- Page 1 and 2:
My Reading on Heat Exchanger Readin
- Page 3:
Charlie Chong/ Fion Zhang Fion Zhan
- Page 7:
The Magical Book of Heat Exchanger
- Page 11:
Charlie Chong/ Fion Zhang 有 书
- Page 15:
Charlie Chong/ Fion Zhang American
- Page 19:
Contents 1. Scope 2. Normative refe
- Page 23:
8.1.2 Castings shall not be used un
- Page 27:
8.3 Tubes 8.3.1 Integrally finned t
- Page 31:
Tubes All welded tubes shall be edd
- Page 35:
Tubes- All welded tubes shall be ed
- Page 39:
Tubes- All welded tubes shall be ed
- Page 43:
Kettle-type Heat Exchangers Charlie
- Page 47:
9.1.2 For removable-bundle heat exc
- Page 51:
TEMA (8th edition), TABLE RCB-4.3 S
- Page 55:
Tubes All tubes including U-tubes s
- Page 59:
• 9.5.6 Tubes shall be welded to
- Page 63:
9.6.3 The heat-treated portion of t
- Page 67: Post-weld Heat Treatment of fabrica
- Page 71: Heating Cycle ASME A335 Cr-Mo P92 S
- Page 75: 9. 7 Dimensional tolerances 9.7.1 M
- Page 79: Piping Fabrication Dimensional tole
- Page 83: Ra value The roughness of a surface
- Page 87: Elcometer 7062 MarSurf PS10 Surface
- Page 91: 9.8.4 The flatness tolerance on pas
- Page 95: 9.10 Tube-to-tubesheet joints 9.10.
- Page 99: Tube Expander Charlie Chong/ Fion Z
- Page 103: Tube Expansion 1. If welded-and-exp
- Page 107: Dinner Time 20180601- 1817hrs 儿
- Page 111: Quality assurance verification that
- Page 115: Quality assurance verification that
- Page 121: Quality assurance review and/or exa
- Page 125: 10.2 Quality control 10.2.1 Radiogr
- Page 128: UW-11 RADIOGRAPHIC AND ULTRASONIC E
- Page 132: 10.2.5 Weld-hardness testing shall
- Page 136: Table 5-Hardness limits Material Ma
- Page 140: Brinell Hardness Testing Charlie Ch
- Page 144: 10.2.6 At welded joints in alloy-cl
- Page 148: Overlay weldments shall be liquid-p
- Page 152: Overlay weldments shall be liquid-p
- Page 156: Picasso Charlie Chong/ Fion Zhang
- Page 159 and 160: Picasso Charlie Chong/ Fion Zhang
- Page 162: Pressure testing Welded-and-expande
- Page 166:
Pressure Testing Welded-and-expande
- Page 170:
Pressure Testing The water used for
- Page 174:
Pressure Testing The water used for
- Page 178:
Pressure Testing The chloride conte
- Page 182:
Pressure testing Charlie Chong/ Fio
- Page 186:
• 10.3.5 Any additional requireme
- Page 190:
Re-Hydrotesting Flanged joints that
- Page 194:
10.4 Nameplates and stampings 1 0.4
- Page 198:
11 Preparation for shipment 11.1 Pr
- Page 202:
11.2 Identification 11.2.1 The item
- Page 206:
Thick Walled Shell Construction Cha
- Page 210:
Design…. Set-on type connections
- Page 214:
Plate Sub-Surface Defects Charlie C
- Page 218:
Examination 12.3.1 All material for
- Page 222:
Plate Ultrasonic Testing (Pre-forme
- Page 226:
Plate Ultrasonic Testing (Pre-forme
- Page 230:
Ultrasonic Examination of Forging A
- Page 234:
Ultrasonic Examination of Forging A
- Page 238:
Hot Forging Charlie Chong/ Fion Zha
- Page 242:
Hot Forging Charlie Chong/ Fion Zha
- Page 246:
Cold Forming Charlie Chong/ Fion Zh
- Page 250:
Hot Forming https://www.youtube.com
- Page 254:
Cold Forming Charlie Chong/ Fion Zh
- Page 258:
MPI Magnetic-particle examination s
- Page 262:
12.3.5 Magnetic-particle examinatio
- Page 266:
MPI- Magnetic Particle Testing Char
- Page 270:
Tabulated Part Description NDT Cove
- Page 274:
Part Description NDT Coverage Claus
- Page 278:
A.2.2 Tube bundle and tubes- Guidan
- Page 282:
Helical Baffles Charlie Chong/ Fion
- Page 286:
Twisted Tube Design Charlie Chong/
- Page 290:
A.2.5 Tube to tubesheet joint- Guid
- Page 294:
A.4 Preparation for shipment protec
- Page 298 and 299:
ISO 16812:2002(E) API Standard 660
- Page 300:
Annex C (informative) Shell-and-tub
- Page 303 and 304:
API Standard 660 / ISO 16812:2002 (
- Page 305 and 306:
API Standard 660 / ISO 16812:2002 (
- Page 307:
Annex D (informative) Responsibilit
- Page 310:
Part 2: Materials System Specificat
- Page 313 and 314:
Document Responsibility: Heat Trans
- Page 315 and 316:
Document Responsibility: Heat Trans
- Page 317 and 318:
Document Responsibility: Heat Trans
- Page 319 and 320:
Document Responsibility: Heat Trans
- Page 321 and 322:
Document Responsibility: Heat Trans
- Page 323 and 324:
Document Responsibility: Heat Trans
- Page 325 and 326:
Document Responsibility: Heat Trans
- Page 327 and 328:
Document Responsibility: Heat Trans
- Page 329 and 330:
Document Responsibility: Heat Trans
- Page 331 and 332:
Document Responsibility: Heat Trans
- Page 333 and 334:
Document Responsibility: Heat Trans
- Page 335 and 336:
Document Responsibility: Heat Trans
- Page 337 and 338:
Document Responsibility: Heat Trans
- Page 339 and 340:
Document Responsibility: Heat Trans
- Page 341 and 342:
Document Responsibility: Heat Trans
- Page 343 and 344:
Document Responsibility: Heat Trans
- Page 345 and 346:
Document Responsibility: Heat Trans
- Page 347 and 348:
Document Responsibility: Heat Trans
- Page 349 and 350:
Document Responsibility: Heat Trans
- Page 351 and 352:
Document Responsibility: Heat Trans
- Page 353 and 354:
Document Responsibility: Heat Trans
- Page 355 and 356:
Document Responsibility: Heat Trans
- Page 357 and 358:
Document Responsibility: Heat Trans
- Page 359 and 360:
Document Responsibility: Heat Trans
- Page 361:
Part 3: Inspection & Testing Requir
- Page 364 and 365:
INSPECTION & TESTING REQUIREMENTS S
- Page 366:
Charlie Chong/ Fion Zhang