and Bidding Terms Page 27


Request for Proposal for establishing e-Governance Systems<br />

adjustments arising there<strong>of</strong> shall be permitted by ASI on account <strong>of</strong> failure <strong>of</strong><br />

the Bidder to appraise themselves <strong>of</strong> local laws and conditions.<br />

7.2.11 Last Date for Receipt <strong>of</strong> Bids<br />

7.2.11.1 Bids will be received by ASI at the address specified under Section 8.1.2 not<br />

later than the time and date specified in Section 8.1.3. In the event <strong>of</strong> the<br />

specified date for the receipt <strong>of</strong> Bids being declared a holiday for ASI, the<br />

Bids will be received up to the appointed time on the next working day.<br />

7.2.11.2 ASI may, at its discretion, extend the last date for the receipt <strong>of</strong> bids by<br />

7.2.12 Late Bids<br />

amending the RFP Document, in which case all rights and obligations <strong>of</strong> ASI<br />

and Bidders previously subject to the last date will thereafter be subject to<br />

the last date as extended.<br />

7.2.12.1 Any bid received by ASI after the last date for receipt <strong>of</strong> bids prescribed by<br />

ASI will be rejected and/or returned unopened to the Bidder.<br />

7.2.13 Modification and Withdrawal <strong>of</strong> Bids<br />

7.2.13.1 No bid may be altered / modified subsequent to the closing time and date<br />

for submission <strong>of</strong> bids. Unsolicited correspondences from Bidders will not be<br />

considered.<br />

7.2.13.2 No bid may be withdrawn in the interval between the last date for receipt <strong>of</strong><br />

bids and the expiry <strong>of</strong> the bid validity period specified by the Bidder in the<br />

Bid. Withdrawal <strong>of</strong> a bid during this interval may result in the Bidder’s<br />

forfeiture <strong>of</strong> its bid security.<br />

RFP Volume 2: Commercial and Bidding Terms Page 28


Request for Proposal for establishing e-Governance Systems<br />

7.2.14 Address for Correspondence<br />

7.2.14.1 The Bidder has designated the <strong>of</strong>ficial mailing address, place and fax number<br />

7.2.15 Contacting ASI<br />

stated in Section 8.1.2. All correspondence shall be sent by ASI on this<br />

address only.<br />

7.2.15.1 No Bidder shall contact ASI on any matter relating to its bid, from the time <strong>of</strong><br />

the bid opening to the time the Contract is awarded.<br />

7.2.15.2 Any effort by a Bidder to influence ASI’s bid evaluation, bid comparison or<br />

7.3 Bid Submission Instructions<br />

contract award decisions may result in the rejection <strong>of</strong> the Bidder’s bid.<br />

7.3.1 Procedure for Submission <strong>of</strong> Bids<br />

7.3.1.1 Prequalification Bid (1 hard copy) in one separate cover.<br />

7.3.1.2 Technical Bid (1 hard copy) in one separate cover.<br />

7.3.1.3 Commercial Bid (1 hard copy) in one separate cover<br />

7.3.1.4 Each <strong>of</strong> the Prequalification Bid, Technical Bid and Commercial Bid <strong>of</strong> the RFP<br />

should be covered in separate sealed covers super scribing “Pre Qualification<br />

Bid”, "Technical Bid" and “Commercial Bid” respectively. Please Note that<br />

Prices should not be indicated in the Pre Qualification Bid or Technical Bid<br />

and should only be indicated in the Commercial Bid.<br />

7.3.1.5 The Prequalification and Technical Bid should be duly initialed by Authorized<br />

Signatory and stamped with correct name <strong>of</strong> the Bidder’s<br />

company/organization.<br />

7.3.1.6 The cover containing Prequalification Bid, Technical Bid and Commercial Bid<br />

as mentioned in clause 8.3.1.4 above should be put in another single sealed<br />

envelope clearly marked “Selection <strong>of</strong> Implementation Agency for ASI e-<br />

Governance <strong>Project</strong>”. This envelope is to be superscribed with RFP Number,<br />

Due Date and the wordings “DO NOT OPEN BEFORE 1500 hours on 12<br />

RFP Volume 2: Commercial and Bidding Terms Page 29


Request for Proposal for establishing e-Governance Systems<br />

December 2011”. Same details are to be marked on the covers <strong>of</strong> the<br />

Prequalification, Technical Bids and Commercial Bid also.<br />

7.3.1.7 The cover thus prepared, encapsulating the three bids as mentioned above,<br />

should also indicate clearly the name, address and telephone number <strong>of</strong> the<br />

Bidder.<br />

7.3.1.8 The bids received after the due date and time shall be summarily rejected<br />

and returned to the Bidder declaring as “Late submission” and the same shall<br />

not be opened.<br />

7.3.1.9 Each copy <strong>of</strong> the RFP should be a complete document and should be bound<br />

as a volume. The document should be page numbered and appropriately<br />

flagged and must contain the list <strong>of</strong> contents with page numbers.Different<br />

copies must be bound separately. If not properly bounded the ASI shall not<br />

be in any way responsible for loss <strong>of</strong> sheets due to inadvertent opening <strong>of</strong><br />

the document at any stage and that affecting the prospects <strong>of</strong> the Bidder<br />

during the evaluation due to loss <strong>of</strong> these documents.<br />

7.3.1.10 As part <strong>of</strong> the bid, Bidder should also provide the pre qualification, technical<br />

and commercial bid in editable s<strong>of</strong>t copy format, in the form <strong>of</strong> a non-re-<br />

writeable CD–R (Compact Disc) as follows:<br />

One CD containing the pre qualification bid - The CD containing pre<br />

qualification should be sealed along with the hard copy <strong>of</strong> the ‘Original’<br />

copy <strong>of</strong> the pre qualification bid<br />

One CD containing the technical bid - The CD containing technical bid<br />

should be sealed along with the hard copy <strong>of</strong> the ‘Original’ copy <strong>of</strong> the<br />

technical bid.<br />

One CD containing the commercial bid - The CD containing commercial<br />

bid should be sealed along with the hard copy <strong>of</strong> the ‘Original’ copy <strong>of</strong><br />

the commercial bid.<br />

All CDs submitted by the Bidder must be in sealed covers.The sealed<br />

covers as well as the CD media must be duly signed by the Bidder using<br />

a “Permanent Pen/Marker”, should be super scribed with “Pre<br />

RFP Volume 2: Commercial and Bidding Terms Page 30


Request for Proposal for establishing e-Governance Systems<br />

7.3.2 Language <strong>of</strong> Bids<br />

Qualification Bid” / “Technical Bid” / “Commercial Bid” (as the case may<br />

be) and should bear the name <strong>of</strong> the Bidder.<br />

Bidder must ensure that the information furnished by him in respective<br />

CDs is identical to that submitted by him in the original paper bid<br />

document. In case <strong>of</strong> any discrepancy observed by ASI in the contents<br />

<strong>of</strong> the CDs and original paper bid documents, the information furnished<br />

on original paper bid document will prevail over the s<strong>of</strong>t copy.<br />

Bidder must ensure that Technical Bid CD do not contain any<br />

Commercial items / prices.<br />

7.3.2.1 The Bids prepared by the Bidder and all correspondence and documents<br />

relating to the bids exchanged by the Bidder and ASI, shall be written in<br />

English language.<br />

7.3.3 Documents Comprising the Bids<br />

7.3.3.1 The bid prepared by the Bidder shall comprise <strong>of</strong> the following components:<br />

A. Pre Qualification Bid - The Prequalification shall comprise <strong>of</strong> the following:<br />

Section 10.1 - Covering Letter<br />

Section 10.2 – Prequalification Formats along with supporting documents<br />

Bid Security (Demand Draft)<br />

RFP document fees (Demand Draft)<br />

Power <strong>of</strong> Attorney executed by the Bidder in favor <strong>of</strong> the Principal Officer or<br />

the duly Authorized Representative, certifying him/her as an authorized<br />

signatory for the purpose <strong>of</strong> this RFP<br />

B. Technical Bid - The Technical Bid shall comprise <strong>of</strong> the following:<br />

Section 10.3 – Technical Formats<br />

Section 10.3.1 – Technical Bid Letter<br />

RFP Volume 2: Commercial and Bidding Terms Page 31


Request for Proposal for establishing e-Governance Systems<br />

Section 12 – Statement <strong>of</strong> Deviations<br />

C. Commercial Bid - The Commercial Bid shall comprise <strong>of</strong> the following:<br />

7.3.4 Format and Signing <strong>of</strong> Bid<br />

Section 10.4.1 - Commercial Bid Letter<br />

Section 10.4.2 - Breakdown <strong>of</strong> cost components<br />

7.3.4.1 The Bidder shall prepare one copy <strong>of</strong> the Bid.<br />

7.3.4.2 The original and all copies <strong>of</strong> the bid shall be typed or written in indelible ink.<br />

All pages <strong>of</strong> the ‘Original’ bid document shall be initialed and stamped by the<br />

person or persons signing the bid.<br />

7.3.4.3 The bid shall contain no interlineations, erasures or overwriting except as<br />

necessary to correct errors made by the Bidder, in which case such<br />

corrections shall be initialed by the person or persons signing the bid.<br />

7.3.4.4 The Bidder shall duly sign and seal its bid with the exact name <strong>of</strong> the<br />

firm/company to whom the contract is to be issued.<br />

7.3.4.5 The Bidder shall seal and mark the original and each copy <strong>of</strong> the Bid.<br />

7.3.4.6 If the outer cover <strong>of</strong> the bid is not sealed and marked as required by Section<br />

8.3.1, ASI will assume no responsibility for the bid's misplacement or<br />

premature opening.<br />

7.4 Clarification on RFP Document<br />

7.4.1.1 Bidder requiring any clarification on the RFP Document may submit his<br />

queries, in writing, at ASI's mailing address and as per schedule indicated in<br />

Section 8.1. The queries must be submitted in Micros<strong>of</strong>t Excel format as<br />

provided in Section 13.1.<br />

7.4.1.2 The Bidders shall bear in mind that their bids with any Technical or<br />

Commercial deviations will not be accepted. Thus, any issues / queries<br />

regarding Contract terms and conditions, Scope <strong>of</strong> Work, minimum<br />

requirements for Hardware infrastructure, essential features <strong>of</strong> the<br />

RFP Volume 2: Commercial and Bidding Terms Page 32


Request for Proposal for establishing e-Governance Systems<br />

application / components and minimum staffing requirements etc, should be<br />

either clarified before bid submission or submitted to ASI in writing as per<br />

the schedule indicated in Section 8.1.<br />

7.4.1.3 ASI will respond in writing, to any request for clarification to queries on the<br />

RFP Document, received not later than the dates prescribed by ASI in Section<br />

8.1.3 <strong>of</strong> this RFP document. Written copies <strong>of</strong> ASI's response (including the<br />

query but without identifying the source <strong>of</strong> inquiry) would be put up on the<br />

ASI website. Bidders are advised to keep browsing the information posted<br />

on the website.<br />

7.5 Bid Opening & Evaluation Process<br />

7.5.1 Opening <strong>of</strong> Bids by Purchaser<br />

7.5.1.1 ASI will open the Pre-Qualification and Technical Bids at the schedule given,<br />

in the presence <strong>of</strong> the representatives <strong>of</strong> the Bidders who choose to attend,<br />

at the time, date and place, as mentioned in Section 8.1.5 <strong>of</strong> this document.<br />

7.5.1.2 The Bidders' names, modifications, bid withdrawals and the presence or<br />

7.5.2 Evaluation <strong>of</strong> Bids<br />

absence <strong>of</strong> the requisite Bid Security and such other details as ASI, at its<br />

discretion, may consider appropriate will be announced at the bid opening.<br />

7.5.2.1 The selected Bidder must possess the requisite experience, strength and<br />

capabilities in providing the solution, equipment and services necessary to<br />

meet ASI’s requirements, as described in the RFP Document. The Bidder<br />

must possess the technical know-how and the financial wherewithal that<br />

would be required to successfully perform activities as per the Scope <strong>of</strong><br />

Work in Section 2 <strong>of</strong> the RFP for the entire period <strong>of</strong> the contract. The<br />

Bidder’s bid must be complete in all respect and covering the entire scope <strong>of</strong><br />

work as stipulated in the RFP document.<br />

7.5.2.2 The evaluation process <strong>of</strong> the RFP proposed to be adopted by ASI is<br />

indicated under this Clause. The purpose <strong>of</strong> this Clause is only to provide the<br />

Bidders an idea <strong>of</strong> the evaluation process that ASI may adopt.<br />

RFP Volume 2: Commercial and Bidding Terms Page 33


Request for Proposal for establishing e-Governance Systems<br />

7.5.3 Preliminary Examination<br />

7.5.3.1 ASI will examine the bids to determine whether they are complete, whether<br />

the bid format conforms to the RFP requirements, whether any<br />

computational errors have been made, whether required RFP fees and bid<br />

security has been furnished, whether the documents have been properly<br />

signed, and whether the bids are generally in order.<br />

7.5.3.2 ASI may waive any nonconformity or irregularity in a bid which does not<br />

constitute a material deviation according to ASI.<br />

7.5.4 Clarification from the Bidder<br />

7.5.4.1 When deemed necessary, during the tendering process, ASI may seek<br />

clarifications on any aspect from any or all the Bidders. However, that would<br />

not entitle the Bidder to change or cause any change in the substance <strong>of</strong> the<br />

RFP submitted or price quoted.<br />

7.5.4.2 During the tendering process, the Bidders will make Technical presentations<br />

to ASI on experience, proposed project staff experience and proposed<br />

project approach and methodology. Purchaser expects that the Bidder’s<br />

<strong>Project</strong> Manager and other key personnel named in the proposal will take an<br />

active and leading role in these presentations.<br />

7.5.4.3 Bidders may also be required to demonstrate the features <strong>of</strong> the proposed<br />

products, if needed, or demonstrate pro<strong>of</strong> <strong>of</strong> concept.<br />

7.5.5 Evaluation <strong>of</strong> Prequalification Bid<br />

7.5.5.1 In this part, the technical bid will be reviewed for determining the eligibility<br />

<strong>of</strong> the Bidder for the <strong>Project</strong>.<br />

7.5.5.2 This will be the first stage <strong>of</strong> the evaluation by ASI.<br />

7.5.5.3 Bidder needs to provide satisfactory documents against the Pre Qualification<br />

criteria stated in Section 10.2.2 to clear the pre qualification stage.<br />

7.5.6 Evaluation <strong>of</strong> Technical Bids<br />

RFP Volume 2: Commercial and Bidding Terms Page 34


Request for Proposal for establishing e-Governance Systems<br />

7.5.6.1 In this part, the technical bid will be reviewed for determining the eligibility<br />

<strong>of</strong> the Bidder for the <strong>Project</strong> and to ascertain Compliance <strong>of</strong> the Technical<br />

bids with the RFP terms and conditions, technical requirements and scope <strong>of</strong><br />

work as defined in this RFP.<br />

7.5.6.2 This shall be the second stage <strong>of</strong> the evaluation by ASI. Only those Bidders<br />

who cross the threshold level <strong>of</strong> Technical Evaluation indicated below and<br />

adhere to ASI’s technical requirements shall be considered for commercial<br />

evaluation.<br />

7.5.6.3 In case <strong>of</strong> no response by the Bidder to any <strong>of</strong> the requirements with regard<br />

to the contents <strong>of</strong> the Technical Bid, he shall not be assigned any marks for<br />

the same.<br />

7.5.6.4 Technical bid <strong>of</strong> the bidder shall be opened and evaluated for acceptability <strong>of</strong><br />

Techno-functional requirements, deviations and technical suitability.<br />

Bidders shall respond to the requirements as explained in Section 11.2 <strong>of</strong><br />

Volume 2 <strong>of</strong> RFP for their evaluation with regard to experience and<br />

qualification. Also, Bidder shall refer and respond to ALL technical<br />

requirements as mentioned in the RFP document. The evaluation process<br />

would also include a presentation <strong>of</strong> technical proposal by the Bidder.<br />

7.5.6.5 In order to qualify technically, a proposal must secure a minimum <strong>of</strong> 70% <strong>of</strong><br />

total marks after summing up. The Bidder would be technically evaluated<br />

out <strong>of</strong> 100 marks.Only those proposals which have a minimum score <strong>of</strong> 70%<br />

<strong>of</strong> total marks will be considered for opening <strong>of</strong> their Commercial Bid and<br />

evaluation there<strong>of</strong>.<br />

7.5.6.6 Detailed technical evaluation criteria are provided in Section 11.2 <strong>of</strong> the<br />

Volume 2 <strong>of</strong> this RFP.<br />

7.5.7 Evaluation <strong>of</strong> Commercial Bids<br />

7.5.7.1 ASI will open the Commercial Bids <strong>of</strong> only Technically Qualified Bidders, in<br />

the presence <strong>of</strong> the representatives <strong>of</strong> the Bidderwho choose to attend, at<br />

the time, date and place, as decided by ASI.<br />

RFP Volume 2: Commercial and Bidding Terms Page 35


Request for Proposal for establishing e-Governance Systems<br />

7.5.7.2 The commercial bids shall be evaluated by ASI for completeness and<br />

accuracy. Arithmetical errors will be rectified on the following basis. If there<br />

is a discrepancy between the unit price and the total price that is obtained<br />

by multiplying the unit price and quantity, the unit price shall prevail and the<br />

total price shall be corrected. If there is a discrepancy between words and<br />

figures, the amount in words will prevail.<br />

7.5.7.3 The Bid having the Lowest Commercial Quote shall be termed as the Lowest<br />

7.5.8 Rejection Criteria<br />

Evaluated Bid. The technically qualified Bidder with the lowest commercial<br />

quote, termed as L1, will be considered as best evaluated Bid.<br />

7.5.8.1 Besides other conditions and terms highlighted in the RFP document, bids<br />

may be rejected under following circumstances:<br />

7.5.8.2 General Rejection Criteria<br />

Bids submitted without or improper Bid Security or tender fees<br />

Bids received through non-prescribed modes such as Fax/ e-Mail.<br />

Bids not bounded appropriately e.g. in the form <strong>of</strong> loose papers.<br />

Bids which do not confirm unconditional validity <strong>of</strong> the bid as prescribed in the<br />

RFP.<br />

If the information provided by the Bidder is found to be incorrect / misleading<br />

at any stage / time during the Tendering Process.<br />

Any effort on the part <strong>of</strong> a Bidder to influence ASI’s bid evaluation, bid<br />

comparison or contract award decisions.<br />

Bids received by ASI after the last date for receipt <strong>of</strong> bids prescribed by ASI,<br />

pursuant to Section 8.1.3.<br />

Bids without signature <strong>of</strong> duly authorized person(s) on all pages <strong>of</strong> bid<br />

documents<br />

Bids without power <strong>of</strong> authorization and any other document consisting <strong>of</strong><br />

adequate pro<strong>of</strong> <strong>of</strong> the ability <strong>of</strong> the signatory to bind the Bidder.<br />

7.5.8.3 Technical Rejection Criteria<br />

Technical Bid containing commercial details.<br />

Revelation <strong>of</strong> Prices in any form or in bids other than Commercial or by any<br />

reason before opening the Commercial Bid.<br />

RFP Volume 2: Commercial and Bidding Terms Page 36


Request for Proposal for establishing e-Governance Systems<br />

Failure to furnish all information required by the RFP Document or submission<br />

<strong>of</strong> a bid not substantially responsive to the RFP Document in every respect.<br />

Bidders not responding to the complete scope <strong>of</strong> Work as indicated in the RFP<br />

documents, addendum (if any) and any subsequent information given to the<br />

Bidder.<br />

If the bid does not confirm to the timelines indicated in the bid.<br />

7.5.8.4 Commercial Rejection Criteria<br />

Incomplete price bid<br />

Price Bids that do not conform to the RFP’s price bid format.<br />

If there is an arithmetic discrepancy in the commercial bid calculations ASI shall<br />

rectify the same. If the Bidder does not accept the correction <strong>of</strong> the errors, its<br />

bid may be rejected.<br />

RFP Volume 2: Commercial and Bidding Terms Page 37


Request for Proposal for establishing e-Governance Systems<br />

8 Award <strong>of</strong> Contract<br />

8.1 Post Qualification and Award Criteria<br />

8.1.1 ASI will determine to its satisfaction whether the Bidder selected as having submitted the<br />

best evaluated bid is qualified to satisfactorily perform the Contract.<br />

8.1.2 This determination will take into account the Bidder's financial, technical, implementation<br />

and post-implementation strengths and capabilities. It will also include examination <strong>of</strong> the<br />

documentary evidence submitted by the Bidder as part <strong>of</strong> the bid and any other<br />

information as ASI deems necessary and appropriate.<br />

8.1.3 An affirmative determination will be a prerequisite for award <strong>of</strong> the Contract to the Bidder.<br />

A negative determination will result in rejection <strong>of</strong> the Bidder's bid, in which event; ASI will<br />

proceed to the next lowest commercial bid to make a similar determination <strong>of</strong> that Bidder's<br />

capabilities to perform satisfactorily.<br />

8.1.4 ASI is not bound to accept the best evaluated bid or any bid and reserves the right to accept<br />

any bid, wholly or in part.<br />

8.2 Purchaser's Right to Vary Scope <strong>of</strong> Contract<br />

8.2.1 ASI may at any time, by a written order given to the Bidder, make changes within the<br />

quantities, specifications, services or scope <strong>of</strong> the Contract as specified.<br />

8.2.2 If any such change causes an increase or decrease in the cost <strong>of</strong>, or the time required for<br />

the Bidder’s performance <strong>of</strong> any part <strong>of</strong> the work under the Contract, whether changed or<br />

not changed by the order, an equitable adjustment shall be made in the Contract Price or<br />

time schedule, or both, and the Contract shall accordingly be amended.<br />

8.3 Purchaser's Right to Accept and Reject Bids<br />

8.3.1 ASI reserves the right to accept any bid, and to annul the RFP process and reject all bids at<br />

any time prior to award <strong>of</strong> Contract, without thereby incurring any liability to the affected<br />

Bidder or Bidders or any obligation to inform the affected Bidder or Bidders <strong>of</strong> the grounds<br />

for ASI's action.<br />

8.3.2 ASI reserves the right to negotiate the commercials with the selected Bidder and seek<br />

revised commercial bid.<br />

RFP Volume 2: Commercial and Bidding Terms Page 38


Request for Proposal for establishing e-Governance Systems<br />

8.4 Notification <strong>of</strong> Award<br />

8.4.1 Prior to the expiration <strong>of</strong> the period <strong>of</strong> bid validity, pursuant to Section 8.1.6 ASI will notify<br />

the successful Bidder in writing that its bid has been accepted. The Bidder shall provide his<br />

acceptance within 3 working days <strong>of</strong> such notification.<br />

8.4.2 Upon the successful Bidder's furnishing <strong>of</strong> performance security pursuant to Section 9.7,<br />

ASI may notify each unsuccessful Bidder and will discharge their EMD, pursuant to Section<br />

8.2.6.5<br />

8.5 Negotiations with the successful Bidder<br />

8.5.1 If required, negotiations will be held at the date, time and address intimated to the<br />

qualified and selected Bidder. Representatives conducting negotiations on behalf <strong>of</strong> the<br />

Bidder must have written authority to negotiate and conclude a Contract.<br />

8.6 Signing <strong>of</strong> Contract<br />

8.6.1 After completing negotiations ASI shall issue a Letter <strong>of</strong> Intent to the selected Bidder and<br />

promptly notify all other Bidders who have submitted proposals about the decision taken.<br />

8.6.2 The Bidder will sign the contract within 15 working days <strong>of</strong> submission <strong>of</strong> Performance Bank<br />

Guarantee.<br />

8.7 Performance Security<br />

8.7.1 Within 15 working days <strong>of</strong> the receipt <strong>of</strong> notification <strong>of</strong> award from ASI, the successful<br />

Bidder shall furnish the performance security <strong>of</strong> 10% <strong>of</strong> total contract value in accordance<br />

with the Contractual & Legal Specification in the form <strong>of</strong> a Bank Guarantee.<br />

8.7.2 Failure <strong>of</strong> the successful Bidder to comply with the requirement <strong>of</strong> Section 9.7.1 shall<br />

constitute sufficient grounds for the annulment <strong>of</strong> the award and forfeiture <strong>of</strong> the bid<br />

security, in which event ASI may award the Contract to the next best evaluated bidder or<br />

call for new bids.<br />

8.7.3 The Bank Guarantee shall be valid for 180 days more than the period <strong>of</strong> the contract.<br />

RFP Volume 2: Commercial and Bidding Terms Page 39


Request for Proposal for establishing e-Governance Systems<br />

9 Annexure 1: Bid Formats<br />

9.1 Cover Letter<br />

Date: dd/mm/yyyy<br />

To<br />

Director – Administration<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

Janpath, New Delhi –110011<br />

Sir,<br />

*on the Bidder’s Letterhead+<br />

Subject: Selection <strong>of</strong> Implementation Agency for E-Governance <strong>Project</strong>, ASI<br />

Reference: RFP No: _____________________________ Dated _______________<br />

With reference to your Request for Proposal for “Selection <strong>of</strong> Implementation agency for E-<br />

Governance <strong>Project</strong>”, we hereby submit our Pre-Qualification Proposal, Technical Proposal<br />

and Commercial Proposal for the same.<br />

We hereby declare that:<br />

a. We <strong>of</strong>fer to supply equipments and provide services at the prices and rates mentioned in the<br />

attached commercial proposal<br />

b. We have not been banned or blacklisted by ASI.<br />

c. We have never been declared to be a willful defaulter by any Bank<br />

d. We or any person on our behalf will not engage in any corrupt, fraudulent or coercive practices<br />

to influence the Bidding Process.<br />

e. We hereby acknowledge and accept that ASI has the discretion to change or modify criteria as it<br />

deems appropriate while short listing <strong>of</strong> Agency for providing services.<br />

f. We have enclosed Demand Draft <strong>of</strong> `10,00,000/- in favor <strong>of</strong> ‘Director – Administration ,<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>’ as Bid Security, which is valid for 180 days from the opening <strong>of</strong><br />

the Technical Bid.<br />

RFP Volume 2: Commercial and Bidding Terms Page 40


Request for Proposal for establishing e-Governance Systems<br />

g. We hereby declare that all information and details furnished by us in the Proposal are true and<br />

correct, and all documents accompanying such application are true copies <strong>of</strong> their respective<br />

originals.<br />

h. We agree to abide by our <strong>of</strong>fer for a period <strong>of</strong> 180 days from the date <strong>of</strong> opening <strong>of</strong> technical bid<br />

prescribed by ASI and that we shall remain bound by a communication <strong>of</strong> acceptance within that<br />

time.<br />

i. We have carefully read and understood the terms and conditions <strong>of</strong> the RFP and the conditions<br />

<strong>of</strong> the contract applicable to the RFP. We do hereby undertake to provision as per these terms<br />

and conditions.<br />

j. In the event <strong>of</strong> acceptance <strong>of</strong> our bid, we do hereby undertake-<br />

1. To supply the products and commence services as stipulated in the schedule <strong>of</strong> delivery<br />

forming a part <strong>of</strong> the attached proposal.<br />

2. To undertake the project services for a period <strong>of</strong> 3 years from the date <strong>of</strong> signing <strong>of</strong> the<br />

contract.<br />

3. We affirm that the prices quoted are inclusive <strong>of</strong> delivery, commissioning, training, and<br />

providing facility management and inclusive <strong>of</strong> all out <strong>of</strong> pocket expenses, taxes, levies<br />

discounts etc.<br />

k. We do hereby undertake, that, until a formal contract is prepared and executed, this proposal,<br />

together with your written acceptance there<strong>of</strong> and notification <strong>of</strong> award <strong>of</strong> contract, shall<br />

constitute a binding contract between us.<br />

l. We understand that the amount furnished by us as Bid security may be encashed under<br />

conditions enumerated in the RFP<br />

m. We understand that the ASI may cancel the bidding process at any time and that ASI is not<br />

bound to accept any bid that it may receive, without incurring any liability towards the bidder.<br />

In case <strong>of</strong> any clarifications please contact ___________________ email at<br />

_______________<br />

_________________________________________<br />

Signature <strong>of</strong> Authorized Signatory (with <strong>of</strong>ficial seal)<br />

Date ____________<br />

Name ____________<br />

Designation ____________<br />

Address ____________<br />

Telephone ____________<br />

Fax ____________<br />

E-mail address ____________<br />

RFP Volume 2: Commercial and Bidding Terms Page 41


Request for Proposal for establishing e-Governance Systems<br />

RFP Volume 2: Commercial and Bidding Terms Page 42


Request for Proposal for establishing e-Governance Systems<br />

9.2 Pre Qualification<br />

9.2.1 Pre- qualification Letter<br />

To<br />

Director – Administration<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

Janpath, New Delhi – 110011<br />

Sir,<br />

Subject: Selection <strong>of</strong> Implementation Agency for e-Governance project for ASI<br />

Reference: RFP No: Dated <br />

We, the undersigned Bidder, having read and examined in detail all the RFP document in<br />

respect <strong>of</strong> Selection <strong>of</strong> Implementation Agency for e-Governance <strong>Project</strong> for ASI, do hereby<br />

propose to provide the services as specified in the RFP no.<br />

_______________________________ Dated ______________.<br />

We are hereby submitting our Pre-Qualification Bid (one original and two copies), which<br />

includes the following:<br />

Supporting Information for Pre-Qualification Conditions<br />

Bid Security <strong>of</strong> the prescribed amount and validity<br />

RFP document fees as prescribed<br />

Power <strong>of</strong> Attorney in favor <strong>of</strong> the authorized signatory<br />

We hereby declare that all the information and statements made in the Pre-Qualification<br />

related documents are true and accept that any misinterpretation contained in it may lead<br />

to our disqualification.<br />

We also agree to hold in trust any Confidential Information received by us as part <strong>of</strong> the<br />

tendering process, we shall maintain strict confidentiality in respect <strong>of</strong> such Confidential<br />

Information and in no event a degree <strong>of</strong> confidentiality less than we use to protect our own<br />

confidential and proprietary information.<br />

RFP Volume 2: Commercial and Bidding Terms Page 43


Request for Proposal for establishing e-Governance Systems<br />

Yours sincerely,<br />

Bidder<br />

Authorised Signatory<br />

Name<br />

Designation:<br />

Company Seal<br />

RFP Volume 2: Commercial and Bidding Terms Page 44


Request for Proposal for establishing e-Governance Systems<br />

9.2.2 Supporting Information for Pre-Qualification Conditions<br />

The Bidder is required to fill relevant information in each <strong>of</strong> the formats given below. The<br />

pre-qualification bid must contain documentary evidences and supporting information to<br />

enable Purchaser to evaluate the eligibility <strong>of</strong> the Bidder without ambiguity.<br />

S.No. Particulars<br />

Bidder Details<br />

1. Name <strong>of</strong> the company / firm<br />

2. Mailing address in <strong>India</strong><br />

3. Telephone number<br />

4. Fax number<br />

5. E-mail address<br />

6. Name and designation <strong>of</strong> the<br />

authorized person<br />

7. Year <strong>of</strong> establishment and<br />

constitution <strong>of</strong> organization<br />

8. Whether the Firm / Company has<br />

1.<br />

any widely accepted certification.<br />

Minimum Criteria Type <strong>of</strong> Documentary Evidence<br />

Provided<br />

Bidder Pre Qualification<br />

Bidder should be in<br />

operation in <strong>India</strong> in IT/ITeS<br />

for a period <strong>of</strong> at least 5<br />

years as on 31-03-11<br />

Evidence<br />

Annexed at<br />

Page No.<br />

RFP Volume 2: Commercial and Bidding Terms Page 45


Request for Proposal for establishing e-Governance Systems<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

Minimum Criteria Type <strong>of</strong> Documentary Evidence<br />

Provided<br />

Bidder should have annual<br />

turnover <strong>of</strong> minimum `100<br />

Crores in each <strong>of</strong> last three<br />

financial year (ending 31st<br />

March 2011) accruing from<br />

System Integration<br />

(including supply <strong>of</strong><br />

hardware servers,<br />

components, devices, etc),<br />

development <strong>of</strong> IT<br />

applications areas and<br />

Application Maintenance<br />

services.<br />

Bidder should be a pr<strong>of</strong>it<br />

making entity in last<br />

financial year (2010-11)<br />

Bidder should have at least<br />

250 full time s<strong>of</strong>tware<br />

pr<strong>of</strong>essionals on its rolls<br />

Bidder should have<br />

experience <strong>of</strong> handling at<br />

least 2 assignments in <strong>India</strong><br />

as Finance and Accounts<br />

S<strong>of</strong>tware implementation<br />

and at least 1 assignment in<br />

e-ticketing solutions in the<br />

last 3 years.<br />

Bidder should have<br />

experience <strong>of</strong> handling at<br />

least one assignment the<br />

value <strong>of</strong> which should be at<br />

Year Bidder’s turn<br />

over<br />

2010 – 11<br />

2009 – 10<br />

2008 – 09<br />

Audited Financial Statements<br />

Certificate from the Company<br />

<strong>Project</strong> Completion Certificate<br />

Evidence<br />

Annexed at<br />

Page No.<br />

RFP Volume 2: Commercial and Bidding Terms Page 46


Request for Proposal for establishing e-Governance Systems<br />

7.<br />

8.<br />

9.<br />

10.<br />

Minimum Criteria Type <strong>of</strong> Documentary Evidence<br />

Provided<br />

least ` 10 Crores (`Ten<br />

Crores).<br />

Bidder should have<br />

certification <strong>of</strong><br />

a. ISO 9001:2000 and<br />

b. CMMi Level 3 or above<br />

Bidder should submit RFP<br />

fees <strong>of</strong> Rs 10,000 (Rupees<br />

Ten Thousand) in form <strong>of</strong><br />

Demand Draft (DD)<br />

Bidder should submit<br />

Earnest Money Deposit<br />

(EMD) <strong>of</strong> `10,00,000<br />

(Rupees Ten Lakh only) in<br />

the form <strong>of</strong> a Demand Draft<br />

(DD)<br />

Power <strong>of</strong> Attorney<br />

executed by the Bidder in<br />

favor <strong>of</strong> the Principal<br />

Officer or the duly<br />

Authorized Representative<br />

should be attached<br />

Bidder<br />

Authorised Signatory<br />

Name<br />

Designation:<br />

Company Seal<br />

DD Number:<br />

DD Date:<br />

Issuing Authority / Bank:<br />

DD Number:<br />

DD Date:<br />

Issuing Authority / Bank:<br />

Evidence<br />

Annexed at<br />

Page No.<br />

RFP Volume 2: Commercial and Bidding Terms Page 47


Request for Proposal for establishing e-Governance Systems<br />

9.3 Technical Bid Formats<br />

9.3.1 Technical Bid Letter<br />

To<br />

Director – Administration<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

Janpath, New Delhi – 110011<br />

Sir,<br />

Subject: Selection <strong>of</strong> Implementation Agency for e-Governance <strong>Project</strong>, ASI<br />

Reference: RFP No: _____________________________ Dated ______________<br />

Sir,<br />

We, the undersigned Bidder, having read and examined in detail the entire RFP document in<br />

respect <strong>of</strong> Selection <strong>of</strong> Implementation Agency for E-Governance <strong>Project</strong>, ASI, do hereby<br />

propose to provide the services as specified in the RFP No.<br />

_____________________________ Dated ______________.<br />

1. Deviations<br />

We declare that all the services shall be performed strictly in accordance with the RFP<br />

documents except for the variations and deviations, all <strong>of</strong> which have been detailed out<br />

exhaustively in the following statements, irrespective <strong>of</strong> whatever has been stated to the<br />

contrary anywhere else in our RFP:<br />

(a) Statement <strong>of</strong> Deviations Format as per Section 12 Annexure 3 <strong>of</strong> the Volume 2 <strong>of</strong> RFP<br />

document<br />

Further we agree that additional conditions, if any, found in the RFP documents, other than<br />

those stated in deviation schedule, shall not be given effect to.<br />

2. Qualifying Data<br />

RFP Volume 2: Commercial and Bidding Terms Page 48


Request for Proposal for establishing e-Governance Systems<br />

We confirm having submitted the information as required by you as Prequalification Criteria.<br />

In case you require any other further information/documentary pro<strong>of</strong> in this regard before<br />

evaluation <strong>of</strong> our bid, we agree to furnish the same in time to your satisfaction.<br />

We hereby declare that our bid is made in good faith, without collusion or fraud and the<br />

information contained in the bid is true and correct to the best <strong>of</strong> our knowledge and belief.<br />

We understand that our bid is binding on us and that you are not bound to accept bid you<br />

receive.<br />

Thanking you.<br />

Yours faithfully<br />

Bidder<br />

Authorized Signatory<br />

Name<br />

Designation<br />

Company Seal<br />

RFP Volume 2: Commercial and Bidding Terms Page 49


Request for Proposal for establishing e-Governance Systems<br />

9.3.2 Credential Format<br />

Credentials are required in the prescribed format for each <strong>of</strong> the following:<br />

1. At least one engagement as System Integrator for managing large visitor inflow with requirements on a<br />

scale comparable to ASI.<br />

2. At least 2 engagements for Finance and Accounts s<strong>of</strong>tware implementations.<br />

3. Prior experience <strong>of</strong> working with as System Integrator in <strong>India</strong> with project value more than `10 crores<br />

(excluding supply <strong>of</strong> hardware servers, components, devices etc) each in past 3 years<br />

4. Prior experience <strong>of</strong> handling at least one engagements for manning customer facing counter operations.<br />

Agency shall have an experience <strong>of</strong> handling customer facing transactions. Bidder shall submit Published<br />

document by previous client for these engagements<br />

S. No. Items Details<br />

General Information<br />

1. Customer Name<br />

2.<br />

<strong>Project</strong> Details<br />

Name <strong>of</strong> the contact person and<br />

contact details for the client <strong>of</strong> the<br />

assignment<br />

3. <strong>Project</strong> Title<br />

4. Start Date / End Date<br />

5. Date <strong>of</strong> Go-Live<br />

6. Total Cost <strong>of</strong> the project<br />

7.<br />

8.<br />

9.<br />

10.<br />

Current Status (Live / completed / on-<br />

going / terminated / suspended)<br />

Pr<strong>of</strong>essional Staff Provided by your<br />

Company<br />

Size <strong>of</strong> the project<br />

Please indicate the current or the latest<br />

AMC period with the client (From Month<br />

–Year to Month-Year)<br />

Please indicate whether the client is<br />

currently using the implemented solution<br />

11. Number <strong>of</strong> total users and concurrent Total users<br />

RFP Volume 2: Commercial and Bidding Terms Page 50


Request for Proposal for establishing e-Governance Systems<br />

12.<br />

13.<br />

users <strong>of</strong> the solution at the client<br />

location(s):<br />

Hardware (give brief details covering<br />

Server, Processor configuration (SMP<br />

or Cluster), storage technology (SAN<br />

or internal disks with RAID) etc<br />

Security features implemented -<br />

Password-based / Role-based / Digital<br />

certificates / signature, encryption,<br />

public key system, LDAP server, single<br />

sign-on etc.<br />

14. Training responsibilities <strong>of</strong> Bidder<br />

15.<br />

Any other information to be shared<br />

with ASI<br />

Enclosures Required<br />

Enclosure A:<br />

Narrative Description <strong>of</strong> the <strong>Project</strong><br />

Enclosure B:<br />

Concurrent users<br />

Detailed Description <strong>of</strong> actual services provided by your company:<br />

RFP Volume 2: Commercial and Bidding Terms Page 51


Request for Proposal for establishing e-Governance Systems<br />

9.3.3 Overview <strong>of</strong> Proposed Solution<br />

Please provide relevant details on Solutions & Services specific to Bidder’s proposal under<br />

below mentioned Headings. The list is indicative and can be populated with other relevant<br />

headings.<br />

1. Solution Architecture<br />

a. Capabilities <strong>of</strong> the proposed tools to address the functional requirements<br />

b. Testing approach<br />

c. Risk Management Plan<br />

d. Application Security Architecture<br />

e. Disaster Recovery approach<br />

2. Network Solution / Architecture<br />

3. Hardware Solution / Architecture<br />

4. Service Approach for Facility Management Service, POS Staff, Help Desk<br />

5. Training Approach<br />

6. Work Plan and Staffing Schedule<br />

7. Functional Requirement Specification<br />

Any other response to the Schedule would be treated as Requirement Not Met.<br />

8. Technical Requirement Specification<br />

Any other response to the Schedule would be treated as Requirement Not Met.<br />

A Detailed <strong>Project</strong> Plan covering break-up <strong>of</strong> each phase into the key activities, along with the start<br />

and end dates must be provided as per format given below.<br />

9.3.4 Detailed Work plan and Staffing Plan<br />

The Bidder shall provide a detailed project plan with timelines, resource allocation,<br />

milestones etc. in Micros<strong>of</strong>t <strong>Project</strong> format for carrying out the scope <strong>of</strong> work activities. The<br />

project plan should clearly indicate the deliverables at each milestone in the project. The<br />

Approach and Methodology should capture, in detail, all the activities enlisted in the project<br />

plan.<br />

RFP Volume 2: Commercial and Bidding Terms Page 52


Request for Proposal for establishing e-Governance Systems<br />

9.3.5 Manpower details<br />

Note: For the Key Personnel (refer Section 3, Volume 2 <strong>of</strong> this RFP), it is mandatory to<br />

provide name <strong>of</strong> proposed resource along with details desired as per format given below. It<br />

is mandatory that the resource proposed for the key position should not change in the first<br />

six months <strong>of</strong> the project. For all other categories <strong>of</strong> resources, except the Key Personnel,<br />

the details <strong>of</strong> proposed resources may be furnished by the Bidder at the time <strong>of</strong> contract<br />

finalization.<br />

9.3.6 Pr<strong>of</strong>ile <strong>of</strong> Personnel<br />

Note: Bidder must note that CV should not be more than 2 pages<br />

<br />

1. Proposed position<br />

/ role<br />

2 Designation<br />

3 Date <strong>of</strong> Birth<br />

4 Nationality<br />

5 Education<br />

6 Employment<br />

Record<br />

7 Relevant<br />

Experience<br />

(Starting with present position and last two firms, list in reverse order)<br />

(Give an outline on the experience most pertinent to tasks mentioned in<br />

the project. Describe degree <strong>of</strong> responsibility held on these relevant<br />

assignments – Up to half <strong>of</strong> a page).<br />

8 Certification I, the undersigned, certify that to the best <strong>of</strong> my knowledge and belief,<br />

this bio-data correctly describes me, my qualifications and my experience.<br />

Date:<br />

Place Signature <strong>of</strong> the Candidate<br />

RFP Volume 2: Commercial and Bidding Terms Page 53


Request for Proposal for establishing e-Governance Systems<br />

9.4 Commercial Bid<br />

9.4.1 Commercial Bid Letter<br />

To<br />

Director – Administration<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

Janpath, New Delhi – 110011<br />

Sir,<br />

Subject: Selection <strong>of</strong> Implementation Agency for E-Governance <strong>Project</strong>, ASI<br />

Reference: RFP No: __________________________ Dated _______________<br />

Sir,<br />

We, the undersigned Bidder, having read and examined in detail the entire RFP document in<br />

respect <strong>of</strong> Selection <strong>of</strong> Implementation Agency for E-Governance <strong>Project</strong>, ASI, do hereby<br />

propose to provide the services as specified in the RFP No. ______________________<br />

Dated _________________.<br />

1. PRICE AND VALIDITY<br />

All the prices mentioned in our RFP are in accordance with the terms as specified in the RFP<br />

documents. All the prices and other terms and conditions <strong>of</strong> this RFP are valid for a period <strong>of</strong><br />

180 calendar days from the date <strong>of</strong> opening <strong>of</strong> the technical bids.<br />

2. We have studied the relevant clause(s) in <strong>India</strong>n Tax Laws and hereby declare that if any taxes,<br />

surcharge, Pr<strong>of</strong>essional and any other corporate Tax in altercated under the laws, we shall pay<br />

the same.<br />

3. UNIT RATES<br />

We have indicated in the relevant schedules enclosed, the unit rates for the purpose <strong>of</strong> on<br />

account <strong>of</strong> payment as well as for price adjustment in case <strong>of</strong> any increase to / decrease<br />

from the scope <strong>of</strong> work under the contract.<br />

4. BID PRICING<br />

RFP Volume 2: Commercial and Bidding Terms Page 54


Request for Proposal for establishing e-Governance Systems<br />

We further confirm that the prices stated in our bid are in accordance with RFP.<br />

5. QUALIFYING DATA<br />

We confirm having submitted the information as required by you in your Instruction to<br />

Bidders. In case you require any other further information/documentary pro<strong>of</strong> in this regard<br />

before evaluation <strong>of</strong> our bid, we agree to furnish the same in time to your satisfaction.<br />

6. BID PRICE<br />

We declare that our bid prices are for the entire scope <strong>of</strong> the work as specified in the Scope<br />

<strong>of</strong> Work and bid documents. These prices are attached with our bid as part <strong>of</strong> the bid.<br />

7. PERFORMANCE BANK GUARANTEE<br />

We hereby declare that in case the contract is awarded to us, we shall submit the<br />

Performance Bank Guarantee within 15 working days <strong>of</strong> award notification.<br />

8. We hereby declare that our bid is made in good faith, without collusion or fraud and the<br />

information contained in the bid is true and correct to the best <strong>of</strong> our knowledge and belief.<br />

9. We understand that our bid is binding on us DURING THE VALIDITY PERIOD OR THE EXTENSIONS<br />

THEREOF and that you are not bound to accept a Bid you receive.<br />

10. We confirm that no deviations are attached here with this commercial <strong>of</strong>fer.<br />

Thanking you,<br />

Yours faithfully,<br />

(Signature <strong>of</strong> the Bidder)<br />

Printed Name<br />

Designation<br />

Seal:<br />

Date:<br />

Place:<br />

Business Address:<br />

RFP Volume 2: Commercial and Bidding Terms Page 55


Request for Proposal for establishing e-Governance Systems<br />

Sr.<br />

No<br />

9.4.2 Breakdown <strong>of</strong> Cost Components<br />

Item Description Unit Price (A)<br />

1. Hardware for Ticket Counters at PoS – at 10 sites Per site<br />

2. COTS S<strong>of</strong>tware Licenses (Perpetual) Per license<br />

3.<br />

3 a<br />

3 b<br />

3 c<br />

Implementation and Rollout (including one year warranty<br />

and server side hardware)<br />

- Electronic Communication Solution Module<br />

- E-ticketing Solution Module<br />

- Financial Planning and Budgeting Solutions Module<br />

4. Application Hosting<br />

4 a<br />

4 b<br />

4 c<br />

- Electronic Communication Solution Module<br />

- E-ticketing Solution Module<br />

- Financial Planning and Budgeting Solutions Module<br />

Blended person-<br />

month rate<br />

5. AMC for each module for 2 years, post warranty For 1 year<br />

RFP Volume 2: Commercial and Bidding Terms Page 56<br />

Total Base Price<br />

(B)<br />

Total <strong>of</strong> Taxes,<br />

Duties & Levies<br />

(C)<br />

(All Prices in <strong>India</strong>n Rupees)<br />

Total Price<br />

D=B+C


Request for Proposal for establishing e-Governance Systems<br />

Sr.<br />

No<br />

6 a<br />

6 b<br />

6 c<br />

Item Description Unit Price (A)<br />

- Electronic Communication Solution Module<br />

- E-ticketing Solution Module<br />

- Financial Planning and Budgeting Solutions Module<br />

6. PoS Counter Operating Costs<br />

Per person-month per<br />

RFP Volume 2: Commercial and Bidding Terms Page 57<br />

POS<br />

Total Base Price<br />

(B)<br />

Total <strong>of</strong> Taxes,<br />

Duties & Levies<br />

Total Capital Contract Value TOTAL<br />

Amount in Words (……………………………………………………………………….)<br />

Note:<br />

(C)<br />

Total Price<br />

SI is required to make his own Bill <strong>of</strong> Material Assessment. An indicative Bill <strong>of</strong> Materials is provided in RFP volume 1, Annexure 3. SI is required to<br />

provide an undertaking for the Bill <strong>of</strong> Materials along with the Bid.<br />

SI should provide all prices, quantities as per the prescribed format under this Section. SI should not leave any field blank. In case the field is not<br />

applicable, SI must indicate “0” (Zero) in all such fields.<br />

It is mandatory to provide breakup <strong>of</strong> all Taxes, Duties and Levies wherever applicable and/or payable.<br />

ASI may, at its discretion, decide to procure items mentioned in the Bill <strong>of</strong> Materials directly.<br />

ASI reserves the right to ask the SI to submit pro<strong>of</strong> <strong>of</strong> payment against any <strong>of</strong> the taxes, duties, levies indicated.<br />

ASI shall take into account all Taxes, Duties & Levies for the purpose <strong>of</strong> Evaluation.<br />

D=B+C


Request for Proposal for establishing e-Governance Systems<br />

10 Annexure 2: Pre-Qualification and Technical Bid Evaluation<br />

Criteria<br />

10.1 Pre-Qualification Evaluation Criteria<br />

Pre Qualification Condition Documentary Pro<strong>of</strong> Require<br />

General for Bidder<br />

1. Bidder should be in operation in <strong>India</strong> in IT for a period<br />

<strong>of</strong> at least 5 years as on 31-03-11<br />

2. Bidder should have annual turnover <strong>of</strong> minimum ` 100<br />

crores in each <strong>of</strong> last three financial year (ending 31st<br />

March 2011) accruing from System Integration (including<br />

supply <strong>of</strong> hardware servers, components, devices, etc),<br />

development <strong>of</strong> IT applications areas and Application<br />

Maintenance services. The revenues <strong>of</strong> subsidiaries will<br />

not be considered for this purpose.<br />

3. Bidder should be a pr<strong>of</strong>it making entity in last three<br />

financial years<br />

4. Bidder should have experience <strong>of</strong> developing s<strong>of</strong>tware<br />

assignments in <strong>India</strong> with at least 2 assignments as<br />

Finance and Accounts s<strong>of</strong>tware Implementer and at least<br />

1 assignment in e-ticketing solutions. One <strong>of</strong> the<br />

enterprises must be in Government/PSU.<br />

5. Bidder should have certification <strong>of</strong>:<br />

a. ISO 9001:2000 and<br />

b. CMMi Level 3 or more<br />

Certificate <strong>of</strong> Incorporation<br />

issued by the Registrar <strong>of</strong><br />

Companies<br />

Duly certified statement from<br />

their appointed statutory<br />

auditor for the years 2008-09,<br />

2009-10 and 2010-11<br />

indicating the amount <strong>of</strong><br />

turnover during these years<br />

Duly certified statement from<br />

their appointed statutory<br />

auditor for the years 2008-09,<br />

2009-10 and 2010-11<br />

indicating pr<strong>of</strong>it during these<br />

years<br />

Purchase Order / Work Order /<br />

Completion certificate from<br />

client. The last three years will<br />

comprise <strong>of</strong> periods counted<br />

from 2008-09 onward<br />

Completion Certificate would<br />

be preferred.<br />

Copy <strong>of</strong> valid certificate issued<br />

to Bidder by respective<br />

agencies<br />

RFP Volume 2: Commercial and Bidding Terms Page 58


Request for Proposal for establishing e-Governance Systems<br />

Pre Qualification Condition Documentary Pro<strong>of</strong> Require<br />

6. Bidder should have at least 250 full time s<strong>of</strong>tware<br />

pr<strong>of</strong>essionals on its rolls<br />

7. Bidder should submit RFP fees <strong>of</strong> `10,000 (Rupees Ten<br />

Thousand) in form <strong>of</strong> Demand Draft (DD)<br />

8. Bidder should submit Earnest Money Deposit (EMD) <strong>of</strong><br />

`10,00,000 (Rupees Ten Lakhs only) in the form <strong>of</strong> a<br />

Demand Draft (DD)<br />

Certificate by the Statutory<br />

Auditor or Company Secretary<br />

<strong>of</strong> the firm<br />

Demand Draft drawn in favor<br />

<strong>of</strong> “Director – Administration,<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>”<br />

from a Scheduled Bank<br />

payable at New Delhi.<br />

Demand Draft drawn in favor<br />

<strong>of</strong> “Director – Administration,<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>”<br />

from a Scheduled Bank payable<br />

at New Delhi.<br />

RFP Volume 2: Commercial and Bidding Terms Page 59


Request for Proposal for establishing e-Governance Systems<br />

10.2 Evaluation <strong>of</strong> Technical Bids<br />

The evaluation <strong>of</strong> the technical bids will be based on the following parametsrs:<br />

Technical Evaluation Parameter<br />

Understanding <strong>of</strong> RFP and Approach for implementation<br />

Qualifying<br />

Marks<br />

Understanding <strong>of</strong> <strong>Requirements</strong> 5<br />

Adequacy <strong>of</strong> work plan 5<br />

Solution Proposed for ASI 25<br />

Proposed solution and the methodology for each <strong>of</strong> the Application systems<br />

including compliance to Functional Requirement Specification<br />

10<br />

Proposed quality <strong>of</strong> Hardware and Hosting solution<br />

5<br />

Plan for (a) training, (b) Deployment across locations, (c) resource (operator)<br />

ramp-up for additional counters in future.<br />

Assessment <strong>of</strong> Manpower plan for Ticketing Counters<br />

<strong>Project</strong> Plan 10<br />

Adequacy <strong>of</strong> plan 5<br />

Provisions for contingencies 5<br />

Manpower Proposed 30<br />

Program Manager 9<br />

Experience 5<br />

Qualifications 4<br />

Solution Architect (S<strong>of</strong>tware) 7<br />

Experience 4<br />

Qualifications 3<br />

Solution Architect (Infrastructure and Hardware) 7<br />

Experience 4<br />

Qualifications 3<br />

Solution Architect (Network and Security) 7<br />

Experience 4<br />

Qualifications 3<br />

POC for e-ticketing Module 25<br />

Technical quality <strong>of</strong> the POC 15<br />

Modules and required customization 5<br />

Previous installations 5<br />

Total Marks 100<br />

RFP Volume 2: Commercial and Bidding Terms Page 60<br />

10<br />

5<br />

5


Request for Proposal for establishing e-Governance Systems<br />

11 Annexure 3: Statement <strong>of</strong> Deviation Format<br />

11.1 Statement <strong>of</strong> deviations from Schedule <strong>of</strong> <strong>Requirements</strong><br />

S.No.<br />

Dear Sirs,<br />

Following are the Technical deviations and variations from the requirements and documents for<br />

“E-Governance <strong>Project</strong> for <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong>” against RFP No.<br />

________________________ Dated ______________. These deviations and variations are<br />

exhaustive. Except these deviations and variations, the entire work shall be performed as per<br />

your requirements and documents.<br />

Bidders may please note that, compliance to a Clause and a Sub-Clause would mean complete<br />

compliance to all the other Sections within those Clauses and Sub-Clauses.<br />

Deviation in Scope <strong>of</strong> Work<br />

Tenderer:<br />

Section<br />

No.<br />

Clause No. Page No.<br />

Signature ------------------------<br />

Name ------------------------<br />

Address ------------------------<br />

Company ------------------------<br />

Date ------------------------<br />

Statement <strong>of</strong><br />

deviations and<br />

variations.<br />

Remarks<br />

RFP Volume 2: Commercial and Bidding Terms Page 61


Request for Proposal for establishing e-Governance Systems<br />

12 Annexure 4: Request for Clarification Format<br />

12.1 Format for clarifications<br />

Bidder requiring any clarification on the RFP Document may submit his queries, in writing, at the ASI's<br />

mailing address and as per schedule indicated in Section 8.1.2. The queries must be submitted in<br />

Micros<strong>of</strong>t Excel format as follows:<br />

Sr. No. Volume No. Section No. & Page No. Clause in RFP Clarification Sought<br />

RFP Volume 2: Commercial and Bidding Terms Page 62


Request for Proposal for establishing e-Governance Systems<br />

12.2 Clarification on RFP Document<br />

12.2.1 The Bidders shall bear in mind that their bids with any Technical or Commercial deviations<br />

will not be accepted, Thus, any issues / queries regarding Contract terms and conditions,<br />

Scope <strong>of</strong> Work, minimum requirements for Hardware infrastructure, essential features <strong>of</strong> the<br />

