14.12.2012 Views

Similar

Similar

Similar

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

P L A N P R O P O S A L<br />

F O R<br />

B A C K W A R D R E G I O N S G R A N T F U N D<br />

(BRGF) 2007 -0 8<br />

Approved by the District Planning Committee, Ganjam on 06.09.2007.<br />

Ganjam<br />

DISTRICT ADMINISTRATION


Chapter Particulars Page No.<br />

Chapter – 1<br />

Chapter – 2<br />

EXECUTIVE SUMMARY 1<br />

SUMMARY OF PLAN PROPOSALS 15<br />

DISTRICT PROFILE<br />

RESOURCE AND CRITICAL GAP<br />

IDENTIFICATION<br />

Chapter – 3 SECTORS AND PRIORITIES<br />

Chapter – 4 CAPACITY BUILDING FOR PRIS 57<br />

ANNEXURES 1-9 61<br />

PHOTO GALLERY OF RSVY PROJECTS<br />

Ganjam<br />

18<br />

26<br />

35<br />

85<br />

DISTRICT ADMINISTRATION


F O R E W O R D<br />

GANJAM is one of the most populous districts of Orissa having 22 Blocks and 3 Sub-Divisions. It<br />

is a under developed district and shares border with the Andhra Pradesh. Most of the national flag ship<br />

programmes like NREGA, NRHM, PMGSY, RGVKY, SSA, NHM etc. are being implemented in this district.<br />

For the past three years the district was implementing RSVY to bridge the critical gaps and to provide<br />

focused attention to vulnerable areas.<br />

From this year the district will be moving from RSVY to BRGF and the plan proposal for BRGF<br />

for 2007-08 has been prepared following the guidelines prescribed for BRGF. This BRGF plan document<br />

proposes to bridge the critical gaps existing in identified priority sectors with special focus for vulnerable<br />

groups like women, children and tribal girls. In stead of Spreading the funds thinly to all the GPs in one<br />

year, the District Planning Committee has decided to select 100 GPs based on backwardness index and to<br />

cover the rest GPs in a phased manner in the eleventh plan period. The plan also proposes for focused<br />

attention for 34 GPs having predominantly tribal population and the rest 66 GPs will be based on BI. In<br />

the subsequent years of Eleventh Five Year Plan focused attention will be given to the GPs according to the<br />

Backwardness Index prepared.<br />

Under NFFWP/ NREGA a five year perspective plan has been made involving all the<br />

stakeholders. This perspective plan has been prepared through a process of decentralized participatory<br />

planning and has been approved by Palli Sabha/ Gram Sabha, G.P./Panchayat Samiti / Zilla Parishad and<br />

has been recommended by PR Department Government of Orissa to Ministry of Rural Development,<br />

Government of India. This perspective plan has been used as base plan for rural sector. Further areas,<br />

sectors identified and focused under RSVY have also been taken into consideration. Objectives of BRGF<br />

and planning exercise has been discussed with the Honorable MPs, MLAs, ZP members, ULB<br />

representatives and line department officials of the district. In case of urban sector need based plan<br />

proposals to fill the critical gaps have been submitted by the respective ULBs for consideration in the<br />

BRGF. The allocation of funds has been made to the Zilla Parishad, Panchayat Samiti and Gram<br />

Panchayat levels and Urban Local Bodies (ULBs), taking into account the visioning exercise and<br />

prioritization of development goals in the district. The allocation is based on the focus and priority areas<br />

as listed out in the District Plan. This BRGF plan was approved by the District Planning Committee in its<br />

meeting held on 06.09.07.<br />

An executive summary has been provided in the initial part of the plan document which provides<br />

requisite information in a nutshell.<br />

Collector & District Magistrate, Ganjam<br />

-Cum-<br />

Ganjam Member Secretary, District Planning Committee<br />

District Administration


GANJAM DISTRICT GANJAM DISTRICT GANJAM DISTRICT<br />

GANJAM DISTRICT<br />

ADMINISTRATION<br />

GANJAM DISTRICT<br />

ADMINISTRATION<br />

GANJAM DISTRICT<br />

ADMINISTRATION<br />

GANJAM DISTRICT<br />

ADMINISTRATION<br />

GANJAM DISTRICT GANJAM DISTRICT GANJAM DISTRICT<br />

GANJAM DISTRICT GANJAM DISTRICT GANJAM DISTRICT GANJAM DISTRICT


INDEX (TABLES)<br />

Sl No Table Name Page No.<br />

1 “AS IS : To BE” Analysis is presented below based on the<br />

Strength, Opportunities, Threats and Weaknesses of the<br />

District<br />

2<br />

2 Critical Gaps 3<br />

3 Photo Gallery 4<br />

4 Anticipated Fund Flow To Ganjam District Under Various<br />

Schemes During The Year 2007-2008<br />

5-6<br />

5 Showing Distribution of Funds between different local<br />

bodies for the year 2007-08<br />

13<br />

6 Showing Distribution of Funds under BRGF to ULBs of<br />

Ganjam District 07-08<br />

14<br />

7 Summary of Plan Proposals BRGF 2007-08 15-16<br />

8 Capacity Building of the PRIs 17<br />

9 District Map 20-21<br />

10 Land use pattern 23<br />

11 Classification of Forest 24<br />

12 Critical Gaps 34<br />

13 Major Crops 39<br />

14 Nurturing small scale, labor intensive industries on cluster<br />

basis spreading<br />

44<br />

15 Construction of the Tribal Girls hostels 48<br />

16 Infrastructure improvement in High schools/ colleges 49<br />

17 Achievements on SHG-MASS movement 52<br />

18 Panchayat Election held 59<br />

19 The description of various items included under the BRGF<br />

component to improve the capacity of the PRIs<br />

60<br />

Ganjam<br />

DISTRICT ADMINISTRATION


Sl<br />

No<br />

INDEX (ANNEXURE)<br />

ANNEXURE Annexure No. Page<br />

No.<br />

1 Ganjam District at a Glance Annexure-1 61<br />

2 Tribal Girls hostels Annexure-2 68<br />

3 PRI Members for training Annexure-3 69<br />

4 Block Wise list of SEM for Training Annexure-4 70<br />

5 List of GPs Coming within schedule area Annexure-5 71<br />

6 List of GPs coming within micro Project TDA Tumba Annexure-6 72<br />

7<br />

8<br />

Block wise List of Gram Panchayats Based on<br />

Backward ness Index<br />

List of High Schools and Colleges Developed on<br />

convergence proposal of MLA & MP LAD Funds<br />

Annexure-7 73<br />

Annexure-8 75<br />

9 PLAN PROPOSALS BRGF 2007-08 Annexure-9 78-84<br />

Ganjam<br />

DISTRICT ADMINISTRATION


EXECUTIVE SUMMARY<br />

Page No.<br />

� Introduction / Critical Gaps 2-4<br />

� Fund flow to District 5-6<br />

� Planning Process 7<br />

� Prioritizing the interventions 7-9<br />

to bridge critical gaps<br />

� Capacity building of PRIs 10<br />

� Funds allocation within the District 11-14<br />

� Summary of plan proposals 15<br />

� Rural area 15<br />

� Rural – Urban intervention 16<br />

� Urban area 16<br />

� Capacati bulding to PRI 27<br />

Ganjam<br />

DISTRICT ADMINISTRATION<br />

1


Introduction<br />

The district Ganjam got its name from the word "Ganj-i-am" which means the<br />

“Granary of the World”. The district is named after the old Township and European fort of<br />

Ganjam situated on the northern bank of river Rushikulya which was the head quarter of the<br />

district. Ganjam district is situated in the coastal region of the state and broadly divided into<br />

two natural divisions i.e. the coastal plains in the East and the hills and table lands in the<br />

West. The district is endowed with rich natural resources, forests, flora and fauna, and water<br />

resources. The main attraction of the district are Sun surf sand of Gopalpur Sea Beach,<br />

colourful Chilika lake, hot Sulphur spring water of Taptapani and hilly terrain of Taratarini.<br />

In spite of its richness in various areas, the district still remains one of the backward<br />

districts of Orissa. To have an easy and quick grasp of the scenario, an “AS IS : To BE”<br />

analysis is presented below based on the strength, opportunities, threats and weaknesses of<br />

the district followed by an identification of the critical gaps which need to be addressed<br />

under Backward Regions Grant Funds (BRGF)<br />

AS IS TO BE<br />

• Rich cultural heritage • To be a cultural hub of Orissa<br />

• 78.5% of estimated ground<br />

water resources<br />

• Industrious and outward<br />

looking population<br />

• Hardworking and progressive<br />

farming community<br />

• Rich in inland and brackish<br />

water fisheries<br />

• Strong growth of SHG<br />

movement<br />

• A rich and diverse<br />

population base<br />

• Virgin beaches and<br />

diverse flora and fauna<br />

• Threat from left wing<br />

extremism<br />

• To optimally utilize the same in<br />

sustainable way<br />

• Adopting new techniques and<br />

innovations to make it a most<br />

happening place in Orissa<br />

• Diversify and make it market<br />

oriented<br />

• Making it engine of growth and<br />

• Development of social capital and<br />

contribution in the growth<br />

• Multiple activities and diversified<br />

growth<br />

• Tourism hub of Orissa<br />

• Development to reach every left<br />

out area and person to overcome<br />

left wing extremism.<br />

2


o Women and child welfare<br />

CRITICAL GAPS<br />

o Education , particularly High School and college education<br />

o Tribal welfare (including education, health, drinking water,<br />

livelihood security)<br />

o Welfare of other vulnerable sections of the society.<br />

o Capacity building of women / productivity of women SHG groups<br />

o Cap[acity building of PRIs.<br />

3


ANTICIPATED FUND FLOW TO GANJAM DISTICT UNDER VARIOUS SCHEMES DURING THE YEAR 2007-<br />

2008<br />

SI<br />

No<br />

Name of the scheme<br />

Amount (In<br />

Crores)<br />

Approx<br />

1 National Rural Employment Guarantee Act 100.00<br />

Objective Sector<br />

Guarantee 100 days wage employment to Registered job<br />

seeker under NREGA<br />

1. Water Conservation & water Harvesting<br />

2. Irrigation & drought Proofing<br />

3. Rural Connectivity Flood Control & protection.<br />

Rural Connectivity.<br />

Water Conservation<br />

Drought proofing<br />

Flood Control<br />

2 Indira Awas Yojana 23.00 Providing house to BPL families in the Rural Areas. Rural Housing<br />

3 Swarnajayanti Gramin Sworogar Yojana<br />

4 12 th Finance Commission Award<br />

9.00<br />

12.00<br />

Self employment to SHG & Individual , infrastructure<br />

facility training & Marketing<br />

Operation & maintance of tube Wells , Rural water supply<br />

programmes<br />

Rural Development<br />

Drinking water<br />

5 Rajib Gandhi Gramin Bidyutikaran Yojana 68.00 Rural Village El ectrification Rural Electrification<br />

6 Pradhan Mantri Gram sadak Yojana 38.40 Rural Connectivity , PMGSY Roads, RIDF State Plan Rural Connectivity<br />

7<br />

District Primary education Programme<br />

/Sarba Sikhya Abhiyan<br />

81.00<br />

8 Special Central Assistance and Art.275(i) 0.21<br />

9<br />

10<br />

Total Sanitation Campaign<br />

Integrated Wasteland Development<br />

Programme<br />

Sarba Sikhya Abhijan, Training of Teacher, K.G.B.V.<br />

Hostel-17 @ 22 to 25 Lakhs. B.L.C.C. Building, MCA<br />

Centre, Additional Classroom, Toilet, Boundary wall,<br />

Dilapidated Building.<br />

Under Art(i) and SCA for prompting livelihood issues of the<br />

scheduled Tribes and infrastructure development<br />

Primary and elementary<br />

education<br />

Tribal Development<br />

12.00 Rural Sanitation Programme & Capacity Building Health & Sanitation<br />

2.00<br />

Creating Harvesting structure , Irrigation facility ,<br />

Plantation , Fisheries , Soil & W.C and HR Dev.<br />

Water Conservation<br />

5


SI<br />

No<br />

11<br />

Name of the scheme<br />

Rural Infrsasture Development<br />

Fund/NABARD<br />

Amount<br />

( In Crores)<br />

Approx<br />

Objective Sector<br />

30.00 Construction of MIP Irrigation<br />

12 Mid Day Meal Programme 22.00 MDM/Kitchen shed<br />

13 Forest 3.00 Plantation /WHS infrastructure<br />

14 National Rural Health Mission<br />

15 National Horticulture Mission<br />

16 Extension reform /Work plan /ISOPOM<br />

30.19<br />

0.74<br />

1.87<br />

17 Biju Gramin Jyoti Yojan 3.50<br />

18<br />

Jaladhara<br />

(Accelarated rural water supply PGM)<br />

Total<br />

10.00<br />

458.91<br />

Improved access to health , improvement in health<br />

infrastructure and services<br />

Primary and<br />

elementary education<br />

Afforestatuion and<br />

forest conservation<br />

Health<br />

Improving the Horticulture in the District Horticulture<br />

Improving Agriculture extension service<br />

Providing Electricity & house hold conncetions in<br />

rural areas; missing linkage under the flagship<br />

program “ Rajeev Gandhi Gramin Vidyut Karan<br />

Yojana ”<br />

Provide safe drinking water through pipe water<br />

supply in rural areas.<br />

Agriculture<br />

Rural electrification<br />

Rural safe drinking<br />

water supply &<br />

sanitation<br />

6


PLANNING PROCESS<br />

A comprehensive planning process involving all the stake holders has been done for<br />

both urban and rural areas as per the BRGF guidelines.<br />

In case of rural areas the perspective plan prepared for NFFWP/NREGA through a<br />

decentralized planning process involving Palli Sabha, Gram Sabha, Gram panchayat,<br />

Panchayat Samiti and Zilla Parishad has been taken as the base document. The five year<br />

perspective plan of NREGA taken into consideration the fund flow from various schemes/<br />

sources and projects that can be taken up under NREGA and the critical gaps that exist at GP<br />

and PS levels. The critical gaps that are identified through this decentralized planning process<br />

is proposed to be bridged through BRGF in a phased manner.<br />

In case of urban area need based plan proposals have been prepared by the respective<br />

ULBs with special focus for intervention for vulnerable groups like slum dwellers. The plan so<br />

prepared for urban and rural area have been converged at the district level and duly approved<br />

by the District Planning Committee on 06.09.07.<br />

PRIORATISING THE INTERVENTIONS TO BRIDGE CRITICAL GAPS<br />

I. SOCIAL SECTOR<br />

Women and Child Welfare<br />

With high IMR and MMR interventions for women & Child welfare are one of the top<br />

priorities of the district. The launch of NRHM with emphasis on institutional delivery has also<br />

been helpful in bringing down these two vital indicators. However these initiative needs to be<br />

supported and sustained. In this regard one of the critical gaps identified is the lack of<br />

