At present, there are 2564 Anganwadi Centres functioning in this district in 23 I.C.D.S.<br />

Projects. While, 446 Centers are functioning in their own buildings. As a result, 2118<br />

Anganwadi Centres are running without building due to which Pre-school classes could not be<br />

conducted smoothly. Particularly during rainy season, it becomes almost impossible to hold the<br />

Pre-school classes and prepare hot meals for the children.<br />

The Hon’ble Supreme Court as per their order dt. 28.11.2001 in case WP(C)-196/2001<br />

has stressed upon to cover all village / hamlets with the ICDS projects. Recently, funds were<br />

sanctioned for 136 nos. of additional AWC for the district.<br />

There is inadequate funding from Women and Child Development Department for<br />

construction of buildings for the remaining Anganwadi Centres. The World bank assistance,<br />

state share and social safety net fund towards construction of such buildings have not been<br />

received since 1997-98 . Under RSVY, we have covered 25 Anganwadi Center buildings in<br />

remote GPs and 30 Anganwadi cum ANM centers with common facility center. The<br />

intervention has a very positive impact and there has been significant declining trend in IMR.<br />

There is no other fund source for construction of the Anganwadi center buildings. So it is<br />

suggested to construct at least 100 buildings for Anganwadi Centres located in 100 GPs of this<br />

district out of B.R.G.F. Fund.<br />

Almost all the Gram panchayats have requested for funds for the Anganwadi centers in<br />

their perspective plan. Keeping in view the funds constraints, only 100GPs can be taken up in<br />

the first phase of the BRGF. A transparent process of selection of the GPs has been adopted.<br />

100 GPs are selected which are having maximum Backwardness Index Values. Backwardness<br />

Index is prepared taking into account the % of ST, SC, BPL population, and average distance<br />

of the villages in the GP from nearest town and % of non irrigated area in the GP.<br />

It is proposed that during the Eleventh Plan period, all the building less Anganwadi<br />

centers will be provided with buildings. These centers will deliver Six packages of services to<br />

the children & mothers of that locality, i.e. Pre-school Education, Health Check-up,<br />

Immunization, Referral Services, Nutrition and health Education, Supplementary Nutrition<br />

Programme, after construction of AWC buildings, which will certainly have a positive impact<br />

on IMR.<br />

These centers can also be used by good numbers of SHGs, which have been formed and<br />

promoted by AWW for their common place of meeting and other activities. These buildings<br />

can also be used as EGS centers to impart education. Besides, it has also been decided to cover<br />

all buildings less AWCs in phased manner.<br />