COTS products / components and minimum staffing requirements etc, should be either<br />

clarified before bid submission or submitted to the ASI in writing as per the schedule<br />

indicated in Clause 7.2.<br />

12.2.2 The ASI will respond in writing, to any request for clarification to queries on the RFP<br />

Document, received not later than the dates prescribed by the ASI in Clause 7.2 <strong>of</strong> this RFP<br />

document. Written copies <strong>of</strong> the ASI's response (including the query but without identifying<br />

the source <strong>of</strong> inquiry) would be put up on the www.ASI.nic.in website. Bidders are advised to<br />

keep browsing the information posted on the website.<br />

RFP Volume 2: Commercial and Bidding Terms Page 63


Request for Proposal<br />

For establishing e-Governance Systems<br />

For<br />

<strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

Draft Legal Contract<br />

October 2011


Request for Proposal for establishing e-Governance Systems<br />

Volume 3: Draft Legal Contract<br />

1 INTRODUCTION .................................................................. ERROR! BOOKMARK NOT DEFINED.<br />

1.1 PARTICULARS OF RFP ........................................................... ERROR! BOOKMARK NOT DEFINED.<br />

2 SCOPE OF WORK FOR IMPLEMENTATION AGENCY (SI) ........ ERROR! BOOKMARK NOT DEFINED.<br />

2.1 OVERVIEW OF SCOPE OF WORK .............................................. ERROR! BOOKMARK NOT DEFINED.<br />

3 CONSTITUTION OF THE TEAM ............................................. ERROR! BOOKMARK NOT DEFINED.<br />

4 PROJECT IMPLEMENTATION ............................................... ERROR! BOOKMARK NOT DEFINED.<br />

4.1 APPROACH & METHODOLOGY FOR IMPLEMENTATION OF TECHNICAL SOLUTIONERROR! BOOKMARK NOT DEFINED.<br />

4.2 PROJECT TIMELINES .............................................................. ERROR! BOOKMARK NOT DEFINED.<br />

5 IMPLEMENTATION MODEL ................................................. ERROR! BOOKMARK NOT DEFINED.<br />

5.1 OPERATION MODEL ............................................................. ERROR! BOOKMARK NOT DEFINED.<br />

6 PAYMENT TERMS & SCHEDULE ........................................... ERROR! BOOKMARK NOT DEFINED.<br />

6.1 PAYMENT TERMS ................................................................. ERROR! BOOKMARK NOT DEFINED.<br />

6.2 PAYMENT SCHEDULE ............................................................ ERROR! BOOKMARK NOT DEFINED.<br />

7 BIDDING PROCESS DETAILS ................................................. ERROR! BOOKMARK NOT DEFINED.<br />

7.1 BIDDING SCHEDULE .............................................................. ERROR! BOOKMARK NOT DEFINED.<br />

7.2 GENERAL INSTRUCTION TO BIDDERS ........................................ ERROR! BOOKMARK NOT DEFINED.<br />

7.3 BID SUBMISSION INSTRUCTIONS ............................................. ERROR! BOOKMARK NOT DEFINED.<br />

7.4 CLARIFICATION ON RFP DOCUMENT ....................................... ERROR! BOOKMARK NOT DEFINED.<br />

7.5 BID OPENING & EVALUATION PROCESS ................................... ERROR! BOOKMARK NOT DEFINED.<br />

8 AWARD OF CONTRACT ....................................................... ERROR! BOOKMARK NOT DEFINED.<br />

8.1 POST QUALIFICATION AND AWARD CRITERIA ............................ ERROR! BOOKMARK NOT DEFINED.<br />

8.2 PURCHASER'S RIGHT TO VARY SCOPE OF CONTRACT .................. ERROR! BOOKMARK NOT DEFINED.<br />

8.3 PURCHASER'S RIGHT TO ACCEPT AND REJECT BIDS..................... ERROR! BOOKMARK NOT DEFINED.<br />

8.4 NOTIFICATION OF AWARD ..................................................... ERROR! BOOKMARK NOT DEFINED.<br />

8.5 NEGOTIATIONS WITH THE SUCCESSFUL BIDDER .......................... ERROR! BOOKMARK NOT DEFINED.<br />

8.6 SIGNING OF CONTRACT ......................................................... ERROR! BOOKMARK NOT DEFINED.<br />

8.7 PERFORMANCE SECURITY ...................................................... ERROR! BOOKMARK NOT DEFINED.<br />

9 ANNEXURE 1: BID FORMATS ............................................... ERROR! BOOKMARK NOT DEFINED.<br />

9.1 COVER LETTER ..................................................................... ERROR! BOOKMARK NOT DEFINED.<br />

9.2 PRE QUALIFICATION ............................................................. ERROR! BOOKMARK NOT DEFINED.<br />

9.3 TECHNICAL BID FORMATS ...................................................... ERROR! BOOKMARK NOT DEFINED.<br />

9.4 COMMERCIAL BID ................................................................ ERROR! BOOKMARK NOT DEFINED.<br />

10 ANNEXURE 2: PRE-QUALIFICATION AND TECHNICAL BID EVALUATION CRITERIAERROR! BOOKMARK NOT DEFIN<br />

10.1 PRE-QUALIFICATION EVALUATION CRITERIA ............................. ERROR! BOOKMARK NOT DEFINED.<br />

10.2 EVALUATION OF TECHNICAL BIDS ............................................ ERROR! BOOKMARK NOT DEFINED.<br />

11 ANNEXURE 3: STATEMENT OF DEVIATION FORMAT ............ ERROR! BOOKMARK NOT DEFINED.<br />

11.1 STATEMENT OF DEVIATIONS FROM SCHEDULE OF REQUIREMENTS ERROR! BOOKMARK NOT DEFINED.<br />

12 ANNEXURE 4: REQUEST FOR CLARIFICATION FORMAT ........ ERROR! BOOKMARK NOT DEFINED.<br />

12.1 FORMAT FOR CLARIFICATIONS ................................................ ERROR! BOOKMARK NOT DEFINED.<br />

12.2 CLARIFICATION ON RFP DOCUMENT ....................................... ERROR! BOOKMARK NOT DEFINED.<br />

RFP Volume 3: Draft Legal Contract Page 1


Request for Proposal for establishing e-Governance Systems<br />

A & P Accounts and Pay<br />

List <strong>of</strong> Abbreviations<br />

ADG Additional Director General<br />

AMC Annual Maintenance Contract<br />

ASI <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong><br />

BE Budget Estimate<br />

CDDO Cheque Drawing and Disbursing Officer<br />

CDO Cheque Drawing Officer<br />

CGF Central Government Fund<br />

COTS Commercial Off the Shelf<br />

DDO Drawing and Disbursing Officer<br />

FRS Functional Requirement Specifications<br />

FTP Full Technical Proposal<br />

HLD High Level Design<br />

IMAP Internet Message Access Protocol<br />

ISO International Standards Organization<br />

LLD Low Level Design<br />

MIME Multipurpose Internet Mail Extensions<br />

NIC National Informatics Centre<br />

NISG National Institute for Smart Government<br />

NOC No Objection Certificate<br />

PAO Pay and Account Offices<br />

PKI Public Key Infrastructure<br />

PoS Point <strong>of</strong> Sale<br />

RFP Request for Proposal<br />

SI System Integrator<br />

SLA Service Level Agreement<br />

SPOC Single Point <strong>of</strong> Contact<br />

SRS S<strong>of</strong>tware Requirement Specifications<br />

VPN Virtual Private Network<br />

SMTP Simple Mail Transfer Protocol<br />

RFP Volume 3: Draft Legal Contract Page 2


Request for Proposal for establishing e-Governance Systems<br />

1.1 DRAFT CONTRACT<br />

Draft Contract between the<br />

<br />

Government <strong>of</strong> <strong>India</strong><br />

and<br />

(Name <strong>of</strong> the Company)<br />

for<br />

PROVIDING THE SYSTEM INTEGRATION SERVICES FOR THE IMPLEMENTATION OF E-GOVERNANCE<br />

SOLUTION AT ASI<br />

Contract No dated <br />

Contract Number <br />

THIS CONTRACT is made on this <strong>of</strong>,, by and between:<br />

(i) The President <strong>of</strong> <strong>India</strong>, through the represented by<br />

AND<br />

_______________ (hereinafter called as the “BUYER”, which expression unless repugnant to<br />

the context or meaning there<strong>of</strong>, shall mean and include its successors or nominees or<br />

assignees or legal representative) <strong>of</strong> the FIRST PART;<br />

(ii) a company registered under the Companies Act, 1956 represented<br />

by and in the business <strong>of</strong> system integration (hereinafter called as<br />

“System Integrator” or “SI”, which expression unless repugnant to the context or meaning<br />

there<strong>of</strong>, shall mean and include its successors or permitted assigns ).<br />

( BUYER and SI are collectively referred to as the “Parties” and individually as a “Party”)<br />

WHEREAS<br />

RECITALS<br />

A. The BUYER intends to procure System Integration Services, Operations & Maintenance <strong>of</strong> E-<br />

governance solution on a turnkey basis (hereinafter called as “<strong>Project</strong>”) for selected<br />

locations <strong>of</strong> <strong>Archaeological</strong> <strong>Survey</strong> <strong>of</strong> <strong>India</strong> (ASI).<br />

B. The BUYER carried out selection process for selecting a suitable system integrator for<br />

implementing the <strong>Project</strong>, through the process <strong>of</strong> competitive bidding,pursuant to the “RFP”<br />

(as defined hereinafter);<br />

C. SI has been selected as the successful bidder to implement the <strong>Project</strong> on the basis <strong>of</strong> the<br />

proposal no. ------ dated -------- submitted by SI (“Proposal”).<br />

RFP Volume 3: Draft Legal Contract Page 3


Request for Proposal for establishing e-Governance Systems<br />

D. The BUYER has agreed to accord SI, the right to implement the <strong>Project</strong> on the terms and<br />

conditions set forth below.<br />

E. SI in pursuance <strong>of</strong> its Proposal undertakes to implement the <strong>Project</strong> on the terms and<br />

conditions set forth below.<br />

NOW THEREFORE, IN THE TERMS AND CONDITIONS OF THIS INDENTURE ARE SET OUT HEREIN<br />

UNDER, the Parties have agreed to enter into this Contract to govern the way in which the SI<br />

shall implement and execute the <strong>Project</strong> under this Contract and define the roles and<br />

responsibilities <strong>of</strong> the BUYER and SI.<br />

RFP Volume 3: Draft Legal Contract Page 4


Request for Proposal for establishing e-Governance Systems<br />

2 Article 1: Definitions And Interpretations<br />

1.1. Definitions:In this Contract, unless the context otherwise requires<br />

(1) “Annual Maintenance Contract” (AMC) means the following services to be provided<br />

by SI.<br />

(i) Warranty Services<br />

(ii) Technical Support and help desk services<br />

for the application, data center and other IT related infrastructure<br />

(2) “Applicable Laws” includes all applicable statutes, enactments, acts <strong>of</strong> legislature or<br />

parliament laws, ordinances, rules, by-laws, regulations, notifications, guidelines,<br />

policies, directions, directives and orders <strong>of</strong> any Governmental authority, tribunal,<br />

board, court or other quasi judicial authority<br />

(3) “ASI Area” means portion(s) <strong>of</strong> the Data Center, Disaster Recovery Center,<br />

Deployment and Implementation Sites that are made available to SI for the<br />

placement <strong>of</strong> IT infrastructure, and solutions.<br />

(4) “Availability and Performance Report” means the report on the Service Levels<br />

measured for the defined period.<br />

(5) “Business Hours” would invariably mean 9:00am to 6:00pm on all working days.<br />

Business hours at Implementation Sites may vary as per local orders.<br />

(6) “Conditions Precedent” shall have the meaning assigned to it in Article 2.2 here<strong>of</strong>.<br />

(7) “Contract” means this contract together with all the Schedules and shall include any<br />

modifications, alterations, additions or deletions thereto agreed between the Parties<br />

in writing after the date here<strong>of</strong> in terms <strong>of</strong> this contract. In the event <strong>of</strong> a conflict<br />

between this contract and the Schedules, the terms <strong>of</strong> the Contract shall prevail.<br />

(8) “Confidential Information” means all information as defined in the Article 17.<br />

(9) “Customization” means the process <strong>of</strong> making Modifications, Enhancements,<br />

developing interfaces and making changes to the s<strong>of</strong>tware including but not limited<br />

to Electronic Communication, E-ticketing and Financial Planning and Budgeting<br />

Modules, Help Desk s<strong>of</strong>tware, s<strong>of</strong>tware for access to historical data, Security<br />

applications and products, backup s<strong>of</strong>tware and applications, hardware and network<br />

control and the monitoring s<strong>of</strong>tware to be implemented by SI to meet the<br />

requirements <strong>of</strong> the BUYER as specified in Article 3 and system requirement<br />

specifications study to be performed by SI.<br />

RFP Volume 3: Draft Legal Contract Page 5


Request for Proposal for establishing e-Governance Systems<br />

(10) “Data” shall mean any record <strong>of</strong> any matter or thing tangible or intangible, factual,<br />

fictitious or imaginary, hypothetical or abstract, known or unknown, accurate or<br />

inaccurate and includes any thought, form or substance, or knowledge proposition<br />

or opinion supplied or recorded by man or machine and prepared, stored or<br />

transmitted in computer readable form and shall include information.<br />

(11) “DataCenter” or “(DC)” means the primary centre where Data, s<strong>of</strong>tware, computer<br />

systems and associated components, such as telecommunication and storage<br />

systems, redundant or backup power supplies, redundant data communications,<br />

environment controls and security devices are housed and operated from.<br />

(12) “Data Migration” means moving <strong>of</strong> Data from existing manual systems or existing<br />

automated systems to the new E-governance solution.<br />

(13) “Deliverables” means the business designs, the process documentations, the<br />

hardware, the solutions, the training materials, etc agreed to be delivered by SI as<br />

defined in Article 3 in pursuance <strong>of</strong> the Contract.<br />

(14) “Development Site” means the site that is provided to SI by the BUYER where SI<br />

would perform the activities related to the <strong>Project</strong>.<br />

(15) “Disaster Recovery Centre” or “DRC” means the centre that is designed to act as the<br />

DataCenter on occurrence <strong>of</strong> a disaster / non-functioning <strong>of</strong> the primary DC.<br />

(16) “Documentation” shall mean the explanatory electronic or paper documents and<br />

notes referring to the installation, configuration, customization, maintenance and<br />

use <strong>of</strong> the Licensed S<strong>of</strong>tware.<br />

(17) “Effective Date <strong>of</strong> Contract” or “Effective Date” means the date on which this<br />

Contract is signed by both the Parties.<br />

(18) “Effective Date <strong>of</strong> <strong>Project</strong> Commencement” means the date on which the<br />

Conditions Precedent have been satisfied by SI or waived by the BUYER. For<br />

calculation <strong>of</strong> all project schedules/delays etc, this date will be taken into account as<br />

the date <strong>of</strong> commencement <strong>of</strong> the <strong>Project</strong>.<br />

(19) “End Users” means the users who use the s<strong>of</strong>tware and services.<br />

(20) “Enhancement” means incorporation <strong>of</strong> new modules, etc made to the Licensed<br />

S<strong>of</strong>tware by SI, so as to support new technologies, functionalities and upgrades.<br />

(21) “Equipment” means the computer hardware, network, peripherals, and other<br />

tangible equipments supplied for the <strong>Project</strong>, pursuant to the Contract.<br />

(22) “E-governance solution” means the three modules related to electronic<br />

communication solutions, e-ticketing solutions, and Finance and budgeting solutions<br />

proposed by BUYER to meet the functional and technical requirements <strong>of</strong> the<br />

BUYER. This includes all the standard modules <strong>of</strong> the E-governance solution as well<br />

RFP Volume 3: Draft Legal Contract Page 6


Request for Proposal for establishing e-Governance Systems<br />

as the third party tools, databases, and middleware s<strong>of</strong>tware bundled with the E-<br />

governance solution to make it work as a complete solution.<br />

(23) “Executive Committee” shall be the committee constituted by ASI to take up the<br />

project <strong>of</strong> implementation <strong>of</strong> E-governance solution at ASI.<br />

(24) “Go-Live” or “Go Live” means commissioning and integration <strong>of</strong> all the hardware<br />

including Data Center, Disaster Recovery Center, the networks, the client side<br />

computing devices and all the s<strong>of</strong>tware applications, including the E-governance<br />

solutions configured, customized and used successfully by all the intended users <strong>of</strong><br />

the BUYER for successfully executing all the intended transactions as mentioned in<br />

the Article 3 at mutually agreeable levels<br />

(25) “Handholding” means the support provided by SI that includes but not limited to<br />

the onsite support at the Implementation sites, DataCenter,<br />

DisasterRecoveryCenter, Help Desk, support for the implemented s<strong>of</strong>tware, users <strong>of</strong><br />

the system and maintenance <strong>of</strong> the related information technology infrastructure.<br />

(26) “Help Desk” means the facility setup by SI at selected locations that provides<br />

support through personnel or telephonic or any other means for issues faced by End<br />

Users.<br />

(27) “Implementation Services” means the services required to be delivered by SI to the<br />

BUYER for successful and comprehensive implementation <strong>of</strong> E-governance solution<br />

for the BUYER as per the requirements detailed in Article 3.<br />

(28) “Implementation Site” means any locations <strong>of</strong> the BUYER where E-governance<br />

solution is implemented.<br />

(29) “Information” shall mean any Data after being processed for the purpose <strong>of</strong> being<br />

applied or supplied in response to a given requirement and other statement or<br />

record made by man or machine and capable <strong>of</strong> being perceived by the human<br />

senses.<br />

(30) “Intellectual Property Rights" means rights as defined in the Article 14.<br />

(31) “Licensed S<strong>of</strong>tware” shall mean ……..…. as specified in Schedule III <strong>of</strong> this Contract.<br />

(32) “Modification” means any change effected to fix bugs and program s<strong>of</strong>tware<br />

defects, errors, minor customization, incorporation <strong>of</strong> minor new features etc in the<br />

Licensed Electronic Communication, E-ticketing, and Finance and Budgeting<br />

Solutions by SI, so as to make it functionally complete.<br />

(33) “Material Adverse Effect” means material adverse effect on (a) the ability <strong>of</strong> SI to<br />

perform/discharge any <strong>of</strong> its duties/obligations under and in accordance with the<br />

provisions <strong>of</strong> this Contract and/or (b) the legal validity, binding nature or<br />

enforceability <strong>of</strong> this Contract.<br />

RFP Volume 3: Draft Legal Contract Page 7


Request for Proposal for establishing e-Governance Systems<br />

(34) “Network” means the physical medium through which Data is transferred from<br />

source to destination.<br />

(35) “New Version” means a version <strong>of</strong> Licensed S<strong>of</strong>tware or hardware released as “New<br />

Version” by the OEM.<br />

(36) “OEM” or “Original Equipment Manufacturer” means the original manufacturer <strong>of</strong><br />

the s<strong>of</strong>tware or hardware that owns the original Intellectual Property rights to the<br />

s<strong>of</strong>tware or hardware to be used in the <strong>Project</strong> and to which the BUYER has been<br />

granted license to use.<br />

(37) “Operations and Maintenance Services” or “O&M” includes the activities covered<br />

during the period from “Go Live” till the expiry or termination <strong>of</strong> the Contract. Some<br />

<strong>of</strong> the key activities in this stage include but are not limited to the warranty for<br />

equipments, ATS for s<strong>of</strong>tware, handholding for the implemented s<strong>of</strong>tware solution,<br />

supporting the End Users in using the new system, maintenance <strong>of</strong> the entire<br />

Information Technology infrastructure, New Versions, Helpdesk services and AMC.<br />

(38) “Operative Period <strong>of</strong> Contract” or “Term”means the period <strong>of</strong> the Contract<br />

commencing from the Effective Date <strong>of</strong> <strong>Project</strong> Commencement and continuing till<br />

the last day <strong>of</strong> Operations and Maintenance Service, or the date <strong>of</strong> termination, in<br />

case <strong>of</strong> earlier termination <strong>of</strong> the Contract.<br />

(39) “<strong>Project</strong>” means the entire set <strong>of</strong> activities that include “System Integration<br />

Services” and “Operations & Maintenance Services”.<br />

(40) “<strong>Project</strong> Assets” means the assets (including hardware and s<strong>of</strong>tware), other than ASI<br />

Supplied Equipment, supplied for the purpose <strong>of</strong> the <strong>Project</strong>, pursuant to this<br />

Contract.<br />

(41) “<strong>Project</strong> Site” means all the sites that include Development Site, Implementation<br />

Sites, DataCenter and DisasterRecoveryCenter.<br />

(42) “Request for Proposal (RFP)” means the documents containing the general,<br />

technical, functional, commercial and legal specifications for the implementation <strong>of</strong><br />

the <strong>Project</strong> issued in different parts and as different Appendices and Annexure and<br />

includes the clarifications, explanations, minutes <strong>of</strong> the meetings and amendments<br />

issued from time to time during the bidding process.<br />

(43) "Replacement SI" means any third party that the BUYER may appoint to replace SI<br />

on or before the expiry <strong>of</strong> the Operative Period <strong>of</strong> Contract or on termination <strong>of</strong> this<br />

Contract to undertake the <strong>Project</strong> or part or extension there<strong>of</strong>.<br />

(44) "Service Level" means the level <strong>of</strong> service and the completeness <strong>of</strong> the services<br />

delivered, and other performance criteria which will apply to the services as set out<br />

in Article 3.<br />

RFP Volume 3: Draft Legal Contract Page 8


Request for Proposal for establishing e-Governance Systems<br />

(45) “SI Assets for Own Use” or “SI Assets” means assets other than the <strong>Project</strong> Assets<br />

including but not limited to the computer hardware, s<strong>of</strong>tware, Network<br />

components, power supply and other tangible equipment used by SI for the <strong>Project</strong>.<br />

(46) “Source Code” means the human-readable version <strong>of</strong> the Licensed S<strong>of</strong>tware made<br />

up <strong>of</strong> the source program containing computer instructions and Data definitions,<br />

which cannot be executed on a computer processor without compilation or<br />

conversion into binary language.<br />

(47) “System Integration Services or “SIS” includes the activities till Go Live. These<br />

include but are not limited to Integration & Commissioning <strong>of</strong> hardware<br />

configuration, Customization and implementation <strong>of</strong> all the s<strong>of</strong>tware including the<br />

Electronic Communication, E-ticketing, and Finance and Budgeting Solutions; Data<br />

Migration and training.<br />

(48) “Third Party Systems” means systems or any part there<strong>of</strong> for which the Intellectual<br />

Property Rights are owned by a third party and the BUYER has been granted a<br />

license to use.<br />

(49) “Updates” means but is not limited to a minor change, Modification, customization<br />

made to the Licensed S<strong>of</strong>tware by SI or OEM so as to incorporate ‘bug fixes’, or<br />

improve the existing technology, features or functionality.<br />

(50) “Working Day” means any day on which any <strong>of</strong> the unit <strong>of</strong> ASI will be functioning.<br />

The BUYER will provide list <strong>of</strong> its scheduled holidays.<br />

1.2. Interpretations. In this Contract, unless the context otherwise requires:-<br />

(1) Any reference to a statutory provision and shall include such provision as from time<br />

to time modified or re-enacted or consolidated so far as such modification or re-<br />

enactment or consolidation applies or is capable <strong>of</strong> applying to any transactions<br />

entered into hereunder.<br />

(2) The words importing singular shall include plural and vice versa, and words denoting<br />

natural person shall include partnerships, firms, companies, corporations, joint<br />

ventures, trusts, associations, organizations, executors, administrators, successors,<br />

agents, substitutes and any permitted assignees or other entities (whether or not<br />

having a separate legal entity). A reference to a group <strong>of</strong> persons is a reference to<br />

all <strong>of</strong> them collectively, to any two or more <strong>of</strong> them collectively and to each <strong>of</strong> them<br />

individually. Reference to a Party or the Parties is a reference to a party or to the<br />

parties to this Contract unless otherwise stated.<br />

(3) Unless otherwise expressly stated, the words "herein", "here<strong>of</strong>", "hereunder" and<br />

similar words refer to this Contract as a whole and not to any particular Article or<br />

Schedule. The term Articles, refers to Articles <strong>of</strong> this Contract. The words "in writing"<br />

RFP Volume 3: Draft Legal Contract Page 9


Request for Proposal for establishing e-Governance Systems<br />

and "written" mean "in documented form", whether electronic or hard copy, unless<br />

otherwise stated. Any reference to attorneys' fees shall include fees <strong>of</strong> the<br />

pr<strong>of</strong>essional assistants <strong>of</strong> such attorneys.<br />

(4) The headings and use <strong>of</strong> bold type in this Contract are for convenience only and shall<br />

not affect the interpretation <strong>of</strong> any provision <strong>of</strong> this Contract. The table <strong>of</strong> contents<br />

and any headings in this Contract are for ease <strong>of</strong> reference only and shall not affect<br />

the construction or interpretation <strong>of</strong> this Contract.<br />

(5) References to “installation” include investigation, design, engineering, procurement,<br />

delivery, transportation, installation, processing, fabrication, testing, commissioning<br />

and other activities incidental to the construction.<br />

(6) Any reference to any period <strong>of</strong> time shall mean a reference to that according to<br />

<strong>India</strong>n standard time.<br />

(7) Any reference to day shall mean a reference to <strong>India</strong>n calendar day.<br />

(8) Any reference to month shall mean a reference to <strong>India</strong>n calendar month<br />

(9) Any reference at any time to any Contract, deed, instrument, license or document <strong>of</strong><br />

any description shall be construed as reference to that Contract, deed, instrument,<br />

license or other document as amended, varied, supplemented, modified or<br />

innovated at the time <strong>of</strong> such reference.<br />

(10) Any Contract, consent, approval, authorization, notice, communication, information<br />

or report required under or pursuant to this Contract from or by any Party or the<br />

independent engineer and/or a statutory auditor and/or any other authority shall be<br />

valid and effectual only if it is in writing under the hands <strong>of</strong> duly authorized<br />

representative <strong>of</strong> such Party or the independent engineer and/or statutory auditor<br />

or any other authority, as the case may be, in this behalf and not otherwise.<br />

(11) Unless otherwise stated, any reference to any period commencing “from” a<br />

specified day or date and “till” or “until” a specified day or date shall include both<br />

such days or dates.<br />

(12) Unless otherwise specified, any interest to be calculated and payable under this<br />

Contract shall accrue on an Annual basis and from the respective due dates as<br />

provided for in this Contract.<br />

(13) A reference to an article, clause, section, schedule, annexure or appendix is a<br />

reference to an article, clause, section, schedule, annexure or appendix to this<br />

Contract unless otherwise stated and references to this Contract include any recital,<br />

schedule, annexure or appendix to this Contract.<br />

(14) A word denoting a gender includes all genders.<br />

RFP Volume 3: Draft Legal Contract Page 10


Request for Proposal for establishing e-Governance Systems<br />

(15) A reference to knowledge <strong>of</strong> a person includes information that a reasonable person<br />

in the circumstances <strong>of</strong> that person would have known by reasonable inquiry.<br />

(16) In interpreting this Contract no rule <strong>of</strong> construction applies to the disadvantage <strong>of</strong> a<br />

party because that party or its legal advisor was responsible for the preparation <strong>of</strong><br />

this Contract or any part <strong>of</strong> it.<br />

1.3. Measurements and Arithmetic Conventions. All measurements and calculations shall be in<br />

metric system and calculations done to 2 decimal places, with the third digit <strong>of</strong> 5 or above<br />

being rounded up and below 5 being rounded down.<br />

1.4. Ambiguities and Discrepancies. In case <strong>of</strong> ambiguities or discrepancies within this<br />

Contract, the following shall apply:-<br />

(1) Between two Articles <strong>of</strong> this Contract, the provisions <strong>of</strong> specific Articles relevant to<br />

the issue under consideration shall prevail over those in other Articles.<br />

(2) Between the dimension scaled from the design and drawings and its specific written<br />

dimension, the latter shall prevail.<br />

(3) Between any value written in numerals and that in words, the latter shall prevail;<br />

and<br />

(4) Between the provisions <strong>of</strong> this Contract and any other documents forming part <strong>of</strong><br />

this Contract, the former shall prevail.<br />

RFP Volume 3: Draft Legal Contract Page 11


Request for Proposal for establishing e-Governance Systems<br />

3 Article 2: Structure<br />

2.1. Overview. This Contract shall operate as a legally binding contract for the <strong>Project</strong> specifying<br />

the master terms which apply to the Parties under this Contract, including but not limited to<br />

terms in relation to implementation <strong>of</strong> Electronic Communication, E-ticketing, and Finance<br />

and Budgeting Solutions, integration <strong>of</strong> the solution components, training <strong>of</strong> the users and<br />

subsequently operate and maintain the system with commitment for delivering the goods<br />

and services specified under this Contract in accordance with roles and responsibilities set<br />

for the herein for maximum total consideration <strong>of</strong> Rs. , inclusive <strong>of</strong><br />

all taxes, levies, cess and any other statutory dues.<br />

(1) This Contract constitutes the entire understanding between the Parties regarding<br />

the <strong>Project</strong> and supersedes or supplements all previous written and/or oral<br />

representations and/or arrangements regarding the same. If there is any aspect <strong>of</strong><br />

the <strong>Project</strong> not covered by any <strong>of</strong> the provisions <strong>of</strong> this Contract, then and only in<br />

that event, reference may be made by the Parties to the bid documents, inter alia<br />

including the clauses and materials <strong>of</strong> all the specifications, terms and conditions <strong>of</strong><br />

RFP issued by the BUYER and also including the addendums, clarifications given in<br />

writing in the pre-bid meetings and the submissions <strong>of</strong> SI and the bid submitted by SI<br />

but not otherwise. In case <strong>of</strong> any contradictions in the terms <strong>of</strong> this Contract and any<br />

such other bid documents as referred to above, the terms <strong>of</strong> this Contract shall<br />

prevail.<br />

(2) This Contract shall include all the commitments made by SI through the response to<br />

the RFP, duly signed by the authorised signatory <strong>of</strong> SI.<br />

(3) There are two distinct stages during which the Contract will be in force. The nature<br />

<strong>of</strong> work, the commitment and the interpretation <strong>of</strong> the Contract will be based on<br />

the context <strong>of</strong> these two stages. Both these stages together comprise the <strong>Project</strong> :-<br />

(i) System Integration Services (SIS) Stage.<br />

(ii) Operations and Maintenance Services stage.<br />

(4) While the SIS stage will be executed in a project mode with emphasis on the supply<br />

2.2. Conditions Precedent.<br />

<strong>of</strong> the <strong>Project</strong> Assets, installing, commissioning and implementing them, etc. as per<br />

the technical and functional specifications, the Operations and Maintenance<br />

Services stage will be driven by definition <strong>of</strong> services, the Service Levels, the<br />

measurement <strong>of</strong> Service Levels, penalties for non conformance to services, etc.<br />

RFP Volume 3: Draft Legal Contract Page 12


Request for Proposal for establishing e-Governance Systems<br />

(1) Subject to express terms to the contrary, the rights and obligations under this<br />

Contract shall be effective (at any point <strong>of</strong> time during the course <strong>of</strong> the Contract)<br />

only upon fulfilment <strong>of</strong> all the conditions precedent (“Conditions Precedent”) set<br />

out in this Article 2.2 (a). SI shall:-<br />

(i) Provide the “Performance Bank Guarantee” (as defined in Article 2.6 here<strong>of</strong>)<br />

to the BUYER as specified in the RFP document.<br />

(ii) Provide the BUYER, the certified true copies <strong>of</strong> its constitutional documents<br />

and board resolutions authorizing the execution, delivery and performance <strong>of</strong><br />

this Contract with the BUYER.<br />

However, the BUYER may at any time at its sole discretion waive fully or partially any<br />

<strong>of</strong> the Conditions Precedent.<br />

(2) Non-fulfilment <strong>of</strong> Conditions Precedent.<br />

(i) Subject to Article 2 (b) (iv) below, in the event that any <strong>of</strong> the Conditions<br />

Precedent has not been fulfilled within fifteen days <strong>of</strong> the Effective Date and the<br />

same has not been waived by the BUYER fully or partially, this Contract shall<br />

stand terminated as <strong>of</strong> that date.<br />

(ii) In the event <strong>of</strong> termination <strong>of</strong> the Contract on account <strong>of</strong> non-fulfillment <strong>of</strong><br />

Conditions Precedent, the BUYER shall not be liable in any manner whatsoever<br />

to SI and SI shall forthwith forfeit the money deposited by Buyer under RFP<br />

(“Earnest Money Deposit”). Such termination and forfeitures shall be without<br />

prejudice or other rights <strong>of</strong> the BUYER under law or Contract.<br />

(iii) In the event that vacant possession <strong>of</strong> any <strong>of</strong> the <strong>Project</strong> facilities and/or<br />

equipment has been delivered to SI prior to the fulfillment in fulfillment <strong>of</strong> the<br />

Conditions Precedent, then on termination <strong>of</strong> this Contract such possession shall<br />

immediately revert to the BUYER free and clear from any encumbrances or<br />

claims.<br />

2.3. Entire Agreement.<br />

(iv) Instead <strong>of</strong> terminating this Contract as provided in Article 2.2 (b)(i) above, the<br />

Parties may mutually agree in writing to extend the time for fulfilling the<br />

Conditions Precedent and the Term. It is further clarified that any such extension<br />

<strong>of</strong> time shall be subject to imposition <strong>of</strong> penalties on SI linked to the delay in<br />

fulfilling the Conditions Precedent.<br />

(1) This Contract shall constitute the entire agreement amongst the Parties hereto in<br />

respect <strong>of</strong> the subject matter here<strong>of</strong>.<br />

(2) This Contract, including all documents incorporated herein by reference, constitutes the<br />

complete and final agreement between the BUYER and SI with respect to the subject<br />

matter here<strong>of</strong>, and supersedes all prior or contemporaneous negotiations, written or<br />

RFP Volume 3: Draft Legal Contract Page 13


Request for Proposal for establishing e-Governance Systems<br />

oral understandings and agreements, between the Parties regarding such subject<br />

matter.<br />

(3) This Contract may be executed in two or more counterparts, each <strong>of</strong> which will be<br />

deemed an original, but all <strong>of</strong> which together shall constitute one and the same<br />

instrument.<br />

(4) It is the obligation <strong>of</strong> SI to inform OEMs in respect <strong>of</strong> their respective obligations to SI<br />

and in turn to ASI under the Contract and to ensure that they agree and commit to due<br />

discharge <strong>of</strong> their obligations under the relevant terms and conditions <strong>of</strong> this Contract.<br />

2.4. Severability. If any provision <strong>of</strong> the Contract, or any part there<strong>of</strong>, shall be found by any court<br />

or administrative body <strong>of</strong> competent jurisdiction to be illegal, invalid or unenforceable, the<br />

illegality, invalidity or unenforceability <strong>of</strong> such provision or part provision shall not affect the<br />

other provisions <strong>of</strong> the Contract or the remainder <strong>of</strong> the provisions in question which shall<br />

remain in full force and effect. The Parties shall negotiate in good faith in order to agree to<br />

substitute for any illegal, invalid or unenforceable provision a valid and enforceable<br />

provision, which achieves to the greatest extent possible the economic, legal and<br />

commercial objectives <strong>of</strong> the illegal, invalid or unenforceable provision or part provision.<br />

2.5. Additional work. The BUYER has the option to avail the services <strong>of</strong> SI for carrying out any<br />

extension or changes in scope <strong>of</strong> work, as a part <strong>of</strong> the <strong>Project</strong>, provided the prices for the<br />

same has been obtained already in the bidding process leading to this Contract in the<br />

Schedule I. All such additional work will be initiated using the change control procedures<br />

listed in the Schedule II.<br />

2.6. Bank guarantee.SI warrants to provideBank guarantee for the Contract as a whole, valued at<br />

10% <strong>of</strong> value <strong>of</strong> the Contract valid for the Operative Period <strong>of</strong> Contract. (“Performance Bank<br />

Guarantee”) or (“PBG)”):<br />

2.7. Extension <strong>of</strong> the Contract. The BUYER has the option to extend the Contract on expiry, to<br />

avail the services <strong>of</strong> SI for specific work or continuation <strong>of</strong> the work carried out during the<br />

Operative Period <strong>of</strong> Contract. All the general terms and conditions other than the scope <strong>of</strong><br />

work as listed in Article 3 <strong>of</strong> this Contract will be in force during the extended period <strong>of</strong> the<br />

Contract. The new scope <strong>of</strong> work for the extension period will be defined through the<br />

change control procedure mentioned in Schedule II.<br />

2.8. Amendment. No provisions <strong>of</strong> this Contract shall be changed or modified in any way<br />

(including this provision) either in whole or in part except by an instrument in writing made<br />

after the Effective Date <strong>of</strong> Contract and signed by both Parties and which expressly states to<br />

amend this Contract.<br />

RFP Volume 3: Draft Legal Contract Page 14


Request for Proposal for establishing e-Governance Systems<br />

4 Article 3: Scope <strong>of</strong> the <strong>Project</strong><br />

Scope <strong>of</strong> the project is detailed in Volume I <strong>of</strong> the RFP document.<br />

3.1. Interpretation <strong>of</strong> the Scope <strong>of</strong> Work.<br />

(1) The BUYER retains the right <strong>of</strong> the final say in the interpretation <strong>of</strong> the scope <strong>of</strong> the<br />

<strong>Project</strong>. The possible variations to the processes during the Business Design phase<br />

from the way they are specified in the Schedule III should not be considered as<br />

deviations or extensions to the original process specifications.<br />

(2) The performance <strong>of</strong> the ultimate system can be achieved by different combinations<br />

<strong>of</strong> the Equipments and Network components. The final acceptance <strong>of</strong> the integrated<br />

solution and infrastructure components should be as per the performance<br />

requirements and will be the determining factor but not the specifications <strong>of</strong> the<br />

infrastructure alone.<br />

RFP Volume 3: Draft Legal Contract Page 15


Request for Proposal for establishing e-Governance Systems<br />

4.1. Terms <strong>of</strong> Payment.<br />

5 Article 4 : Payment Terms<br />

(1) In consideration <strong>of</strong> the <strong>Project</strong> and subject to the provisions <strong>of</strong> this Contract, the BUYER<br />

shall pay SI for the services rendered in pursuance <strong>of</strong> this Contract, in accordance with<br />

the Schedule IV to this Contract.<br />

(2) Except as otherwise provided for herein or as agreed between the Parties in writing, the<br />

BUYER shall not be required to make any payments in respect <strong>of</strong> the services other than<br />

those covered by the terms <strong>of</strong> payment, as stated in the Schedule IV.<br />

4.2. Invoicing and Settlement.<br />

(1) In respect <strong>of</strong> its remuneration for the <strong>Project</strong> SI shall be eligible to receive payments in<br />

accordance with the Schedule IV.<br />

(i) The BUYER shall be invoiced by SI for the <strong>Project</strong>. Generally and unless otherwise<br />

agreed in writing between the Parties or expressly set out in the Contract SI shall<br />

raise an invoice as per the terms <strong>of</strong> payment as stated in Schedule IV.<br />

(ii) The invoices will be accepted by the BUYER for payment only if the or the designated representative <strong>of</strong> the issues an acceptance certificate that the respective<br />

milestones and the Deliverables <strong>of</strong> those milestones are accepted.<br />

(iii) Any invoice presented in accordance with this Article shall be in a form agreeable by<br />

the BUYER.<br />

(2) Invoices shall be accurate and all adjustments to or changes in the terms <strong>of</strong> payment as<br />

stated in the Schedule IV shall be applied to the next payment invoice.<br />

(3) The BUYER shall be entitled to process the payment <strong>of</strong> any invoice raised by SI or part <strong>of</strong><br />

it only after the acceptance certificate for the Deliverables is issued by the . Any exercise by the BUYER under this<br />

Article shall not entitle SI to delay or withhold provision <strong>of</strong> the <strong>Project</strong>.<br />

(4) SI shall pay all their sub-contractors in a timely fashion in accordance with a mechanism,<br />

which will not prejudice the objective <strong>of</strong> the <strong>Project</strong>.<br />

4.3. Payment <strong>of</strong> Tax / Tax Considerations.<br />

(1) The BUYER shall be entitled to deduct tax (at source) from the amounts due and payable<br />

to SI, wherever applicable. SI shall pay for all other taxes in connection with this<br />

Contract, and any other including, but not limited to, property, sales, use, excise duty,<br />

value-added goods and services, consumption and other similar taxes or duties.<br />

RFP Volume 3: Draft Legal Contract Page 16


Request for Proposal for establishing e-Governance Systems<br />

(2) The BUYER or its associated entity shall provide SI with the statement <strong>of</strong> tax receipt <strong>of</strong><br />

any taxes deducted at source on payments under this Contract. SI agrees to reimburse<br />

and do not hold the BUYER accountable from any deficiency (including penalties and<br />

interest) relating to taxes that are its responsibility under this paragraph. For purposes<br />

<strong>of</strong> this Contract, taxes shall include taxes incurred on transactions between and among<br />

the BUYER, SI and any third party subcontractors.<br />

(3) In the event <strong>of</strong> any increase or decrease <strong>of</strong> the rate <strong>of</strong> taxes due to any statutory<br />

notification/s during the term <strong>of</strong> the Contract, the consequential effect shall be to the<br />

account <strong>of</strong> SI.<br />

(4) The Parties shall cooperate to enable each Party to accurately determine its own tax<br />

liability and to minimize such liability to the extent legally permissible. In connection<br />

therewith, the Parties shall provide each other with (i) any resale certificates, (ii) any<br />

relevant information regarding use <strong>of</strong> out-<strong>of</strong>-state materials, equipment or services and<br />

(iii) any exemption certificates or information reasonably requested by the other Party.<br />

4.4. Liquidated Damages. In the event <strong>of</strong> SI's failure to submit the Bonds, Guarantees and<br />

Documents, supply the <strong>Project</strong> Assets and conduct trials, installation <strong>of</strong> equipment and<br />

training as per Schedule III specified in this Contract, the BUYER may at his discretion<br />

withhold any payment until the completion <strong>of</strong> the Contract. The BUYER may also deduct<br />

from SI as agreed, liquidated damages to the sum <strong>of</strong> 0.5% <strong>of</strong> the Contract price <strong>of</strong> the<br />

delayed/undelivered stores/ services mentioned above for every week <strong>of</strong> delay or part <strong>of</strong> a<br />

week, subject to the maximum value <strong>of</strong> the Liquidated Damages being not higher than 5% <strong>of</strong><br />

the value <strong>of</strong> delayed stores. This right to claim any liquidated damages shall be without<br />

prejudice to other rights and remedies available to BUYER under the Contract and/or law.<br />

RFP Volume 3: Draft Legal Contract Page 17


Request for Proposal for establishing e-Governance Systems<br />

6 Article 5: Representation and Warranties<br />

5.1. Representations and Warranties and Covenants <strong>of</strong> SI. SI represents and warrants and<br />

covenants to the BUYER that:<br />

(1) It is duly organised, validly existing and in good standing under the laws <strong>of</strong> <strong>India</strong> and<br />

hereby expressly and irrevocably waives any immunity in any jurisdiction in respect<br />

<strong>of</strong> this Contract or matters arising thereunder including any obligation, liability or<br />

responsibility hereunder.<br />

(2) It has full power and authority to execute, deliver and perform its obligations under<br />

this Contract.<br />

(3) It has taken all necessary action to authorise the execution, delivery and<br />

performance <strong>of</strong> this Contract.<br />

(4) This Contract constitutes the legal, valid and binding obligation <strong>of</strong> SI, enforceable<br />

against it in accordance with the terms here<strong>of</strong>.<br />

(5) There are no actions, suits or proceedings pending or to its best knowledge,<br />

threatened against or affecting it before any court, administrative body or arbitral<br />

tribunal which might materially and adversely affect its ability to meet or perform<br />

any <strong>of</strong> its obligations under this Contract.<br />

(6) It has the financial standing and capacity to undertake the <strong>Project</strong> in accordance<br />

with the terms <strong>of</strong> this Contract.<br />

(7) The execution, delivery and performance <strong>of</strong> this Contract will not conflict with,<br />

result in the breach <strong>of</strong>, constitute a default under, or accelerate performance<br />

required by any <strong>of</strong> the terms <strong>of</strong> its memorandum <strong>of</strong> association and articles <strong>of</strong><br />

association or any Applicable Laws or any covenant, Contract, agreement,<br />

arrangement, understanding, decree or order to which it is a Party or by which it or<br />

any <strong>of</strong> its properties or assets is bound or affected.<br />

(8) It has no knowledge <strong>of</strong> any violation or default with respect to any order, writ,<br />

injunction or decree <strong>of</strong> any court or any legally binding order <strong>of</strong> any Government<br />

authority which may result in any Material Adverse Effect on its ability to perform its<br />

obligations under this Contract and no fact or circumstance exists which may give<br />

rise to such proceedings that would adversely affect the performance <strong>of</strong> its<br />

obligations under this Contract.<br />

(9) It has complied with Applicable Laws in all material respects and has not been<br />

subject to any fines, penalties, injunctive relief or any other civil or criminal liabilities<br />

RFP Volume 3: Draft Legal Contract Page 18


Request for Proposal for establishing e-Governance Systems<br />

which in the aggregate have or may have a Material Adverse Effect on its ability to<br />

perform its obligations under this Contract.<br />

(10) All its rights and interests in the <strong>Project</strong>/<strong>Project</strong> Assets that are to be transferred to<br />

the BUYER, pursuant to this Contract shall pass to and vest in the BUYER or its<br />

nominee on the Transfer Date free and clear <strong>of</strong> all liens, claims and encumbrances,<br />

without any further act or deed on its part or that <strong>of</strong> the BUYER, and that none <strong>of</strong><br />

the <strong>Project</strong> Assets that are acquired by the BUYER shall be acquired by it, subject to<br />

any agreement under which a security interest or other lien or encumbrance is<br />

retained by any person, save and except as expressly provided in this Contract. The<br />

expression “Transfer Date” shall mean date on which the <strong>Project</strong> Assets or any part<br />

there<strong>of</strong> are transferred to the BUYER or its nominee, pursuant to the Contract, on<br />

Go Live coming into effect or on termination <strong>of</strong> the Contract, if such termination<br />

happens prior to Go-Live.<br />

(11) No representation or warranty by it contained herein or in any other document<br />

furnished by it to the BUYER including the Proposal or to any Government Authority<br />

contains or will contain any untrue or misleading statement <strong>of</strong> material fact or omits<br />

or will omit to state a material fact necessary to make such representation or<br />

warranty not misleading.<br />

(12) No sums, in cash or kind, have been paid or will be paid, by it or on its behalf, to any<br />

person by way <strong>of</strong> fees, commission or otherwise for securing the Contract or<br />

entering into this Contract or for influencing or attempting to influence any <strong>of</strong>ficer<br />

or employee <strong>of</strong> the BUYER in connection therewith.<br />

(13) Agrees that the execution, delivery and performance by it <strong>of</strong> this Contract and all<br />

other agreements, Contracts, documents and writings relating to this Contract<br />

constitute private and commercial acts and not public or governmental acts.<br />

(14) Consents generally in respect <strong>of</strong> the enforcement <strong>of</strong> any judgement against it in any<br />

proceedings in any jurisdiction to the giving <strong>of</strong> any relief or the issue <strong>of</strong> any process<br />

in connection with such proceedings.<br />

(15) Provide support in terms <strong>of</strong> warranty, technical support, and maintenance for a<br />

minimum period <strong>of</strong> three years for s<strong>of</strong>tware (E-governance solution and other<br />

applications) from the date <strong>of</strong> Go Live. The BUYER may, at its discretion, opt to<br />

extend the warranty, technical support and maintenance for an additional period <strong>of</strong><br />

two years.<br />

(16) Even after the mandatory warranty period, the SI agrees to give a commitment<br />

obtained from OEMs that they shall give at least two years notice to the ASI prior to<br />

closing the production line (or the support for the application) so as to enable a “Life<br />

Time Buy” <strong>of</strong> all spares before closure <strong>of</strong> the said production line or the particular<br />

version <strong>of</strong> the s<strong>of</strong>tware. SI shall intimate to BUYER all New Versions and<br />

RFP Volume 3: Draft Legal Contract Page 19


Request for Proposal for establishing e-Governance Systems<br />

Modifications carried out on the application and changes introduced to the s<strong>of</strong>tware<br />

during the period <strong>of</strong> support as mentioned above.<br />

5.2. Representations and Warranties <strong>of</strong> the BUYER. The BUYER represents and warrants to SI<br />

that :-<br />

(1) It has full power and authority to execute, deliver and perform its obligations under this<br />

Contract.<br />

(2) It has taken all necessary action to authorize the execution, delivery and performance <strong>of</strong><br />

this Contract.<br />

5.3. Warranties on the Supply and Services.<br />

(1) SI warrants that the <strong>Project</strong> Assets supplied under this Contract conform to technical<br />

specifications prescribed in RFP and shall perform according to the said technical<br />

specifications.<br />

(2) SI warrants that the <strong>Project</strong> Assets are new, non-refurbished, unused and recently<br />

manufactured; the <strong>Project</strong> Assets are <strong>of</strong> the latest version, at the time <strong>of</strong> delivery to<br />

the BUYER. They shall not be nearing end <strong>of</strong> sale/ end <strong>of</strong> support; and shall be<br />

supported by SI and respective OEM along with service and spares support to ensure<br />

its efficient and effective operation for the entire Operative Period <strong>of</strong> Contract.<br />

(3) SI warrants that the <strong>Project</strong> Assets supplied under this Contract shall be <strong>of</strong> the highest<br />

grade and quality and consistent with the established and accepted standards for<br />

materials <strong>of</strong> this type. The <strong>Project</strong> Assets shall be in full conformity with the<br />

specifications and shall operate properly and safely. All recent design improvements in<br />

<strong>Project</strong> Assets, unless provided otherwise in the Contract shall also be made available.<br />

(4) SI warrants that the <strong>Project</strong> Assets shall be free from all encumbrances and defects /<br />

faults arising from design, material, manufacture or workmanship or from any act or<br />

omission <strong>of</strong> SI, that may present a snag/fault, under normal use <strong>of</strong> the same.<br />

(5) SI warrants for a period <strong>of</strong> three years mandatory support and two years <strong>of</strong> optional<br />

support for the configured and customized E-governance solution, from the date <strong>of</strong><br />

expiry <strong>of</strong> Post Go-Live support; that the <strong>Project</strong> Assets and/or services supplied under<br />

this Contract and each component used in the manufacture there<strong>of</strong> shall be free from<br />

all types <strong>of</strong> defects / failures.<br />

(6) If within the period <strong>of</strong> warranty, the <strong>Project</strong> Assets are reported by the BUYER to have<br />

failed to perform as per the specifications, SI shall either replace or rectify the same<br />

free <strong>of</strong> charge or accept damages as per Service Levels and terms <strong>of</strong> damages<br />

contained in Schedule III. Warranty <strong>of</strong> such <strong>Project</strong> Asset would be extended by such<br />

duration. Record <strong>of</strong> the down time would be maintained by user in log book. Spares<br />

required for warranty repairs shall be maintained at the <strong>Project</strong> Site and provided free<br />

<strong>of</strong> cost by SI. SI also undertakes to diagnose, test, adjust, calibrate and repair / replace<br />

RFP Volume 3: Draft Legal Contract Page 20


Request for Proposal for establishing e-Governance Systems<br />

the <strong>Project</strong> Assets damaged or malfunctioning due to accidents by neglect or misuse<br />

by the operator or damage due to transportation <strong>of</strong> the <strong>Project</strong> Assets during the<br />

warranty period, at no cost to ASI or the BUYER.<br />

(7) SI hereby warrants that the warranty and technical support shall be provided and it<br />

will ensure the implementation <strong>of</strong> the necessary upgrades and patches <strong>of</strong> the New<br />

Versions <strong>of</strong> the <strong>Project</strong> Assets (for a period <strong>of</strong> one year years from the date <strong>of</strong> expiry <strong>of</strong><br />

Post Go-Live support for the Equipment and s<strong>of</strong>tware).<br />

(8) SI hereby warrants providing Handholding support to ensure the necessary bug fixes,<br />

configuration changes, and enhancements to the <strong>Project</strong> Assets.<br />

(9) In case the complete delivery <strong>of</strong> <strong>Project</strong> Assets is delayed beyond the period stipulated<br />

in this Contract, then SI undertakes that the warranty period for such <strong>Project</strong> Assets<br />

shall be extended to that extent.<br />

(10) SI hereby warrants that necessary service and repair back up during the warranty<br />

period <strong>of</strong> the Equipment shall be provided and it will ensure that the performance,<br />

availability, and other metrics for application (including OS) is as per Service Levels<br />

described in Schedule III.<br />

5.4. Insurance. SI warrants and represents that it shall maintain adequate standard forms <strong>of</strong><br />

comprehensive insurance including liability insurance, system and facility insurance and any<br />

other insurance for the personnel, assets, Data, s<strong>of</strong>tware, etc and further agrees to provide to<br />

the BUYER on request copies <strong>of</strong> such policy <strong>of</strong> insurance and evidence that the premiums have<br />

been paid. SI also warrants and represents that it shall keep all their respective directors,<br />

partners, advisers, agents, representatives and or employees adequately insured in respect <strong>of</strong><br />

business travel in <strong>India</strong> and further agrees to provide to the BUYER on request copies <strong>of</strong> such<br />

policy <strong>of</strong> insurance and evidence that the premiums have been paid.<br />

5.5. Disclosure. In the event that any occurrence or circumstance comes to the attention <strong>of</strong> either<br />

Party that renders any <strong>of</strong> its aforesaid representations or warranties untrue or incorrect, such<br />

Party shall immediately notify the other Party <strong>of</strong> the same. Such notification shall not have the<br />

effect <strong>of</strong> remedying any breach <strong>of</strong> the representation or warranty that has been found to be<br />

untrue or incorrect nor shall it adversely affect or waive any obligation <strong>of</strong> either Party under<br />

this Contract.<br />

RFP Volume 3: Draft Legal Contract Page 21


Request for Proposal for establishing e-Governance Systems<br />

6.1. Statutory Obligations.<br />

7 Article 6: Obligations, Compliance<br />

(1) The Contract shall be governed by and interpreted in accordance with the laws <strong>of</strong> the<br />

Republic <strong>of</strong> <strong>India</strong>.<br />

(2) The Parties agree that the rights and obligations under this Contract are recognized<br />

and performed in conformity with laws and legal procedures established in the<br />

country and no right under this Contract becomes enforceable and no obligation<br />

requires performance, if the enforcement <strong>of</strong> such right or the performance <strong>of</strong> such<br />

obligation violates any such laws and legal procedures established.<br />

(3) SI represents and warrants to the BUYER that at the date here<strong>of</strong> the entering into this<br />

Contract or the performance <strong>of</strong> obligations under this Contract will not conflict with or<br />

result in a breach <strong>of</strong> any <strong>of</strong> the terms, conditions or provisions <strong>of</strong> or constitute a<br />

default or require any consent under, any instrument or arrangement to which SI is a<br />

party or violate any other Applicable Laws or any writ, order, injunction or judgment<br />

by which SI is bound and notwithstanding Article 6.1 (a) as far as SI is aware, no<br />

provision <strong>of</strong> this Contract derogates from the statutory obligations <strong>of</strong> SI.<br />

6.2. Compliance with Laws.<br />

(1) Each Party to this Contract accepts that its individual conduct shall (to the extent<br />

applicable to it) at all times comply with all applicable laws, rules and regulations. For<br />

the avoidance <strong>of</strong> doubt the obligations <strong>of</strong> the Parties to this Contract are subject to their<br />

respective compliance with all applicable laws and regulations.<br />

(2) Compliance with all applicable laws: SI agrees and undertakes to observe, adhere to,<br />

abide by, comply with and notify the BUYER about all laws in force or as are or as made<br />

applicable in future, pertaining to or applicable to them, their business, their employees<br />

or their obligations towards them and all purposes <strong>of</strong> this Contract and shall indemnify,<br />

keep indemnified, hold harmless, defend and protect the BUYER and its<br />

employees/<strong>of</strong>ficers/staff/ personnel/representatives/ agents from any failure or<br />

omission on its part to do so and against all claims or demands <strong>of</strong> liability and all<br />

consequences that may occur or arise for any default or failure on its part to conform or<br />

comply with the above and all other statutory obligations arising there-from.<br />

(3) Compliance in obtaining approvals/permissions/licenses: SI shall promptly and timely<br />

obtain all such consents, permissions, approvals, licenses, etc., as may be necessary or<br />

required for any <strong>of</strong> the purposes <strong>of</strong> this Contract or for the conduct <strong>of</strong> its own business<br />

under any applicable Law, Government regulation/guidelines and shall keep the same<br />

RFP Volume 3: Draft Legal Contract Page 22


Request for Proposal for establishing e-Governance Systems<br />

valid and in force during the term <strong>of</strong> this Contract, and in the event <strong>of</strong> any failure or<br />

omission to do so, shall indemnify, keep indemnified, hold harmless, defend, protect and<br />

fully compensate the BUYER and its employees/ <strong>of</strong>ficers/ staff/ personnel/<br />

representatives/agents from and against all claims or demands <strong>of</strong> liability and all<br />

consequences that may occur or arise for any default or failure on its part to conform or<br />

comply with the above and all other statutory obligations arising there-from.<br />

RFP Volume 3: Draft Legal Contract Page 23


Request for Proposal for establishing e-Governance Systems<br />

8 Article 7: Force Majeure Events And Events Of Default<br />

7.1. Force Majeure Events.<br />

(1) The failure or delay <strong>of</strong> a Party (“Affected Party”) to perform any obligation under this<br />

Contract solely by reason <strong>of</strong> “Force Majeure” event shall not be deemed to be a breach<br />

<strong>of</strong> this Contract, provided, however, that the Affected Party so prevented from<br />

complying shall continue to take all actions within its power to comply as fully as<br />

possible herewith and to remove or remedy such cause with all reasonable dispatch.<br />

‘Force Majeure’ events are only those events which prevents or impedes the due<br />

performance <strong>of</strong> the Affected Party and which such Affected Party while observing due<br />

diligence is unable to avoid or overcome through its individual concerted effort. For the<br />

purpose <strong>of</strong> this Contract, Force Majeure event shall mean but not limited to acts <strong>of</strong> God<br />

not confined to the premises <strong>of</strong> the Affected Party, flood, drought, lightning or fire,<br />

earthquakes, strike, lock-outs beyond its control, labour disturbance not caused at the<br />

instance <strong>of</strong> the Affected Party, acts <strong>of</strong> government or other competent authority,<br />

“Change in Law”, war, terrorist activities, military operations, riots, epidemics, civil<br />

commotions etc. Notwithstanding anything contained herein, no failure, delay or other<br />

default <strong>of</strong> any contractor or sub-contractor to either Party shall entitle such Party to<br />

claim Force Majeure under this provision.<br />

(2) The Party seeking to rely on Force Majeure shall promptly, within 2 days, notify the<br />

other Party (“Non Affected Party”) <strong>of</strong> the occurrence <strong>of</strong> a Force Majeure event as a<br />

condition precedent to the availability <strong>of</strong> this defence with particulars detail in writing to<br />

the Non Affected Party and shall demonstrate that it has and is taking all reasonable<br />

measures to mitigate the events <strong>of</strong> Force Majeure. The Non Affected Party shall grant<br />

such postponement <strong>of</strong> the date <strong>of</strong> completion as may in all the circumstances be<br />

considered reasonable.<br />

(3) If any delay in the Affected Party’s performance caused by Force Majeure event exceeds<br />

ninety (90) days, the Non Affected Party may at its option terminate this Contract<br />

immediately.<br />

(4) Notwithstanding anything contained herein, the failure on the part <strong>of</strong> SI under the<br />

Contract to implement any disaster contingency planning and back-up and other data<br />

safeguards in accordance with the terms <strong>of</strong> the Contract against natural disaster, fire,<br />

sabotage or other similar occurrence shall not be an event <strong>of</strong> Force Majeure.<br />

(5) Notwithstanding the rights <strong>of</strong> SI during an event <strong>of</strong> Force Majeure, if it is essential for<br />

the BUYER to run its operations smoothly and uninterrupted, like in the case <strong>of</strong> war or<br />

external aggression, if the <strong>Project</strong> is under O&M Stage, the BUYER has the right to reject<br />

the notice <strong>of</strong> SI for a Force Majeure and request SI to provide the services required by<br />

RFP Volume 3: Draft Legal Contract Page 24


Request for Proposal for establishing e-Governance Systems<br />

the BUYER. However under these circumstances, it will be the responsibility <strong>of</strong> the<br />

BUYER to provide security to SI personnel on duty and be responsible and accountable<br />

for all the eventualities as per the Applicable Laws.<br />

(6) The expression “Change in Law” means any <strong>of</strong> the following events which have a<br />

Material Adverse Effect:<br />

(i) Adoption, promulgation, Modification, reinterpretation or repeal after the date <strong>of</strong><br />

this Contract by any Government Authority <strong>of</strong> any statute, rule, ordinance,<br />

regulation or order, treaty, convention, directive, guideline, policy having force <strong>of</strong><br />

law; or<br />

(ii) The imposition by any Government Authority <strong>of</strong> any material condition (other<br />

than a condition which has been imposed as a consequence <strong>of</strong> a violation by SI <strong>of</strong><br />

any Applicable Permit) in connection with the issuance, renewal or Modification <strong>of</strong><br />

any applicable permits after the date <strong>of</strong> this Contract which renders the<br />

performance by SI <strong>of</strong> any <strong>of</strong> the terms <strong>of</strong> this Contract impossible or unviable; or<br />

(iii) Any applicable permit previously granted, ceasing to remain in full force and effect<br />

for reasons other than breach/violation by or the negligence <strong>of</strong> SI or if granted for<br />

a limited period, being renewed on terms different from those previously<br />

stipulated.<br />

(iv) Provided any (i) imposition <strong>of</strong> new taxes, duties, cess and the like and/or the<br />

increase in taxes, duties, cess and the like effected from time to time by any<br />

Government Authority, and/or (ii) imposition <strong>of</strong> standards and condition <strong>of</strong><br />

operations, maintenance and safety arising out <strong>of</strong> a new or revised Environmental<br />

Law; and/or (iii) any rules or regulations stipulated by regulatory authority having<br />

jurisdiction over the <strong>Project</strong> in respect <strong>of</strong> the standards <strong>of</strong> service, testing,<br />

acceptance norms, shall not constitute a Change in Law.<br />

7.2. SI Event <strong>of</strong> Default. “SI Event <strong>of</strong> Default” means any <strong>of</strong> the following events unless<br />

such an event has occurred as a consequence <strong>of</strong> a Force Majeure Event :-<br />

(1) SI’s failure to perform or discharge any <strong>of</strong> its obligations in accordance with the<br />

provisions <strong>of</strong> this Contract.<br />

(2) The activities at any <strong>Project</strong> Site is abandoned by SI for a more than 7 (Seven) Days<br />

during the <strong>Project</strong>.<br />

(3) A delay <strong>of</strong> more than 180 (one hundred and eighty) days from any Milestone date in<br />

achieving any <strong>of</strong> the performance obligations set forth for the relevant Milestone<br />

Date.<br />

(4) Change in the structure <strong>of</strong> the project team, the “Key Personnel” by SI without<br />

written approval <strong>of</strong> the BUYER for the changes.<br />

RFP Volume 3: Draft Legal Contract Page 25


Request for Proposal for establishing e-Governance Systems<br />

(5) Inability to staff the <strong>Project</strong> with competent team in case any <strong>of</strong> the team members<br />

leave the <strong>Project</strong> either due to voluntary severance or disciplinary actions against<br />

them.<br />

(6) SI’s failure to perform or discharge any <strong>of</strong> its obligations under any other project<br />

contract, which has or is likely to affect the <strong>Project</strong>/ facilities and services related to<br />

the <strong>Project</strong>, materially.<br />

(7) Any representation made or warranties given by SI under this Contract is found to<br />

be false or misleading.<br />

(8) If SI has given false information in qualifying for the <strong>Project</strong> or getting selected or<br />

any information provided by the SI during the procurement process is found to be<br />

false.<br />

(9) Breach <strong>of</strong> any clause or part there<strong>of</strong> <strong>of</strong> the “Integrity Pact” signed by the Parties<br />

pursuant to the RFP.<br />

(10) Appointment <strong>of</strong> a provisional liquidator, administrator, trustee or receiver <strong>of</strong> the<br />

whole or substantially whole <strong>of</strong> the undertaking <strong>of</strong> SI by a court <strong>of</strong> competent<br />

jurisdiction in proceedings for winding up or any other legal proceedings.<br />

(11) Levy <strong>of</strong> an execution or restraint on SI’s assets which has or is likely to have Material<br />

Adverse Effect and/or affect the <strong>Project</strong>/ facilities and services related to the<br />

<strong>Project</strong>, materially and such execution or destraint remaining in force for a period<br />

exceeding 90 (ninety) Days.<br />

(12) The Performance Bank Guaranteeand any other securities required to be maintained<br />

under this Contract is not maintained in terms <strong>of</strong> the provisions here<strong>of</strong>.<br />

(13) SI abandons or expresses its intention to revoke/terminate this Contract without<br />

being entitled to do so as is expressly provided in the Contract.<br />

(14) Change in constitution/organization <strong>of</strong> SI which violates the short listing criteria used<br />

in EoI process.<br />

(15) Amalgamation <strong>of</strong> SI with any other company or reconstruction or transfer <strong>of</strong> the<br />

whole or part <strong>of</strong> the <strong>Project</strong> or the revenue earning parts <strong>of</strong> the <strong>Project</strong> [other than<br />

transfer <strong>of</strong> assets in the ordinary course <strong>of</strong> business] in contravention with the<br />

provisions <strong>of</strong> Article 2 here<strong>of</strong>; and<br />

(16) SI engages or knowingly allows any <strong>of</strong> its employees, agents, Contractor or<br />

representative to engage in any activity prohibited under this Contract and/or by<br />

law or which constitutes a breach <strong>of</strong> the Contract or breach <strong>of</strong> or an <strong>of</strong>fence under<br />

any law, in the course <strong>of</strong> any activity undertaken pursuant to this Contract.<br />

(17) SI suffers a change <strong>of</strong> control. For the purpose <strong>of</strong> this provision the change <strong>of</strong> control<br />

<strong>of</strong> SI would happen if:<br />

RFP Volume 3: Draft Legal Contract Page 26


Request for Proposal for establishing e-Governance Systems<br />

(i) the promoter group <strong>of</strong> SI ceases to control the board <strong>of</strong> directors <strong>of</strong> SI; or<br />

(ii) Any reduction in the cumulative shareholding <strong>of</strong> the promoter group <strong>of</strong> SI falls<br />

below 26% <strong>of</strong> the total paid up equity share capital <strong>of</strong> SI.<br />

Note: For this provision “Promoter group” shall mean <br />

7.3. The BUYER Events <strong>of</strong> Default.<br />

7.4. Parties Rights.<br />

(1) The BUYER’s failure to perform or discharge its obligations in accordance with the<br />

provisions <strong>of</strong> this Contract unless such failure has occurred as a consequence <strong>of</strong> any<br />

SI Event <strong>of</strong> Default or a Force Majeure Event.<br />

(2) Any representation made or warranties given by the BUYER under this Contract is<br />

found to be false or misleading<br />

(1) Upon the occurrence <strong>of</strong> SI’s Event <strong>of</strong> Default, the BUYER shall without prejudice to any<br />

other rights and remedies available to it under this Contract, be entitled to terminate<br />

this Contract.<br />

(2) Upon the occurrence <strong>of</strong> the BUYER Event <strong>of</strong> Default, SI shall without prejudice to any<br />

other rights and remedies available to it under this Contract, be entitled to terminate<br />

this Contract.<br />

(3) Consultation Notice. The non defaulting Party shall issue to the defaulting Party a notice<br />

in writing specifying in reasonable detail the underlying Event <strong>of</strong> Default(s) and<br />

proposing consultation amongst the Parties and the OEMs (if required) to consider<br />

possible measures <strong>of</strong> curing or otherwise dealing with the underlying Event <strong>of</strong> Default<br />

(“Consultation Notice”).<br />

RFP Volume 3: Draft Legal Contract Page 27


Request for Proposal for establishing e-Governance Systems<br />

7.5. Remedial Process.<br />

8.1 Following the issue <strong>of</strong> Consultation Notice by the non defaulting Party, within a period<br />

not exceeding 90 (ninety) Days or such extended period as the Parties may agree in<br />

writing (“Remedial Period”) the Parties shall, in consultation with the OEMs (if<br />

applicable) whose contracts are in vogue, endeavor to arrive at an agreement as to<br />

the manner <strong>of</strong> rectifying or remedying the underlying Event <strong>of</strong> Default.<br />

7.6. Obligations during Remedial Period.Except expressly provided otherwise in the<br />

Contract, during the Remedial Period, the Parties shall continue to perform their<br />

respective obligations under this Contract which can be performed, failing which the<br />

Party in breach shall compensate the other Party for any loss or damage occasioned<br />

or suffered on account <strong>of</strong> the underlying failure/breach.<br />

7.7. Revocation <strong>of</strong> Consultation Notice.If during the Remedial Period the underlying<br />

Event <strong>of</strong> Default is cured or waived or the Parties and the OEMs agree upon any <strong>of</strong><br />

the measures set out in this Article, the Consultation Notice shall be withdrawn in<br />

writing by the Party who has issued the same.<br />

7.8. Termination due to Events <strong>of</strong> Default.If before the expiry <strong>of</strong> the Remedial Period, the<br />

underlying Event <strong>of</strong> Default is neither cured nor waived the Party who has issued the<br />

Consultation Notice shall have the right to terminate this Contract, in which event,<br />

inter alia, the provisions <strong>of</strong> Article 9 and Schedules V and VIshall, to the extent<br />

expressly made applicable, apply<br />

7.9. Remedies Cumulative. The exercise <strong>of</strong> right by either Party to terminate this<br />

Contract, as provided herein, shall not preclude, such Party from availing any other<br />

rights or remedies that may be available to it under law or Contract. All remedies<br />

available to the Parties shall be cumulative and the exercise or failure there<strong>of</strong> <strong>of</strong> one<br />

or more remedies by any Party shall not limit or preclude the exercise <strong>of</strong> or constitute<br />

a waiver <strong>of</strong> any other remedies by such Party.<br />

RFP Volume 3: Draft Legal Contract Page 28


Request for Proposal for establishing e-Governance Systems<br />

8.1. Amicable Settlement.<br />

9 Article 8: Dispute Resolution<br />

(1) If any dispute or difference or claims <strong>of</strong> any kind arise between the BUYER and SI in<br />

connection with construction, interpretation or application <strong>of</strong> any terms and conditions<br />

or any matter or thing in any way connected with or in connection with or arising out <strong>of</strong><br />

this Contract, or the rights, duties or liabilities <strong>of</strong> any Party under this Contract, whether<br />

before or after the termination <strong>of</strong> this Contract, then the Parties shall meet together<br />

promptly, at the request <strong>of</strong> any Party, in an effort to resolve such dispute, difference or<br />

claim by discussion between them.<br />

(2) Any dispute arising out <strong>of</strong> or in connection with this Contract shall in the first instance be<br />

dealt with in accordance with the escalation mechanism as set out in the Schedule V.<br />

(3) Assistance <strong>of</strong> Experts. The Parties may, in appropriate cases agree to refer the matter to<br />

an Expert/s appointed by them with mutual consent. The cost <strong>of</strong> obtaining the service <strong>of</strong><br />

the Expert shall be shared equally.<br />

8.2. Arbitration. Any dispute or difference whatsoever arising between the parties to this<br />

Contract out <strong>of</strong> or relating to the construction, meaning, scope, operation or effect <strong>of</strong><br />

this Contract or the validity <strong>of</strong> the breach there<strong>of</strong>, which can not be resolved through<br />

the application <strong>of</strong> the provisions <strong>of</strong> Article 8.1 above, shall be taken to arbitration.<br />

8.3. Arbitrators.<br />

(1) Failing amicable settlement and/or settlement with the assistance <strong>of</strong> Expert appointed<br />

by the Parties by mutual consent, the dispute or differences or claims as the case may<br />

be, shall be finally settled by binding arbitration under the Arbitration and Conciliation<br />

Act, 1996.<br />

(2) The arbitration shall be by a panel <strong>of</strong> three Arbitrators, one to be appointed by each<br />

Party and the third, who shall act as presiding arbitrator, to be appointed by the two<br />

arbitrators appointed by the Parties.<br />

(3) The arbitration shall be invoked by one party issuing to the other a notice in writing<br />

invoking the arbitration and appointing an Arbitrator. Upon receipt <strong>of</strong> the notice, the<br />

other Party shall appoint the second Arbitrator. The two Arbitrators so appointed shall<br />

appoint the third Arbitrator who shall act as the ‘Presiding Arbitrator’. In the event <strong>of</strong> a<br />

vacancy caused in the <strong>of</strong>fice <strong>of</strong> the arbitrators, the Party which nominated such<br />

arbitrator shall be entitled to nominate another in his place and the arbitration<br />

proceedings shall continue from the stage they were left by the retiring arbitrator.<br />

(4) In the event <strong>of</strong> one <strong>of</strong> the Parties failing to appoint an arbitrator within thirty (30) days<br />

from the receipt <strong>of</strong> notice or if any <strong>of</strong> the Parties does not nominate another arbitrator<br />

RFP Volume 3: Draft Legal Contract Page 29


Request for Proposal for establishing e-Governance Systems<br />

within thirty (30) days <strong>of</strong> the place <strong>of</strong> arbitrator falling vacant, the appointment shall be<br />

made upon request <strong>of</strong> the other Party by the Chief Justice <strong>of</strong> the Andhra Pradesh High<br />

Court.<br />

(5) Both the Parties will make attempts to appoint arbitrators with background in<br />

Information Technology related activities, Information Technology related acts,<br />

understanding <strong>of</strong> the processes and activities <strong>of</strong> defence PSU organizations and an<br />

understanding <strong>of</strong> the s<strong>of</strong>tware applications.<br />

8.4. Place <strong>of</strong> Arbitration. Place <strong>of</strong> arbitration will be New Delhi, <strong>India</strong>.<br />

8.5. Language for Arbitration. The request for arbitration, answer to the request, terms<br />

<strong>of</strong> reference, any written submissions, any orders and rulings shall be in English and,<br />

if oral hearings take place, English shall be the language to be used in the hearings.<br />

8.6. Procedure. The procedure to be followed within the arbitration, including<br />

appointment <strong>of</strong> arbitrator/arbitral tribunal, the rules <strong>of</strong> evidence which are to apply<br />

shall be in accordance with the Arbitration and Conciliation Act, 1996.<br />

8.7. Enforcement <strong>of</strong> Award. Any decision or award resulting from arbitration shall<br />

be final and binding upon the Parties. The Parties hereto agree that the arbitral<br />

award may be enforced against the Parties to the arbitration proceeding or their<br />

assets wherever they may be found and that a judgment upon the arbitral award<br />

may be entered in any court having jurisdiction there<strong>of</strong>.<br />

8.8. Fees and Expenses.<br />

(1) The fees and expenses <strong>of</strong> the arbitrators and all other expenses <strong>of</strong> the arbitration shall<br />

be initially borne and paid equally by respective Parties subject to determination by the<br />

arbitrators.<br />

(2) The arbitrators may provide in the arbitral award for the reimbursement to the<br />

successful party <strong>of</strong> its costs and expenses in bringing or defending the arbitration claim,<br />

including legal fees and expenses incurred by the Party.<br />

8.9. Performance during Arbitration. Pending the submission <strong>of</strong> and/or decision on a<br />

dispute, difference or claim or until the arbitral award is made, the Parties shall<br />

continue to perform all <strong>of</strong> their obligations under this Contract without prejudice to a<br />

final adjustment in accordance with such award.<br />

RFP Volume 3: Draft Legal Contract Page 30


Request for Proposal for establishing e-Governance Systems<br />

10 Article 9: Termination And Transfer<br />

9.1. Termination Procedure. The Party entitled to terminate this Contract either on account<br />

<strong>of</strong> a Force Majeure Event or on account <strong>of</strong> an Event <strong>of</strong> Default shall do so by issue <strong>of</strong> a<br />

notice in writing as per Schedule V to the other Party. The Termination Notice shall be<br />

<strong>of</strong> not more than 30(thirty) days, (“Termination Period”) and at the expiry <strong>of</strong> the<br />

Termination Period, this Contract shall stand terminated without any further notice.<br />

9.2. Obligations during Termination Period. During Termination Period, SI shall, subject<br />

where applicable to the provisions <strong>of</strong> this Article, continue to perform such <strong>of</strong> their<br />

respective obligations under this Contract which are capable <strong>of</strong> being performed with<br />

the object, as far as possible, <strong>of</strong> ensuring continued availability <strong>of</strong> the <strong>Project</strong> team,<br />

<strong>Project</strong> Assets and services to the BUYER, failing which the SI shall compensate the<br />

BUYER for any loss or damage occasioned or suffered on account <strong>of</strong> the underlying<br />

failure/breach.<br />

9.3. Consequence <strong>of</strong> Termination.<br />

(1) The liability <strong>of</strong> BUYER in case <strong>of</strong> termination <strong>of</strong> the Contract initiated on account <strong>of</strong><br />

BUYER event <strong>of</strong> default or Force Majeure, shall be limited to full payments for<br />

Equipment, Systems, Licensed S<strong>of</strong>tware, up to the milestone immediately preceding the<br />

milestone SI would be working on at the time <strong>of</strong> termination.<br />

(2) In case <strong>of</strong> termination due to SI event <strong>of</strong> default, SI shall pay damages amounting to<br />

encashment <strong>of</strong> all bank guarantees by BUYER and all outstanding payments. Any<br />

additional expenditure arising from subsequent negotiations <strong>of</strong> the Contract with any<br />

other agency will also be SI’s liability. Final payment up to the last completed milestone<br />

will be after handing over the complete documentation and meeting all requirements as<br />

per the Contract to the satisfaction <strong>of</strong> BUYER.<br />

(3) In the event <strong>of</strong> a termination effected in pursuance <strong>of</strong> this Article, or expiry <strong>of</strong> this<br />

Contract, the relevant provisions <strong>of</strong> the Exit Management (Schedule VI) shall apply.<br />

9.4. Risk. Until transfer in accordance with the Contract, during the <strong>Project</strong>, the <strong>Project</strong><br />

Assets and OEM contracts shall remain at the sole risk <strong>of</strong> SI except for any loss or<br />

damage caused to or suffered by SI due to any act or omission or negligence on the<br />

part <strong>of</strong> the BUYER under this Contract.<br />

RFP Volume 3: Draft Legal Contract Page 31


Request for Proposal for establishing e-Governance Systems<br />

10.1. Undertaking by SI.<br />

11 Article 10: Use Of Undue Influence<br />

(1) SI undertakes that he has not given, <strong>of</strong>fered or promised to give, directly or indirectly<br />

any gift, consideration, reward, commission, fees brokerage or inducement to any<br />

person in service <strong>of</strong> the BUYER or otherwise in procuring the Contracts or forbearing to<br />

do or for having done or forborne to do any act in relation to the obtaining or execution<br />

<strong>of</strong> the Contract or any other agreement with the Government for showing or forbearing<br />

to show favour or disfavour to any person in relation to the Contract or any other<br />

agreement with the Government. Any breach <strong>of</strong> the aforesaid undertaking by SI or any<br />

one employed by it or acting on its behalf (whether with or without the knowledge <strong>of</strong><br />

SI) or the commission <strong>of</strong> any <strong>of</strong>fers by SI or anyone employed by it or acting on its<br />

behalf, as defined in Chapter IX <strong>of</strong> the <strong>India</strong>n Penal Code, 1860 or the Prevention <strong>of</strong><br />

Corruption Act, 1988 or any other acts/legislations enacted for the prevention <strong>of</strong><br />

corruption shall entitle the BUYER to forthwith terminate the Contract and all or any<br />

other contracts with SI and recover from SI the amount <strong>of</strong> any loss arising from such<br />

cancellation. The decision <strong>of</strong> the BUYER or his nominee to the effect that a breach <strong>of</strong> the<br />

undertaking had been committed shall be final and binding on SI.<br />

(2) Giving or <strong>of</strong>fering <strong>of</strong> any gift, bribe or inducement or any attempt at any such act on<br />

behalf <strong>of</strong> SI towards any <strong>of</strong>ficer/employee <strong>of</strong> the BUYER or to any other person in a<br />

position to influence any <strong>of</strong>ficer/employee <strong>of</strong> the BUYER for showing any favour in<br />

relation to this or any other Contract, shall render SI to such liability/ penalty as the<br />

BUYER may deem proper, including but not limited to termination <strong>of</strong> the Contract,<br />

imposition <strong>of</strong> penal damages, forfeiture <strong>of</strong> the Performance Bank Guarantee and seek<br />

immediate refund <strong>of</strong> the amounts paid by the BUYER.<br />

RFP Volume 3: Draft Legal Contract Page 32


Request for Proposal for establishing e-Governance Systems<br />

12 Article 11: Agents / Agency Commission<br />

11.1. Undertaking by SI. SI confirms and declares to the BUYER that it has not engaged<br />

any individual or firm, whether <strong>India</strong>n or foreign whatsoever, to intercede, facilitate<br />

or in any way to recommend to the Government <strong>of</strong> <strong>India</strong> or any <strong>of</strong> its functionaries,<br />

whether <strong>of</strong>ficially or un<strong>of</strong>ficially, to the award <strong>of</strong> the Contract to SI; nor has any<br />

amount been paid, promised or intended to be paid to any such individual or firm in<br />

respect <strong>of</strong> any such intercession, facilitation or recommendation. SI agrees that if it is<br />

established at any time to the satisfaction <strong>of</strong> the BUYER that the present declaration<br />

is in any way incorrect or if at a later stage it is discovered by the Buyer that SI has<br />

engaged any such individual/firm, and paid or intended to pay any amount, gift,<br />

reward, fees, commission or consideration to such person, party, firm or institution,<br />

whether before or after signing <strong>of</strong> this Contract, SI will be liable to refund that<br />

amount to the BUYER. SI will also be debarred from entering into any contract with<br />

the Government <strong>of</strong> <strong>India</strong> for a minimum period <strong>of</strong> five years. The BUYER will also<br />

have a right to consider cancellation <strong>of</strong> the Contract either wholly or in part, without<br />

any entitlement or compensation to SI who shall in such event be liable to refund all<br />

payments made by the BUYER in terms <strong>of</strong> the Contract along with interest at the rate<br />

<strong>of</strong> 2% per annum above LIBOR rate. The BUYER will also have the right to recover any<br />

such amount from any contracts concluded earlier with the Government <strong>of</strong> <strong>India</strong>.<br />

RFP Volume 3: Draft Legal Contract Page 33


Request for Proposal for establishing e-Governance Systems<br />

13 Article 12: Non Disclosure Of Contract Documents<br />

12.1. Undertaking by SI. Except as provided under the Contract, SI shall not disclose and<br />

cause other parties (connected with the <strong>Project</strong>, who have been disclosed the<br />

information on Contract as per the terms <strong>of</strong> the Contract) not to disclose the Contract<br />

or any provision, specification, plan, design, pattern, sample or information there<strong>of</strong><br />

to any third party, without prior written consent <strong>of</strong> the BUYER.<br />

RFP Volume 3: Draft Legal Contract Page 34


Request for Proposal for establishing e-Governance Systems<br />

14 Article 13: Assets And Third Party Contracts<br />

13.1. The Physical Assets <strong>of</strong> SI Prior to Go Live.<br />

(1) SI agrees to install and commission a development environment consisting <strong>of</strong> the<br />

hardware, Networks and s<strong>of</strong>tware at a mutually agreed <strong>Project</strong> Development Assets, big<br />

enough to organize the entire <strong>Project</strong> team pursuant to this Contract.<br />

(2) SI Assets for Own Use will be owned, operated and managed by SI.<br />

(3) SI is free to bring in and move out <strong>of</strong> ASI all SI Assets for Own Use by following the<br />

procedures listed below :-<br />

(i) The details <strong>of</strong> equipments required to be brought in/ taken out <strong>of</strong> the ASI Area,<br />

will be approved by an <strong>of</strong>ficial designated by the BUYER for the purpose.<br />

(ii) When the equipments have to be brought in to the ASI Area, a requisite<br />

permission will be sought and the equipments would move in on an approval slip<br />

signed by designated <strong>of</strong>ficial.<br />

(iii) When the equipments have to be taken out <strong>of</strong> the ASI Area, a gate pass will be<br />

prepared and signed by the SI delegated authority. A copy <strong>of</strong> signed gate pass will<br />

be deposited at the main gate.<br />

(iv) SI must adhere to the security regulations <strong>of</strong> the ASI in vogue.<br />

(4) SI will keep a register <strong>of</strong> all the Equipments brought into the ASI Area and inform BUYER<br />

<strong>of</strong> this movement.<br />

(5) It is the responsibility <strong>of</strong> SI to ensure the safety, security and upkeeping <strong>of</strong> the physical<br />

assets brought into the ASI Area.<br />

(6) The BUYER shall not be liable for the safety, security and upkeep <strong>of</strong> any <strong>of</strong> the assets <strong>of</strong><br />

SI.<br />

13.2. The <strong>Project</strong> Assets.<br />

(1) The physical/tangible/intangible assets, forming part <strong>of</strong> the “<strong>Project</strong> Assets”, shall be<br />

brought into ASI area by SI for the purpose <strong>of</strong> the <strong>Project</strong> and transferred to the BUYER,<br />

pursuant to this Contract.<br />

(2) The list <strong>of</strong> <strong>Project</strong> Assets is given in Schedule VII.<br />

(3) SI will keep a register <strong>of</strong> all the assets <strong>of</strong> the <strong>Project</strong> bought into the project site, with all<br />

the documents indicating the movement and ownership. This register will be<br />

countersigned by the BUYER representative<br />

(4) It is the responsibility <strong>of</strong> SI to ensure the safety <strong>of</strong> the <strong>Project</strong> Assets and insure these<br />

assets till transfer <strong>of</strong> ownership.<br />

RFP Volume 3: Draft Legal Contract Page 35


Request for Proposal for establishing e-Governance Systems<br />

(5) The ownership <strong>of</strong> all the <strong>Project</strong> Assets will be transferred to BUYER or its nominee, in<br />

the event <strong>of</strong> Go-Live coming into effect. Further in the event <strong>of</strong> termination <strong>of</strong> the<br />

Contract prior to Go-Live, the ownership <strong>of</strong> only such <strong>Project</strong> Assets shall be transferred<br />

to the BUYER or its nominee as the BUYER in its sole discretion may determine. The<br />

relevant provisions <strong>of</strong> Schedule VI would apply to any transfer <strong>of</strong> the <strong>Project</strong> Assets to<br />

the BUYER, pursuant to this Article.<br />

13.3. Transfer <strong>of</strong> <strong>Project</strong> Assets.<br />

(1) All the <strong>Project</strong> Assets shall be transferred to the BUYER at the end <strong>of</strong> the contract t or<br />

termination <strong>of</strong> the Contract prior to closing <strong>of</strong> the contract, without any liabilities.<br />

(2) The transfer <strong>of</strong> these assets means the BUYER will have the complete ownership <strong>of</strong><br />

these assets and will be responsible for safety <strong>of</strong> these assets and authority for usage.<br />

(3) However, SI will be responsible for maintaining <strong>Project</strong> Assets after “Go Live”, as per the<br />

warranty clauses and will be fully accountable for the warranty clauses.<br />

13.4. ASI Supplied Equipments.<br />

(1) ASI Supplied Equipments includes the <strong>of</strong>fice space, the physical assets associated with<br />

the <strong>of</strong>fice, power supply, power backup, client computing environment, belonging to<br />

BUYER and earmarked by BUYER for the purpose <strong>of</strong> the <strong>Project</strong> and used by SI for the<br />

<strong>Project</strong> are treated as the ASI assets for the <strong>Project</strong>.<br />

(2) The details <strong>of</strong> the assets earmarked by the BUYER for the purpose <strong>of</strong> the <strong>Project</strong> and<br />

used by SI shall be listed in a register duly signed by the representatives <strong>of</strong> SI and BUYER.<br />

(3) The ownership <strong>of</strong> ASI Supplied Equipmentslies with BUYER.<br />

(4) In normal circumstances the BUYER will not charge SI for using the ASI Supplied<br />

Equipments.<br />

(5) SI is responsible for ensuring that the ASI Supplied Equipments are used for the purpose<br />

<strong>of</strong> the <strong>Project</strong> only.<br />

(6) If SI is found to be using the ASI Supplied Equipmentsfor any other activity other than<br />

directly or indirectly related to the <strong>Project</strong>, the BUYER has the rights to initiate<br />

appropriate proceedings and claim reliefs (including damages) against SI for the misuse<br />