Anganwadi Center Building in about 2166 Centers of total 2646 AWCs. The Anganwadi<br />

Center being the nodal point of service delivery of most Child & women welfare related<br />

interventions, it is important to provide building infrastructure for these centers. After closure<br />

of SGRY and launch of NREGA in the district, there are no schemes under which AWCs can<br />

be constructed. Realizing this fact, under RSVY 25 AWCs and 30 AWCs cum ANM centers<br />

were constructed in backward GPs. Now under BRGF it is proposed to provide building to all<br />

the building-less AWCs in a phased manner. In the first phase during 2007-08, it is proposed to<br />

construct at least 100 AWCs, one each in the 100 GPs selected having maximum<br />

7


Backwardness Index Values and the center is selected within a GP with maximum SC,ST<br />

population or minority polpulation. These AWCs will also be used as SHG centre to conduct<br />

Mahila Sabhas and SHG meetings. <strong>Similar</strong>ly ANM center will also be taken up in the selected<br />

GPs wherever ANM buildings are not there.<br />

II. EDUCATION SECTOR<br />

HIGH SCHOOLS/COLLEGES<br />

In the era of cut-throat competition in the private sector, there is a need to prepare the students<br />

with sufficient knowledge and skills. Though there are sufficient high schools in the district,<br />

the basic infrastructure is not able to cater to the requirements of the students. The Sarva<br />

Shikshya Abhiyan (SSA) takes cares of the infrastructure requirements of the schools up to<br />

Class-VIII. But, there is a critical gap for the high schools and the colleges for which there is<br />

no other source of funding. Most of these high schools and colleges require a good Library-<br />

cum-discussion hall and a laboratory hall for science experiments.<br />

It is proposed that the infrastructural development shall be done in convergence with the<br />

MP/MLA LADS. Four high schools/colleges in rural area and one high school/college in urban<br />

area will be taken up in each of the 12 Assembly Constituencies and two Parliament<br />

Constituencies in this phase of the BRGF. Annexure-8<br />

III. FOCUSED ATTENTION TO TIRBAL AND BACKWARD AREAS<br />

Even though only 2.88% of the total population of the district is Scheduled Cast population<br />

but there are some tribal remote pockets which need focused attention. Improvement of<br />

physical infrastructure and livelihood support in these areas is being identified as critical gap.<br />

The process started in RSVY with construction of small irrigation structures in the form of<br />

diversion weir, bunds, AWCs and ANM cum AWCs. The Tumba Micro Project in Patrapur<br />

block is home of Soura, the PTG (Primitive Tribal Groups) is being identified as the most<br />

backward region and priority area for intervention. <strong>Similar</strong>ly 31 Gps of soroda, dharakote,<br />

Saragada Blocks of the District, which are thickly populated by Kandha, Sura, Tribes and also<br />

declared as schedule area by GOI deserves priority under BRGF. It is proposed to allocate Rs<br />

10 lacks for each GP in this area for dovetailing with TDA funds to provide better physical<br />

infrastructure and livelihood support under BRGF 2007-08. Annexure 5-6<br />

8


For other backwards areas a Backwardness Index is being prepared based on % of<br />

SC,ST and BPL population, along with average distance of villages in a GP from nearest town<br />

and % of non-irrigated land for allocating GP wise funds under BRGF in future during<br />

Eleventh Plan period. At least three GPs have been identified from each Block area based of<br />

B.I. for 07-08. Annexure-7<br />

IV. URBAN SECTOR<br />

Ganjam district has one municipality at Beharampur and 17 NACs located generally at<br />

block or tahsil headquarters. All these areas have emerged as growth centers of the district.<br />

People from adjoining rural areas depend on these urban areas for employment, market facility,<br />

health care , higher education and other basic needs. With the increasing trend towards<br />

urbanization, there has been tremendous pressure on the civic amenities of these urban zones.<br />

With inadequate funding from government schemes and also lack of sufficient resources to<br />

generate own funds, these urban areas have suffered a lot over the years in terms of lower<br />

quality of life and amenities. These urban areas are the socio-economic and cultural centers in<br />

their sphere of influence. The district plan identifies the need to improve the infrastructural<br />

amenities in these areas to enable a guided development. These areas will be emerging as the<br />

nodes for the overall development strategy for the district. The ripple effect from the<br />

development of these areas can be visible in other parts of the district as well. That is the<br />

reason why 25% of the Development Grant under BRGF has been allocated to the Urban Local<br />

Bodies for improving the road and civic amenities even though they account for only 18% of<br />

the population.<br />

9


CAPACITY BUILDING OF PRIs<br />

Effective implementation of the provisions of Part IX of the Constitution will require<br />

building of the capability of Panchayats encompassing training, provision of adequate<br />

functionaries, technical assistance and other support to Panchayats. The objective of the<br />

training is to enable Panchayat elected representatives to upgrade their knowledge and skills to<br />

better perform their responsibilities, such as implementing programmes equitably, enabling<br />

them to think in terms of concrete actions they can take or facilitate and equipping them with<br />

the skills required for day-to-day performance of executive duties. The proposal under the<br />

Capacity building of the PRIs component of the BRGF 2007-08, shall include the training of<br />

the newly elected PRI members / the functionaries dealing with and assisting PRIs and ULB<br />

members.<br />

Further, the following activities are being proposed:<br />

• Establishment of a District Resources center : The resource center will provide the<br />

technical support to the Zilla Parishad and help in effective discharging of functions.<br />

The center can engage the technical experts from economics, agriculture, GIS,<br />

statistics, micro planning, etc. It can also act as a district level training institute.<br />

• District development report and GIS database: The report can be prepared by a<br />

specialized agency with previous experience in preparation of such reports. The<br />

• report will help in assessing the socio-economic condition of the district in a<br />

professional manner and in devicing the suitable strategies to overcome the<br />

backwardness. The database will be linked to GIS.<br />

• Intensive training to the Computer operators engaged in Panchayat Samitis and<br />

Gram Panchayats: With increasing computerization of the activities at the PRI level,<br />

there is a felt need to give professional training to the computer operators engaged in<br />

various PRIs. The IT sector is dynamic and new technologies are emerging. The<br />

technical skills of the PRIs can be enhanced considerably if the Computer operators are<br />

trained intensively on the latest skills in computers.<br />

• Training to Self Employed Mechanics(SEMs) for Rural water supply: Panchayats<br />

have been given the responsibility of maintaining the water supply schemes. But there<br />

is lack of trained manpower at the Gram Panchayat level. The SEM will help the<br />

Panchayats in managing the water supply systems.<br />

10


FUNDS ALLOCATION WITHIN THE DISTRICT<br />

Based on the above mentioned processes, analysis and justifications, funds have been<br />

allocated to different Sectors/ Areas as per the details given in Summary of the Plan proposal.<br />

The allocation of funds has been made to the Zilla Parishad, Panchayat Samiti and Gram<br />

Panchayat levels and Urban Local Bodies (ULBs), taking into account the visioning exercise<br />

and prioritization of development goals in the district. The allocation is based on the focus and<br />

priority areas as listed out in the District Plan. The Critical gaps have been identified with<br />

respect to funding from other sources and the immediate priorities of the district. Accordingly,<br />

the projects to be taken up under the BRGF 2007- 08 have been formulated.<br />

PRINCIPLES OF FUND ALLOCATION<br />

In case of interventions that can be implemented in the entire district within the<br />

proposed outlay of funds, equal distribution of funds has been proposed. However, in case of<br />

intervention that has to be taken up in a phased manner, backward/vulnerable GPs in TDA /<br />

schedule area have been taken in the first Phase and the rest GPs will be covered under BRGF<br />

during the 11 th \ 12 th Plan Period based on Backwardness Index.<br />

Gram Panchayat: There are 475 GPs in the district and if funds are divided amongst all the<br />

GPs, then the funds will be so thinly spread that it be difficult to bridge critical gaps. Hence it<br />

was decided to take up GPs in a phased manner throughout the BRGF plan period. GPs have<br />

been ranked based on backwardness under BI prepared at the district level. This BI has been<br />

prepared based on % of SC, ST, BPL population, % of un-irrigated area, and remoteness index.<br />

In the first year 100 GPs based on the BI ranking will be taken up for implementation of<br />

BRGF. There are 22 blocks in the district and to ensure spatial distribution 3 GPs/block is<br />

selected based on BI thus totally to 66 GPs. The rest 34 GPs are the GPs in scheduled area<br />

having predominantly tribal population that require focused attention. About Rs. 10.00<br />

lakhs/GP will be funded to 100 GPs amounting to a total of 10 crores that is about 60% of fund<br />

allocation for rural areas. Based on the points identified in pallisabha, gram sabha funds<br />

earmarked for GP will be utilized for taking up project to bridge the critical gaps like AWCs,<br />

ANM centres, rural play grounds, LI centres, cross drainage works, internal concrete roads etc.<br />

with in the GP, size of the habitation and SC, ST population will be used as criteria for<br />

selection hamlets / Villages<br />

11


Rural Areas: 75% of the total funds have been earmarked for rural area. Within the rural areas<br />

funds have been earmarked for intervention to be taken up at various levels.<br />

Urban Areas : 25% of the total funds have been earmarked for intervention in urban areas.<br />

This has been done taking into consideration that 18% of the total population live in urban<br />

areas and also the fact that urban areas are growth centers which also cater to the overall<br />

economic activity and growth of rural areas.<br />

Within the urban areas Rs. 10.00 lakh as a base amount has been kept for all ULBs and<br />

based on BPL population extra funds have been allotted for respective ULBs.About<br />

Rs.5,00,00,000 has been earmarked for Urban sector based on the population and also keeping<br />

in consideration their importance as a node of economic activity in the district.<br />

Block Level Intervention : Education esp. high school, college education identified as one<br />

of the priority areas in the district High school/college, cater to more than one GP so it is<br />

decided to take up development of High School through Blocks.<br />

Bridging critical gap in infrastructure in about 75 high schools / 16 collages covering<br />

all the blocks and urban local bodies will be taken up in convergence with MP/MLA Lad<br />

funds. An amount of Rs6.00 cores has been earmarked for the same and an amount of Rs 2.6<br />

cores will be utilized from MP/MLA Lads for convergence under BRGF fund. (Annexure-A)<br />

Welfare of other vulnerable section of the society in the “Rural & Urban area”: Nine<br />

Institutions for sheltering orphan, blind students, deaf and dumb students and destitute women<br />

are being functioning in the district. They don’t have adequate hostel facilities with provision<br />

of safe drinking water and sanitation facilities.<br />

They also don’t have adequate fund flow for meeting the minimum requirements. It is<br />

decided to provide Rs 1.00 core to bridge the critical gaps in providing better civic amenities<br />

and improving livelihood supports of the vulnerable section of the society.<br />

Training to PRIS : Rs 1.00 core is programmed to provide better training to PRIS and also to<br />

up-grade the skill of computer operators/ SEMS etc. This also includes the expenditure towards<br />

establishment of district resource center and GIS database.<br />

The estimates given in the proposals are approximate in nature and there may be<br />

variations based on site conditions, price rise etc. The works will be executed in a transparent<br />

process fulfilling all the instructions/ guidelines. The plan proposal has been made for an<br />

amount of Rs. 22.00 Cores under Development grant and Rs. 1.00 Core for capacity building<br />

for 07-08. In case of receipt of less funds the ongoing infrastructure projects will be carried<br />

forward to the next year.<br />

12


TABLE SHOWING DISTRIBUTION OF FUNDS BETWEEN DIFFERENT LOCAL BODIES FOR THE<br />

Local Bodies Description of activities<br />

100 GPs<br />

Block<br />

ULBS<br />

District level<br />

Infrastructure<br />

development for other<br />

vulnerable section of<br />

the society PS & ULB<br />

Training & capacity<br />

building PRIS<br />

YEAR 2007-08 UNDER BRGF<br />

Expected Allotement Rs 23 Croce<br />

Construction of 100AWC/ANM/LI Center/Play ground /improvement of cross<br />

drainage works/ construction of CC Road (25 % of total budget)<br />

Improvement High school & Collages covering all Blocks in convergence with<br />

MLA LAD & MP LAD funds.<br />

Improvement High school & Collages covering all ULBS in convergence with<br />

MLA LAD & MP LAD funds.<br />

Development of missing infrastructure in ULBS / CC roads<br />

Development for construction of hostels and up gradation of livelihood<br />

standards<br />

Amount<br />

allocated(Rs)<br />

Percentage<br />

10,00,00,000 43.48%<br />

Rural area 5,25,000,00<br />

Urban area 80,00,000<br />

5,00,000,00<br />

22.83%<br />

25%<br />

1,00,000,00 4.35%<br />

District Resource center / GIS data base Traning to PRIS/ C.Os/ SEMS etc. 1,00,000,00 4.35%<br />

TOTAL 23,00,000,00 100%<br />

13


Sl<br />

No<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

TABLE SHOWING DISTRIBUTION OF FUNDS UNDER BRGF TO ULBs OF<br />

GANJAM DISTRICT 07-08<br />

Name of NAC No fo BPL<br />

HH<br />

Base<br />

money in<br />

lakhs<br />

BPL<br />

proprationate<br />

maount in<br />

lakhs<br />

Total in<br />

lakhs<br />

ASKA 1889 10.00 11.00 21.00<br />

BELLAGUNTHA 1072 10.00 7.00 17.00<br />

BERHAMPUR (M) 21865 10.00 137.00 147.00<br />

BHANJANAGAR 1421 10.00 9.00 19.00<br />

BUGUDA 1561 10.00 10.00 20.00<br />

CHATRAPUR 1926 10.00 12.00 22.00<br />

CHIKITI 1067 10.00 7.00 17.00<br />

DIGAPAHANDI 1279 10.00 8.00 18.00<br />

GANJAM 1123 10.00 7.00 17.00<br />

GOPALPUR 860 10.00 5.00 15.00<br />

HINJILKATU 2384 10.00 15.00 25.00<br />

KABISURAYONAGAR 2403 10.00 15.00 25.00<br />

KHALIKOTE 1907 10.00 12.00 22.00<br />

KODALA 2366 10.00 15.00 25.00<br />

POLOSORA 2858 10.00 18.00 28.00<br />

PURUSOTTAMPUR 1932 10.00 12.00 22.00<br />

RAMBHA 1575 10.00 10.00 20.00<br />

SORADA<br />

TOTAL<br />

1555 10.00 10.00 20.00<br />

51043 180.00 320.00 500.00<br />

14


1. Special intervention in Reomote Tribal GPs<br />

SUMMARY OF PLAN PROPOSALS BRGF 2007-08<br />

Plan item Description Unit cost No. of units<br />

Provision for<br />

improving<br />

infrastructure and<br />

livelihood security in<br />

Tumba Micro project<br />

area & schedule areas<br />

of the District 34 GPs<br />

Special program meant for tribal<br />

development will be takent up in<br />

convergence with funds under SCA<br />

to TSP & Article 275(1) to promote<br />

livili hood security and to bidge<br />

critical gaps in infrastructure .<br />

2. GPs selected based on Backwardness Index.<br />

Rs. 10 Lakhs<br />

to each GP<br />

34 GPs.<br />

Plan item Description Unit cost No. of units<br />

Brdging critical<br />

gaps of<br />

backwardness of<br />

the GPs<br />

Provision of AWC, ANM centre,<br />

concret roads, LI centre, Play gounds<br />

at GP level, small bridges , culverts as<br />

per need of GP to be priortised in<br />

Pallisabha and Gramsabha<br />

Rs. 10 Lakhs<br />

to each GP<br />

66 GPs.<br />

Total<br />

cost<br />

Rs.<br />

3.40<br />

core<br />

Total<br />

cost<br />

Rs.<br />

6.60<br />

core<br />

Outcome/Benefit<br />

Addness critical gaps in<br />

infrastructure and<br />

promote living<br />

standards of the tribals<br />

Outcome/Benefit<br />

Help in bridging<br />

critical gaps for the<br />

benefit of women and<br />

children development<br />

of animal<br />

husbandry,better<br />

communication in side<br />

villages with proper<br />

drainage and sanitation<br />

and upgrading sports<br />

infrastrectur in rural<br />

area.<br />

15


3. Proposal for Urban-Rural Interventions<br />

Plan item Description<br />

I). Infrastructure<br />

for improvement in<br />

High Schools/<br />

Colleges.<br />

II). Infrastructure<br />

for other velnerabl e<br />

sections of the society,<br />

construction of<br />

hostels, providing<br />

vocational trainings<br />

etc.<br />

Bridging critical gaps in High<br />

school/Colleges Based on need<br />

in laboratory, libraryhall,<br />

books, Girls common room<br />

facilities to create facilities for<br />

improving knowledge horizon<br />

of the students.<br />

The centers will help the<br />

physically handicapped<br />

students, orphans and<br />

destitutes girls in promoting<br />

their living standard and<br />

livily hood prospects<br />

SUMMARY OF PLAN PROPOSALS BRGF 2007-08<br />

Unit<br />

cost<br />

Rs. 10<br />

Lakhs.<br />

Rs. 10<br />

Lakhs<br />

No. of units Total cost Local Body<br />

I) 75<br />

Highschools<br />

II) 16<br />

Collages<br />

Rs 7.50 cores<br />

Rs 5.25 cores BRGF<br />

Rs 2.25 cores from MP/MLA<br />

LADs<br />

Rs1.60 Cores<br />

Rs 0.80 cores from BRGF & Rs<br />

0.80 Cores form MP/MLA LADs<br />

10 Rs. 1.00 core<br />

SUMMARY OF PLAN FOR URBAN LOCAL BODIES BRGF 2007-08 (Annexure-9)<br />

Zilla<br />

parishad and<br />

ULB<br />

ZP=50%<br />

ULB =50%<br />

Outcome/Benef<br />

it<br />

Better<br />

satandard of<br />

education in<br />

highsochools/col<br />

leges<br />

To solve major<br />

social issues of<br />

the disabled<br />

Plan item Description Unit cost No. of units Total cost Local Body Outcome/Benefit<br />

Infrastructure development<br />

like community hall/<br />

development of swerage<br />

systems/ slum area<br />

development etc.<br />

The swerage systems as well as slum area<br />

development will help improving health &<br />

hygeinies condition. Community center will<br />

provide ample scope for conducting social<br />

functions which is a problem area now.<br />

- 18<br />

Rs.<br />

5.00Crose<br />

ULB<br />

To address Urabn<br />

slum problems &<br />

development system<br />

for better hygeinies<br />

condition.<br />

16


Plan Item<br />

Training for the<br />

PRI/ULB members<br />

Establishment of a<br />

District Resources<br />

center<br />

District<br />

development report<br />

and GIS database<br />

Intensive training<br />

to the Computer<br />

operators engaged<br />

in Panchayat<br />

Samitis and Gram<br />

Panchayats.<br />

Training to Self<br />

Employed<br />

Mechanics(SEMs)<br />

for Rural water<br />

supply.<br />

5. CAPACITY BUILDING OF THE PRIs<br />

Description Allocation Local Body<br />

The training to the PRI/ULB member and the offcials will provide them with the<br />

necessary skills to improve local governance<br />

The resource center will provide the technical support to the Zilla Parishad /<br />

ULBs and help in effective discharging of functions. The center can engage the<br />

technical experts from engineering, economics, agriculture, GIS, statistics, micro<br />

planning, etc. It can also act as a district level training institute.<br />

The report can be prepared by a specialized agency with previous experience in<br />

preparation of such reports. The report will help in assessing the socio-economic<br />

condition of the district in a professional manner and in devicing the suitable<br />

strategies to overcome the backwardness. The database will be linked to GIS.<br />

With increasing computerization of the activities at the PRI level, there is a felt<br />

need to give professional training to the computer operators engaged in various<br />

PRIs. The IT sector is dynamic and new technologies are emerging. The technical<br />

skills of the PRIs can be enhanced considerably if the Computer operators are<br />

trained intensively on the latest skills in computers.<br />

Panchayats have been given the responsibility of maintaining the water supply<br />

schemes. But there is lack of trained manpower at the Gram Panchayat level. The<br />

SEM will help the Panchayats in managing the water supply systems.<br />

Rs. 60 lakhs DPC / ZP<br />

Rs.15,76,475 DPC / ZP<br />

Rs.15 lakhs DPC<br />

Total Rs. 1 crore<br />

Rs. 5 Lakhs Panchayat Samiti<br />

Rs. 4,23,525 Panchayat Samiti<br />

17


CHAPTER – 1<br />

DISTRICT PROFILE<br />

1.1 INTRODUCTION<br />

1.2 LOCATION<br />

1.3 ADMINISTRATIVE SET UP<br />

1.4 CLIMATE<br />

1.5 AREA<br />

1.6 SOIL<br />

1.7 FOREST<br />

1.8 RIVER SYSTEM AND STREAMS<br />

1.9 MINERAL RESOURCES<br />

1.10 HUMAN RESOURCES<br />

Ganjam<br />

DISTRICT ADMINISTRATION<br />

18


1.1 INTRODUCTION<br />

The Ganjam District is named after the old township and European Fort of Ganjam<br />

situated on the Northern bank of river Rushikulya which was the Headquarter of the District.<br />

The rock Edicts of Ashok, inscribed on a hill then known as Kapingala Parbat are found at<br />

Jaugada, The Ganjam area was a part of ancient Kalinga, which was occupied by Ashoka in<br />

261 B.C. Though in 1757 it was French Commander Bussy, who marched into Ganjam and<br />

realised areas of tribute from feudal chiefs, it as English who ultimately defeated the French in<br />

the Decan and annexed Ganjam in 1759. The Office the Collector Ganjam was established in<br />

1794. Originally, the district was in Madras Presidency in the British period. It had only 3<br />

Government –Taluks, 16 large proprietory estates, 35 minor Zamindar. In Madras Presidency,<br />

the area of the district was 8311 Square miles of which 5205 square miles comprised of agency<br />

tracts. The Headquarter of the district at Ganjam was abandoned in 1855 owing to out-break of<br />

a dreadful epidemic fever by which 80% population of Ganjam town was reduced .The<br />

Headquarter temporarily shifted to Gopalpur then to Berhampur and finally in and around 1902<br />

to Chatrapur. The district got separated from Madrass Presidency and formed a part of the<br />

newly created State of Orissa province with effect from 1.4.1936<br />

1.2 LOCATION<br />

The District of Ganjam in its southern periphery borders to the State of Andhra Pradesh<br />

(Srikakulam District). The Bay of Bengal in the Southeast covers approximately 60 kms of<br />

coastal length. The Geographical area of Ganjam District is about 8206 Sq.kms. The<br />

District lies between 19 o 4’N to 20 o 17’N latitude and 84 o 7’E longitude to 85 o 12’E.<br />

Ganjam district is broadly divided into two divisions, the coastal plains area in the east and<br />

hill and table lands in the west. The eastern ghats run along the western side of the district.<br />

The plains are narrow because of the absence of big rivers. The coastal plains in the east<br />

contain more fertile and irrigated lands. Towards the centre and south it is hilly with<br />

beautiful well watered valley. The south eastern portion is fertile. The extreme north east is<br />

occupied by a portion of the famous Chilika lake.<br />

19


1.3 ADMINISTRATIVE SET UP<br />

The District is divided into 3 administrative Sub-Divisions :<br />

1. Chatrapur,<br />

2. Berhampur and<br />

3. Bhanjanagar<br />

Besides the district has 14 Tahasils, 22 Blocks and 18 Urban Local Bodies including one<br />

municipality at Berhampur.<br />

1.4 CLIMATE<br />

The district is characterized by an equitable temperature all through the year,<br />

particularly in the coastal regions. The winter starts from December and lingers till February. It<br />

is followed by summer from March to May. The month October and December constitutes the<br />

post monsoon transition period. The average annual rainfall of the district is 129.60 cms. The<br />

rainfall generally increases from the coast towards the interior hilly tracks of the district. The<br />

annual rainfall of the district starts from second week of june and ends early in October. On an<br />

average district has 95 rainy days but this of course varies from year to year.<br />

The relative humidity is high through out the year specifically in coastal areas. Winds are fairly<br />

strong particularly in coastal regions and monsoon months.<br />

22


1.5 AREA<br />

The District has a Geographically area of 8206 Square K.Ms. Which is 5.27% of the<br />

total Geographical area of the state. The percentage of plain land is comparatively higher than<br />

the high land and hills. The district has a net area sown of 375 thousand hect. Rice being the<br />

staple food of the district the farmers cultivate paddy in both Kharif and Rabi.The Forest cover<br />

stretches over an area of 315 thousand Hect.<br />

Land Use Area(In 000’Hect.)<br />

Forest area 315<br />

Net area shown 375<br />

Misc tree & Groves 22<br />

Permanent Pasture 20<br />

Cultivable Waste 11<br />

Land put to non Agrl.use 60<br />

Barren & uncultivable land 03<br />

Current & other fallow 28<br />

Land use pattern in Ganjam District<br />

3%<br />

2% 1% 7% 0% 3%<br />

46%<br />

(Source District at Glance 2007,DES)<br />

38%<br />

Forest area<br />

Net area shown<br />

Misc tree & Groves<br />

Permanent Pasture<br />

Cultivable Waste<br />

Land put to non<br />

Agrl.use<br />

Barren &<br />

uncultivable land<br />

Current & other<br />

fallow<br />

23


1.6 SOIL<br />

The soil of the district are mostly alluvial, black lateritic and red and saline. The texture<br />

is sandy loam or clay loam. Silted soils are available near river banks. The soil reaction is<br />

mostly acidic in all blocks except Patrapur block where the soil is neutral. Available N-P-K are<br />

mostly low, low to medium and low respectively. Soil salinity is found in blocks like<br />

Khalikote, Ganjam, Chatrapur, Rangeilunda and Chikiti.<br />

1.7 FOREST<br />

The District has sizable forest cover with 3149.9 Sq.Kms of forest areas which is 37%<br />

of the total geographical area of the District. It comprises of 3 Forest Divisions i.e. Ghumsur<br />

(North), Ghumsur (South) and Berhampur Division.<br />

The classification with area in Sq. kms. are.<br />

Classification of forest Area in Sq.Kms.<br />

1. Reserve Forest 1485.69<br />

2. Demarcated Protected forest 143.59<br />

3. Un-demarcated Forest 1167.36<br />

4. Un-classified Forest 0.86<br />

5. Other Forest 352.45<br />

Total: 3149.90<br />

Major portion of the forests are located in Sorada, Kodala, Khallikote,<br />

Imana,Karachuli, Buguda, Tarasingi, Gallery, Dholpita and Durga Prasad areas.The main<br />

forest products are timber, bamboo, myrabolin, tamarind, mahua, sal, resin, kenduleave, siali<br />

leaves, sal leaves & neem & karanja seeds.<br />

24


1.8 River System and Streams<br />

The Bay of Bengal touches the eastern frontier of Ganjam district and its coast<br />

extends over 60 Kms. It provides unique oppertunity for fishing and port facility at<br />

Gopalpur for international trade. The rivers like Rushikulya, Dhanei, Bahuda, Ghoda Hada<br />

are the prominent ones which govern the agriculture and power sectors of the district. The<br />

vast river basine of Rushikulya provides grand potential for exploitation of ground water.<br />

How ever the rivers only navigable during the rain season only. The Chilika lake which<br />

attracts international tourist known for its scenic beauty and a marvalous birds centuary is<br />

situated in the eastern part of district. Since the hills of the District are close to the Sea, the<br />

rivers flowing from the hills are not very large and so they are subject to sudden flood.<br />

There are certain small perennial streams in the tribal interior pockets as well as coastal<br />

region of the District. The Jayamangal Canal is the largest natural canal in the District.<br />

This stream has a potential additional irrigational facility.<br />

1.9 Minerals.<br />

Ganjam, District is famous for “Rare Earth”, Minerals sands and soap stones etc. The<br />

chief economic mineral found in the District are Abrasives and Grinding materials,<br />

Limestone(Kankar), Manganese, Monazite, Garnetiferrous Granities and Charano Kites are<br />

used for manufacture of Grinding stones in the District.<br />

1.10 Human Resources.<br />

As regards the demographic profile, the total population of the District is 31.37 lakhs<br />

according to 2001 census. Out of which 15.69 lakhs are male and 15.68 lakhs are females. The<br />

SC population is 17.91 % and ST population is 2.93 %. The population growth rate is 1.3%. As<br />

per 1991 census, the Total Fertility Rate (T.F.R) for Ganjam District was 3.7%, which is<br />

expected to be 2.8% by 2006. As regards population growth rate, Ganjam records 1.3%<br />

compared to all Orissa figure of 1.8% and all India figure of 1.9%. So far as life expectancy is<br />

concerned, in 1991 the life expectancy of male was 57.7 years and for female 58.1 years which<br />

is expected to be 63 year for male and 64 for female by 2006. The sex ratio of Orissa is<br />

