14.12.2012 Views

Similar

Similar

Similar

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rural Areas: 75% of the total funds have been earmarked for rural area. Within the rural areas<br />

funds have been earmarked for intervention to be taken up at various levels.<br />

Urban Areas : 25% of the total funds have been earmarked for intervention in urban areas.<br />

This has been done taking into consideration that 18% of the total population live in urban<br />

areas and also the fact that urban areas are growth centers which also cater to the overall<br />

economic activity and growth of rural areas.<br />

Within the urban areas Rs. 10.00 lakh as a base amount has been kept for all ULBs and<br />

based on BPL population extra funds have been allotted for respective ULBs.About<br />

Rs.5,00,00,000 has been earmarked for Urban sector based on the population and also keeping<br />

in consideration their importance as a node of economic activity in the district.<br />

Block Level Intervention : Education esp. high school, college education identified as one<br />

of the priority areas in the district High school/college, cater to more than one GP so it is<br />

decided to take up development of High School through Blocks.<br />

Bridging critical gap in infrastructure in about 75 high schools / 16 collages covering<br />

all the blocks and urban local bodies will be taken up in convergence with MP/MLA Lad<br />

funds. An amount of Rs6.00 cores has been earmarked for the same and an amount of Rs 2.6<br />

cores will be utilized from MP/MLA Lads for convergence under BRGF fund. (Annexure-A)<br />

Welfare of other vulnerable section of the society in the “Rural & Urban area”: Nine<br />

Institutions for sheltering orphan, blind students, deaf and dumb students and destitute women<br />

are being functioning in the district. They don’t have adequate hostel facilities with provision<br />

of safe drinking water and sanitation facilities.<br />

They also don’t have adequate fund flow for meeting the minimum requirements. It is<br />

decided to provide Rs 1.00 core to bridge the critical gaps in providing better civic amenities<br />

and improving livelihood supports of the vulnerable section of the society.<br />

Training to PRIS : Rs 1.00 core is programmed to provide better training to PRIS and also to<br />

up-grade the skill of computer operators/ SEMS etc. This also includes the expenditure towards<br />

establishment of district resource center and GIS database.<br />

The estimates given in the proposals are approximate in nature and there may be<br />

variations based on site conditions, price rise etc. The works will be executed in a transparent<br />

process fulfilling all the instructions/ guidelines. The plan proposal has been made for an<br />

amount of Rs. 22.00 Cores under Development grant and Rs. 1.00 Core for capacity building<br />

for 07-08. In case of receipt of less funds the ongoing infrastructure projects will be carried<br />

forward to the next year.<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!