<strong>of</strong> the ASI Supplied Equipments.<br />

(7) The ASI Supplied Equipments shall not be transferred or moved by SI either within or<br />

outside the premises <strong>of</strong> ASI.<br />

13.5. Third Party Contracts.<br />

(1) The contracts executed by SI to procure any <strong>of</strong> the services or <strong>Project</strong> Assets to be used<br />

by SI in the <strong>Project</strong>, including but not limited to development tools, testing facilities,<br />

outsourcing contracts during the <strong>Project</strong> are to be treated as third party contracts.<br />

RFP Volume 3: Draft Legal Contract Page 36


Request for Proposal for establishing e-Governance Systems<br />

(2) The third party contracts are owned by SI and the liability for these contracts lies solely<br />

with SI.<br />

(3) The agreements with the OEMs for supply <strong>of</strong> goods and service including but not limited<br />

to hardware, Network components, E-governance solution applications & other<br />

s<strong>of</strong>tware applications, service contracts for warranty support, specialized services for<br />

audit/testing etc. will be assigned to the BUYER or its nominees and will indicate ASI<br />

units / echelons as “End Users” as per the Contract.<br />

(4) List <strong>of</strong> goods and services to be supplied by the OEM subject to Article 13.6 (a) is<br />

appended at Schedule VII.<br />

(5) SI will share these contracts and licenses in entirety with BUYER.<br />

(6) The BUYER will have the right to overrule any restrictive clauses or clauses limiting the<br />

ownership <strong>of</strong> these contracts.<br />

(7) In the event <strong>of</strong> termination <strong>of</strong> the Contract, SI shall transfer/assign or cause to be<br />

transferred/assigned to the BUYER or its nominee such third party contracts which are<br />

valid and subsisting and which the BUYER has chosen to take over at its sole discretion<br />

as per Schedule VI here<strong>of</strong>.<br />

RFP Volume 3: Draft Legal Contract Page 37


Request for Proposal for establishing e-Governance Systems<br />

14.1. Intellectual Property.<br />

15 Article 14: Intellectual Property<br />

(1) Pre-Existing Works The copyright and other intellectual property rights in any materials<br />

ors<strong>of</strong>tware (whether written or machine-readable) created by or licensed to SI priorto<br />

this Contract or outside this engagement and any subsequent Modifications to the same<br />

(“Pre-Existing Works”) will remain vested in SI or a third party. To the extent that pre-<br />

existingworks are embedded in any deliverable materials, the BUYER will have a license<br />

to use them in accordancewith the provisions below.<br />

(2) Other Deliverable Materials TheBUYER will own the copyright in all deliverable<br />

materials created under this Contract by SI.<br />

(3) SI agrees that ownership <strong>of</strong> all Intellectual Property Rights for any functional and<br />

technical process <strong>of</strong> ASI or information or materials or ASI Supplied Equipment provided<br />

to SI by the BUYER shall remain vested in the BUYER.<br />

(4) SI agrees that the BUYER shall own all Intellectual Property Rights in all <strong>Project</strong> Assets<br />

produced exclusively for the BUYER by SI pursuant to this Contract, including<br />

improvements that are developed by SI for the BUYER. SI shall execute necessary<br />

documents and instruments to perfect the ownership <strong>of</strong> ASI in respect <strong>of</strong> the aforesaid<br />

materials.<br />

(5) Notwithstanding any other provision <strong>of</strong> this Contract, SI will not be prevented or<br />

restricted by this Contract from using any technique, idea, concepts or know-how<br />

relatingto SI’s business activities. Nothing contained in this Contract shall restrict either<br />

Party from the use <strong>of</strong> any ideas, concepts, know-how, or techniques relating to data<br />

processing or Network management, which either Party, individually orjointly, develops<br />

or discloses under this Contract, except to the extent such use infringes any <strong>of</strong> either<br />

Party’s patent rights or copyrights. However, except for the licenses expressly granted<br />

by an agreement between the Parties to this Contract, neither this Contract nor any<br />

disclosure made hereunder grants any license to either Party under any patents or<br />

copyrights <strong>of</strong> the other Party.<br />

14.2. Infringement <strong>of</strong> Intellectual Property Rights:-<br />

(1) SI confirms that there shall be no infringement <strong>of</strong> any patent or intellectual & industrial<br />

property rights as per the applicable laws <strong>of</strong> relevant jurisdictions, having requisite<br />

competence, in respect <strong>of</strong> the <strong>Project</strong> Assets or any part there<strong>of</strong>, supplied under this<br />

Contract. SI shall indemnify the BUYER against all cost/claims/legal claims/liabilities<br />

arising from third party claim at any time on account <strong>of</strong> the infringement or<br />

unauthorised use <strong>of</strong> patent or intellectual & industrial property rights <strong>of</strong> any such<br />

RFP Volume 3: Draft Legal Contract Page 38


Request for Proposal for establishing e-Governance Systems<br />

parties, whether such claims arise in respect <strong>of</strong> manufacture or use. Without prejudice<br />

to the aforesaid indemnity, SI shall be responsible for the completion <strong>of</strong> the supplies<br />

including spares and uninterrupted use <strong>of</strong> such <strong>Project</strong> Asset or any part there<strong>of</strong> by the<br />

BUYER and persons authorised by the BUYER, irrespective <strong>of</strong> the fact <strong>of</strong> claims <strong>of</strong><br />

infringement <strong>of</strong> any or all the rights mentioned above.<br />

(2) If, as a result <strong>of</strong> such claim, the BUYER is injuncted from using such <strong>Project</strong> Asset or any<br />

part there<strong>of</strong> or is likely to be injuncted, SI, at its expense, shall (i) modify such <strong>Project</strong><br />

Asset (provided its functionality is not impaired) so that it is no longer infringing and<br />

obtains a certificate to the said effect from the party claiming infringement, (ii) replace<br />

such <strong>Project</strong> Asset with a functionally equivalent component <strong>of</strong> the same qulaity, or (iii)<br />

obtain the right for the BUYER to continue using such <strong>Project</strong> Assets.<br />

(3) For a third party product supplied by SI, SI shall pass on to BUYER all the indemnities<br />

<strong>of</strong>fered by the third party.<br />

14.3. Trademarks and Publicity. Neither Party may use the trademarks <strong>of</strong> the other Party<br />

without the prior written consent <strong>of</strong> the other Party. Except as required by law or the<br />

rules and regulations <strong>of</strong> each stock exchange upon which the securities <strong>of</strong> one <strong>of</strong> the<br />

Parties is listed, neither Party shall publish or permit to be published either along or in<br />

conjunction with any other person any press release, information, article,<br />

photograph, illustration or any other material <strong>of</strong> whatever kind relating to this<br />

Contract, or the business <strong>of</strong> the Parties without prior reference to and approval in<br />

writing from the other Party, such approval not to be unreasonably withheld or<br />

delayed.<br />

RFP Volume 3: Draft Legal Contract Page 39


Request for Proposal for establishing e-Governance Systems<br />

16 Article 15: Access To Book Of Accounts, Audit And Reporting<br />

15.1. Access to Book <strong>of</strong> Accounts, Audit and Reporting.<br />

(1) SI shall provide access to the auditors <strong>of</strong> the BUYER, or the authorised representatives <strong>of</strong><br />

the BUYER to the following or any such material required under circumstances, to<br />

determine compensation, payment <strong>of</strong> agent’s commission, unlawful payments,<br />

employment <strong>of</strong> suspected personnel for the <strong>Project</strong>, availability and grant <strong>of</strong> the<br />

authorisation to the authorized representatives <strong>of</strong> SI etc:-<br />

(i) Books <strong>of</strong> accounts.<br />

(ii) SI’s contracts.<br />

(iii) Recruitment and employment practices.<br />

(iv) <strong>Project</strong> loading practices and procedures.<br />

(v) The project management techniques and tools.<br />

(vi) The documentation standards.<br />

(vii) Statutory Books and Registers<br />

(2) SI should provide the BUYER or its authorized representatives necessary<br />

information/right to inspect the documents or information as per Schedule IX.<br />

RFP Volume 3: Draft Legal Contract Page 40


Request for Proposal for establishing e-Governance Systems<br />

16.1. Supervision and Management.<br />

17 Article 16: Personnel<br />

(1) Personnel assigned by SI to implement the <strong>Project</strong> shall be employees <strong>of</strong> SI, and<br />

under no circumstances will such personnel be considered employees <strong>of</strong> the BUYER.<br />

(2) SI agrees that no right <strong>of</strong> any employment with BUYER shall accrue or arise, by virtue<br />

<strong>of</strong> engagement <strong>of</strong> employees, agents, contractors, subcontractors etc. by SI,<br />

pursuant to this Contract.<br />

(3) All remuneration, claims, wages, dues <strong>of</strong> such employees, agents, contractors,<br />

subcontractors <strong>of</strong> SI is agreed to be paid by SI alone and the BUYER shall not have<br />

any direct or indirect liability or obligation, to pay any charges, claims or wages <strong>of</strong><br />

any <strong>of</strong> employee, agents, contractors, and subcontractors <strong>of</strong> SI.<br />

(4) SI has the responsibility for payment <strong>of</strong> such personnel's entire compensation,<br />

including salary, withholding <strong>of</strong> income taxes and other taxes as applicable, worker's<br />

compensation, employee and disability benefits and the like and shall be responsible<br />

for all employer obligations under all applicable laws<br />

(5) SI shall have the sole responsibility for supervision and control <strong>of</strong> its personnel and<br />

for ensuring that they carry out their assigned job in a pr<strong>of</strong>essional manner.<br />

(6) SI shall use its best efforts to ensure that sufficient SI personnel are employed to<br />

perform the services pursuant to the <strong>Project</strong>, and also that such personnel have<br />

appropriate qualifications to perform the services.<br />

(7) The BUYER has the right to seek replacement <strong>of</strong> any member <strong>of</strong> the <strong>Project</strong> team<br />

being deployed by SI or the subcontractor, based on the assessment <strong>of</strong> the BUYER<br />

that the person in question is incompetent to carry out the tasks expected <strong>of</strong><br />

him/her or found that person does not really possess the skills<br />

/experience/qualifications as projected in his/her pr<strong>of</strong>ile or on the ground <strong>of</strong><br />

security concerns or breach <strong>of</strong> ethics.<br />

(8) Except as stated in this Article, nothing in this Contract will limit the ability <strong>of</strong> SI to<br />

assign or reassign its employees; provided that SI shall be responsible, at its<br />

expense, for transferring all appropriate knowledge from personnel being replaced<br />

to their replacements. The BUYER shall have the right to review and approve SI's<br />

plan for any such knowledge transfer. SI shall maintain the same standards for skills<br />

and pr<strong>of</strong>essionalism among replacement personnel as in personnel being replaced.<br />

(9) In the event that the BUYER requests that any SI personnel be replaced, the<br />

substitution <strong>of</strong> such personnel shall be accomplished pursuant to a mutually agreed<br />

upon schedule but not later than 15 working days from the date <strong>of</strong> such requests.<br />

RFP Volume 3: Draft Legal Contract Page 41


Request for Proposal for establishing e-Governance Systems<br />

(10) The BUYER would like to identify as the “Key Personnel” those persons whose<br />

pr<strong>of</strong>iles were the basis for the evaluation <strong>of</strong> the competence <strong>of</strong> SI to carry out the<br />

implementation <strong>of</strong> the <strong>Project</strong> at the BUYER as listed in Schedule VIII. It is the<br />

responsibility <strong>of</strong> SI to deploy these resources either on a full time or part time basis<br />

for the activities they have been proposed to be deployed during the <strong>Project</strong> as per<br />

the response to the RFP submitted by SI.<br />

(11) In the event that the BUYER identifies any personnel <strong>of</strong> SI as Key Personnel, then SI<br />

shall not remove or replace such personnel without the prior written consent <strong>of</strong> the<br />

BUYER under the applicable section <strong>of</strong> this Contract.<br />

(12) Under exceptional circumstances when the Key Personnel are to be replaced or<br />

removed, SI shall put forward the pr<strong>of</strong>iles <strong>of</strong> personnel being proposed as<br />

replacements. These pr<strong>of</strong>iles should be either equivalent or better than the ones<br />

being replaced. However whether these pr<strong>of</strong>iles are better or equivalent to the ones<br />

being replaced will be decided by the BUYER or its authorised representative. The<br />

BUYER or its authorised representative will have the right to accept or reject these<br />

substitute pr<strong>of</strong>iles.<br />

(13) In the event that any Key Personnel is to be replaced for reasons not attributed to<br />

the BUYER the substitution <strong>of</strong> such personnel shall be accomplished pursuant to a<br />

mutually agreed upon schedule but not later than 7 working days from the date <strong>of</strong><br />

exit <strong>of</strong> such personnel.<br />

(14) In the event that the Key Personnel are to be replaced, it can be done only by<br />

following the procedure in Schedule VIII.<br />

(15) Each Party shall be responsible for the performance <strong>of</strong> all its obligations under this<br />

Contract and shall be liable for the acts and omissions <strong>of</strong> its employees and agents in<br />

connection therewith.<br />

(16) SI warrants that its personnel shall at all times comply with security regulations in<br />

effect from time to time at the BUYER premises and externally for materials<br />

belonging to the BUYER.<br />

(17) SI will comply with the directions issued from time to time by the BUYERand the<br />

standards related to the security and safety ins<strong>of</strong>ar as it applies to the personnel<br />

operating out <strong>of</strong> the BUYER premises.<br />

RFP Volume 3: Draft Legal Contract Page 42


Request for Proposal for establishing e-Governance Systems<br />

16.2. The Minimum Pr<strong>of</strong>iciency. The BUYER would like to identify as “Key Roles”, certain<br />

roles <strong>of</strong> the <strong>Project</strong> team being deployed by SI during the implementation <strong>of</strong> <strong>Project</strong><br />

as per Schedule VIII. These key roles are identified to be critical to the success <strong>of</strong> the<br />

<strong>Project</strong> and it is expected that these key roles will be staffed with personnel with<br />

adequate pr<strong>of</strong>iciency. The minimum pr<strong>of</strong>iciency in terms <strong>of</strong> expertise, skills and<br />

educational qualifications are listed in Schedule VIII.<br />

16.3. Clearance for Personnel.<br />

(1) In pursuance <strong>of</strong> the conditions in the the RFP, SI undertakes that all the personnel being<br />

deployed by SI for the <strong>Project</strong> are <strong>India</strong>n nationals.<br />

(2) It is the responsibility <strong>of</strong> SI to ensure that all the personnel deployed by SI for the <strong>Project</strong><br />

are not involved in any criminal or antinational activities.<br />

(3) SI should submit the police verification records <strong>of</strong> any <strong>of</strong> the personnel <strong>of</strong> SI/ Sub<br />

Contractors/ OEMs, if demanded by BUYER.<br />

16.4. Sub Contract Liabilities.Any sub contracting by SI shall be as per the terms <strong>of</strong> the<br />

Contract. It is understood by the Parties that SI shall be liable for any such<br />

subcontracting and further SI shall be the principal employer for all claims arising<br />

from the liabilities, statutory or otherwise, concerning the sub-contractors. SI<br />

undertakes to indemnify the BUYER or its nominated agencies from any claims on the<br />

grounds stated hereinabove.<br />

16.5. The OEM Personnel.<br />

(1) In pursuance <strong>of</strong> the commitment made in the RFP, SI undertakes to take the services <strong>of</strong><br />

experts from the OEM for the specific activities as listed in Schedule III.<br />

(2) The OEM personnel and the services rendered by them will be paid by SI<br />

(3) The OEM personnel will report directly to the BUYER on their work, observations and<br />

audit findings<br />

(4) Within the framework <strong>of</strong> this Contract, the BUYER will seek the deployment <strong>of</strong> the OEM<br />

personnel through SI.<br />

16.6. Liability for Actions <strong>of</strong> the Personnel.<br />

(1) SI agrees to be responsible for managing the activities <strong>of</strong> its personnel (including OEMs)<br />

and shall be accountable for both.<br />

(2) The SI agrees and shall be vicariously liable for any acts, deeds or things done by their<br />

employees, agents, contractors, subcontractors, etc., which is outside the scope <strong>of</strong><br />

power vested or instructions issued by the BUYER.<br />

RFP Volume 3: Draft Legal Contract Page 43


Request for Proposal for establishing e-Governance Systems<br />

(3) SI agrees and shall be the principal employer <strong>of</strong> the employees, agents, contractors,<br />

subcontractors, etc. engaged by SI and shall be vicariously liable for all the acts, deeds or<br />

things, whether the same is within the scope <strong>of</strong> instructions or outside the scope <strong>of</strong><br />

instructions set out in the Contract.<br />

(4) SI agrees to hold the BUYER, its successors, assignees, employees, representatives and<br />

administrators fully indemnified and harmless against loss or liability, claim actions or<br />

proceedings, if any, that may arise from whatsoever nature, caused to the BUYER<br />

through the action <strong>of</strong> its employees, agents, contractors, subcontractors, etc.<br />

(5) The BUYER agrees to inform SI, all breaches and claims <strong>of</strong> indemnification and agrees to<br />

grant SI sole authority to defend, manage, negotiate or settle such claims; and make<br />

available all reasonable assistance in defending the claims and the expenses <strong>of</strong> such<br />

activities are directly borne by SI.<br />

(6) The written demand by the BUYER as to the loss / damages stated in Articles 16.6() to (e)<br />

shall be final, conclusive and binding on SI and SI agrees and shall be liable to pay on<br />

demand the actual amount <strong>of</strong> such loss / damages caused to the BUYER.<br />

16.7. Personnel during Exit Management.<br />

(1) At any time during the exit management period, SI shall, subject to applicable laws,<br />

restraints and regulations (including in particular those relating to privacy) provide to<br />

the BUYER a list <strong>of</strong> all employees (with job titles) <strong>of</strong> SI dedicated to providing the services<br />

at the commencement <strong>of</strong> the exit management period.<br />

(2) If the termination happens and the exit management provisions need to be invoked<br />

during the SIS Stage, the BUYER will have the right to request the services <strong>of</strong> the Key<br />

Personnel <strong>of</strong> SI to facilitate transfer <strong>of</strong> knowledge to the BUYER or the Replacement SI as<br />

per the Schedule VI.<br />

(3) On the termination <strong>of</strong> the Contract during O&M Stage, the BUYER will have the right to<br />

identify SI personnel and demand their presence for knowledge transfer to the BUYER or<br />

the Replacement SI.<br />

(4) If the BUYER hires the services <strong>of</strong> another agency on the expiry <strong>of</strong> the Contract, or<br />

16.8. Non Hiring.<br />

before that, to carry out any next phase <strong>of</strong> the E-governance solution implementation<br />

and other applications, SI shall cooperate with the new agency in knowledge transfer<br />

and the BUYER shall have the right to demand the presence <strong>of</strong> the required personnel<br />

from SI for this purpose.<br />

(1) During the term <strong>of</strong> the Contract and for a period <strong>of</strong> one year thereafter, except as<br />

otherwise provided under this Contract, neither party shall (either directly or indirectly<br />

RFP Volume 3: Draft Legal Contract Page 44


Request for Proposal for establishing e-Governance Systems<br />

through a third party) employ, solicit to employ, cause to be solicited for the purpose <strong>of</strong><br />

employment or <strong>of</strong>fer employment to any employee/s or sub contractor/s <strong>of</strong> the other<br />

party, or aid any third person to do so, without the specific written consent <strong>of</strong> the other<br />

party.<br />

(2) The clause does not prevent hiring based on responses by employees to public<br />

advertisement on any media that are not specifically targeted at the other Party’s<br />

employees.<br />

RFP Volume 3: Draft Legal Contract Page 45


Request for Proposal for establishing e-Governance Systems<br />

18 Article 17: Information Security And Audit Rights<br />

17.1. Information Security.<br />

(1) SI shall also comply with the Information Technology security and standards policies in<br />

force from time to time at the <strong>Project</strong> Site <strong>of</strong> the BUYER and SI, and which the<br />

BUYERmakes SI aware in writing ins<strong>of</strong>ar as the same apply to the <strong>Project</strong>.<br />

(2) The Parties to the Contract shall use reasonable endeavours to report forthwith in<br />

writing to each other all identified attempts (whether successful or not) by unauthorized<br />

persons (including unauthorized persons who are employees <strong>of</strong> any Party) either to gain<br />

access to or interfere with the <strong>Project</strong>'s Data, facilities or Confidential Information.<br />

(3) SI shall, upon reasonable request by the BUYER participate in regular meetings when<br />

safety and Information Technology security matters are reviewed.<br />

(4) The Parties under the Contract shall promptly report in writing to each other any act or<br />

omission which they are aware that could have an adverse effect on the proper conduct<br />

<strong>of</strong> safety and information technology security at the <strong>Project</strong> Site.<br />

(5) The Parties acknowledge that high level <strong>of</strong> security needs to be maintained. All persons<br />

employed by SI for this Contract shall undergo verification as per regulations in force in<br />

ASI. SI undertakes to treat information passed on to them under this Contract as<br />

classified. Such information will not be communicated/published/advertised by SI to any<br />

person without the express permission <strong>of</strong> the BUYER. All persons working on this<br />

Contract shall be required to render a certificate that they have familiarized themselves<br />

with the provisions <strong>of</strong> The <strong>India</strong>n Official Secret Act 1927.<br />

(6) Any private, proprietary or classified information which has to be made available by the<br />

receiving party to a third party for the execution <strong>of</strong> this Contract, shall be submitted to<br />

such a third party with the same restrictions as included in this Article.<br />

(7) SI undertakes to meet the laid down security requirements/stipulations. All the matters<br />

related to the Contract will be treated as classified and highly confidential and shall not<br />

be communicated to anybody (except for the purpose <strong>of</strong> this Contract) or<br />

published/advertised without the consent <strong>of</strong> the BUYER.<br />

17.2. Confidential Information.<br />

(1) SI recognizes that during the term <strong>of</strong> the Contract, sensitive Data will be procured and<br />

made available to it, its sub contractors and agents and others working for or under SI.<br />

Further, SI also recognises that any improper and unauthorised disclosure or usage <strong>of</strong><br />

the <strong>Project</strong> Data by any such recipient may constitute a breach <strong>of</strong> applicable laws<br />

causing harm not only to BUYER but also the stakeholders whose data is used. SI, its<br />

subcontractors and agents shall demonstrate utmost care, sensitivity and strict<br />

RFP Volume 3: Draft Legal Contract Page 46


Request for Proposal for establishing e-Governance Systems<br />

confidentiality. Any breach <strong>of</strong> any confidentiality obligation set out in the Contract,<br />

including Articles will result in BUYER a right to seek injunctive relief and damages<br />

suffered or are reasonably likely to be suffered and the cost incurred to mitigate the<br />

implication <strong>of</strong> such disclosure or usage, from SI<br />

(2) “Confidential Information” means any and all information that is or has been received<br />

by either Party (the “Receiving Party”) from the other Party (the “Disclosing Party”) and<br />

that: (a) relates to the Disclosing Party; and (b) is designated by the Disclosing Party as<br />

being confidential or is disclosed in circumstances where the Receiving Party would<br />

reasonably understand that the disclosed information would be confidential or (c) is<br />

prepared or performed by or on behalf <strong>of</strong> the Disclosing Party by its employees, <strong>of</strong>ficers,<br />

directors, agents, representatives or consultants.<br />

(3) Without limiting the generality <strong>of</strong> the foregoing, Confidential Information shall mean<br />

and include any information, data, analysis, compilations, notes, extracts, materials,<br />

reports, drawings, designs, specifications, graphs, layouts, plans, charts, studies,<br />

memoranda or other documents, or materials relating to the Licensed S<strong>of</strong>tware, the<br />

modules, the Program Documentation, the Source Codes, the object codes and all<br />

Enhancements and Updates, services, systems processes, ideas, concepts, formulas,<br />

methods, know-how, trade secrets, designs, research, inventions, techniques, processes,<br />

algorithms, schematics, testing procedures, s<strong>of</strong>tware design and architecture, computer<br />

code, internal documentation, design and function specifications, product requirements,<br />

problem reports, analysis and performance information, business affairs, <strong>Project</strong>s,<br />

technology, finances (including revenue projections, cost summaries, pricing formulae),<br />

clientele, markets, marketing and sales programs, client and customer data, appraisal<br />

mechanisms, planning processes etc. or any existing or future plans, forecasts or<br />

strategies in respect there<strong>of</strong>.<br />

(4) “Confidential Materials” shall mean all tangible materials containing Confidential<br />

Information, including, without limitation, written or printed documents and computer<br />

disks or tapes, whether machine or user readable.<br />

17.3. Managing Confidential Information.<br />

(1) The Receiving Party agrees to regard, preserve and keep as secret and confidential<br />

all confidential information and materials <strong>of</strong> the Disclosing Party howsoever<br />

obtained and agrees that it shall not, without obtaining the written consent <strong>of</strong> the<br />

Disclosing Party :-<br />

(i) Disclose, transmit, reproduce or make available any such Confidential<br />

Information and materials to any person, firm, Company or any other entity<br />

other than its directors, partners, advisers, agents or employees, who need to<br />

know the same for the purposes <strong>of</strong> the <strong>Project</strong>. The Receiving Party agrees to be<br />

RFP Volume 3: Draft Legal Contract Page 47


Request for Proposal for establishing e-Governance Systems<br />

responsible for ensuring that the usage and confidentiality by its directors,<br />

partners, advisers, agents or employees is in accordance with the terms and<br />

conditions <strong>of</strong> this Contract; or<br />

(ii) Unless otherwise agreed herein, use any such Confidential Information and<br />

materials for its own benefit or the benefit <strong>of</strong> others or do anything prejudicial<br />

to the interests <strong>of</strong> the Disclosing Party or its customers or their projects.<br />

(2) In maintaining confidentiality hereunder, the Receiving Party on receiving the<br />

Confidential Information and materials agrees and warrants that it shall:<br />

i. Take at least the same degree <strong>of</strong> care in safeguarding such Confidential<br />

Information and materials as it takes for its own Confidential Information <strong>of</strong><br />

like importance and such degree <strong>of</strong> care shall be at least that which is<br />

reasonably calculated to prevent such inadvertent disclosure.<br />

ii. Keep the Confidential Information and materials and any copies there<strong>of</strong><br />

secure and in such a way so as to prevent unauthorized access by any third<br />

party.<br />

iii. Limit access to such Confidential Information and materials to those <strong>of</strong> its<br />

directors, partners, advisers, agents or employees who are directly involved<br />

in the consideration/evaluation <strong>of</strong> the Confidential Information and bind<br />

each <strong>of</strong> its directors, partners, advisers, agents or employees so involved to<br />

protect the Confidential Information and materials in the manner prescribed<br />

in this Contract; and<br />

iv. Upon discovery <strong>of</strong> any unauthorized disclosure or suspected unauthorized<br />

disclosure <strong>of</strong> Confidential Information, promptly inform the Disclosing Party<br />

<strong>of</strong> such disclosure in writing and immediately return to the Disclosing Party<br />

all such Information and materials, in whatsoever form, including any and all<br />

copies there<strong>of</strong>.<br />

(3) The Receiving Party who receives the Confidential Information and materials agrees<br />

that on a regular basis or in receipt <strong>of</strong> a written demand from the Disclosing Party or<br />

at the end <strong>of</strong> the contract period or on termination <strong>of</strong> contract:-<br />

i. Immediately return all Confidential Materials and all copies there<strong>of</strong> provided<br />

to, or produced by it or its advisers, as the case may be, which is in Receiving<br />

Party’s possession or under its custody and control;<br />

ii. Hand over all analyses, compilations, notes, studies, memoranda or other<br />

documents prepared by it or its associates to the extent that the same<br />

contain, reflect or derive from Confidential Information relating to the<br />

Disclosing Party.<br />

RFP Volume 3: Draft Legal Contract Page 48


Request for Proposal for establishing e-Governance Systems<br />

iii. Expunge any Confidential Information relating to the Disclosing Party or its<br />

projects from any computer, word processor or other device in its<br />

possession or under its custody and control; and<br />

iv. Furnish a certificate signed by its director or other responsible<br />

representative confirming that to the best <strong>of</strong> his/her knowledge,<br />

information and belief, having made all proper enquiries the requirements<br />

<strong>of</strong> this paragraph have been fully complied with.<br />

(4) The restrictions in this Article 17.3 shall not apply to:<br />

i. Any information that is publicly available at the time <strong>of</strong> its disclosure or<br />

becomes publicly available following disclosure (other than as a result <strong>of</strong><br />

disclosure by the Disclosing Party contrary to the terms <strong>of</strong> this Contract); or<br />

ii. Any disclosure required by law or by any court <strong>of</strong> competent jurisdiction, the<br />

rules and regulations <strong>of</strong> any recognised stock exchange or any enquiry or<br />

investigation by any governmental, statutory or regulatory body which is<br />

lawfully entitled to require any such disclosure provided that, so far as it is<br />

lawful and practical to do so prior to such disclosure, the Receiving Party<br />

shall promptly notify the Disclosing Party <strong>of</strong> such requirement with a view to<br />

providing the Disclosing Party an opportunity to obtain a protective order or<br />

to contest the disclosure or otherwise agree to the timing and content <strong>of</strong><br />

such disclosure; or<br />

iii. is identified in writing by the Discloser as no longer proprietary or<br />

confidential.<br />

(5) The Receiving Party agrees that its obligation under this Section with respect to<br />

confidentiality will survive the termination <strong>of</strong> this Contract<br />

(6) Confidential Information shall be and remain the property <strong>of</strong> the Discloser and<br />

nothing in this Article shall be construed to grant either Party any right or licence<br />

with respect to the other Party's Confidential Information otherwise than as is<br />

expressly set out in this Contract.<br />

(7) Both Parties agree that monetary damages would not be a sufficient remedy for any<br />

breach <strong>of</strong> this Article by the other Party and that the BUYER and Partner, as<br />

appropriate, shall be entitled to equitable relief, including injunction and specific<br />

performance as a remedy for any such breach. Such remedies shall not be deemed<br />

to be the exclusive remedies for a breach by a Party <strong>of</strong> this Article, but shall be in<br />

addition to all other remedies available at law or equity to the damaged Party.<br />

(8) In connection with the <strong>Project</strong> under this Contract, the BUYER may from time to<br />

time undertake one or more quality assessment reviews for the purpose <strong>of</strong><br />

improving quality <strong>of</strong> the E-governance solution implementation project. In order for<br />

RFP Volume 3: Draft Legal Contract Page 49


Request for Proposal for establishing e-Governance Systems<br />

such reviews to be frank and candid, for the greatest benefit to the BUYER and SI,<br />

they shall be kept confidential to the greatest extent possible. The Parties agree that<br />

any documentation created in connection with such quality assessment reviews<br />

shall be Confidential Information <strong>of</strong> the BUYER which is licensed to SI for any internal<br />

use except that in no event shall such documentation or the results <strong>of</strong> such reviews<br />

be discoverable or admissible (or used for any purpose) in any arbitration or legal<br />

proceedings against the BUYER related to this Contract or the <strong>Project</strong>.<br />

(9) SI agrees that all information processed, stored, or transmitted by SI equipment<br />

belongs to the BUYER. By having the responsibility to maintain the equipment, SI<br />

agrees not to acquire implicit access rights to the information or rights to<br />

redistribute the information.<br />

(10) SI understands and agrees that civil, criminal, or administrative penalties may apply<br />

for failure to protect information appropriately.<br />

17.4. Information Ownership<br />

(1) SI agrees that all information processed, stored, or transmitted by the <strong>Project</strong> Assets or<br />

SI Assets for Own Use belongs to the BUYER. By having the responsibility to maintain the<br />

equipment, SI agrees not to acquire implicit access rights to the information or rights to<br />

redistribute the information.<br />

(2) SI understands and agrees that civil, criminal, or administrative implications may arise<br />

for failure to protect information appropriately.<br />

(3) SI agrees that<br />

(i) All customers’, suppliers’, associated organisations and process related<br />

information <strong>of</strong> the BUYER is considered as sensitive and will be protected from<br />

unauthorized disclosure, modification or access.<br />

(ii) Any sensitive information <strong>of</strong> the BUYERwould be protected from unauthorized<br />

disclosure, modification or access.<br />

(iii) The type <strong>of</strong> sensitive information that will be found on the BUYER systems that<br />

SI agrees to support or have access to includes but is not limited to , process<br />

information, user rights, security features & guidelines, disaster management<br />

practices etc.<br />

17.5. Privacy and Security Safeguards.<br />

(1) SI agrees not to publish or disclose in any manner, under any circumstances the details<br />

<strong>of</strong> any security safeguards designed, developed, or implemented by SI under this<br />

Contract or existing at any <strong>of</strong> the BUYER locations.<br />

RFP Volume 3: Draft Legal Contract Page 50


Request for Proposal for establishing e-Governance Systems<br />

(2) SI agrees to develop procedures and implementation plans to ensure that IT resources<br />

(being used during the system integration phase or O&M phase) leaving the control <strong>of</strong><br />

the assigned user (such as being reassigned, removed for repair, replaced,or upgraded)<br />

are cleared <strong>of</strong> all the BUYER information, data and sensitive application s<strong>of</strong>tware.<br />

17.6. Access for Inspection<br />

(1) SI shall be obliged to extend all co-operation to the BUYER personnel or the experts<br />

appointed by the BUYER for purposes <strong>of</strong> verifying that the <strong>Project</strong> Systems and the<br />

<strong>Project</strong> Facilities and the activities within the project team are operated and maintained<br />

in compliance with Information Technology Security Policies <strong>of</strong> ASI.<br />

(2) Additionally, SI shall, upon prior intimation by the BUYER, provide the BUYER personnel<br />

or the authorized representatives <strong>of</strong> the BUYER access to the <strong>Project</strong> Assets/the <strong>Project</strong><br />

Facilities and documents for inspection and review <strong>of</strong> operations and also to ascertain<br />

compliance with any <strong>of</strong> the requirements under this Contract.<br />

(3) Without prejudice to the generality <strong>of</strong> this provision, it is agreed that SI shall in particular<br />

extend all co-operation to, and provide all information required by the Experts<br />

appointed by the BUYER for conducting a security audit and verifying that the<br />

<strong>Project</strong>/<strong>Project</strong> Facilities and Services are in strict compliance with the information<br />

security requirements.<br />

(4) These audits may include, but are not limited to, a review <strong>of</strong> access and authorization<br />

procedures, physical security controls, backup and recovery procedures, Network<br />

security controls and program change controls.<br />

(5) SI agrees to provide the BUYER access to various monitoring and performance<br />

measurement systems (both manual and automated). The BUYER has the right to get<br />

the monitoring and performance measurement systems (both manual and automated)<br />

audited without prior approval / notice to SI.<br />

(6) The audit, access, reporting and inspection rights <strong>of</strong> the BUYER under this Article shall be<br />

governed by Schedule IX <strong>of</strong> the Contract.<br />

RFP Volume 3: Draft Legal Contract Page 51


Request for Proposal for establishing e-Governance Systems<br />

19 Article 18: Indemnities, Limitations <strong>of</strong> Liabilities<br />

18.1. Third Party Claims.<br />

(1) SI undertakes to indemnify the BUYER from and against all losses, claims or damages on<br />

account <strong>of</strong> bodily injury, death or damage to tangible personal property arising in favour<br />

<strong>of</strong> any person, corporation or other entity (including the BUYER) attributable to SI’s<br />

performance under this Contract.<br />

(2) The indemnities set out in this Articles shall be subject to the following conditions :-<br />

(i) The BUYER, as promptly as practicable, informs SI in writing <strong>of</strong> the claim or<br />

proceedings and provides all relevant evidence, documentary or otherwise.<br />

(ii) The BUYER mayat its option (but shall not be obligated to), at the cost <strong>of</strong> SI, give SI<br />

all reasonable assistance in the defense <strong>of</strong> such claim including reasonable access<br />

to all relevant information, documentation and personnel provided that the<br />

BUYER may, at its sole cost and expense, reasonably participate, through its<br />

attorneys or otherwise, in such defense.<br />

(iii) If SI does not assume full control over the defense <strong>of</strong> a claim as provided in this<br />

Article, the BUYER may participate in such defense at cost and expense <strong>of</strong> SI.<br />

(iv) The BUYER shall not prejudice, pay or accept any proceedings or claim, or<br />

compromise any proceedings or claim, without the written consent <strong>of</strong> SI.<br />

(v) All settlements <strong>of</strong> claims subject to indemnification under this Article will: (i) be<br />

entered into only with the consent <strong>of</strong> the BUYER, which consent will not be<br />

unreasonably withheld and include an unconditional release to the BUYER from<br />

the claimant for all liability in respect <strong>of</strong> such claim; and (ii) include any<br />

appropriate confidentiality agreement prohibiting disclosure <strong>of</strong> the terms <strong>of</strong> such<br />

settlement.<br />

(vi) The BUYER shall account to SI for all awards, settlements, damages and costs (if<br />

18.2. Limitation <strong>of</strong> Liability.<br />

any) finally awarded in favor <strong>of</strong> the BUYER which are to be paid to it, in connection<br />

with any such claims or proceedings;<br />

(1) SI’s aggregate liability for actual direct damages shall be capped at *x]% <strong>of</strong> the value <strong>of</strong><br />

the Contract provided that this limit shall not apply to 1) the bodily injury (including<br />

death) and damage to real property and tangible personal property caused by SI's<br />

negligence and/or 2) the intellectual property infringement claims as per Article 14.<br />

(2) SI shall not in any event be liable for any indirect or consequential damages, or for loss<br />

<strong>of</strong> pr<strong>of</strong>it, business, revenue, goodwill, anticipated savings or Data, or third party claims<br />

RFP Volume 3: Draft Legal Contract Page 52


Request for Proposal for establishing e-Governance Systems<br />

except with respect to bodily injury (including death) and damage to real and tangible<br />

personal property.<br />

(3) Neither this Contract nor the services delivered by SI under this Contract grants or<br />

creates any rights, benefits, claims, obligations or causes <strong>of</strong> action in, to or on behalf <strong>of</strong><br />

any person or entity (including any third party) other than between the respective<br />

Parties to this Contract, as the case may be.<br />

(4) Title and Risk <strong>of</strong> Loss. SI shall bear the risk <strong>of</strong> loss on <strong>Project</strong> Assets, up to the time they<br />

are transferred and handed over to the BUYER - after which it shall stand transferred to<br />

the BUYER. SI shall arrange and pay for insurance to cover such item until it is<br />

transferred.<br />

RFP Volume 3: Draft Legal Contract Page 53


Request for Proposal for establishing e-Governance Systems<br />

19.1. Notices<br />

20 Article 19: Miscellaneous<br />

(1) Except as expressly otherwise provided in this Contract, any notice or other document,<br />

which may be given by either Party under the Contract, shall be given in writing in<br />

person or by pre-paid recorded delivery post or by facsimile transmission or by email.<br />

(2) All the notices will be initiated by the designated <strong>of</strong>ficers <strong>of</strong> the respective Parties :-<br />

(i) BUYER –.<br />

(ii) SI – <strong>Project</strong> Manager<br />

(iii) Buyer - <br />

(iv) SI – The nominated representative.<br />

NOTE: All the notices will be sent to the following “principal <strong>of</strong>ficers” <strong>of</strong> both Parties<br />

with a copy marked to the designated initiating <strong>of</strong>ficers <strong>of</strong> the other party.<br />

(3) In relation to a notice given under the Contract, any such notice or other document shall<br />

be addressed to the other Party's address as set out below:<br />

BUYER :<br />

Tel:<br />

Fax:<br />

SI: Address<br />

Tel:<br />

Fax:<br />

(4) Any notice or other document shall be deemed to have been given to the other Party<br />

(or, if relevant, its relevant associated company) when delivered (if delivered in person)<br />

between the hours <strong>of</strong> 9.00 am and 6.00 pm (or on the next working day thereafter if<br />

delivered outside such hours) at the address <strong>of</strong> the other Party set forth above or if sent<br />

by fax, provided the copy fax is accompanied by a confirmation <strong>of</strong> transmission between<br />

the hours <strong>of</strong> 9.00 am and 6.00 pm (or on the next working days thereafter if delivered<br />

outside such hours), and 7 working days from the date <strong>of</strong> posting (if by letter under<br />

Regd. AD)<br />

(5) Either Party to the Contract may change its address, telephone number, facsimile<br />

number and nominated contact for notification purposes by giving the other reasonable<br />

prior written notice <strong>of</strong> the new information and its effective date.<br />

19.2. Independent Contractors. Nothing in this Contract shall be construed as establishing<br />

or implying any partnership or joint venture between the Parties to this Contract and,<br />

RFP Volume 3: Draft Legal Contract Page 54


Request for Proposal for establishing e-Governance Systems<br />

except as expressly stated in this Contract, nothing in this Contract shall be deemed<br />

to constitute any Parties as the agent <strong>of</strong> any other Party or authorizes either Party<br />

(1) To incur any expenses on behalf <strong>of</strong> the other Party,<br />

(2) To enter into any engagement or make any representation or warranty on behalf <strong>of</strong> the<br />

other Party,<br />

(3) To pledge the credit <strong>of</strong> or otherwise bind or oblige the other Party,<br />

(4) To commit the other Party in any way whatsoever without in each case obtaining the<br />

other Party's prior written consent.<br />

19.3. Sub Contractors.SI shall not subcontract any work related to the following works<br />

pertaining to the implementation <strong>of</strong> the E-governance solution to be performed<br />

under this Contract without the BUYER’s prior written consent.<br />

(1) <strong>Project</strong> management for the implementation <strong>of</strong> the E-governance solution<br />

(2) Business design and process documentation<br />

(3) Configuration / customisation <strong>of</strong> the E-governance solution<br />

(4) Go Live <strong>of</strong> the solution<br />

19.4. Authority For Assignment<br />

(1) The BUYER may assign this Contract in whole or as part <strong>of</strong> a reorganization,<br />

restructuring, consolidation, merger, or as per the decisions <strong>of</strong> the Ministry <strong>of</strong> Culture,<br />

Government <strong>of</strong> <strong>India</strong>.<br />

(2) SI shall not assign the Contract or its rights or its duties under this Contract either in<br />

whole or in part without the prior written consent <strong>of</strong> the BUYER, and any attempted<br />

assignment or delegation without such consent will be void. It is understood that<br />

transfer <strong>of</strong> 25% or more voting share capital <strong>of</strong> SI by one transaction or a series <strong>of</strong><br />

transaction in favour <strong>of</strong> any person or a group persons shall inter-alia be considered and<br />

deemed to be an assignment/transfer <strong>of</strong> this Contract and shall require prior written<br />

consent <strong>of</strong> the BUYER.<br />

19.5. Specific Performance. SI acknowledges and agrees that the BUYER would suffer<br />

irreparable loss and damage in the event any <strong>of</strong> the provisions <strong>of</strong> this Contract are<br />

not performed in accordance with their specific terms or are otherwise breached.<br />

Accordingly, SI agrees that BUYER shall be entitled to an injunction or such other<br />

equitable relief without notice to SI to prevent any breach <strong>of</strong> the provisions <strong>of</strong> this<br />

Contract and to enforce this Contract specifically and the terms and provisions here<strong>of</strong><br />

in any action instituted in any court having jurisdiction over the Parties and the<br />

matter, in addition to any other remedy to which the BUYER may be entitled, at law<br />

or in equity.<br />

RFP Volume 3: Draft Legal Contract Page 55


Request for Proposal for establishing e-Governance Systems<br />

19.6. Waiver.No waiver <strong>of</strong> any provision <strong>of</strong> this Contract shall be effective unless set forth<br />

in a written instrument signed by the Party waiving such provision. No failure or<br />

delay by a Party in exercising any right, power or remedy under this Contract shall<br />

operate as a waiver there<strong>of</strong>, nor shall any single or partial exercise <strong>of</strong> the same<br />

preclude any further exercise there<strong>of</strong> or the exercise <strong>of</strong> any other right, power or<br />

remedy. Without limiting the foregoing, no waiver by a Party <strong>of</strong> any breach by any<br />

other Party <strong>of</strong> any provision here<strong>of</strong> shall be deemed to be a waiver <strong>of</strong> any subsequent<br />

breach <strong>of</strong> that or any other provision here<strong>of</strong>.<br />

19.7. Survival.The termination <strong>of</strong> this Contract shall in no event terminate or prejudice (a)<br />

any right or obligation arising out <strong>of</strong> or accruing under this Contract attributable to<br />

events or circumstances occurring prior to such termination; (b) the provisions <strong>of</strong> this<br />

Contract that by their nature are intended to survive the termination <strong>of</strong> this Contract,<br />

including without limitation the provisions dealing with the Representations and<br />

Warranties <strong>of</strong> the Parties, Termination, Confidentiality, Indemnity Arbitration, Non-<br />

Solicitation, Governing Law and Notice respectively.<br />

RFP Volume 3: Draft Legal Contract Page 56


Request for Proposal for establishing e-Governance Systems<br />

21 Schedule I: Costs And Pricing<br />

<br />

Table I - The costs and pricing for different work elements/services<br />

Table II – The unit rates for supplementary work / services/resources<br />

RFP Volume 3: Draft Legal Contract Page 57


Request for Proposal for establishing e-Governance Systems<br />

22 Schedule II: Change Control<br />

2.1. Purpose. This Schedule applies to and describes the procedure to be followed in the<br />

event <strong>of</strong> any proposed change to the scope <strong>of</strong> work. Such change shall include, but<br />

shall not be limited to, changes in the scope <strong>of</strong> services provided by SI, pursuant to<br />

this Contract, and changes to the terms <strong>of</strong> payment as stated in the Schedule IV. The<br />

BUYER and SI recognize that change is an inevitable part <strong>of</strong> delivering services and<br />

that a significant element <strong>of</strong> this change can be accomplished by re-organizing<br />

processes and responsibilities without a material effect on the cost. SI will endeavor,<br />

wherever reasonably practicable, to effect change without an increase in the terms <strong>of</strong><br />

payment as stated in the Schedule IV, and The BUYER will work with SI to ensure that<br />

all changes are discussed and managed in a constructive manner.<br />

2.2. Change Control Note (CCN).<br />

(1) Change requests in respect <strong>of</strong> the Contract, the scope <strong>of</strong> work, the Deliverables, the<br />

acceptance criteria for the Deliverables, the <strong>Project</strong> management, or the Operation and<br />

Maintenance and the Implementation Services will emanate from the Parties' respective<br />

relevant <strong>Project</strong> representatives who will be responsible for obtaining approval for the<br />

change and who will act as its sponsor throughout the change control process and will<br />

complete Part A <strong>of</strong> the CCN given under section 2.7. CCNs will be presented to the other<br />

Party's Programme Manager who will acknowledge receipt by signing the CCN.<br />

(2) SI and the BUYER, while preparing the CCN, shall consider the change in the context <strong>of</strong><br />

the following parameter, namely whether the change is beyond the scope <strong>of</strong> services<br />

pursuant to the Contract including ancillary and concomitant services required and as<br />

detailed in the RFP and is suggested and applicable only after the configuring, testing,<br />

commissioning and acceptance <strong>of</strong> the E-governance solution, as set out in this Contract.<br />

(3) It is hereby also clarified that the costs for the changes brought in after project sign-<strong>of</strong>f<br />

2.3. Quotation.<br />

will be calculated on the basis <strong>of</strong> implementation cost and blended man-month rate<br />

quoted by SI in its bid and estimated blended man-month effort to be submitted by SI<br />

prior to taking up the change control note and accepted by the BUYER.<br />

(1) SI shall assess the CCN and complete Part B <strong>of</strong> the CCN. In completing Part B <strong>of</strong> the CCN,<br />

SI shall provide as a minimum :-<br />

(i) A description <strong>of</strong> the change.<br />

RFP Volume 3: Draft Legal Contract Page 58


Request for Proposal for establishing e-Governance Systems<br />

(ii) A list <strong>of</strong> deliverables required for implementing the change. A timetable for<br />

implementation.<br />

(iii) An estimate <strong>of</strong> the timelines or effort <strong>of</strong> any proposed change.<br />

(iv) The unit <strong>of</strong> measure to cost the change (either the resource cost as indicated in<br />

the proposal or as a work element as mentioned in the proposal <strong>of</strong> SI).<br />

(v) Any relevant acceptance criteria.<br />

(vi) An assessment <strong>of</strong> the value <strong>of</strong> the proposed change.<br />

(vii) Material evidence to prove that the proposed change is not already covered<br />

within the scope <strong>of</strong> the <strong>Project</strong> and the implementation services.<br />

(viii) Description <strong>of</strong> the circumstances which influenced the origin <strong>of</strong> this change.<br />

(ix) Alternative options possible to address the change if any and the implications <strong>of</strong><br />

these alternative options.<br />

(2) Prior to submission <strong>of</strong> the completed CCN to the BUYER, or its nominated agencies, SI<br />

will undertake its own internal review <strong>of</strong> the proposal and obtain all necessary internal<br />

approvals. As a part <strong>of</strong> this internal review process, SI shall consider the materiality <strong>of</strong><br />

the proposed change in the context <strong>of</strong> the Contract, the scope <strong>of</strong> implementation<br />

services, the deliverables, the <strong>Project</strong> Management, Operation and Maintenance<br />

affected by the change and the total effect that may arise from implementation <strong>of</strong> the<br />

change.<br />

(3) Materiality criteria will be established by the BUYER and the SI's Programme Manager.<br />

Changes requiring no escalation <strong>of</strong> authority can be implemented. Discussion and<br />

Contract as to materiality will be held in accordance with the Schedule V.<br />

2.4. Costs.Each Party shall be responsible for its own costs incurred in the quotation,<br />

preparation <strong>of</strong> CCNs and in the completion <strong>of</strong> its obligations described in this process<br />

provided SI meets the obligations as set in the CCN. In the event SI is unable to meet<br />

the obligations as defined in the CCN then the cost <strong>of</strong> getting it done by third party<br />

will be borne by SI.<br />

2.5. Reporting. Change requests and CCNs will be reported monthly to each Party's<br />

Programme Managers who will prioritize and review progress.<br />

2.6. Obligations. SI shall be obliged to implement any proposed changes once the<br />

approval in accordance with clauses above has been given, with effect from the date<br />

agreed for implementation.<br />

2.7. Change Control Note.<br />

Change Control Note CCN Number:<br />

RFP Volume 3: Draft Legal Contract Page 59


Request for Proposal for establishing e-Governance Systems<br />

Part A: Initiation<br />

Title:<br />

Originator:<br />

Sponsor:<br />

Date <strong>of</strong> Initiation:<br />

Details <strong>of</strong> Proposed Change<br />

(To include reason for change and appropriate details/specifications. Identify any<br />

attachments as A1, A2, and A3 etc.)<br />

Authorized by THE<br />

BUYER<br />

Name:<br />

Signature:<br />

Received by the<br />

Operator<br />

Name:<br />

Signature:<br />

Date:<br />

Date:<br />

Change Control Note CCN Number:<br />

Part B : Evaluation<br />

(Identify any attachments as B1, B2, and B3 etc.)<br />

Changes to Services, charging structure, payment pr<strong>of</strong>ile, documentation, training, services<br />

and component working arrangements and any other contractual issue.<br />

RFP Volume 3: Draft Legal Contract Page 60


Request for Proposal for establishing e-Governance Systems<br />

Brief Description <strong>of</strong> Solution:<br />

Impact:<br />

Deliverables:<br />

Timetable:<br />

Charges for Implementation:<br />

(including a schedule <strong>of</strong> payments)<br />

Other Relevant Information:<br />

(including value-added and acceptance criteria)<br />

Authorized by the<br />

Operator<br />

Name:<br />

Signature:<br />

For the THE BUYER and its nominated<br />

agencies<br />

Date:<br />

For SI<br />

RFP Volume 3: Draft Legal Contract Page 61


Request for Proposal for establishing e-Governance Systems<br />

Signature Signature<br />

Name Name<br />

Title Title<br />

Date Date<br />

Change Control Note<br />

Part C : Authority to Proceed<br />

Implementation <strong>of</strong> this CCN as<br />

submitted in Part A, in accordance with<br />

Part B is: (tick as appropriate)<br />

Approved<br />

Rejected<br />

Requires Further Information (as<br />

follows, or as Attachment 1 etc.)<br />

For the THE BUYER and its nominated<br />

agencies<br />

CCN Number :<br />

For SI<br />

Signature Signature<br />

Name Name<br />

Title Title<br />

Date Date<br />

2.8. Amendment to the Contract.<br />

Amendment Note Amendment Number:<br />

Part A: Initiation<br />

RFP Volume 3: Draft Legal Contract Page 62


Request for Proposal for establishing e-Governance Systems<br />

Title:<br />

Originator:<br />

Date <strong>of</strong> Initiation:<br />

Details <strong>of</strong> Amendment<br />

(To include reason for amendment and appropriate details/specifications. Identify any<br />

attachments as A1, A2, and A3 etc.)<br />

The clause or<br />

schedule <strong>of</strong> the<br />

Contract (the original<br />

wording)<br />

The clause or<br />

schedule <strong>of</strong> the<br />

Contract – changed<br />

wording<br />

Validated by PM <strong>of</strong><br />

THE BUYER<br />

Name:<br />

Signature:<br />

Date:<br />

Validated by PM <strong>of</strong> SI Date:<br />

Name:<br />

Signature:<br />

Change Control Note<br />

Part C : Authority to Incorporate (tick as<br />

Amendment Number :<br />

RFP Volume 3: Draft Legal Contract Page 63


Request for Proposal for establishing e-Governance Systems<br />

appropriate)<br />

Approved<br />

Rejected<br />

Requires Further Information (as<br />

follows, or as Attachment 1 etc.)<br />

For the BUYER and its nominated agencies<br />

For the SI<br />

Signature Signature<br />

Name Name<br />

Title Title<br />

Date Date<br />

RFP Volume 3: Draft Legal Contract Page 64


Request for Proposal for establishing e-Governance Systems<br />

23 Schedule III: Specifications for Supply And Services<br />

<br />

RFP Volume 3: Draft Legal Contract Page 65


Request for Proposal for establishing e-Governance Systems<br />

24 Schedule IV: Terms <strong>of</strong> Payment Schedule<br />

<br />

RFP Volume 3: Draft Legal Contract Page 66


Request for Proposal for establishing e-Governance Systems<br />

25 Schedule V: Governance<br />

5.1. The Governance Structure and Governance Procedure.<br />

(1) There will be a <strong>Project</strong> Management Committee for managing the <strong>Project</strong>. The<br />

committee <strong>of</strong> the governance structure are duly constituted within seven days <strong>of</strong> signing<br />

the Contract:<br />

(2) The “<strong>Project</strong> Management Committee” will consist <strong>of</strong> :-<br />

(i) .<br />

(ii)<br />

(iii)<br />

(3) The principal <strong>of</strong>ficers: – and the Representative <strong>of</strong> SI will be<br />

“Principal Officers” with authority and responsibility for initiating actions for dispute<br />

resolution, overcoming the impact <strong>of</strong> events, facilitating consultation and initiating<br />

notices which will have impact on the continuity and content <strong>of</strong> the Contract.<br />

5.2. <strong>Project</strong> Manager.<br />

(1) The relationship under this Contract will be managed by the <strong>Project</strong> Managers appointed<br />

by each Party, who will provide the interface between the executive <strong>of</strong>ficers <strong>of</strong> the<br />

respective Parties.<br />

(2) In the case <strong>of</strong> the BUYER the <strong>Project</strong> Manager will be an individual who is appointed by<br />

. In the case <strong>of</strong> SI, the <strong>Project</strong> Manager will be an<br />

individual who is on the rolls <strong>of</strong> SI. In the event that either Party wishes to substitute its<br />

<strong>Project</strong> Manager, it will do so in manner in which the original appointment is made and<br />

notify the other Party <strong>of</strong> such substitution as soon as reasonably practicable but at the<br />

latest within fourteen days <strong>of</strong> the substitution.<br />

(3) The <strong>Project</strong> Managers shall have responsibility for maintaining the interface and<br />

communication between the Parties.<br />

(4) The Director BUYER.The Director from the BUYER will be single point <strong>of</strong> contact (SPOC)<br />

for SI. The responsibilities <strong>of</strong> Director (Buyer) include the following :-<br />

(i) Provide access to information required and available with BUYER for the<br />

engagement.<br />

(ii) Own <strong>Project</strong> Plan, <strong>Project</strong> Communication and Team Coordination.<br />

(iii) <strong>Project</strong> Reporting and Communication.<br />

(iv) <strong>Project</strong> issue resolution.<br />

(v) Initiate Change Control process, where required.<br />

(vi) Expedite approvals and clarifications raised by SI and the BUYER team.<br />

RFP Volume 3: Draft Legal Contract Page 67


Request for Proposal for establishing e-Governance Systems<br />

(vii) Provide access to physical resources as outlined above.<br />

(viii) Nominate specific executives from within the BUYER for the <strong>Project</strong> for a specific<br />

process and activity and responsibility.<br />

(ix) Coordinate with the BUYER Management on any specific aspects requiring their<br />

approval.<br />

(x) Initiating the notices as applicable.<br />

(5) The <strong>Project</strong> Manager SI. The <strong>Project</strong> Manager assumes overall responsibility for the<br />

assignment and ensures that all resources required are made available and the<br />

engagement is carried out according to agreed implementation plans. He/she shall<br />

function as the primary channel <strong>of</strong> communication for all the BUYER requirements to SI.<br />

The responsibilities <strong>of</strong> <strong>Project</strong> Manager include the following :-<br />

(i) Overall responsibility for operations <strong>of</strong> SI at the <strong>Project</strong> site.<br />

(ii) Lead the <strong>Project</strong> team <strong>of</strong> SI.<br />

(iii) Ensure successful completion <strong>of</strong> unit tests and integration tests for all<br />

development activity.<br />

(iv) Ensure that all phases <strong>of</strong> the development activity are duly signed <strong>of</strong>f by the<br />

BUYER.<br />

(v) He / She will handle all the issues at the BUYER relating to implementation project.<br />

(vi) Walk-through <strong>of</strong> Business Blue Print, ensure sign <strong>of</strong>f <strong>of</strong> detailed design and<br />

coordinate testing activities.<br />

(vii) <strong>Project</strong> Reporting and Communication.<br />

(viii) <strong>Project</strong> issue resolution.<br />

(ix) Initiating the notices as applicable.<br />

5.3. <strong>Project</strong> Management Committee.<br />

(1) <strong>Project</strong> Management Committee will meet formally on a periodical basis at a time and<br />

location (either physically at one place or through teleconferencing facility) to be agreed<br />

between them. These meetings will cover, as a minimum, the following agenda items :-<br />

(i) Consideration <strong>of</strong> monthly Performance Reports.<br />

(ii) Consideration <strong>of</strong> matters arising out <strong>of</strong> the Schedule II.<br />

(iii) Issues escalated in accordance with the escalation procedure as set out in the<br />

Schedule V.<br />

(iv) Matters to be brought before the <strong>Project</strong> Management Committee in accordance<br />

with the Contract and the Schedules.<br />

RFP Volume 3: Draft Legal Contract Page 68


Request for Proposal for establishing e-Governance Systems<br />

(v) Any matter brought before the <strong>Project</strong> Management Committee by SI or the<br />

BUYER under this Schedule.<br />

(vi) Any other issue which either Party wishes to add to the agenda.<br />

5.4. Purpose <strong>of</strong> Governance Procedures.The purpose <strong>of</strong> Governance procedure is to:-<br />

(1) Establish and maintain the formal and informal processes for managing the relationship<br />

between the BUYER and SI (including the outputs from other Schedules to this Contract).<br />

(2) Define the principles that both Parties wish to follow to ensure the delivery <strong>of</strong> the<br />

Services.<br />

(3) Ensure the continued alignment <strong>of</strong> the interests <strong>of</strong> the Parties.<br />

(4) Ensure that the relationship is maintained at the correct level within each Party.<br />

(5) Create the flexibility to revise and maintain the relationship and this Contract during the<br />

Term <strong>of</strong> the contract.<br />

(6) Set out the procedure for escalating disagreements and resolving disputes.<br />

(7) Enable Contract administration and performance management.<br />

5.5. Governance Procedures<br />

(1) The agenda for each meeting <strong>of</strong> the <strong>Project</strong> Management Committee, shall be set to<br />

reflect the discussion items referred to above and extraordinary items may be added<br />

either with the Contract <strong>of</strong> the Parties or at the request <strong>of</strong> either Party. Copies <strong>of</strong> the<br />

agenda for meetings <strong>of</strong> the Committees, along with relevant pre-reading material, shall<br />

be distributed at least one week in advance <strong>of</strong> the relevant meeting.<br />

(2) SI shall be responsible for bringing in the representatives <strong>of</strong> the OEMs, if requisitioned<br />

by the BUYER as special invitees to participate in the meetings <strong>of</strong> the <strong>Project</strong><br />

Management Committee, to discuss or resolve any issues arising out <strong>of</strong> or requiring the<br />

involvement <strong>of</strong> the OEMs in the <strong>Project</strong>.<br />

(3) All meetings and proceedings will be documented; such documents to be distributed to<br />

both Parties and copies shall be kept as a record. All actions, responsibilities and<br />

accountabilities arising out <strong>of</strong> any meeting shall be tracked and managed.<br />

(4) The Parties shall ensure as far as reasonably practicable that the <strong>Project</strong> Management<br />

Committee shall resolve the issues and resolve the objectives placed before them and<br />

those members representing that Party are empowered to make relevant decisions or<br />

have easy access to empowered individuals for decisions to be made to achieve this.<br />

(5) In the event that there is any material factor which affects the <strong>Project</strong> or the terms <strong>of</strong><br />

payment as stated in the Schedule IV, the Parties agree to discuss in the <strong>Project</strong><br />

Management Committee any appropriate amendment to the Contract or Statement <strong>of</strong><br />

Works including any variation to the terms <strong>of</strong> payment as stated in the Schedule IV. Any<br />

RFP Volume 3: Draft Legal Contract Page 69


Request for Proposal for establishing e-Governance Systems<br />

variation so agreed shall be put forward to the Executive Committee (EC) for approval<br />

and action.<br />

(6) Any amendments to the Contract or any supplements to be added to the Contract will<br />

be discussed by the <strong>Project</strong> Management Committee. These documents will become<br />

part <strong>of</strong> the Contract after being duly signed by the authorised representatives <strong>of</strong> the<br />

BUYER and SI.<br />

5.6. Escalation Procedures<br />

(1) Irrespective <strong>of</strong> the nature <strong>of</strong> disputes, events, and defaults, the notices for discussion or<br />

resolution will follow the escalation procedures.<br />

(2) The initiation <strong>of</strong> the escalation activities, other than the ones for termination and<br />

arbitration, will be from the <strong>Project</strong> Management Committee or its members.<br />

(3) The escalations will follow the guidelines listed for each type <strong>of</strong> notices.<br />

5.7. Procedure for Issuing Notices<br />

(1) Subject to the provisions here<strong>of</strong>, all notices hereunder shall be issued as per Article 19.1<br />

(Notices) <strong>of</strong> this Contract.<br />

(2) If the responding party fails to respond to the notice within 21 days <strong>of</strong> a notice, a<br />

maximum <strong>of</strong> one more notice to the same effect may be issued to the party.<br />

(3) If the responding party does not respond to two notices, it is treated as wilful violation<br />

<strong>of</strong> the Contract and the actions related to breach <strong>of</strong> Contract will come into force.<br />

5.8. Notices on Disputes<br />

(1) Either Party (“Claimant”) shall first submit any dispute or disagreement (dispute notice)<br />

between the Parties arising out <strong>of</strong> or relating to and/or in connection with this Contract<br />

which is not a material breach <strong>of</strong> this Contract (a "Disputed Matter") to the , with a copy to the other Party.<br />

(2) The dispute notices will be a written notice and shall be accompanied by :-<br />

(i) A statement by the Claimant describing the Disputed Matter in reasonable detail.<br />

(ii) Documentation, if any, supporting the Claimant's position on the Disputed Matter.<br />

(3) The other Party ("Respondent") shall have the right to respond to the Dispute Notice<br />

within 7 days after receipt <strong>of</strong> the Dispute Notice.<br />

(4) The two designated authorities from both the parties will resolve the dispute through<br />

mutual discussions<br />

(5) The minutes <strong>of</strong> the meeting <strong>of</strong> the proceedings <strong>of</strong> the committees will serve as the basis<br />

for action on disputes, withdrawal <strong>of</strong> notice, or taking matter to arbitration.<br />

RFP Volume 3: Draft Legal Contract Page 70


Request for Proposal for establishing e-Governance Systems<br />

5.9. Notice for Consultation<br />

(1) The Party shall submit a notice for consultation for an event <strong>of</strong> default to the , with a copy to the other Party,<br />

(2) The consultation notice will be accompanied by :-<br />

(i) Description <strong>of</strong> the event <strong>of</strong> default.<br />

(ii) The date and circumstances <strong>of</strong> default.<br />

(iii) Documentary evidence if any <strong>of</strong> the event <strong>of</strong> default.<br />

(3) The other Party ("Respondent") shall have the right to respond to the Consultation<br />

Notice within 7 days after receipt <strong>of</strong> the Consultation Notice.<br />

(4) The respective authorities will initiate the remedial process, with specific action and<br />

timelines for action (not exceeding 90 days) to rectify the event <strong>of</strong> default, through<br />

mutual discussions.<br />

(5) The minutes <strong>of</strong> the meeting <strong>of</strong> the proceedings <strong>of</strong> the committees will serve as the basis<br />

for action on consultation, withdrawal <strong>of</strong> notice or termination.<br />

5.10. Notice <strong>of</strong> an Event<br />

(1) The Affected Party shall give notice on the event to the other Party <strong>of</strong> the occurrence <strong>of</strong><br />

any event within 7 (seven) days after the Affected Party knew, or ought reasonably to<br />

have known, <strong>of</strong> its occurrence.<br />

(2) The Notice shall include details <strong>of</strong> :-<br />

(i) The nature, time <strong>of</strong> occurrence and extent <strong>of</strong> the Force Majeure Event with<br />

documentary evidence in respect there<strong>of</strong>.<br />

(ii) If the event is due to Change in Law, a certified copy <strong>of</strong> the changed law, the<br />

effective date <strong>of</strong> the law and a copy <strong>of</strong> the earlier law which was applicable when<br />

the Contract came into effect.<br />

(iii) If the event is due to Change in Law, the notice will also include the list <strong>of</strong> articles<br />

or part <strong>of</strong> the articles which will be impacted and suggestions if any for<br />

modification.<br />

(iv) Description <strong>of</strong> the adverse effect it has or is likely to have on the performance <strong>of</strong><br />

the party’s obligations under this Contract.<br />

(v) The duration or estimated duration and the effect or probable effect the Event has<br />

or will have on the Affected Party’s ability to perform its obligations or any <strong>of</strong><br />

them under this Contract.<br />

RFP Volume 3: Draft Legal Contract Page 71


Request for Proposal for establishing e-Governance Systems<br />

(vi) The measures which the Affected Party has taken or proposes to take, to alleviate<br />

the impact <strong>of</strong> the Event or to mitigate the damage; and<br />

(vii) Any other relevant information.<br />

(3) If the notice <strong>of</strong> an event is accepted by the other Party as valid, the two Principal Officers<br />

will initiate the actions required to be undertaken and the periodicity (at least once in a<br />

month) for the affected party to submit reports on the event to the other party.<br />

5.11. Notices on Arbitration and Termination<br />

(1) Notice for arbitration or termination will be issued when all the mechanisms <strong>of</strong> dispute<br />

resolution listed in the governance procedure have failed to resolve or overcome the<br />

event.<br />

(2) The minutes <strong>of</strong> the EC will be the basis for issuing arbitration and/or termination notices.<br />

(3) The arbitration and termination notices will include :-<br />

(i) The details <strong>of</strong> events, default or disputes leading to arbitration or termination.<br />

(ii) In case <strong>of</strong> termination, a deadline and a plan <strong>of</strong> action for exit management.<br />

5.12. Declaration <strong>of</strong> “Go- Live”.<br />

(1) The two <strong>Project</strong> Managers from the Buyer and SI, after satisfactory completion <strong>of</strong> all the<br />

activities as listed in the section on scope <strong>of</strong> SIS <strong>of</strong> the Article 3, and after scrutinizing all<br />

the inspection reports, audit findings, Contracts, licensing agreements etc. will initiate<br />

jointly the notice for declaring “Go Live”.<br />

(2) The “Go Live” notice is submitted to the “<strong>Project</strong> Management Committee” for action.<br />

(3) Within fifteen days <strong>of</strong> receiving the notice the <strong>Project</strong> ManagementCommittee will<br />

decide on the actions to be taken on “Go Live”.<br />

(4) If the project ManagementCommittee approves the Go-Live notice, the same is<br />

submitted to the EC.<br />

(5) The Go Live date comes into effect only when the EC approves the notice for Go Live.<br />

(6) In the event that any <strong>of</strong> the approving committees do not approve or suggest further<br />

action, the notices are reinitiated only after the recommended actions have been<br />

satisfactorily completed.<br />

RFP Volume 3: Draft Legal Contract Page 72


Request for Proposal for establishing e-Governance Systems<br />

6.1. Initiation.<br />

26 Schedule VI: Exit Management<br />

(1) This schedule sets out the provisions, which will apply on expiry or termination <strong>of</strong> the<br />

Contract, during the SIS Stage and O&M Stage <strong>of</strong> the <strong>Project</strong>.<br />

(2) In the case <strong>of</strong> termination <strong>of</strong> the Contract, the Parties shall agree at that time whether,<br />

and if so during what period, the provisions <strong>of</strong> this schedule shall apply.<br />

(3) In case <strong>of</strong> expiry <strong>of</strong> the Contract or part <strong>of</strong> the contracted service, the provisions <strong>of</strong> this<br />

schedule come into effect three months before the Contract for the particular service<br />

comes to an end.<br />

(4) However, if the BUYER, in the intervening period, invokes the provisions <strong>of</strong> the Contract<br />

and extends the term <strong>of</strong> the Contract for the particular service, the provisions <strong>of</strong> the<br />

schedule will not come into effect.<br />

(5) The Parties shall ensure that their respective associated entities carry out their<br />

respective obligations set out in this Schedule.<br />

6.2. Exit Management Plan.<br />

(1) On the initiation <strong>of</strong> the provisions <strong>of</strong> the exit management schedule by the BUYER, SI<br />

shall provide the BUYER with a recommended exit management plan which shall<br />

deal with at least the following aspects <strong>of</strong> exit management in relation to the<br />

Contract or the particular service <strong>of</strong> the Contract.<br />

(2) A detailed program <strong>of</strong> the transfer process that could be used in conjunction with a<br />

Replacement SI or the BUYER’s <strong>Project</strong> team including details <strong>of</strong> the means to be<br />

used to ensure continuing provision <strong>of</strong> the services throughout the transfer process<br />

or until the cessation <strong>of</strong> the services and <strong>of</strong> the management structure to be used<br />

during the transfer.<br />

(3) Plans for the communication with such <strong>of</strong> SI's , staff, suppliers, and any related third<br />

party as are necessary to avoid any material detrimental impact on <strong>Project</strong>’s<br />

operations as a result <strong>of</strong> undertaking the termination or expiry.<br />

(4) The proposed arrangements for the segregation <strong>of</strong> communication means<br />

(including but not limited to transfer <strong>of</strong> data in electronic forms, emails etc.) from<br />

the Networks employed by the BUYER and identification <strong>of</strong> specific security tasks<br />

necessary for ensuring this.<br />

(5) Plans for provision <strong>of</strong> contingent support to the BUYER and Replacement SI for a<br />

reasonable period after transfer.<br />

(6) The plan for settling the payments and claims pursuant to the Contract, if applicable.<br />

(7) The list <strong>of</strong> services to be rendered by SI, during the exit management period.<br />

RFP Volume 3: Draft Legal Contract Page 73


Request for Proposal for establishing e-Governance Systems<br />

(8) The acceptance mechanisms for successful completion <strong>of</strong> exit management.<br />

(9) Payments during the Exit Management period shall be made in accordance with the<br />

Schedule IV.<br />

(10) This Exit Management plan shall be furnished in writing to the BUYER within 7 days<br />

from the date on which the action for termination is initiated or ninety days prior to<br />

the date <strong>of</strong> expiry <strong>of</strong> the Contract.<br />

6.3. SI Obligations on Termination.On termination or expiry <strong>of</strong> the Contract, the<br />

obligations <strong>of</strong> the SI are listed below and these shall be applicable on the basis <strong>of</strong> the<br />

last milestone achieved by SI prior to termination :-<br />

(1) Hand over the possession <strong>of</strong> the Development Site, <strong>Project</strong> Assets, ASI Supplied<br />

Equipment and Documentation to the BUYER or its nominee.<br />

(2) Transfer all rights, titles and interests in such <strong>Project</strong> Assets (as the BUYER in its sole<br />

discretion may determine) to the BUYER or its nominee and transfer information which<br />

are required to be transferred to the BUYER in accordance with this Contract and<br />

execute such deeds and documents as may be necessary for the aforesaid purposes<br />

including completing all legal or other formalities required in this regard.<br />

(3) Hand over to the BUYER or its nominee all documents including, but not limited to,<br />

process specifications, testing specifications, test results, manuals and records relating<br />

to operation and maintenance <strong>of</strong> the s<strong>of</strong>tware and hardware.<br />

(4) Transfer/assign or cause to be transferred/assigned to the BUYER or its nominee any<br />

OEM contracts which are valid and subsisting and those OEM Contracts which the BUYER<br />

has chosen to take over, and, cancel or cause to be cancelled such OEM contracts which<br />

are not to be transferred/assigned to the BUYER or its nominee. For this purpose, SI shall<br />

ensure that all OEM Contracts are assignable in favor <strong>of</strong> the BUYER or its nominee<br />

without any further action on part <strong>of</strong> the respective counterparties. SI shall entirely at its<br />

cost, terminate all such OEM contracts which are not transferred/assigned and/or are<br />

not required to be transferred/assigned to the BUYER.<br />

(5) Transfer/assign all the warranties for the hardware and s<strong>of</strong>tware, in favour <strong>of</strong> the BUYER<br />

or its nominee, which are required by the BUYER to continue to operate or use, either<br />

during the SIS Stage or O&M Stage.<br />

(6) At its cost, remove within 90 (ninety) days from expiry <strong>of</strong> the Contract, from the <strong>Project</strong><br />

Site, any moveable assets that are not taken over by or not to be transferred to the<br />

BUYER in terms <strong>of</strong> the provisions <strong>of</strong> this Contract.<br />

(7) SI shall extend all support for the exit without service disruption as per the conditions<br />

under this Schedule.<br />

RFP Volume 3: Draft Legal Contract Page 74


Request for Proposal for establishing e-Governance Systems<br />

6.4. Confidential Information, Security and Data.SI will promptly on the commencement<br />

<strong>of</strong> the exit management period, hand over to the BUYER the following :-<br />

(1) Information relating to the current services rendered and customer satisfaction surveys<br />

and performance data relating to the performance <strong>of</strong> sub Contractors in relation to the<br />

services.<br />

(2) Documentation relating to <strong>Project</strong>’s Intellectual Property Rights.<br />

(3) The data belonging to the BUYER and Confidential Information.<br />

(4) All current and updated data <strong>of</strong> the <strong>Project</strong> as is reasonably required for purposes <strong>of</strong> the<br />

BUYER or its nominated agencies, transitioning the services to its Replacement SI in a<br />

readily available format nominated by the BUYER.<br />

(5) All other information (including, but not limited to, documents, records and Contracts)<br />

relating to the services reasonably necessary to enable the BUYER or its nominated<br />

agencies, or its Replacement SI to carry out due diligence in order to transition the<br />

provision <strong>of</strong> the services to the BUYER or its nominated agencies, or its Replacement SI<br />

(as the case may be).<br />

(6) Before the expiry <strong>of</strong> the exit management period, SI shall deliver to the BUYER; all new<br />

or up-dated materials from the categories set out in Article above and shall not retain<br />

any copies there<strong>of</strong>, except that SI shall be permitted to retain one copy <strong>of</strong> such materials<br />

for archival purposes only.<br />

(7) Before the expiry <strong>of</strong> the exit management period, unless otherwise provided under the<br />

Contract, the BUYER shall deliver to SI all forms <strong>of</strong> SI’s confidential information, which is<br />

in the possession or control <strong>of</strong> the BUYER or its users.<br />

6.5. Knowledge Transfer.<br />

(1) SI will undertake the following activities to ensure that the knowledge about the entire<br />

Information Technology system including, but not limited to, Data Centres, Disaster<br />

Recovery Centres, the Networks, the applications, customised solution, the design and<br />

operational characteristics <strong>of</strong> these systems are transferred to the Buyer Team or the<br />

Replacement SI. The activities will be aimed at :-<br />

(i) Knowledge transfer <strong>of</strong> operations.<br />

(ii) Knowledge transfer <strong>of</strong> technology<br />

(iii) Knowledge transfer <strong>of</strong> processes<br />

(2) Some <strong>of</strong> the key activities to be carried out by SI for knowledge transfer will be :-<br />

(i) Documents walk through to explain design and characteristics.<br />

(ii) The code walkthrough to explain the characteristics <strong>of</strong> the s<strong>of</strong>tware applications.<br />

RFP Volume 3: Draft Legal Contract Page 75


Request for Proposal for establishing e-Governance Systems<br />

(iii) Joint operations <strong>of</strong> key activities or services <strong>of</strong> help desk, Data Centre and DR<br />

centre operations.<br />

(iv) Briefing sessions on process and process documentation.<br />

(v) Walk through the logs <strong>of</strong> the bugs, the changes to the codes etc.<br />

(vi) Briefing sessions on applications, the way these are deployed and integrated.<br />

(3) Transfer technology and up-to-date know-how relating to operation and maintenance <strong>of</strong><br />

6.6. Employees.<br />

the s<strong>of</strong>tware and hardware.<br />

(1) Since the <strong>Project</strong> team <strong>of</strong> SI is critical for effective knowledge transfer and exit<br />

management, SI will comply with the obligations set out in Article 16.7 <strong>of</strong> the Contract<br />

and ensure the following during the exit management period :-<br />

(i) At least 75% <strong>of</strong> the key personnel as identified in the Schedule VIII are available for<br />

joint operations and knowledge transfer.<br />

(ii) At least 75% <strong>of</strong> the operations team is staffed with people with minimum<br />

pr<strong>of</strong>iciency as listed in the Schedule VIII.<br />

(2) Ensure that all the employees who worked on the <strong>Project</strong> have followed the clauses in<br />

the Article 14 and Article 17 <strong>of</strong> this Contract.<br />

(3) Ensure that the exiting employees have followed the security guidelines <strong>of</strong> the ASI<br />

premises.<br />

6.7. General Obligations <strong>of</strong> SI.<br />

(1) SI will involve the services <strong>of</strong> the OEMs as the case may be, for the purpose <strong>of</strong> executing<br />

the exit management plans, without any costs to the BUYER.<br />

(2) SI shall provide all such information as mentioned in the above clauses in order to affect<br />

as seamless a handover as practicable in the circumstances.<br />

(3) For the purposes <strong>of</strong> this Schedule, anything in the possession or control <strong>of</strong> SI, any<br />

associated entity, or is deemed to be in the possession or control <strong>of</strong> SI.<br />

(4) SI shall commit adequate resources to comply with its obligations under this Exit<br />

Management Schedule.<br />

(5) The task <strong>of</strong> SI with reference to the exit management is deemed to be complete only<br />

when the <strong>Project</strong> Manager SI <strong>of</strong> the BUYER issues a satisfactory completion certificate<br />

for the “exit management plan”.<br />

RFP Volume 3: Draft Legal Contract Page 76


Request for Proposal for establishing e-Governance Systems<br />

6.8. BUYER’s Obligations on Termination. On termination <strong>of</strong> the Contract, the BUYER’S<br />

obligations towards SI will be as follows:-<br />

(1) The BUYER confirms that the payment for the last milestone achieved by SI will be<br />

expedited subject to the set <strong>of</strong>f rights.<br />

(2) The BUYER shall extend all support for the knowledge transfer activities as per this<br />

Schedule VI.<br />

RFP Volume 3: Draft Legal Contract Page 77


Request for Proposal for establishing e-Governance Systems<br />

27 Schedule VII: List <strong>of</strong> Assets<br />

<br />

RFP Volume 3: Draft Legal Contract Page 78


Request for Proposal for establishing e-Governance Systems<br />

8.1. The List <strong>of</strong> Key Personnel.<br />

28 Schedule VIII: Personnel<br />

<br />

8.2. The Procedure for Replacing Key Personnel.<br />

(1) SI will give an advanced notice in writing <strong>of</strong> not less than four weeks on its intention to<br />

replace the core team member.<br />

(2) After getting the approval <strong>of</strong> the BUYER, SI will propose an equivalent pr<strong>of</strong>ile as<br />

replacement to the BUYER.<br />

(3) The BUYER or its authorized representative will evaluate the pr<strong>of</strong>ile and indicate the<br />

acceptance / rejection <strong>of</strong> the pr<strong>of</strong>ile. The BUYER may seek a personal interview <strong>of</strong> the<br />

person being proposed.<br />

(4) After getting the approval <strong>of</strong> the BUYER, SI will ensure that there will be sufficient time<br />

for the replacement person to work with the person being replaced, for transferring the<br />

project specific knowledge to him/her.<br />

(5) If the proposed pr<strong>of</strong>ile is rejected by the BUYER, SI will provide alternate pr<strong>of</strong>iles, till<br />

there is an acceptable pr<strong>of</strong>ile.<br />

(6) The costs associated with replacements like conducting interviews, travel costs <strong>of</strong> the<br />

replacement pr<strong>of</strong>ile will be completely borne by SI<br />

(7) The format for submitting the pr<strong>of</strong>iles <strong>of</strong> replacement for core team members should be<br />

as below:-<br />

RFP Volume 3: Draft Legal Contract Page 79


Request for Proposal for establishing e-Governance Systems<br />

Name <strong>of</strong> the person<br />

Role in the <strong>Project</strong><br />

Qualification<br />

Total number <strong>of</strong> years <strong>of</strong> experience<br />

Number <strong>of</strong> years with the current company (the bidder)<br />

Functional area / expertise<br />

Area <strong>of</strong> certification<br />

Number <strong>of</strong> complete life cycle implementations carried<br />

out<br />

The names <strong>of</strong> customers. (Please provide the relevant<br />

names)<br />

The functional areas /processes implemented<br />

RFP Volume 3: Draft Legal Contract Page 80


Request for Proposal for establishing e-Governance Systems<br />

29 Schedule IX: Audit, Access, And Reporting<br />

9.1. Purpose. This Schedule details the audit, access and reporting rights <strong>of</strong> the BUYER<br />

and respective obligations <strong>of</strong> SI under the Contract.<br />

9.2. Audit Notice and Timing.<br />

(1) As soon as reasonably practicable after the Effective Date, the Parties shall use their best<br />

endeavours to agree to a timetable for routine audits during the <strong>Project</strong>.Such time table<br />

may be reviewed every 3 months. During the Term, the BUYER or its nominated agencies<br />

shall conduct routine audits in accordance with such agreed timetable and shall not be<br />

required to give SI any further notice <strong>of</strong> carrying out such audits.<br />

(2) The BUYER may conduct non-timetabled (adhoc) audits at its own discretion if it<br />

reasonably believes that such non-timetabled audits are necessary as a result <strong>of</strong> an act<br />

<strong>of</strong> fraud by SI, a security violation, or breach <strong>of</strong> confidentiality obligations by SI, provided<br />

that the requirement for such an audit is notified in writing to SI a reasonable period<br />

time prior to the audit (taking into account the circumstances giving rise to the<br />

reasonable belief) stating in a reasonable level <strong>of</strong> detail the reasons for the requirement<br />

and the alleged facts on which the requirement is based. If SI considers that the non-<br />

timetabled audit was not appropriate, the matter shall be referred to the escalation<br />

procedure as set out in the Schedule V.<br />

(3) The frequency <strong>of</strong> audits shall be six (6) monthly, provided always thatthe BUYER or ASI<br />

shall endeavour to conduct such audits with the lowest levels <strong>of</strong> inconvenience and<br />

disturbance as practicable being caused to SI.<br />

(4) The audit and access rights contained shall survive the termination or expiration <strong>of</strong> the<br />

Contract for a period <strong>of</strong> twenty-four(24) months.<br />

9.3. Access. SI shall provide to the BUYER or its nominated agencies, or its or their<br />

authorised representatives, reasonable access to employees, subcontractors,<br />

suppliers, third party facilities, including leased premises, Data Recovery Centres,<br />

documents, records and systemsreasonably required for audit and shall provide all<br />

such persons with routine assistance in connection with the audits and inspections.<br />

The BUYER or its nominated agencies during the audit shall have the right to copy<br />

and retain copies <strong>of</strong> any relevant records. SI shall make every reasonable effort to co-<br />

operate with them in effecting the Audit.<br />

9.4. Audit Rights.<br />

(1) The BUYER shall have the right to audit and inspect suppliers, agents, third party<br />

facilities, including leased premises, Data recovery centres, documents, records,<br />

RFP Volume 3: Draft Legal Contract Page 81


Request for Proposal for establishing e-Governance Systems<br />

procedures and systems relating to the <strong>Project</strong>, but only to the extent that they relate to<br />

these , as shall be reasonably necessary to verify:-<br />

(i) The security, integrity and confidentiality availability <strong>of</strong> all the BUYER Data<br />

processed, held or conveyed by SI on behalf <strong>of</strong> the BUYER or its nominated<br />

agencies and its Usersand documentation related thereto;<br />

(ii) That SI has complied with the relevant technical standards, and has adequate<br />

internal controls in place; and<br />

(iii) The compliance <strong>of</strong> SI with any other obligation under the Contract.<br />

(iv) SI’s internal cost records shall be excluded for the purpose <strong>of</strong> audit<br />

(v) That the actual level <strong>of</strong> performance <strong>of</strong> the Services is the same as that specified in<br />

the Service Level Agreement<br />

9.5. Audit Rights <strong>of</strong> Sub-Contractors, Suppliers and Agents.<br />

(1) SI shall use reasonable endeavours to achieve the same audit and access provisions as<br />

defined in this Schedule with sub-Contractors, suppliers and agents who supply labour,<br />

services, materials in respect <strong>of</strong> the services. SI shall inform the BUYER, prior to<br />

concluding any sub-Contract or supply agreement, <strong>of</strong> any failure to achieve the same<br />

rights <strong>of</strong> audit and/or access.<br />

(2) Reporting.SI will provide reports to the BUYER regarding any specific aspects <strong>of</strong> the<br />

<strong>Project</strong> and in context <strong>of</strong> the audit and access information as required by the BUYER<br />

9.6. Action and Review.<br />

(1) Any change or amendment to the systems and procedures <strong>of</strong> SI, or sub-Contractors,<br />

where applicable, arising from the audit report shall be agreed within thirty (30)<br />

calendar days from the submission <strong>of</strong> the said report.<br />

(2) Any discrepancies identified by any audit pursuant to this Schedule shall be immediately<br />

notified to the who shall determine what action<br />

should be taken in respect <strong>of</strong> such discrepancies in accordance with the terms <strong>of</strong> the<br />

Contract.<br />

9.7. Records and Information. For the purposes <strong>of</strong> audit in accordance with this<br />

Schedule, SI shall maintain true and accurate records in connection with the<br />

provision <strong>of</strong> the services and SI shall handover all the relevant records and<br />

documents upon the termination or expiry <strong>of</strong> the Contract.<br />