927/1000 and of Ganjam is 1000/1000 which is a positive sign.<br />

25


CHAPTER – 2<br />

RESOURCES AND CRITICAL GAP<br />

IDENTIFICATION<br />

2.1 STRENGTHS<br />

2.2 WEAKNESSES<br />

2.3 OPPORTUNITIES<br />

2.4 THREATS<br />

2.5 CRITICAL GAPS<br />

Ganjam<br />

DISTRICT ADMINISTRATION<br />

26


Ganjam is one of the most resource rich and developed districts of Orissa. However it<br />

still lags behind to its road to an all round development which will address the problems of all<br />

areas and all sections of the society. Such growth imbalances and disparities in economic<br />

development may be attributed to several constraints / factors.<br />

An identification of such critical gaps and inadequacies in the existing infrastructure<br />

and an analysis of factors, which may be considered as the strength, weakness, opportunities<br />

and threat (SWOT) in the development perspective of this district are briefly indicated below:<br />

2.1 STRENGTHS:<br />

Water Resource<br />

There is 78.5% of estimated unutilized ground water resources in the district. Besides<br />

there are a number of perennial streams in the backward hilly areas of the district which could<br />

be harnessed through construction of check-dam, diversion-weir and water-harvesting<br />

structures. <strong>Similar</strong>ly, in the plain areas, the big tanks, perennial streams like Jayamangala Nala,<br />

could be renovated which would help create increased irrigation ayacut, prevent soil erosion<br />

and recharge the under-ground water tables. There is an enormous potential for boring<br />

shallow tube wells wherever possible; irrigation wells and attachment of motor pumps to such<br />

irrigation sources for providing micro-irrigation.<br />

One major , ten medium and over thousand minor irrigation projects and thousand of<br />

ponds and tanks available in the district offer tremendous scope for reservoir fishery and<br />

development of pisciculture.<br />

Fishery potential<br />

The district is rich in inland and brackish water fisheries. It has a cost line of 60 kms<br />

with 36 fishing villages and 14 fish landing centers. The available inland water resources are<br />

27,686 hectares, out of which 8321.33 hectares are ponds and 19364.91 hectares are reservoirs.<br />

The area developed till date is 6,992 hectares (pond) and 4416 hectares (reservoirs). The<br />

brackish water fisheries development agency had surveyed the area suitable for brackish<br />

water prawn culture in the 5 coastal blocks viz. Chatrapur, Ganjam, Khallikote,<br />

Rangeilunda and Chikiti and found that 2,845.26 hectares are available for development , of<br />

this 2394.<br />

27


Agricultural potential<br />

The total area under cultivation is 4.06 lakh hectors. i.e. 47% of total area. The district<br />

is important producer of the crops like paddy , groundnut, ragi, biri, arhar, sugarcane, cotton,<br />

vegetables in the state. Irrigation facility is available for 2.51 hectors in kharif and .45 lakh<br />

hectors in rabi through Medium irrigation, minor irrigation projects, water harvesting<br />

structures and diversion weirs. With increase in irrigation facilities , diversification and<br />

improved technology ,the district has tremendous scope to achieve higher level of production<br />

and productivity.<br />

As regards the quality of farmer, it is an acknowledged fact that the Ganjam farmers are<br />

very hard working and progressive. They are the most economic users of water resource. They<br />

can adapt to modern methods of agriculture easily with suitable extension coverage. The<br />

district is identified under state agriculture policy, under Zone – I in the new industrial policy<br />

of the State Govt. Small Farmers Agric – Business Consortium (SFAC), Social Livestock<br />

Development Programme (SLDP) of Govt. of India are also under implementation.<br />

Self Help Groups (SHGs)<br />

The district is fast developing in the macro credit front. Development of “Social<br />

Capital” in the form of 17431 nos. of women self help groups with nearby 32 crores of savings<br />

and 67 crore credit linkage so far. One District level federation of women SHG called<br />

D’MASSes and 23 Block/ ULB level federation of SHGs called B’MASSes formed and<br />

nurtured by District administration 40 Vikas Volunteer Vahini (VVV) clubs formed by banks<br />

through NABARD assistance speak volumes of micro credit expansion. SHG groups are<br />

dedicated to the cause of social mobilization and social inclusion. They have proven track<br />

record of thrift and credit. The level of trust, confidence, homogeneity and networking is<br />

amazing. Their collective action for income generating activity by using local technology, raw<br />

material and resources portray an enviable record of social capital formation.<br />

Physical and industrial infrastructure<br />

Ganjam has one of the best physical infrastructure in the state in the form of roads,<br />

schools , colleges , a University and many reputed technical and professional institutions<br />

necessary for the overall development of the people and improvement in the standard of living.<br />

Other supporting infrastructure like Banks, cooperative credit societies is also spread evenly<br />

throughout the district.<br />

28


Ganjam has four medium scale industries, 8580 SSI units and numerous food<br />

processing units. Apart from this IDCO has developed industrial estates at Berhampur,<br />

Chatrapur and Bhanjnagar. It has also developed a Autonagar Complex at Haldiapadar and a<br />

large no. of micro enterprises have also started in the area. Under micro and small enterprise<br />

sector food & allied sector, chemical & allied sector, forest & allied sector, engineering and<br />

metal sector and textile sector are being promoted for future development.<br />

2.2 WEAKNESSES:<br />

Poor Connectivity<br />

Ganjam is covered by 87 kms of National Highway and 770 kms of State Highway<br />

along with other roads. Number of bridges and culverts are being built over rivers and nalas.<br />

Despite these, growth centers and education centers are not being connected with interior and<br />

remote areas by all weather roads. Lack good road and communication facility hampers the<br />

mobility of the people and in a way affects the economy of the district badly. Lack of<br />

provisions of funds for upkeep and maintenance of road networks affects their durability. Poor<br />

connectivity to market affects agricultural and non agricultural produce of rural areas.<br />

Poor Agriculture productivity<br />

Agriculture sector predominantly occupies the important place in Ganjam District as a<br />

major source of income and employment opportunity. Out of the total geographical area of<br />

8.21 lakh hectors the total area under cultivation is 4.06 lakh hectors. i.e. 47% of total area.<br />

However, the agriculture is at the vagaries of Monsoon and dry-land farming technology is<br />

absent among farmers.Inputs like quality seeds, fertilizer and bio-fertiliser; pesticides, etc are<br />

not available in sufficient quantity and in time of need. Soil testing facility to determine the<br />

Micro nutrient contents of soil is available only at Bserhampur. At least three such facilities are<br />

required at Aska, Bhanjanagar and Kabisuryanagar for such tests. Other impediment is limited<br />

use of farm mechanization equipment and absence of structured programmes on dissemination<br />

of technical knowledge to farmers on seed treatment, epidemic control, weed control, rodent<br />

control; biological control etc. to be made on outreach mode in regular intervals in back-ward<br />

areas of the district. Agriculture and agribusiness centers are nearly absent in the district.<br />

District also lags behind in technology transfer and post harvest technology.<br />

29


Under utilized Dairy Potential<br />

The district has the distinction of having one of the largest bovine populations in the<br />

state. However the rearing is done in traditional way by way of which the domestic animals are<br />

used only as a drought proofing support by poor people. The non-availability of quality milch<br />

animals and scientific rearing are the main focus areas in this regards. At present six milk routs<br />

are operating in the district. Chilling plants at Berhampur, Aska & seven bulk cooling units<br />

established by OMFED (Orissa Milk Federation) & 188 Artificial Insemination centers augurs<br />

well for the development of Animal Husbandry as main activity of the rural masses of the<br />

district.<br />

Under developed Human Resource<br />

As regards to literacy rate, it is as low as 60.77% and the female literacy is just 46.44%.<br />

This is in contrast to the excellent educational infrastructure available in the district. Except the<br />

sex ratio district figures pertaining to important vital statistics such as TFR, life expectancy,<br />

MMR are not encouraging. In the age of knowledge and information until the people have<br />

some economic asset or some specialized or technical knowledge they can not participate in<br />

the economy and get benefited. So education is prerequisite for any intervention in the<br />

direction of livelihood security and economic wellbeing of the people the district.<br />

Inadequate health and sanitation awareness<br />

Ganjam district has a District Hospital with specialized services, two area hospitals,<br />

two sub- divisional hospitals, five CHC-I, five CHCs and 103 Primary Health Centers. Apart<br />

from these MKCG College Hospital provides referral facility for the patients. In spite of this<br />

the overall health situation of the district is not very different from the state scenario. AIDS<br />

and malaria are the main health related problems of the districts. The seasonal occurrences of<br />

cholera, dysentery and diarrhea are regular feature of the district. The situation is aggravated<br />

by prevalent traditions and superstitions mainly in the rural areas where the people rely on<br />

quacks. The poor sanitation leads to many health hazards.<br />

30


2.3 OPPORTUNITIES:<br />

Untapped water resources<br />

The balance of groundwater potential available in the district is 76,159. the present<br />

stage of development is 21.1%. In order to exploit 65% of the groundwater potential, it will<br />

sustain 17,697 dugwells, 1893 sanitary wells 45 deep wells, & 325 RLPs. This potential<br />

provides huge opportunity to increase the area under irrigation and solve the drinking water<br />

problem of all parts of the district.<br />

Availability of technical institutions<br />

The district has the distinction of having reputed technical and vocational institutions<br />

such as polytechnic colleges, pharmacy, engineering colleges, ITIs and computer training<br />

institutions. They provide the good background for capacity building and human resource<br />

development.<br />

Vibrant SHG movement<br />

The district has a privilege of having a very vibrant SHG movemet and a well<br />

structured and time tested federation of SHGs in the form of D’MASS and B’MASS. As on<br />

date there are 17431 SHG groups with nearly 32 crores of saving and 67 crores of credit<br />

linkage. They can become medium of social mobilization and social engineering badly<br />

required for making the government programe a success.<br />

Tourism potential<br />

Ganjam district has always have a special place in the hearts of tourists all over India<br />

due to exotic beaches at Gopalpur, Patisonpur. However hot water geezers at the beautiful<br />

Taptapani, Taratarini, Bhairavi temples, Chilika and Tampara Lake have tremendous potential<br />

to come up as leading tourist destinations in the country.<br />

Socio- cultural equity<br />

Ganjam people are known everywhere as hard working and enterprising. They are<br />

amenable to any forward looking ideas. This makes them valuable asset for any intervention.<br />

Due to intermingling of Andhra and Orissa culture in Ganjam the society is very vibrant.<br />

31


2.4 THREATS:<br />

Natural Calamities<br />

Flood & Super cyclone etc.<br />

Ganjam District is regularly affected by various natural calamities like Drought,<br />

Though Ganjam District is rich in natural resources like water, forest and mineral<br />

wealth, but frequent natural calamities hinder in the way of development. The unprecedented<br />

flood of the 1990, Super cyclone of 1999, drought of 2001. This also affects the economic<br />

backbone of the district continuously.<br />

Natural calamities not only cause untold miseries to physical, natural and human assets<br />

at the time of occurrence but push the economic development into the cocoon of backwardness<br />

for years to come.<br />

Naturally therefore, despite pooling together of all resources under normal heads, the sign of<br />

backwardness in the form of high IMR, illiteracy, poor health, poverty, inaccessibility,<br />

deprivation, continue in this district.<br />

Economic disparity<br />

There are 3,01,581 out of 5.5 lakhs families who are below poverty line in the district.<br />

The families living in interior pockets have vulnerability to ill health, economic distortion and<br />

natural calamities.<br />

Poverty is the result of economic, social and political phenomenon that interact with each other<br />

in way that exacerbate the deprivation in which poor people live. Meager assets, inaccessible<br />

markets and scarce job opportunities lock people in abject poverty loop.<br />

Inaccessibility<br />

There are certain tribal pockets in Blocks like Surada, Dharakote, Bhanjanagar,<br />

Khallikote, Polosara, Patrapur, Beguniapada, Jaganathprasad, Buguda, Sanakhemundi,<br />

Digapahandi and Seragada which are inaccessible. The rivulets, brimming to their full obstruct<br />

the accessibility in the hilly regions. Efforts have been made to connect the pockets under RCP<br />

and PMGSY. Inaccessibility cause multiple disadvantages like ill health, stagnation, lack of<br />

marketability to products etc<br />

32


Un- employment<br />

Out of 31.61 lakhs of population as per 2001 census, 5.04 lakhs are Agricultural<br />

labourers, 4.84 lakhs are marginal labourers. Migration in search of work is very high, un-<br />

employment rate among the educated youth is also very high. . The problem of un-employment<br />

among educated persons in the District is also precarious. As per the employment register the<br />

position of educated job seekers stands at 46.415.<br />

Illiteracy<br />

As per 1991 census the literacy rate was 48.72 % and as per 2001 census this has<br />

increased to 60.77%. Yet female literacy is low compared to all India figure. An indigenous<br />

programme called “Saraga Shashi” under which efforts have been made to provide boundary<br />

walls, tube wells for safe drinking water supply for children, toilet and kitchen, garden in all<br />

Govt. Primary and U.P schools of the district. This would supplement the joyful learning<br />

process and help to check the dropouts. Existing sources are not sufficient to cover all Primary<br />

Schools. Additional fund under BRGF is required to fill the gap.<br />

Rising extremism<br />

Now the Naxal activities have crept into the district from mainly Andhra Pradesh and<br />

Gajapati district border. There is need to develop accessibility of the police personnel to the<br />

naxal-prone area to combat the situation and to save the life and resources of general public.<br />

The lack of infrastructure, especially in the interior areas, lack of basic facilities like health,<br />

education, inaccessibility and want of gainful employment have forced people to look towards<br />

extremist and extremism as an option. A plan of development of those areas will go a long way<br />

in checking Naxal terrorism and bring the areas into main stream activities.<br />

33


2.5 Critical Gaps:<br />

Based on the Plan prepared with the involvement of the Palli Sabha, Gram Sabha and<br />

compilation at the District level for NFFW, NREGA and RSVY, the District Planning<br />

Committee is focusing on the areas of women and child welfare, education particularly High<br />

School and college education, and tribal welfare including infrastructure and livelihood<br />

security in tribal. The requirements under these focus areas are being addressed by the funding<br />

from various govt. schemes. However, there are some critical gaps where the funding is either<br />

inadequate or not available. These critical gaps are being proposed to be filled by the<br />

development grant provided under BRGF. Some of the priority sectors with critical gaps are<br />

being given below. In the current year, some of the activities are proposed to be taken up as<br />

explained elsewhere. Over the entire Eleventh Plan period, it is proposed that most of the<br />

critical gaps shall be addressed in a phased manner.<br />

Women and child welfare<br />

Education particularly High School and College education<br />

Tribal welfare including improved physical infrastructure and livelihood<br />

security in remote tribal pockets<br />

Improving the status of living and promoting livelihood supports to the<br />

other vulureable sectors of the society.<br />

Capacity building of women/ productivity of women SHGs.<br />

Capacity building of PRIS / other state holders.<br />

Establishment of District resources centre and GIS database.<br />

Increasing livelihood supports by promoting live stock Development<br />

activities.<br />

34


CHAPTER – 3<br />

SECTORS AND PRIORITIES<br />

LIVELIHOOD SECTOR<br />

3.1 FISHERIES<br />

3.2 AGRICULTURE<br />

3.3 ANIMAL HUSBANDRY<br />

3.4 HORTICULTURE<br />

3.5 INDUSTRIES<br />

3.6 SOIL CONSERVATION<br />

3.7 TOURISM<br />

SOCIAL SECTOR<br />

3.8 EDUCATION<br />

3.9 WOMEN EMPOWERMENT AND CHILD WELFARE<br />

3.10 HEALTH<br />

INFRASTRUCTURE<br />

3.11 RURAL CONNECTIVITY<br />

3.12 ELECTRICITY<br />

3.13 DRINKING WATER<br />

3.14 MINOR IRRIGATION<br />

3.15 URBAN INFRASTRUCTURE<br />

Ganjam<br />

DISTRICT ADMINISTRATION<br />

35


Under NFFWP/NREGA a five year perspective plan has been prepared involving all<br />

the stakeholders. This perspective plan has been prepared through a process of decentralized<br />

participatory planning and has been approved by Palli Sabha/ Gram Sabha, G.P./Panchayat<br />

Samiti / Zilla Parishad. This perspective plan has been used as base plan for rural sector.<br />

Further areas, sectors identified and focused under RSVY have also been taken into<br />

consideration. Objectives of BRGF and planning exercise has been discussed with the<br />

Honorable MPs, MLAs, ZP members, ULB representatives and line department officials of the<br />

district. In case of urban sector need based plan proposals to fill the critical gaps have been<br />

submitted by the respective ULBs for consideration in the BRGF.<br />

This chapter describes the priority and focus areas for the District. The critical gaps<br />

where the funding is either inadequate or not available from any other source have also been<br />

identified. The present development grant under BRGF is proposed to be utilized for<br />

addressing these critical gaps. The socio-economic analysis of the Ganjam district reveals that<br />

women and child welfare, education; particularly High School and College education and tribal<br />

welfare including physical infrastructure and livelihood security are the critical issues to be<br />

addressed. Other areas like physical infrastructure, drinking water, unemployment,<br />

connectivity in remote pockets and tourism development are also being seen as important for<br />

the overall development of the district. In the first year of funding of BRGF, a holistic<br />

approach is being adopted to address missing links pertaining to social and educational areas.<br />

The other priority areas will be taken up in subsequent years of funding during the Eleventh<br />

Plan period.<br />

LIVELIHOOD SECTOR<br />

3.1 FISHERIES<br />

Ganjam is potentially rich in inland and Brackish Water Fisheries. It has coast line of<br />

60 Kms with 26 fishing villages and 14 fish landing centres. There is about 20,000 fishermen<br />

population dependent on inland, Brackish Water and marine fisheries. The available inland<br />

water resources are 27,686 hectares, out of which 8321.33 hectares are ponds and 19364.91<br />

hectares are reservoirs. The area developed till date is 6,992 hectares (pond) and 4416 hectares<br />

(reservoirs).<br />

36


The brackish water fisheries development agency had surveyed the area suitable for<br />

brackish water prawn culture in the 5 coastal blocks viz. Chatrapur, Ganjam, Khallikote,<br />

Rangeilunda and Chikiti and found that 2,845.26 hectares are available for development , of<br />

this 2394.35 hectares belong to Govt. and 450.90 hectares belong to private owners. In spite<br />

of existence of such a vast water resources and facilities, struggle for existence among the<br />

rural poor is still persisting due to lack of managerial skill and poor technical know how the<br />

rural mass are still in dark to utilize this resources to its optimum level.<br />

Among the fresh water resources the reservoirs/MIPs provide important sources of livelihood<br />

to the rural mass, particularly to the landless rural poor. But their sources of living is threatened<br />

due to lack of adequate planning , financial support and insufficient natural fish seed<br />

requirement and infrastructure for which these resources are under utilized resulting a wide<br />

gape between the growing demand of fish and present level of production.<br />

OBJECTIVES:<br />

In spite of all the efforts for strengthening the socio-economic condition of poor<br />

fishermen due to above problems, the socio-economic conditions of the fishermen remains<br />

unaltered due to low production. The present level of production in reservoirs is about 40<br />

kg/ha. On proper management the production may go up to 200 kg/ha. So to achieve the above<br />

goal the following development support is anticipated<br />

(i) Provision of captive nursery near reservoir/MIP to raise fingerlings.<br />

(ii) Provision of rearing tank at block level for raising fingerlings.<br />

(iii) Establishment of hatchery unit and fry packing yard to produce fish seed.<br />

PROGRAME ACTIVITIES<br />

Activities to be taken under fisheries in near future as listed below<br />

• To implement reservoir policy for development of fishries in reservoirs/MIPs to boost<br />

fish production.<br />

• To induct skill training to the BPL fish farmers in scientific pisciculture and fish seed<br />

rearing.<br />

• To provide input assistance in the form of fish seed, fertilizers, feed and medicines etc.<br />

towards operational expenditure.<br />

37


• To organize pisciculture Women Self Help Groups (SHGs) and arrange lease of G.P.<br />

tanks / MIPs on long-term basis for adoption of scientific pisciculture.<br />

• To provide captive nurseries for backyard Fish seed rearing as a source of profitable<br />

income.<br />

• Clearing ipomea (Amari ) weed from Surada reservoir under NREGS.<br />

• To provide input assistance for fish seed rearing at minimum cost.<br />

• To promote fresh water prawn culture.<br />

• To create additional water area through institutional finance / own source investment to<br />

increase fish production.<br />

• Overall increase of fish production and per capita consumption of fish to reach the level<br />

of WHO standard of 11.0 Kg per annum for combating malnutrition.<br />

• Sustainable increase of income of the members of the SHGs to cross the poverty line.<br />

3.2 AGRICULTURE<br />

Agriculture sector predominantly occupies the important place in Ganjam District as a<br />

major source of income and employment opportunity. Out of the total geographical area of<br />

8.21 lakh hectors the total area under cultivation is 4.06 lakh hectors. i.e. 47% of total area.<br />

The area under paddy cultivation is 2.36 which includes 11% under upland paddy, 46%<br />

medium land and 43% low land. Crops like groundnut, ragi, biri, arhar, sugarcane, cotton,<br />

vegetables etc are grown in rest of the areas. Irrigation facility is available for 2.51 hectors in<br />

kharif and .45 lakh hectors in rabi through Medium irrigation, minor irrigation projects, water<br />

harvesting structures and diversion weirs.<br />

The cropping pattern followed in the district depends on topography, type of land, soil<br />

and socio-economic condition of farming community. Few common cropping patterns are as<br />

follows.<br />

1. Paddy - Paddy 2. Paddy- ground nut – pulses<br />

3. Paddy – vegetable - vegetable 4. Vegetable – vegetable – vegetable<br />

5. Paddy – sunflower – pulses 6. Sugercane – Cane – cane (3 years)<br />

7. Cotton 7. Maize – pulses<br />

38


The cropping intensity of the district is 135%. The productivity, area under cultivation and<br />

production of major crops is as follows:<br />

Major crops Area (hec.) Production (MT)-<br />

for Kharif-06<br />

Productivity(Kg/he)-<br />

for Kharif-06<br />

Paddy 225865 641605 2840<br />

Maize 8871 11625 1310<br />

Ragi 46130 42670 925<br />

Pulses 40985 21626 528<br />

Oil seeds 30314 17089 564<br />

Vegetables 47310 386285 8165<br />

Fibers 4992 4094 820<br />

At present Work Plan scheme such as Rice development scheme, Ragi development<br />

scheme, sugarcane development scheme and farm mechanization scheme are in operation in<br />

the district. Other schemes like Integrated scheme for Oil seeds, Pulses, Oil palm & Maize.<br />

(ISOPOM), Integrated Cotton Development Programe (ICDP) and Agricultural<br />

Technology Management Agency (ATMA) are also in operation.<br />

However following critical areas remains to be addressed.<br />

Critical areas<br />

• Expansion of irrigation facilities to remote areas and economic use of available water<br />

resources.<br />

• Interventions need to be more focused and complete.<br />

• Lack of sufficient storage facilities and post harvest management of farm produce.<br />

• Diversification and lack of market oriented approach.<br />

• Inadequate institutional and non institutional support to farmers and farmers’<br />

organizations<br />

Since 82% of the population of the district is dependent on agriculture there has always<br />

been emphasis on agriculture in the district. In RSVY also total 13.5 crores rupees were<br />

allocated for improving the irrigation scenario through tank irrigation, minor irrigation<br />

structures and soil and water conservation structures. Earlier in SGRY as well as presently in<br />

NREGA , irrigation infrastructure like tank, diversion weirs , farm ponds and bunds are being<br />

given due importance.<br />

39


With this all the balance of ground water potential in the district is 76,159 (Ha.M). The<br />

present stage of development is 21.1%. in order to exploit 65% of the groundwater potential, it<br />

will sustain 17,697 dugwells, 1893 STWs/Bore 45 Deep Tube wells & 325 RLPs.<br />

To increase the cropping intensity & productivity , more areas are to be brought under<br />

irrigation through creation of irrigation of potentiality under different ongoing schemes in the<br />

dist like NREGA , KSK , LI points , Soil Conservation measures , drought proofing etc. . The<br />

Agriculture department in the state is also proposing farmers oriented programs through<br />

ATMA, provisions of irrigations under KSK , farm mechanization , organic farming , rice<br />

development & many other beneficial agriculture productivity oriented programmes .<br />

A time bound Plan will be prepared to boost agricultural productivity which will be<br />

implemented through the Eleventh Plan Period and critical gaps in this sector will be funded<br />

through BRGF fund next year.<br />

3.3 ANIMAL HUSBANDRY<br />

With total bovine population of 9,72 ,966 animal husbandry is a household activity and<br />

it drives the wheel of rural economy of the Ganjam district in real sense. There are 132 milk<br />

societies functioning at present under the aegis of Great Ganjam Gajpati Milk Union. There are<br />

245 Livestock Aid Centers(LACs) giving services throughout the district. Over 188 LACs are<br />

having Artificial Insemination facility. At present 6 milk routs are operating in the district.<br />

Two chilling plants at Berhampur and Aska, seven bulk- cooling units spread throughout the<br />

district and hatcheries and feed plants being established in the district; it provides good<br />

background for the expansion of animal husbandry activities throughout the length and breadth<br />

of the district.<br />

There is tremendous scope for the development of goat rearing/ sheep rearing in tribal<br />

and remote areas of the district. In RSVY also one crore was being spent on addressing critical<br />

gaps pertaining to animal husbandry. Under SGSY animal husbandry is being identified as<br />

core activity.<br />

Identifying new milk routs in the remote areas, involving SHG groups , tribal will be<br />

the thrust area and main focus of future interventions in this regards. Critical infrastructural<br />

and institutional gaps will be addressed in the Eleventh plan period and BRGF in the coming<br />

few years.<br />

40


3.4 HORTICULTURE<br />

Agro-climatic condition of the Ganjam district permits cultivation of a large variety of<br />

Horticultural crop. It includes fruit crops like Mango, Cashew, Banana, Sapota, Kagzilime,<br />

Vegetable & Flower crops such as Tuberose, Marigold, Gladioli, Rose, Jasmine, Crossandra<br />

etc. There is ample scope for commercial cultivation of the crops in the district. Presently<br />

vegetable crops are grown both extensively and intensively in the district. On this background<br />

Government has included Ganjam for National Horticulture Mission from 2006-07.<br />

Horticulture is being recognized as an important area for diversification in today’s<br />

Agri-business systems. It decreases malnutrition, increases rural income and provides healthy<br />

atmosphere for sound living. It also generates employment to unemployed youths, rural labors<br />

through value addition by effective pre & post harvest management of the crop in a planned<br />

way. Further horticulture crops are not only responsible for nutritional and environmental<br />

security but are key players at export front fetching handsome amount of foreign exchange.<br />

Objectives<br />

The general objective is providing sustainable livelihood to poor rural families through<br />

proper utilization of land and water resources. Specific objectives are as follows.<br />

Strategy<br />

• To create opportunities for employment generation for skilled and unskilled<br />

persons especially unemployed youth.<br />

• Enhance income of normal families.<br />

• Proper utilization of land and water resources.<br />

• Capacity Building of rural poor through training and exposure.<br />

• To promote, develop and disseminate technologies and modern scientific<br />

knowledge.<br />

• Basing on the Agro climatic and soil condition different Horticulture crops has been<br />

suggested for different areas.<br />

• Fruit plants will be planted both in irrigated and non-irrigated condition.<br />

• Horticulture Nurseries in private sector will be encouraged including strengthening of<br />

govt. nurseries and farms.<br />

• Protected cultivation like green house, shade net and mulching.<br />

• Dissemination of latest technology through demonstration, training, workshop and<br />

exhibition.<br />

41


• Emphasis will be given on integrated pest management and Organic farming.<br />

• For post harvest management, preservation activities of fruits and vegetables will be<br />

taken care of.<br />

• Promotion of private entrepreneur for sale of Horticultural inputs, garden tools and<br />

implements etc.<br />

• Use of vermi compost and bio-fertilizer with aim for organic farming will be<br />

encouraged.<br />

Programme Activities:<br />

The various activities chosen under Horticulture are<br />

1. Production and productivity improvement<br />

2. Vegetable seed production..<br />

3. Area expansion of fruit crops like Mango, Banana.<br />

4. Development of private nursery and construction of Market yard.<br />

5. Demonstration of root and tuber crops.<br />

6. Organization of training.<br />

7. Rubber Plantation in tribal area (Rubber Board).<br />

8. Plasticulture like drip, sprinkler and micro irrigation in Horticulture crops.<br />

The funding for the above activities is being sourced through the National Horticulture<br />

Mission.<br />

3.5 SOIL CONSERVATION<br />

It is being said that every inch of soil is either present resource or future resource. Huge<br />

quantities of most valuable soils are being eroded making the land unproductive and sterile day<br />

by day due to biotic pressure, ignorance and unscientific farming. To overcome these lapses,<br />

holistic approach on soil and water conservation is highly essential for sustainable production.<br />

