My Reading on Heat Exchanger Readin
- Page 3 and 4:
Charlie Chong/ Fion Zhang Fion Zhan
- Page 5 and 6:
The Magical Book of Tank Inspection
- Page 7 and 8:
STANDARDS OF THE TUBULAR EXCHANGER
- Page 9 and 10:
HEAT EXCHANGER NOMENCLATURE SECTION
- Page 11 and 12:
NOMINAL DIAMETER The nominal diamet
- Page 13 and 14:
N1.32 U-tube exchanger with bonnet
- Page 15 and 16:
QUIZ Type: AKU? CKU? Charlie Chong/
- Page 17 and 18:
Type NEN Heat Exchanger Charlie Cho
- Page 19 and 20:
N-2 NOMENCLATURE OF HEAT EXCHANGER
- Page 21 and 22:
A: Removable Channel and Cover E: O
- Page 23 and 24:
C: Integral With Tubesheet Removabl
- Page 25 and 26:
A: Removable Channel and Cover J: D
- Page 27 and 28:
HEAT EXCHANGER FABRICATION TOLERANC
- Page 29 and 30:
Connection nozzle alignment and sup
- Page 31 and 32:
F-2 RECOMMENDED FABRICATION TOLERAN
- Page 33 and 34:
F-3 TUBESHEETS, PARTITIONS, COVERS
- Page 35 and 36:
Alternate Tongue and Groove Joint 1
- Page 37 and 38:
NPS Maximum Radial Projections of i
- Page 39 and 40:
Imperfections In Flange Facing Fini
- Page 41 and 42:
Imperfections In Flange Facing Fini
- Page 43 and 44:
Imperfections In Flange Facing Fini
- Page 45 and 46:
DEFINITIONS 1. Baffle is a device t
- Page 47 and 48:
10. Flange Load Concentration Facto
- Page 49 and 50:
Insert002 FIGURE G·5. 2 HEAT EXCHA
- Page 51 and 52:
Your Choice The detailed methods of
- Page 53 and 54:
Your Choice Charlie Chong/ Fion Zha
- Page 55 and 56:
G-2 INSPECTION G-2.1 MANUFACTURER'S
- Page 57 and 58:
G-3.12 SUPPLEMENTAL INFORMATION The
- Page 59 and 60:
G-4 DRAWINGS AND ASME CODE DATA REP
- Page 61 and 62:
G-5.2 PERFORMANCE The purchaser sha
- Page 63 and 64:
G-5.3 CONSEQUENTIAL DAMAGES The man
- Page 65 and 66:
G-6.5 DAMAGE PROTECTION The exchang
- Page 67 and 68:
G-7 GENERAL CONSTRUCTION FEATURES O
- Page 69 and 70:
*G-7.2 UFTING DEVICES Channels, bon
- Page 71 and 72:
*G-7.3 WIND & SEISMIC DESIGN For wi
- Page 73 and 74:
Type: AES Rear Head Type S - FLOATI
- Page 75 and 76:
Worksheet 作 业 Name This Heat Ex
- Page 77 and 78:
Worksheet 作 业 Name This Heat Ex
- Page 79 and 80:
E-1 PERFORMANCE OF HEAT EXCHANGERS
- Page 81 and 82:
User Responsibilities Correct Insta
- Page 83 and 84:
User Responsibilities Correct Insta
- Page 85 and 86:
The Best Assurance lies in Manufact
- Page 87 and 88:
CLEARANCE FOR DISMANTLING Charlie C
- Page 89 and 90:
CLEARANCE FOR DISMANTLING Charlie C
- Page 91 and 92:
CLEARANCE FOR DISMANTLING Charlie C
- Page 93 and 94:
Pipe Sleeve Cast in Place In concre
- Page 95 and 96:
Pipe Sleeve Cast in Place In concre
- Page 97 and 98:
FOUNDATION BOLTS Foundation bolts s
- Page 99 and 100:
E-2.2 CLEANLINESS PROVISIONS E-2.21
- Page 101 and 102:
Vapor Or Gas Binding What is Air Bi
- Page 103 and 104:
E-2.35 PULSATION AND VIBRATION In a
- Page 105 and 106:
Charlie Chong/ Fion Zhang SAFETY RE
- Page 107 and 108:
E-3.21 START-UP OPERATION Most exch
- Page 109 and 110:
START-UP OPERATION/ SHUT-DOWN OPERA
- Page 111 and 112:
START-UP OPERATION/ SHUT-DOWN OPERA
- Page 113 and 114:
E-3.24 BOLTED JOINTS Heat exchanger
- Page 115 and 116:
Bolted Relaxation may due to: • R
- Page 117 and 118:
Bolted Relaxation All external bolt
- Page 119 and 120:
E-3.25 RECOMMENDED BOLT TIGHTENING
- Page 121 and 122:
Bolt Tightening Procedure- Cross Bo
- Page 123 and 124:
E-4 MAINTENANCE OF HEAT EXCHANGERS
- Page 125 and 126:
Heat exchanger Air Vent? Charlie Ch
- Page 127 and 128:
E-4.12 DISASSEMBLY FOR INSPECTION O
- Page 129 and 130:
Shell/ Floating Head and Channel Co
- Page 131 and 132:
FIGURE E-4.13-1 Charlie Chong/ Fion
- Page 133 and 134:
Nil-ductility Transition Temperatur
- Page 135 and 136:
FIGURE E-4.13-2 (with Test Ring) Ob
- Page 137 and 138:
E-4.2 TUBE BUNDLE REMOVAL AND HANDL
- Page 139 and 140:
TUBE BUNDLE REMOVAL AND HANDLING Th
- Page 141 and 142:
1. Circulating hot wash oil or ligh
- Page 143 and 144:
Water Box/ Exchanger Head Charlie C
- Page 145 and 146:
Tube Cleaning (Mechanical- Hydro je
- Page 147 and 148:
Tube Cleaning (Chemical Cleaning) C
- Page 149 and 150: Tube Cleaning (Pre & Post Cleaned)
- Page 151 and 152: E-4.4 TUBE EXPANDING A suitable tub
- Page 153 and 154: Bolted joints and flanges are desig
- Page 155 and 156: Tongue & Groove Flange Metal jacket
- Page 157 and 158: Tongue & Groove Flange Metal jacket
- Page 159 and 160: Marking Spiral Wound Gaskets Charli
- Page 161 and 162: RTJ Groove Flange Type R Ring Gaske
- Page 163 and 164: E-4.7 SPARE AND REPLACEMENT PARTS T
- Page 165 and 166: PLUGGING OF TUBES Defective tubes m
- Page 167 and 168: PLUGGING OF TUBES Defective tubes m
- Page 169 and 170: Pre-Read Exercise- Naming the Compo
- Page 171 and 172: Removal Channel/ Removable Cover Re
- Page 173 and 174: Heat Exchanger- Basic Floating Tube
- Page 175 and 176: Heat Exchanger- Basic Design Data S
- Page 177 and 178: MECHANICAL STANDARDS TEMA CLASS R C
- Page 179 and 180: Charlie Chong/ Fion Zhang
- Page 181 and 182: Heat Exchanger- Basic ASME II & ASM
- Page 183 and 184: Heat Exchanger- Basic ASME XIII Ove
- Page 185: MECHANICAL STANDARDS TEMA CLASS “
- Page 189: RCB Charlie Chong/ Fion Zhang
- Page 193: Heat Exchanger Shell Design- Thickn
- Page 197: Heat Exchanger Tube Sheet Design- B
- Page 203: RCB-1 SCOPE AND GENERAL REQUIREMENT
- Page 207: TEMA Heat Exchanger Class- by Servi
- Page 211: RCB-1.2 DESIGN PRESSURE RCB-1.21 DE
- Page 215: RCB-1.3 TESTING RCB-1.31 STANDARD T
- Page 219: UG-99 STANDARD HYDROSTATIC TEST (c)
- Page 223: UG-100 PNEUMATIC TEST b) Except for
- Page 227: Table 1A Section I; Section III, Cl
- Page 231: UCS-23 MAXIMUM ALLOWABLE STRESS VAL
- Page 235: RCB-1.43 MEAN METAL TEMPERATURES RC
- Page 239: Relative Heat Transfer Area Of The
- Page 243: RCB-1.51 CARBON STEEL PARTS R-1.511
- Page 247: RCB-1.52 ALLOY PARTS Alloy parts ar
- Page 251:
TUBES, BOLTING AND FLOATING HEAD BA
- Page 255:
RCB-1.7 ANODES Selection and placem
- Page 259:
RCB-2 TUBES RCB-2.1 TUBE LENGTH The
- Page 263:
Birmingham University Charlie Chong
- Page 267:
Charlie Chong/ Fion Zhang Integral
- Page 271:
RCB-2.3 U-TUBES RCB-2.31 U-BEND REQ
- Page 275:
U-Bend Tube Bundle t o = t 1 [ 1+ d
- Page 279:
RCB-2.32 BEND SPACING RCB-2.321 CEN
- Page 283:
RCB-2.33 HEAT TREATMENT Cold work i
- Page 287:
RCB-2.4 TUBE PATTERN Standard tube
- Page 291:
RCB-2.42 TRIANGULAR PATTERN Triangu
- Page 295:
R-2.5 TUBE PITCH Tubes shall be spa
- Page 299:
TUBE PITCH Tubes shall be spaced wi
- Page 303:
MINIMUM SHELL THICKNESS Shell thick
- Page 307:
TABLE R-3.13 MINIMUM SHELL THICKNES
- Page 311:
RCB-4 BAFFLES AND SUPPORT PLATES RC
- Page 315:
RCB-4.2 TUBE HOLES Where the maximu
- Page 319:
RCB-4.3 TRANSVERSE BAFFLE AND SUPPO
- Page 323:
Standard Cross Baffle and Support P
- Page 327:
TABLE R-4.41 BAFFLE OR SUPPORT PLAT
- Page 331:
R-4.42 LONGITUDINAL BAFFLES R-4.421
- Page 335:
R-4.422 WELDED-IN LONGITUDINAL BAFF
- Page 339:
CB-4.42 LONGITUDINAL BAFFLES CB-4.4
- Page 343:
RCB-4.5 SPACING OF BAFFLES AND SUPP
- Page 347:
Notes: 1. Above the metal temperatu
- Page 351:
RCB-4.55 SPECIAL CASES When pulsati
- Page 355:
RCB-4.61MPINGEMENT BAFFLES AND EROS
- Page 359:
*RCB-4.622 SHELL ENTRANCE OR EXIT A
- Page 363:
RCB-4.7 TIE RODS AND SPACERS Tie ro
- Page 367:
20180520 0830 at Shanghai/ Charlie
- Page 371:
课 外 常 识 : 永 兴 岛 , 又
- Page 375:
RCB-4.9 KETTLE TYPE REBOILERS For k
- Page 379:
Multipass Floating Head Covers A c
- Page 383:
Single Pass Floating Head Covers Se
- Page 387:
CB-5.11 MINIMUM INSIDE DEPTH OF FLO
- Page 391:
Bending Shear Charlie Chong/ Fion Z
- Page 395:
Charlie Chong/ Fion Zhang
- Page 399:
RCB-5.15 TUBE BUNDLE SUPPORTS When
- Page 403:
FIGURE RCB-5.22 The cylindrical sur
- Page 407:
RCB-5.23 PACKING MATERIAL Purchaser
- Page 411:
LANTERN RING Also referred to as
- Page 415:
LANTERN RING Charlie Chong/ Fion Zh
- Page 419:
LANTERN RING Lantern Ring Charlie C
- Page 423:
LANTERN RING Bushing Stuffing Box G
- Page 427:
TEMA Type BEW or AEW Charlie Chong/
- Page 431:
TABLE RB-5.31 MAXIMUM DESIGN PRESSU
- Page 435:
RCB-5.32 LEAKAGE PRECAUTIONS The de
- Page 439:
RCB-5.33 PACKING MATERIAL Purchaser
- Page 443:
CB-6.2 GASKET MATERIALS For design
- Page 447:
RCB-6.4 PASS PARTITION GASKETS The
- Page 451:
FIGURE RCB-6.5 For dimensions and t
- Page 455:
RCB-7 TUBESHEETS RCB-7.1 TUBESHEETT
- Page 459:
MINIMUM TUBESHEET THICKNESS WITH EX
- Page 463:
B-7.11 MINIMUM TUBESHEET THICKNESS
- Page 467:
FIGURE RCB-7.124 Charlie Chong/ Fio
- Page 471:
RCB-7.126 SEPARATE DOUBLE TUBESHEET
- Page 475:
RB-7.24 TUBE HOLE GROOVING Tube hol
- Page 479:
Tubesheet Growing Milling Tool Each
- Page 483:
When integrally clad or applied tub
- Page 487:
C-7.311 LENGTH OF EXPANSION Tubes s
- Page 491:
TUBE PROJECTION Charlie Chong/ Fion
- Page 495:
TUBE PROJECTION Charlie Chong/ Fion
- Page 499:
TUBE PROJECTION Charlie Chong/ Fion
- Page 503:
Tubesheet Grooving Inspection Charl
- Page 507:
RCB-7.32 WELDED TUBE-TO-TUBESHEET J
- Page 511:
RCB-7.323 FABRICATION AND TESTING P
- Page 515:
TUBESHEET PULLING EVES In exchanger
- Page 519:
C-7.6 CLAD AND FACED TUBESHEETS The
- Page 523:
Historic calculation methods for fl
- Page 527:
The intent is to provide an approac
- Page 531:
RCB-8.1 APPUCATION INSTRUCTIONS AND
- Page 535:
RCB-8.12 CORROSION ALLOWANCE The fl
- Page 539:
TABLE R-3.13 MINIMUM SHELL THICKNES
- Page 543:
RCB-9.12 MINIMUM INSIDE DEPTH For m
- Page 547:
R-10.3 PIPE TAP CONNECTIONS All pip
- Page 551:
RCB-10.31 VENT AND DRAIN CONNECTION
- Page 555:
B-10.32 PRESSURE GAGE CONNECTIONS A
- Page 559:
THERMOMETER CONNECTIONS All flanged
- Page 563:
Skip Chapter 6, 7, 8, 9, 10 张 铁
- Page 567:
有 书 真 幸 福 , 无 事 小
- Page 571:
Charlie Chong/ Fion Zhang