- Page 1 and 2: My Reading on Heat Exchanger Readin
- Page 3: Charlie Chong/ Fion Zhang Fion Zhan
- Page 7: The Magical Book of Heat Exchanger
- Page 11: Charlie Chong/ Fion Zhang 有 书
- Page 15: Charlie Chong/ Fion Zhang American
- Page 21: 8 Materials 8.1 General • 8.1.1 T
- Page 25: 8.2 Gaskets 8.2.1 Gaskets shall not
- Page 29: Tubes All welded tubes shall be edd
- Page 33: Tubes All welded tubes shall be edd
- Page 37: Tubes- All welded tubes shall be ed
- Page 41: 9 Fabrication 9.1 Shells 9.1.1 All
- Page 45: Kettle-type Heat Exchangers Charlie
- Page 49: Transverse baffle-to-shell baffle-t
- Page 53: 9.2 Pass-partition plates Pass-part
- Page 57: 9.5 Welding 9.5.1 Welds may be made
- Page 61: 9.6 Heat treatment 9.6.1 Machined c
- Page 65: 9.6.4 Post-weld heat treatment of f
- Page 69:
• 9.6.5 The purchaser shall speci
- Page 73:
Post-weld Heat Treatment - on site
- Page 77:
Gap: 3 mm max Dimensional tolerance
- Page 81:
9.8 Gasket contact surfaces other t
- Page 85:
Roughness Parameters (EN ISO 4287)
- Page 89:
9.8.2 The flatness tolerance (maxim
- Page 93:
9.9 Tube holes 9.9.1 Tube-hole groo
- Page 97:
Experimental Investigation of Frict
- Page 101:
9.10.2 If welded-and-expanded joint
- Page 105:
9.11 Assembly 9.11.1 Match marks or
- Page 109:
10 Inspection and testing 10.1 Qual
- Page 113:
Quality assurance witnessing of hyd
- Page 117:
Quality assurance verification that
- Page 121:
Quality assurance review and/or exa
- Page 125:
10.2 Quality control 10.2.1 Radiogr
- Page 128:
UW-11 RADIOGRAPHIC AND ULTRASONIC E
- Page 132:
10.2.5 Weld-hardness testing shall
- Page 136:
Table 5-Hardness limits Material Ma
- Page 140:
Brinell Hardness Testing Charlie Ch
- Page 144:
10.2.6 At welded joints in alloy-cl
- Page 148:
Overlay weldments shall be liquid-p
- Page 152:
Overlay weldments shall be liquid-p
- Page 156:
Picasso Charlie Chong/ Fion Zhang
- Page 159 and 160:
Picasso Charlie Chong/ Fion Zhang
- Page 162:
Pressure testing Welded-and-expande
- Page 166:
Pressure Testing Welded-and-expande
- Page 170:
Pressure Testing The water used for
- Page 174:
Pressure Testing The water used for
- Page 178:
Pressure Testing The chloride conte
- Page 182:
Pressure testing Charlie Chong/ Fio
- Page 186:
• 10.3.5 Any additional requireme
- Page 190:
Re-Hydrotesting Flanged joints that
- Page 194:
10.4 Nameplates and stampings 1 0.4
- Page 198:
11 Preparation for shipment 11.1 Pr
- Page 202:
11.2 Identification 11.2.1 The item
- Page 206:
Thick Walled Shell Construction Cha
- Page 210:
Design…. Set-on type connections
- Page 214:
Plate Sub-Surface Defects Charlie C
- Page 218:
Examination 12.3.1 All material for
- Page 222:
Plate Ultrasonic Testing (Pre-forme
- Page 226:
Plate Ultrasonic Testing (Pre-forme
- Page 230:
Ultrasonic Examination of Forging A
- Page 234:
Ultrasonic Examination of Forging A
- Page 238:
Hot Forging Charlie Chong/ Fion Zha
- Page 242:
Hot Forging Charlie Chong/ Fion Zha
- Page 246:
Cold Forming Charlie Chong/ Fion Zh
- Page 250:
Hot Forming https://www.youtube.com
- Page 254:
Cold Forming Charlie Chong/ Fion Zh
- Page 258:
MPI Magnetic-particle examination s
- Page 262:
12.3.5 Magnetic-particle examinatio
- Page 266:
MPI- Magnetic Particle Testing Char
- Page 270:
Tabulated Part Description NDT Cove
- Page 274:
Part Description NDT Coverage Claus
- Page 278:
A.2.2 Tube bundle and tubes- Guidan
- Page 282:
Helical Baffles Charlie Chong/ Fion
- Page 286:
Twisted Tube Design Charlie Chong/
- Page 290:
A.2.5 Tube to tubesheet joint- Guid
- Page 294:
A.4 Preparation for shipment protec
- Page 298 and 299:
ISO 16812:2002(E) API Standard 660
- Page 300:
Annex C (informative) Shell-and-tub
- Page 303 and 304:
API Standard 660 / ISO 16812:2002 (
- Page 305 and 306:
API Standard 660 / ISO 16812:2002 (
- Page 307:
Annex D (informative) Responsibilit
- Page 310:
Part 2: Materials System Specificat
- Page 313 and 314:
Document Responsibility: Heat Trans
- Page 315 and 316:
Document Responsibility: Heat Trans
- Page 317 and 318:
Document Responsibility: Heat Trans
- Page 319 and 320:
Document Responsibility: Heat Trans
- Page 321 and 322:
Document Responsibility: Heat Trans
- Page 323 and 324:
Document Responsibility: Heat Trans
- Page 325 and 326:
Document Responsibility: Heat Trans
- Page 327 and 328:
Document Responsibility: Heat Trans
- Page 329 and 330:
Document Responsibility: Heat Trans
- Page 331 and 332:
Document Responsibility: Heat Trans
- Page 333 and 334:
Document Responsibility: Heat Trans
- Page 335 and 336:
Document Responsibility: Heat Trans
- Page 337 and 338:
Document Responsibility: Heat Trans
- Page 339 and 340:
Document Responsibility: Heat Trans
- Page 341 and 342:
Document Responsibility: Heat Trans
- Page 343 and 344:
Document Responsibility: Heat Trans
- Page 345 and 346:
Document Responsibility: Heat Trans
- Page 347 and 348:
Document Responsibility: Heat Trans
- Page 349 and 350:
Document Responsibility: Heat Trans
- Page 351 and 352:
Document Responsibility: Heat Trans
- Page 353 and 354:
Document Responsibility: Heat Trans
- Page 355 and 356:
Document Responsibility: Heat Trans
- Page 357 and 358:
Document Responsibility: Heat Trans
- Page 359 and 360:
Document Responsibility: Heat Trans
- Page 361:
Part 3: Inspection & Testing Requir
- Page 364 and 365:
INSPECTION & TESTING REQUIREMENTS S
- Page 366:
Charlie Chong/ Fion Zhang