The district has 11,000 hectors of culturable waste land, 5,000 hectors of current fellow<br />

and 8000 hectors of other fellow. The watershed development programe under NWDPRA was<br />

being implemented in 14 micro watershed areas covering treatable area of 8.072 hectors. So far<br />

406 number of Water Harvesting structures/ Diversion Weirs have been constructed of which<br />

252 are functioning and 154 are defunct. The department has also had also undertaken the<br />

shelterbelt plantation along the sea baech of Bay Of Bengal over 18.5 km starting from<br />

Golabandh to Rameyapatana within the range of 1km width from the tide formation zone. The<br />

aim of the plantation was to stabilize the nacked coastal sand dunes by reducing drifting of<br />

sand grains and also to minimize the evil effects of cyclone.<br />

42


It is proposed to construct W.H.S, farm ponds, percolation tanks and improvement of<br />

W.H.S, Diversion weir and Cross bunds in the non-irrigated rain-fed patches under BRGF<br />

scheme which will solve the following problems.<br />

• Provide life saving irrigation to the nearby crop field<br />

• Check the soil erosive velocity of water and erosion of soil<br />

• Recharge the ground water and thus improve the ground water level<br />

• Generate employment opportunity<br />

These projects would be implemented in identified watershed area. The user groups<br />

would be formed and their involvement in operation of the scheme would be ensured so that<br />

the projects after their completion would be handed over to them for their future proper<br />

maintenance.<br />

The Soil conservation department is actively involved in taking up soil and water<br />

conservation projects in watershed approach. The funds are being sourced from the Orissa<br />

Watershed Mission. Under NREGA, priority has been given to create water harvesting<br />

structures and farm ponds on a large scale.<br />

3.6 INDUSTRIES<br />

The District Industries Centre, Ganjam has come into existence in the year 1978. Prior<br />

to that, there were only 2 (two) medium ,& large-scale industries and 620 number of SSI<br />

units. After establishment of D.I.C various support and services are being provided to<br />

prospective entrepreneurs for establishment of small scale/village and cottage industries in<br />

the district. Further, the industrial policy resolutions such as of 1980, 1986, 1992 and 1996<br />

declared by the state government has provided various incentives to SSI for their sustained<br />

growth. Till date there are 8580 number of SSI units have been established in the district<br />

providing employment to 36227 persons in the district.<br />

In Ganjam district there are 3 (three) no. of industrial estates located at Berhampur,<br />

Bhanjnagar and Chatrapur. Developed plots and sheds along with other infrastructural<br />

facilities like Road, Drainage, water supply, electricity are being provided by IDCO in those<br />

areas. The project of Autonagar Complex was also conceived during the year 1987 with the<br />

over all objective of shifting of existing Automobile units from Aska Road, reducing<br />

congestion inside Berhampur City and creating huge employment potential in<br />

Automobile sector by establishing Repairing/ Servicing centres, Engineering work shops,<br />

Spare parts shops etc/.<br />

43


Background:<br />

� Nurturing small scale, labor intensive industries on cluster basis spreading<br />

throughout the length and breadth of the district<br />

Till date 8580 number of Micro and small enterprises have been in operation. Most of<br />

these units have come up in agro based, food processing, engeering & allied, mineral based,<br />

essential oil etc. Generally these units are localized traditionally in some areas of the district.<br />

The following activities have the concentration at the places mentioned there against.<br />

Nature of activity Places of construction<br />

Flexible brass fish Bellaguntha<br />

Brass and bellmetal utensils Patrapur, KS.Nagar & Jagmohan<br />

Silk saris Berhampur, Bomikoi<br />

Leather Berhampur, Bhanjnagar<br />

Kewada essence Tulu, Chatrapur & Gopalpur<br />

All these enterprises are highly labor intensive. They provide fillip to the local<br />

economy of the areas wherever they are located.<br />

Programe Activities<br />

• Lavender granite , one of the most very attractive color granite is available in<br />

Berhampur. A granite cluster is being developed in kukudakhandi block of the district.<br />

More than 12 granite slab cutting & polishing units have already come up in the area.<br />

• District produces 85 to 90% of Kewada essence in the country. The estimated turnover<br />

of the Kewada essence is Rs. 50 crores per annum. It is being proposed to develop this<br />

industry on cluster basis. Government has already notified in this regards.<br />

• More than 60 units have been promoted in the cashew processing activity and govt. has<br />

also notified to develop a cashew cluster in the district.<br />

• Steps have already been taken to promote Ayurvedic and Agarbatic industry on cluster<br />

basis.<br />

Critical gaps:<br />

• Technology up gradation is highly essential in almost all traditional industries<br />

such as Kewda processing, food processing, silk, casting based enterprises.<br />

• Market linkage and exportability is not yet been explored to benefit the industry<br />

and develop its own niche in the area.<br />

• Infrastructure in terms of linkages both forward and backward needed to be<br />

improved to achieve economy of scale.<br />

• Since all the industries are traditional industries, skill up gradation is very<br />

essential to standardize the product and improve the skills.<br />

44


� Developing handcraft and cottage industries with more emphasis on backward<br />

areas.<br />

The Ganjam District owes International repute for its cottage Industries and<br />

handicrafts. The Bomkai and Berhampuri Pata Sarees and Brass Fish of Bellaguntha are<br />

famous for their attractiveness and designs. Different categories of handicraft artisans engaged<br />

in the traditional carft are residing in Ganjam district.The main crafts are applique, stone<br />

carving, wood carving, brass and bell metal, paper machie, terracotta, patta chitras, betel nut,<br />

Textile toys etc. The flexible brass fish of Bellaguntha area is an unique craft of the district.<br />

The artisans of the above crafts are being assisted individually and through co-operative<br />

societies. There are 20 handicrafts societies in the district out of which 16 societies are<br />

working.<br />

There are over 350 rice mills in the district but only 9-10 mills are modernized. There<br />

is ample scope for the modernization of the mills aiming at export to other countries. There is<br />

also scope for the processing of oil seeds and pulses. There is scope and need for promoting the<br />

handicraft and cottage industries in backward areas to address the backwardness and give<br />

impetus to the economy of the area.<br />

Training facilities are available on the following handicraft categories.<br />

i) Betel Nut at Berhampur.<br />

ii) Cotton Toys at Berhampur.<br />

iii) Flexible Brass Fish at Bellaguntha.<br />

iv) Terra Cotta.<br />

v) Kewara Leaf Product.<br />

Activities<br />

• Rehabilitation of handicraft artisans scheme is being implemented with credit linkage<br />

from banks and govt. assistance<br />

• A model salt farm is being developed at Huma with financial support from State govt.<br />

and Central govt.<br />

• Efforts are being made to develop these industries with cluster approach.<br />

45


3.7 TOURISM<br />

On the eastern coast of India, perpetually washed by the blue waters of the Bay of<br />

Bengal, lies the many splendoured District of Ganjam. Endowed with a rich cultural heritage of<br />

old world charms and bestowed liberally with the bounties of nature, sometimes tender,<br />

sometimes awe-inspiring, it is a kaleidoscope of past splendeours and present glamour, a<br />

fascinating District with un spoilt beaches, sprawling lakes, luxuriant forests, teeming wildlife,<br />

superb monuments, colorful fairs and festivals, scintillating music and dances. More refreshing<br />

in the winter are the hot sulphur springs at Taptapani. Chilika, the biggest inland lake of India<br />

stretching across the length of the three districts including Ganjam and finally joins the Bay of<br />

Bengal through narrow mouth, forming an enormous lagoon of brackish water. Encircled by<br />

hills all along its arched shape shores, Chilika lake’s colour changes with passing clouds and<br />

the shifting sun. The water ripples languidly, occasionally dancing with a gentle breeze from<br />

across the Bay of Bengal. Sea beach at Gopalpur is famous for its blue waters and attractive<br />

back water bed in the form of cracks and sleepy lagoon covered with canopies of lush green<br />

foliage. The Gopalpur festival, a cultural extravaganza organized in December every year by<br />

the district administration is important tourist attraction. On the Orissa- Andhra Pardesh border<br />

there is a Beach along the river Bahuda which divides the sea from the main land at Sonepur.<br />

Pati Sonepur is the name of the Beach at the other side which is famous for its virginity,<br />

colourful water and loneliness.<br />

Taratarini is a famous religious place in Southern Orissa where the twin sister<br />

Goddess i.e. Tara & Tarini adorn the sanctum situated on the top of a hillock girdled by the<br />

waddling holy river Rushikulya. Taratarani attracts thousands of devotes, picnickers and<br />

visitors throughout the year. Other tourist places worth mentioning are Khambeswari, Maa<br />

Bhairavi, Surada Reservoir, Tampara Lake apart from numerious fairs and festivals.<br />

However the tourism sector in the District is not yet fully developed. It has potentiality<br />

to stimulate growth of employment generation in the related fields like Hotels, transport, food,<br />

entertainment, guiding etc. Following projects are in pipeline which has the potential to change<br />

the tourist map of the district and put it among the favored destinations in the state.<br />

� Eco friendly cottages (10 nos), jetty on river Bahuda and facility for water sports is<br />

coming up at Pati-Sonpaur.<br />

� Beach front beautification at Gopalpur which includes illumination of beach,<br />

improvement of approach road, Provision of parking facilities will be taken up.<br />

� Food plaza, parking area, lighting, landscaping will come up at Taptapani.<br />

� Development of Tampara lake is being taken up. There is proposal for eco-friendly<br />

cottages and integrated tourist complex with golf course.<br />

46


SOCIAL SECTOR<br />

3.8 EDUCATION<br />

Construction of 100-seater Tribal Girls Hostels<br />

Of the total population around 2.88% of the population of Ganjam district is Schedule<br />

Tribe population.00 The backwardness of the tribal people has been attributed to lack of<br />

sufficient educational facilities in these remote areas. The govt. has established various hostel<br />

facilities for the education of the tribal children. In spite of the efforts, there is a huge<br />

deficiency between the existing facilities and the requirement.<br />

The literacy rate among the tribals in the district is quite low. And in case of the ST<br />

women, the literacy rate is less than 16 %. The dropout percentage of the tribal girls in the<br />

district is also quite high.<br />

Though boarding facilities have been provided in some places of the district, there is<br />

shortage of good infrastructural facilities and study environment. The climate of Ganjam<br />

district is extreme and occurrence of Cholera, Dysentery, and Malaria is a regular feature of the<br />

district. Such diseases are also common to the tribal boarding students studying in educational<br />

institution under ST and SC Department of the district. Inadequate and insufficient<br />

infrastructure facilities in such schools have led to reliance of the boarding students on ponds<br />

for bathing purposes and at times use open field for defecation.<br />

To ensure better hygienic condition in these schools for the benefit of the tribal<br />

boarding students it has been proposed for construction of 16 tribal girl’s hostels which have<br />

been recently converted by state govt. from regular residential/non-residential<br />

Sevashrams/Ashram schools to Special Tribal Girls. Recently, the Govt.of Orissa has<br />

sanctioned 1000 Tribal girls hostels for the entire state. These hostels will accommodate 100<br />

students studying in classes 1 to 10 th . For Ganjam district, 16 tribal girl’s hostels have been<br />

sanctioned in order to check the drop out rates . For safety and hygiene of the tribal girls it has<br />

been programmed to take up construction of girls hostel with electricity , sanitation etc. on<br />

priority basis because everything else can wait but not this , as it is linked to the safety and<br />

hygiene of the girls and their well being. The project to construct the Tribal girls hostels has<br />

been identified as a top priority in the District Plan. The critical gap in the funds for the project<br />

is proposed to be met out of the BRGF funds. Through the convergence of the funds from the<br />

State Plan, Art. 275(1) and the BRGF, it is proposed to provide excellent Model hostel<br />

buildings with all facilities for the Tribal Girl students during remaining period of eleventh<br />

plan.<br />

47


The Panchayat Samitis have been entrusted with the responsibility to execute the<br />

construction of the Tribal Girls hostels. The funds from the BRGF will be placed with the<br />

Panchayat Samiti, as indicated below in the remaining part of the plan period.<br />

Plan Item Description Unit cost<br />

100<br />

seater-<br />

Tribal<br />

Girls<br />

Hostels.<br />

The tribal girls hostels<br />

with all facilities will be<br />

provided. These model<br />

hostels will evolve into<br />

centers of education for<br />

the tribal girls of the<br />

district and help in<br />

reducing the drop out<br />

rates. These hostels will<br />

provide the enabling<br />

environment for allround<br />

development of<br />

the girl child.<br />

No. of<br />

beneficiar<br />

y units<br />

Rs.15 lakhs 16<br />

Total<br />

cost<br />

Rs. 2.4<br />

crores<br />

Local<br />

body<br />

Pancha<br />

yat<br />

Samiti<br />

The list of the schools under this project has been given in Annexure – 2<br />

Improving infrastructure in High Schools/Colleges<br />

Outcome/Be<br />

nefits<br />

Reduced<br />

Dropout rate<br />

of Tribal<br />

girls at High<br />

School level.<br />

In this era of cut-throat competition in the private sector, there is a need to prepare the<br />

students with sufficient knowledge skills. Though there are sufficient numbers of high schools<br />

in the district, the basic infrastructure is not able to cater to the requirements of the students.<br />

The Sarva Shikshya Abhiyan (SSA) takes cares of the infrastructure requirements of the<br />

schools up to Class-VIII . But, there is a critical gap for the high schools and the Colleges for<br />

which there is no other source of funding. Most of these high schools and colleges require a<br />

good Library – cum- discussion hall and a laboratory hall for science experiments.<br />

It is proposed that the infrastructural development shall be done in convergence with<br />

the MP/MLA LADS. Four high schools/colleges will be taken up in each of 12 Assembly<br />

Constituencies and 3 Parliament Constituencies in rural areas and two each in urban areas . A<br />

total of 91 institutions will be taken up in this phase of the BRGF.<br />

48


BRIDGING CRITICAL GAP IN INFRASTRUCTURE<br />

The project will have a component of 9 lakhs for the construction of Library and<br />

laboratory halls, and a further 1 lakh for the books and equipment cost. Out of the total cost of<br />

