Contents 1. Scope 2. Normative refe
- Page 23:
8.1.2 Castings shall not be used un
- Page 27:
8.3 Tubes 8.3.1 Integrally finned t
- Page 31:
Tubes All welded tubes shall be edd
- Page 35:
Tubes- All welded tubes shall be ed
- Page 39:
Tubes- All welded tubes shall be ed
- Page 43:
Kettle-type Heat Exchangers Charlie
- Page 47:
9.1.2 For removable-bundle heat exc
- Page 51:
TEMA (8th edition), TABLE RCB-4.3 S
- Page 55:
Tubes All tubes including U-tubes s
- Page 59:
• 9.5.6 Tubes shall be welded to
- Page 63:
9.6.3 The heat-treated portion of t
- Page 67:
Post-weld Heat Treatment of fabrica
- Page 71:
Heating Cycle ASME A335 Cr-Mo P92 S
- Page 75:
9. 7 Dimensional tolerances 9.7.1 M
- Page 79:
Piping Fabrication Dimensional tole
- Page 83:
Ra value The roughness of a surface
- Page 87:
Elcometer 7062 MarSurf PS10 Surface
- Page 91:
9.8.4 The flatness tolerance on pas
- Page 95:
9.10 Tube-to-tubesheet joints 9.10.
- Page 99:
Tube Expander Charlie Chong/ Fion Z
- Page 103:
Tube Expansion 1. If welded-and-exp
- Page 107:
Dinner Time 20180601- 1817hrs 儿
- Page 111:
Quality assurance verification that
- Page 115:
Quality assurance verification that
- Page 119:
Quality assurance review and/or exa
- Page 123:
10.1.2 No tubes or tube holes shall
- Page 127 and 128:
Charlie Chong/ Fion Zhang
- Page 130:
10.2.3 For non-magnetic materials,
- Page 134:
Table 5-Hardness limits Material Ma
- Page 138:
Brinell hardness Hardness shall be
- Page 142:
Brinell Hardness Testing Charlie Ch
- Page 146:
Overlay weldments shall be liquid-p
- Page 150:
Overlay weldments shall be liquid-p
- Page 154:
Overlay weldments shall be liquid-p
- Page 158 and 159:
Picasso Charlie Chong/ Fion Zhang
- Page 160:
1 0.3 Pressure testing 10.3.1 In th
- Page 164:
Pressure Testing Welded-and-expande
- Page 168:
Pressure Testing The minimum fluid
- Page 172:
Pressure Testing The water used for
- Page 176:
Pressure Testing The water used for
- Page 180:
Pressure Testing Charlie Chong/ Fio
- Page 184:
Pressure Testing Chart- Recorder Ch
- Page 188:
Re-Hydrotesting Flanged joints that
- Page 192: Re-Hydrotesting Flanged joints that
- Page 196: Break 擂 茶 配 料 编 辑 擂
- Page 200: 11.1.5 All threaded connections sha
- Page 204: 12 Supplemental requirements 12.1 G
- Page 208: 12.2 Design 12.2.1 The attachment o
- Page 212: Set-On Connection Examination for l
- Page 216: 12.3 Examination 12.3.1 All materia
- Page 220: Plate Ultrasonic Testing (Pre-forme
- Page 224: Plate Ultrasonic Testing (Pre-forme
- Page 228: Ultrasonic Examination of Forging A
- Page 232: Ultrasonic Examination of Forging A
- Page 236: Ultrasonic Examination of Forging A
- Page 240: Hot Forging Charlie Chong/ Fion Zha
- Page 246: Cold Forming Charlie Chong/ Fion Zh
- Page 250: Hot Forming https://www.youtube.com
- Page 254: Cold Forming Charlie Chong/ Fion Zh
- Page 258: MPI Magnetic-particle examination s
- Page 262: 12.3.5 Magnetic-particle examinatio
- Page 266: MPI- Magnetic Particle Testing Char
- Page 270: Tabulated Part Description NDT Cove
- Page 274: Part Description NDT Coverage Claus
- Page 278: A.2.2 Tube bundle and tubes- Guidan
- Page 282: Helical Baffles Charlie Chong/ Fion
- Page 286: Twisted Tube Design Charlie Chong/
- Page 290: A.2.5 Tube to tubesheet joint- Guid
- Page 294:
A.4 Preparation for shipment protec
- Page 298 and 299:
ISO 16812:2002(E) API Standard 660
- Page 300:
Annex C (informative) Shell-and-tub
- Page 303 and 304:
API Standard 660 / ISO 16812:2002 (
- Page 305 and 306:
API Standard 660 / ISO 16812:2002 (
- Page 307:
Annex D (informative) Responsibilit
- Page 310:
Part 2: Materials System Specificat
- Page 313 and 314:
Document Responsibility: Heat Trans
- Page 315 and 316:
Document Responsibility: Heat Trans
- Page 317 and 318:
Document Responsibility: Heat Trans
- Page 319 and 320:
Document Responsibility: Heat Trans
- Page 321 and 322:
Document Responsibility: Heat Trans
- Page 323 and 324:
Document Responsibility: Heat Trans
- Page 325 and 326:
Document Responsibility: Heat Trans
- Page 327 and 328:
Document Responsibility: Heat Trans
- Page 329 and 330:
Document Responsibility: Heat Trans
- Page 331 and 332:
Document Responsibility: Heat Trans
- Page 333 and 334:
Document Responsibility: Heat Trans
- Page 335 and 336:
Document Responsibility: Heat Trans
- Page 337 and 338:
Document Responsibility: Heat Trans
- Page 339 and 340:
Document Responsibility: Heat Trans
- Page 341 and 342:
Document Responsibility: Heat Trans
- Page 343 and 344:
Document Responsibility: Heat Trans
- Page 345 and 346:
Document Responsibility: Heat Trans
- Page 347 and 348:
Document Responsibility: Heat Trans
- Page 349 and 350:
Document Responsibility: Heat Trans
- Page 351 and 352:
Document Responsibility: Heat Trans
- Page 353 and 354:
Document Responsibility: Heat Trans
- Page 355 and 356:
Document Responsibility: Heat Trans
- Page 357 and 358:
Document Responsibility: Heat Trans
- Page 359 and 360:
Document Responsibility: Heat Trans
- Page 361:
Part 3: Inspection & Testing Requir
- Page 364 and 365:
INSPECTION & TESTING REQUIREMENTS S
- Page 366: