Contents 1. Scope 2. Normative refe
- Page 23:
8.1.2 Castings shall not be used un
- Page 27:
8.3 Tubes 8.3.1 Integrally finned t
- Page 31:
Tubes All welded tubes shall be edd
- Page 35:
Tubes- All welded tubes shall be ed
- Page 39:
Tubes- All welded tubes shall be ed
- Page 43:
Kettle-type Heat Exchangers Charlie
- Page 47:
9.1.2 For removable-bundle heat exc
- Page 51:
TEMA (8th edition), TABLE RCB-4.3 S
- Page 55:
Tubes All tubes including U-tubes s
- Page 59:
• 9.5.6 Tubes shall be welded to
- Page 63:
9.6.3 The heat-treated portion of t
- Page 67:
Post-weld Heat Treatment of fabrica
- Page 71:
Heating Cycle ASME A335 Cr-Mo P92 S
- Page 75:
9. 7 Dimensional tolerances 9.7.1 M
- Page 79:
Piping Fabrication Dimensional tole
- Page 83:
Ra value The roughness of a surface
- Page 87:
Elcometer 7062 MarSurf PS10 Surface
- Page 91:
9.8.4 The flatness tolerance on pas
- Page 95:
9.10 Tube-to-tubesheet joints 9.10.
- Page 99:
Tube Expander Charlie Chong/ Fion Z
- Page 103:
Tube Expansion 1. If welded-and-exp
- Page 107:
Dinner Time 20180601- 1817hrs 儿
- Page 111:
Quality assurance verification that
- Page 115:
Quality assurance verification that
- Page 119:
Quality assurance review and/or exa
- Page 123:
10.1.2 No tubes or tube holes shall
- Page 127 and 128:
Charlie Chong/ Fion Zhang
- Page 130:
10.2.3 For non-magnetic materials,
- Page 134: Table 5-Hardness limits Material Ma
- Page 138: Brinell hardness Hardness shall be
- Page 142: Brinell Hardness Testing Charlie Ch
- Page 146: Overlay weldments shall be liquid-p
- Page 150: Overlay weldments shall be liquid-p
- Page 154: Overlay weldments shall be liquid-p
- Page 158 and 159: Picasso Charlie Chong/ Fion Zhang
- Page 160: 1 0.3 Pressure testing 10.3.1 In th
- Page 164: Pressure Testing Welded-and-expande
- Page 168: Pressure Testing The minimum fluid
- Page 172: Pressure Testing The water used for
- Page 176: Pressure Testing The water used for
- Page 180: Pressure Testing Charlie Chong/ Fio
- Page 186: • 10.3.5 Any additional requireme
- Page 190: Re-Hydrotesting Flanged joints that
- Page 194: 10.4 Nameplates and stampings 1 0.4
- Page 198: 11 Preparation for shipment 11.1 Pr
- Page 202: 11.2 Identification 11.2.1 The item
- Page 206: Thick Walled Shell Construction Cha
- Page 210: Design…. Set-on type connections
- Page 214: Plate Sub-Surface Defects Charlie C
- Page 218: Examination 12.3.1 All material for
- Page 222: Plate Ultrasonic Testing (Pre-forme
- Page 226: Plate Ultrasonic Testing (Pre-forme
- Page 230: Ultrasonic Examination of Forging A
- Page 234:
Ultrasonic Examination of Forging A
- Page 238:
Hot Forging Charlie Chong/ Fion Zha
- Page 242:
Hot Forging Charlie Chong/ Fion Zha
- Page 246:
Cold Forming Charlie Chong/ Fion Zh
- Page 250:
Hot Forming https://www.youtube.com
- Page 254:
Cold Forming Charlie Chong/ Fion Zh
- Page 258:
MPI Magnetic-particle examination s
- Page 262:
12.3.5 Magnetic-particle examinatio
- Page 266:
MPI- Magnetic Particle Testing Char
- Page 270:
Tabulated Part Description NDT Cove
- Page 274:
Part Description NDT Coverage Claus
- Page 278:
A.2.2 Tube bundle and tubes- Guidan
- Page 282:
Helical Baffles Charlie Chong/ Fion
- Page 286:
Twisted Tube Design Charlie Chong/
- Page 290:
A.2.5 Tube to tubesheet joint- Guid
- Page 294:
A.4 Preparation for shipment protec
- Page 298 and 299:
ISO 16812:2002(E) API Standard 660
- Page 300:
Annex C (informative) Shell-and-tub
- Page 303 and 304:
API Standard 660 / ISO 16812:2002 (
- Page 305 and 306:
API Standard 660 / ISO 16812:2002 (
- Page 307:
Annex D (informative) Responsibilit
- Page 310:
Part 2: Materials System Specificat
- Page 313 and 314:
Document Responsibility: Heat Trans
- Page 315 and 316:
Document Responsibility: Heat Trans
- Page 317 and 318:
Document Responsibility: Heat Trans
- Page 319 and 320:
Document Responsibility: Heat Trans
- Page 321 and 322:
Document Responsibility: Heat Trans
- Page 323 and 324:
Document Responsibility: Heat Trans
- Page 325 and 326:
Document Responsibility: Heat Trans
- Page 327 and 328:
Document Responsibility: Heat Trans
- Page 329 and 330:
Document Responsibility: Heat Trans
- Page 331 and 332:
Document Responsibility: Heat Trans
- Page 333 and 334:
Document Responsibility: Heat Trans
- Page 335 and 336:
Document Responsibility: Heat Trans
- Page 337 and 338:
Document Responsibility: Heat Trans
- Page 339 and 340:
Document Responsibility: Heat Trans
- Page 341 and 342:
Document Responsibility: Heat Trans
- Page 343 and 344:
Document Responsibility: Heat Trans
- Page 345 and 346:
Document Responsibility: Heat Trans
- Page 347 and 348:
Document Responsibility: Heat Trans
- Page 349 and 350:
Document Responsibility: Heat Trans
- Page 351 and 352:
Document Responsibility: Heat Trans
- Page 353 and 354:
Document Responsibility: Heat Trans
- Page 355 and 356:
Document Responsibility: Heat Trans
- Page 357 and 358:
Document Responsibility: Heat Trans
- Page 359 and 360:
Document Responsibility: Heat Trans
- Page 361:
Part 3: Inspection & Testing Requir
- Page 364 and 365:
INSPECTION & TESTING REQUIREMENTS S
- Page 366: