Similar
Similar
Similar
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Rural Areas: 75% of the total funds have been earmarked for rural area. Within the rural areas<br />
funds have been earmarked for intervention to be taken up at various levels.<br />
Urban Areas : 25% of the total funds have been earmarked for intervention in urban areas.<br />
This has been done taking into consideration that 18% of the total population live in urban<br />
areas and also the fact that urban areas are growth centers which also cater to the overall<br />
economic activity and growth of rural areas.<br />
Within the urban areas Rs. 10.00 lakh as a base amount has been kept for all ULBs and<br />
based on BPL population extra funds have been allotted for respective ULBs.About<br />
Rs.5,00,00,000 has been earmarked for Urban sector based on the population and also keeping<br />
in consideration their importance as a node of economic activity in the district.<br />
Block Level Intervention : Education esp. high school, college education identified as one<br />
of the priority areas in the district High school/college, cater to more than one GP so it is<br />
decided to take up development of High School through Blocks.<br />
Bridging critical gap in infrastructure in about 75 high schools / 16 collages covering<br />
all the blocks and urban local bodies will be taken up in convergence with MP/MLA Lad<br />
funds. An amount of Rs6.00 cores has been earmarked for the same and an amount of Rs 2.6<br />
cores will be utilized from MP/MLA Lads for convergence under BRGF fund. (Annexure-A)<br />
Welfare of other vulnerable section of the society in the “Rural & Urban area”: Nine<br />
Institutions for sheltering orphan, blind students, deaf and dumb students and destitute women<br />
are being functioning in the district. They don’t have adequate hostel facilities with provision<br />
of safe drinking water and sanitation facilities.<br />
They also don’t have adequate fund flow for meeting the minimum requirements. It is<br />
decided to provide Rs 1.00 core to bridge the critical gaps in providing better civic amenities<br />
and improving livelihood supports of the vulnerable section of the society.<br />
Training to PRIS : Rs 1.00 core is programmed to provide better training to PRIS and also to<br />
up-grade the skill of computer operators/ SEMS etc. This also includes the expenditure towards<br />
establishment of district resource center and GIS database.<br />
The estimates given in the proposals are approximate in nature and there may be<br />
variations based on site conditions, price rise etc. The works will be executed in a transparent<br />
process fulfilling all the instructions/ guidelines. The plan proposal has been made for an<br />
amount of Rs. 22.00 Cores under Development grant and Rs. 1.00 Core for capacity building<br />
for 07-08. In case of receipt of less funds the ongoing infrastructure projects will be carried<br />
forward to the next year.<br />
12