Rs.10 lakhs, the BRGF funding will be Rs. 7.5 lakhs and the MP/MLA LADS will be Rs.2.5<br />

lakhs in rural areas and 5 lakh each in urban areas.<br />

Plan Item Description<br />

Infrastru<br />

cture<br />

improve<br />

ment in<br />

High<br />

schools/<br />

colleges<br />

Library and Laboratory<br />

halls along with the books<br />

and equipments shall be<br />

provided to High schools/<br />

Colleges to create facilities<br />

for improving the<br />

Knowledge horizons of the<br />

students.<br />

Unit<br />

cost<br />

Rs.10<br />

lakhs<br />

No. of<br />

benefici<br />

ary<br />

units<br />

75High<br />

school<br />

16<br />

colleges<br />

Total cost Local body Outcome/<br />

Benefit<br />

Rs.7.5 crore<br />

- Rs. 5.25<br />

crore from<br />

BRGF<br />

- Rs.2.25<br />

crore from<br />

MP/MLA<br />

LADS<br />

Rs 1.60<br />

Cores from<br />

MP/MLA<br />

LADs<br />

Rs 0.80<br />

Cores from<br />

BRGF<br />

3. 9 WOMEN EMPOWERMENT AND CHILD WELFARE<br />

Zilla<br />

Parishad.<br />

Better<br />

Standard<br />

of<br />

education<br />

in High<br />

schools/<br />

colleges<br />

• Reduction of Mal-Nutrition among 0-6 Years children through Positive Deviance<br />

Approach.<br />

Orientation training on Nutrition, Health and Child Care for mothers of 0-6<br />

years children is required to improve the knowledge in this regard with a view to reduce<br />

malnutrition among children. Lack of awareness is one of the causes of malnutrition among<br />

children for which community mobilization through IEC activity is also necessary. The<br />

member of SHGs are also required to be associated with mobilization of community for<br />

adopting best practices on health and nutrition to reduce malnutrition among the children.<br />

Positive Deviance Approach (P.D.A.) which is named as “AME BHI PARIBU” has been<br />

introduced in 10 I.C.D.S. Projects of the District to reduce current level of childhood<br />

malnutrition. The S.H.G. members are also required to be trained under P.D.A. whose services<br />

be utilized to motivate the mothers of their localities.<br />

• Establishment of Anganwadi-cum-SHG Center in Most backward GPs (100)<br />

49


At present, there are 2564 Anganwadi Centres functioning in this district in 23 I.C.D.S.<br />

Projects. While, 446 Centers are functioning in their own buildings. As a result, 2118<br />

Anganwadi Centres are running without building due to which Pre-school classes could not be<br />

conducted smoothly. Particularly during rainy season, it becomes almost impossible to hold the<br />

Pre-school classes and prepare hot meals for the children.<br />

The Hon’ble Supreme Court as per their order dt. 28.11.2001 in case WP(C)-196/2001<br />

has stressed upon to cover all village / hamlets with the ICDS projects. Recently, funds were<br />

sanctioned for 136 nos. of additional AWC for the district.<br />

There is inadequate funding from Women and Child Development Department for<br />

construction of buildings for the remaining Anganwadi Centres. The World bank assistance,<br />

state share and social safety net fund towards construction of such buildings have not been<br />

received since 1997-98 . Under RSVY, we have covered 25 Anganwadi Center buildings in<br />

remote GPs and 30 Anganwadi cum ANM centers with common facility center. The<br />

intervention has a very positive impact and there has been significant declining trend in IMR.<br />

There is no other fund source for construction of the Anganwadi center buildings. So it is<br />

suggested to construct at least 100 buildings for Anganwadi Centres located in 100 GPs of this<br />

district out of B.R.G.F. Fund.<br />

Almost all the Gram panchayats have requested for funds for the Anganwadi centers in<br />

their perspective plan. Keeping in view the funds constraints, only 100GPs can be taken up in<br />

the first phase of the BRGF. A transparent process of selection of the GPs has been adopted.<br />

100 GPs are selected which are having maximum Backwardness Index Values. Backwardness<br />

Index is prepared taking into account the % of ST, SC, BPL population, and average distance<br />

of the villages in the GP from nearest town and % of non irrigated area in the GP.<br />

It is proposed that during the Eleventh Plan period, all the building less Anganwadi<br />

centers will be provided with buildings. These centers will deliver Six packages of services to<br />

the children & mothers of that locality, i.e. Pre-school Education, Health Check-up,<br />

Immunization, Referral Services, Nutrition and health Education, Supplementary Nutrition<br />

Programme, after construction of AWC buildings, which will certainly have a positive impact<br />

on IMR.<br />

These centers can also be used by good numbers of SHGs, which have been formed and<br />

promoted by AWW for their common place of meeting and other activities. These buildings<br />

can also be used as EGS centers to impart education. Besides, it has also been decided to cover<br />

all buildings less AWCs in phased manner.<br />

50


Backwardness and poor infrastructure in the field of ICDS has contributed much for<br />

high ratio of IMR and MMR, which is our prime concern. A holistic approach has been made<br />

to fill up these critical gaps under BRGF.<br />

• Mahila Sanchayika Sangha (MASS) to become the engine of women empowerment.<br />

For facilitating formation Formation and Capacity Building of sufficient number of<br />

Women Self Help Groups in each and every village of Ganjam district the District<br />

Administration in 1998-99 facilitated the federation of SHGs at Block level in the form of<br />

Block “Mahila Sanchayika Sangha” (MASS). Administration took up this job with<br />

missionary sprit. The year 1999 was christened as the year of SHGs in Ganjam. In a span of<br />

five years they have acquired varied experiences both positive and negative. But to a larger<br />

extent the dream of this mission has been fulfilled and the District Administration could be<br />

able to organize 17431 no. of groups ( as on Dec, 06) whose internal savings has reached a<br />

level of Rs.3226.67 lakhs. And all the 22 Block Level & urban MASSes are been federated<br />

at District Level known as District MASS, an Organization registered under the Societies<br />

Registration Act, 1860.<br />

OBJECTIVES OF MASS<br />

• To provide institutional support.<br />

• To establish supportive M.I.S at all the levels of three tier structure of B’MASS.<br />

• Developing strategies with government & non government Agencies.<br />

• To promote thrift and credit among all affiliated SHGs.<br />

• To enhance the economic & social status of women in the family & community<br />

• To empower Women for participating in all the areas of development.<br />

51


District Mahila sanchayika Sangha (D’MASS)<br />

Achievements on SHG-MASS movement in Ganjam district<br />

Perticulars Unit Figure as on<br />

31st<br />

March,2007<br />

SHGs formed Nos 17431<br />

SHG members Nos 217661<br />

Saving amount of SHG members Lacks Rs 3226.67<br />

Block level federation formed(B’MASS) Nos 23<br />

SHG enrolled in MASSes Nos 15808<br />

Saving amount of SHG in MASS Lacks Rs 274.87<br />

Total credit linkage by MASS to SHGs Lacks Rs 6747.33<br />

Loan Payment MASS-Bank Lacks Rs 169.087<br />

The activities taken up by SHG groups includes Pisiculture, Floriculture, Banana<br />

cultivation, Mushroom cultivation, Spices making , Pottery, Candle making, Khalli stitching,<br />

Intense stick making and Kweda flower business.<br />

MASS movement has started a silent revolution in Ganjam district whose effect can be<br />

seen in the countryside. Women are booming with confidence, they are seen everywhere and<br />

there is substantial improvement in the quality of life of women in the district. They are ready<br />

for the new challenge. However there is ample scope for the improvement in the functioning of<br />

MASS. More and more involvement of SHG groups is sought after in many activities. It is the<br />

endeavor of the administration to see that SHGs based approach become the center of all<br />

interventions in future. In the coming years utilization for strengthing mass movement will be<br />

taken up from BRGF.<br />

3.10 HEALTH<br />

As Amartya Sen said,” Primary Health along with Primary Education are the basic human<br />

rights and an essential ingredients of any democratic society “. By providing better health<br />

facilities to these thousands and faceless populace under BRGF, we would just be taking one<br />

step further towards creating a better nation state. Ganjam is one of the largest and most<br />

populous districts of Orissa. Around 65% of the deliveries are institutional. Untrained<br />

personnel do 3% of deliveries. Total immunization in the district is as low as 57%. IMR is<br />

28.3 and Annual Parasite Index is 6.5%. The biggest health problem of the district is AIDS.<br />

There are 2700 officially reported cases of AIDS in the district which is 45% of the state<br />

figure.<br />

52


STRENGTHS<br />

• One of the best health institutions in the state.<br />

• Liaisons with NGOs / PRI / UNICEF and other organizations<br />

• Good networking with ICDS (WandC Dept.) and District Social Welfare Officer<br />

WEAKNESSES<br />

• Lack of sufficient Doctors in the interior areas. The vacant posts are as high as 28% .<br />

• Highest AIDS patients in the state without any special targeted intervention for the district.<br />

• Lack of sufficient coordination at the ground level with other government institutions.<br />

• Lack of good roads and sufficient mobility infrastructure for doctors to attend outstation<br />

patients.<br />

CRITICAL GAPS<br />

• Limited or no infrastructure for institutional delivery at PHC and CHC level.<br />

• Lack of specialist in many hospitals which makes them ineffective for specialized<br />

treatments.<br />

• Limited or no infrastructure for attendants who are visiting the hospitals and lack of decent<br />

accommodation facility for the doctors and other staff paramedical staff.<br />

• No infrastructure to take care of newborn in case of complicated cases.<br />

OBJECTIVES<br />

a. Promote institutionalized delivery and reduction of IMR<br />

b. Promote health care seeking behavior, better hygiene practices and wider health related<br />

awareness from school, colleges.<br />

c. Improve survival rate of newborn in complicated cases.<br />

d. Create awareness movement to control AIDS by targeting migrant population.<br />

Under RSVY, various activities were taken to improve the health infrastructure of the<br />

district. Almost 30 ANM centers and 38 ANM cum Anganwadi centers were built. The<br />

initiation of NRHM has improved the funds availability in the Health sector. In a phased<br />

manner, the health infrastructure of the district shall be brought to the level of the Indian<br />

Health standards, as prescribed. Further, the convergence of the MP/MLA LAD funds.<br />

Wherever there is critical gap which cannot be funded from any other funds, the BRGF will be<br />

utilized.<br />

53


INFRASTRUCTURE<br />

3.11 RURAL CONNECTIVITY<br />

The Ganjam is one of the biggest and most populous district of Orissa. Around 37% of<br />

its area is hilly and forest terrain. Further, in the blocks like Patrapur, Surada, Dharakote and<br />

Jagannathprashad many habitations have low population density and are spread out over a<br />

large area. As a result, some habitations are in remote and inaccessible areas. The approach<br />

roads to these areas are not all-weather, and some of these places remain cut-off during the<br />

monsoon season. The delivery of the govt. services has become difficult in these areas.<br />

Consequently, these areas remain poor and backward. Rural connectivity to growth<br />

centers, interior/ tribal pockets has been the priority in earlier planning process. In the five-year<br />

perspective plan developed, there is a large demand for the roads.<br />

Under the RSVY, many strategic roads have been taken up. Now, there is huge fund<br />

flow under NREGA, which is helping in improving the rural connectivity. Also, the internal<br />

roads of almost all the hamlets are being converted into CC roads under SGRY and NREGA<br />

funds. Further, the PMGSY has allotted huge funds for the creation of excellent roads<br />

connecting rural areas.<br />

3. 12 ELECTRICITY<br />

Electricity has been the propeller for the revolutionary changes witnessed in modern<br />

era. Unfortunately, there are 398 villages large numbers of hamlets in the district which have<br />

been denied this important resource due to lack of funds for a long time. Due to lack of<br />

electricity, the modern day amenities have not reached these parts. The people still live in<br />

ignorance about the rapid changes taking place around the world. The backwardness in these<br />

villages can be rooted out if electricity is included as one of the important strategy component.<br />

The education of the children can also improve significantly if electricity be provided during<br />

the night time.<br />

Presently, funding for the rural electrification is done under the Bharat Nirman – Rajiv<br />

Gandhi Grameen Vidyutikaran Yojana and also under the Biju Gramina Jyoti Yojana. In a<br />

phased manner, under Bharat Nirman project, almost all the hamlets will be provided<br />

electricity over next few years.<br />

54


3.13 MINOR IRRIGATION<br />

Ganjm district is agrarian district. Most of the population in the district depends on<br />

agriculture. But due to the erratic rainfall and unprecedented flood and drought most of the<br />

areas of the district depends on irrigation which mostly served through Minor Irrigation tanks<br />

and diversion weirs. Minor Irrigation holds the prime of place in agricultural productivity<br />

through its vast network of projects covering the entire district. There are total 1015 Minor<br />

Irrigation projects in the district with designated ayacut 96.07 thousand hectors in kharif and<br />

7.64 thousand hectors in rabi with verified ayacut of 77.82 thousand hectors.<br />

Looking at the importance of Minor Irrigation for the agriculture and livelihood support<br />

it has always remained one of the most important components of planning. In RSVY also<br />

Minor Irrigation had been accorded top priority. There is need for exploring and reviving the<br />

age old Minor Irrigation systems in the backward areas of the district so that they come to<br />

parity with other area. Intervention under minor irrigation will be taken up under NREGA and<br />

other state plan schemes.<br />

3.14 DRINKING WATER SUPPLY<br />

To improve the health standards of the people, it is of utmost importance to provide<br />

safe drinking water. On one hand it will reduce the unnecessary pressure on the health system,<br />

and at the same time improve the productive capacity of the people.<br />

Under the Rural water supply mission, efforts are being made to provide safe drinking<br />

water to all the habitations. Drinking water supply to rural community of Ganjam district is<br />

mostly made through deep hand pump tube wells. Ganjm is a big and populous district of<br />

Orissa. Providing safe drinking water to rural and urban population is a big challenge in the<br />

district. Cities like Berhampur face acute water scarcity in summer. However there is<br />

unprecedented support for the community participation based scheme Swajaldhara in the<br />

district. In the year 2006 district received Rs 168.11 lacks with beneficiary contribution Rs 18<br />

lacks against the 20 projects which are in the final stages of completion. In 2006 RWS&S<br />

Division, Berhampur/Bhanjnagar have installed 230 tube wells and are going to install 838 in<br />

2007 under ARWSP (CSP) in Partially Covered (PC) habitations through participatory<br />

approach, where community / GPs are willing for partial cost sharing of installation. Ganjam<br />

district has huge unutilized ground water resources which can solve the drinking water<br />

problem. Due to the paucity of funds, the projects are being taken up in a phased manner. In<br />

55


RSVY Rs 150 lacks were being spent on drinking water, sanitation and Rs 50 lacks were spent<br />

for providing drinking water in tribal and remote areas. Inspite of these funding, there are still<br />

some villages where the safe drinking water has to be taken up on an immediate priority basis.<br />

State Govt has launched ‘Jaldhara’ scheme for provision of safe drinking water in rural ares.<br />

All the left out villages will be covered in a phased manner through this scheme.<br />

3.15 URBAN INFRASTRUCTURE<br />

Ganjam district has one Municipality – Berhampur and 17 Notified Area Councils<br />

(NACs) mainly the Block, Tahsil or Sub-Divisional headquarters. With the increasing trend<br />

towards urbanization, there has been tremendous pressure on the civic amenities of these four<br />

urban zones. With inadequate funding from govt. schemes and also lack of sufficient resources<br />

to generate own funds, these urban areas have suffered a lot over the years in terms of lower<br />

quality of life and amenities. These urban areas are the socio, economic and cultural centers in<br />

their spheres of influence. They also cater to the educational needs of the students from various<br />

parts of the district.<br />

The District Plan identifies the need to improve the infrastructural amenities in these<br />

areas to enable a guided development. These areas will be emerging as the nodes for the<br />

overall developmental strategy for the district. There is a need to carefully plan for the<br />

development of these 18 urban areas over the next few years. Unlike for the rural areas, a<br />

master plan for the holistic development is lacking for the urban areas. Now, an exercise is<br />

being carried out to prepare a master plan for overall development of the urban areas.<br />

However, it is therefore proposed that in the first phase of the BRGF, the urban local bodies be<br />

given the funds for developing the basic infrastructure. Nearly, 25 % of the BRGF for the<br />

district is being allocated for the urban local bodies. The detailed list of project proposal<br />

submitted by the ULBs and duly approved by District planning committee is given in the<br />

executive summary part .<br />

56


CHAPTER – 4<br />

CAPACITY BUILDING FOR PRIs<br />

Ganjam<br />

DISTRICT ADMINISTRATION<br />

57


The Constitution provides for the devolution of powers and responsibilities to<br />

Panchayats including the 29 matters listed in the Eleventh Schedule. Most States have enacted<br />

State Panchayati Raj Acts and Rules, in which they have indicated subjects with regard to<br />

which functions would be devolved to Panchayats. However, effective devolution has to still<br />

be accomplished. The capability of Panchayats to effectively perform the responsibilities<br />

entrusted to them needs to be ensured. The absence of training continues to be a handicap in<br />

proper devolution of powers and empowering the PRIs.<br />

Effective implementation of the provisions of Part IX of the Constitution will require<br />

building of the capability of Panchayats encompassing training, provision of adequate<br />

functionaries, technical assistance and other support to Panchayats. The objective of the<br />

training is to enable Panchayat elected representatives to upgrade their knowledge and skills to<br />

better perform their responsibilities, such as implementing programmes equitably, enabling<br />

them to think in terms of concrete actions they can take or facilitate and equipping them with<br />

the skills required for day-to-day performance of executive duties.<br />

Orienting key officials associated with the devolved functions to (i) better function as<br />

technical advisors and trainers and (ii) respect, be more receptive and learn from the ground<br />

level experience of elected Panchayat representatives.<br />

Improving the Gram Sabha functioning, particularly for the poor, to assert their<br />

demands through participative planning, monitor plan implementation and to hold their<br />

Panchayat to account through invoking Right to Information and social audit.<br />

Sensitising the media, political parties, representatives in the legislatures, civil society<br />

organisations and citizens to accepting and promoting Panchayati Raj as an effective level of<br />

local government.<br />

AS per the decision of the Govt, the operation & maintenance of hand pump tube wells<br />

as well as Piped Water Supply schemes have been transferred to the PRIs wef 21.10.2006. This<br />

has posed a major challenge before the PRIs, particularly on the part of Gram Panchayats to<br />

undertake repair & maintenance in absence of trained Self Employed Mechanics(SEMs). No<br />

SEMs are available in all blocks. Though SEMs have already been selected and deployed, they<br />

need to be trained. It is proposed that the training (Rs.4,23,525/- ) cost be taken up under the<br />

58


BRGF 2007-08.<br />

To achieve the above objectives, the BRGF provides for a capacity building fund for<br />

the PRIs. The fund shall be utilized to develop the capabilities of the PRIs to improve the local<br />

governance structures.<br />

Panchayat Election last held Election Next Due<br />

District<br />

Panchayat<br />

Intermediate<br />

Panchayat<br />

2007 2007 2007<br />

Village<br />

Panchayat<br />

2007 2008 2009 2010 2011 2012<br />

59


The table below shows the description of various items included under the<br />

BRGF component to improve the capacity of the PRIs<br />

Plan Item Description Total cost<br />

Training for the<br />

PRI/ULB members<br />

Establishment of a<br />

District Resources<br />

center<br />

District<br />

development<br />

report and GIS<br />

database<br />

Intensive training<br />

to the Computer<br />

operators engaged<br />

in Panchayat<br />

Samitis and Gram<br />

Panchayats.<br />

Training to Self<br />

Employed<br />

Mechanics(SEMs)<br />

for Rural water<br />

supply.<br />

The training to the PRI/ULB member<br />

and the offcials will provide them with<br />

the necessary skills to improve local<br />

governance<br />

The resource center will provide the<br />

technical support to the Zilla Parishad /<br />

ULBs and help in effective discharging<br />

of functions. The center can engage the<br />

technical experts from engineering,<br />

economics, agriculture, GIS, statistics,<br />

micro planning, etc.It can also act as a<br />

district level training institute.<br />

The report can be prepared by a<br />

specialized agency with previous<br />

experience in preparation of such<br />

reports. The report will help in<br />

assessing the socio -economic condition<br />

of the district in a professional manner<br />

and in devicing the suitable strategies to<br />

overcome the backwardness. The<br />

database will be linked to GIS.<br />

With increasing computerization of the<br />

activities at the PRI level, there is a felt<br />

need to give professional training to the<br />

computer operators engaged in various<br />

PRIs. The IT sector is dynamic and new<br />

technologies are emerging. The<br />

technical skills of the PRIs can be<br />

enhanced considerably if the Computer<br />

operators are trained intensively on the<br />

latest skills in computers.<br />

Panchayats have been given the<br />

responsibility of maintaining the water<br />

supply schemes. But there is lack of<br />

trained manpower at the Gram<br />

Panchayat level. The SEM will help the<br />

Panchayats in managing the water<br />

supply systems.<br />

Executive<br />

agency<br />

Rs. 60 lakhs DPC / ZP<br />

Rs.15,76,475 DPC / ZP<br />

Rs.15 lakhs DPC<br />

Rs. 5 Lakhs<br />

Rs. 4,23,525<br />

Total Rs. 1 crore<br />

Panchayat<br />

Samiti<br />

Panchayat<br />

Samiti<br />

60


ANNEXURE 1<br />

GANJAM DISTRICT AT A GLANCE<br />

DISTRICT GENERAL PROFILE<br />

Particulars Units<br />

Geographical Area 9499.7 Sq.K.Ms.<br />

No. of Sub-divisions 03<br />

No. of Tahasils 14<br />

No of C D Blocks 22<br />

No. of Municipalities 01<br />

No of NACs 17<br />

No. of Police Stations 28<br />

No. of G.Ps 475<br />

No. of R.I. Circles 198<br />

No. of Revenue Villages 3229<br />

POPULATION<br />

Particulars Units Figure as per 2001<br />

Census (prov.)<br />

TOTAL POPULATION 3160<br />

RURAL 2604<br />

URBAN 556<br />

SCHEDULED CASTE<br />

SCHEDULED TRIBE<br />

000 NOS.<br />

586<br />

90<br />

MALE 1581<br />

FEMALE 1578<br />

NUMBER OF BPL FAMILIES<br />

312<br />

DENSITY OF POPULATION /SQ. KM 385<br />

LITERACY RATE % 46.44<br />

SEX RATIO 998<br />

61


FOREST PROFILE<br />

Particulars Units Figures as per<br />

2001 Census<br />

FOREST AREA 3149.90<br />

RESERVE FOREST 1472.26<br />

DEMARCATED PROTECTED<br />

1150.85<br />

FOREST<br />

Sq. Kms<br />

UN-DEMARCATED FOREST 1167.36<br />

UN-CLASSIFIED FOREST .86<br />

OTHER FOREST<br />

527.79<br />

PERCENTAGE OF FOREST % 28<br />

AGRICULTURE<br />

Utilization Units Figure as per Census<br />

2001<br />

NET AREA SOWN 394<br />

FALLOW LAND 12<br />

BARREN AND<br />

47<br />

UNCULTIVATED LAND 000,<br />

CULTIVABLE WATELAND hectors 11<br />

MISC. TREE AND GRORE 22<br />

PERMANENT PASTURE 20<br />

GROSS CROPD AREA<br />

598<br />

INTENSITY OF CROPPING % 151<br />

IRRIGATION<br />

Particulars Numbers Ayacut area<br />

(Hectors)<br />

MAJOR IRRIGATION 1 60,980<br />

MEDIUM IRRIGATION 11 54,056<br />

MINOR IRRIGATION 1272 99,406<br />

LIFT IRRIGATION POINTS 900 5,638<br />

TANK IRRIGATION 8000 2,839<br />

DUG WELL 35,900 12,000<br />

WATER HARVESTING STRUCTURES 355 2,000<br />

Total. 236919<br />

62


HEALTH<br />

Particulars Unit<br />

Figure as per<br />

census- 2001<br />

(Prov.)<br />

Allopathic Institutions 113<br />

Homoeopathic Institutions 37<br />

Ayurvedic Institutions 41<br />

D.T.C.Institutions 1<br />

Government Hospitals 10<br />

Up-graded Primary Health Centres 5<br />

Community Health Centres 5<br />

Primary Health Centres No.<br />

15<br />

Additional P.H.C.s 10<br />

Government Dispensaries 16<br />

Subsidiary Health Centres 10<br />

Maternity Aid Centres 2<br />

Leprosy Eradication Units 6<br />

Urban Leprosy Centre 1<br />

Beds in Hospitals<br />

1575<br />

COMMUNICATION<br />

Particulars Unit Figure as per 2001<br />

census(prov.)<br />

NATIONAL HIGHWAY(NH-5) 87<br />

STATE HIGH WAY 770<br />

MAJOR DISTRICT HIGHWAY 158<br />

VILLAGE ROAD 2118<br />

OTHER DISTRICT ROAD<br />

FOREST ROAD<br />

Kms<br />

487<br />

480<br />

G.P. ROAD 6717<br />

CLASSIFIED VILLAGE ROAD 200<br />

PANCHAYAT SAMITI ROAD 761<br />

TOTAL LENGTH OF RAILWAY<br />

11778<br />

PORT (MINOR) Nos 1<br />

63


ELECTRICITY<br />

Particulars Unit Figure as per<br />

2001<br />

census(prov.)<br />

TOWNS ELECTRIFIED 18<br />

VILLAGES ELECTRIFIED 2470<br />

HAMLETS ELECTRIFIED 467<br />

HARIJAN BASTI ELECTRIFIED Nos<br />

591<br />

VILLAGES NOT ELECTRIFIED 293<br />

LI POINTS ENERGIGED -OLIC 1318<br />

LI POINTS ENERGIGED -PRIVATE<br />

7251<br />

C O-O P E R A T I V E S<br />

Particulars Unit Figure as per<br />

Census-2001<br />

(Prov.)<br />

AGRICULTURAL CREDIT CO-<br />

400<br />

OPERATIVE SOCIETIES<br />

MEMBERSHIP OF AGRICULTURAL<br />

CO-OPERATIVE CREDIT<br />

SOCIETIES<br />

No.<br />

281633<br />

LOANS ADVANCED BY<br />

8944.97<br />

AGRICULTURAL CREDIT CO-<br />

OPERATIVE SOCIETIES<br />

Lakhs<br />

NON AGRICULTURAL CREDIT CO-<br />

96<br />

OPERATIVE SOCIETIES<br />

CO-OPERATIVE BANKS<br />

No.<br />

66<br />

REGIONAL AND SPECIALISED<br />

COMMODITY MARKETING<br />

COOPERATIVE SOCIETIES<br />

3<br />

64


INDUSTRY<br />

Particulars Unit Figure as per<br />

Census-2001 (Prov.)<br />

A. SMALL SCALE INDUSTRY<br />

I. NO. OF SSI UNITS ESTABLISHED No. 8580<br />

II. TOTAL CAPITAL INVESTMENT Rs. Lakh 182.76<br />

III. EMPLOYMENT GENERATED No. 8580<br />

B. COTTAGE INDUSTRY<br />

I. NO. OF COTTAGE INDUSTRY SETUP No. 1892<br />

II. TOTAL CAPITAL INVESTMENT<br />

Rs. in<br />

Lakh<br />

243.01<br />

III. EMPLOYMENT GENERATED No. 2867<br />

C. HANDLOOM INDUSTRY<br />

I. NO. OF LOOMS No. 3128<br />

II. PRODUCTION In Lakh<br />

Sq.mtrs<br />

456.23<br />

III. EMPLOYMENT GENERATED No. 5164<br />

E D U C A T I O N<br />

Particulars Unit Figure as per Census-2001<br />

(Prov.)<br />

1. PRIMARY SCHOOLS 2362<br />

2. ME SCHOOLS 503<br />

3. HIGH SCHOOLS 458<br />

5. STUDENTS IN THE PRIMARY<br />

SCHOOLS<br />

308162<br />

6. TEACHERS IN PRIMARY SCHOOL No.<br />

4877<br />

7. TEACHERS IN ME SCHOOLS 2904<br />

8. TEACHERS IN HIGH SCHOOLS 4056<br />

9. STUDENTS IN ME SCHOOLS 115374<br />

10. STUDENTS IN SECONDARY<br />

SCHOOLS<br />

11. COLLEGES<br />

1,01,640<br />

65<br />

65


Sl.<br />

No<br />

Name of the District<br />

Beneficiaries<br />

Population<br />

1 Ganjam (Chatrapur) 31,60,635<br />

Sl.<br />

No<br />

DISTRICT HEADQUARTERS - CHATRAPUR<br />

Name of the Subdivision<br />

Sub-divisional Headquarters<br />

Beneficiaries<br />

Population<br />

SC/ ST Population<br />

(2001 census)<br />

6,75,717<br />

1 Chatrapur 20289 2401<br />

2 Berhampur 307792 28817<br />

3 Bhanjnagar 19748 3706<br />

NAC (Notified Area Council) towns<br />

Sl No Name Of the ULBs Benificiary<br />

Population<br />

SC/ ST<br />

Population (2001<br />

census)<br />

SC/ST Population<br />

1 Buguda (NAC) 13257 1770<br />

2 Bhanjanagar (NAC) 19748 3706<br />

3 Bellaguntha (NAC) 9962 1704<br />

4 Surada (NAC) 14648 4285<br />

5 Asika (NAC) 20739 3659<br />

6 Purusottampur (NAC) 14249 2977<br />

7 Kavisurjyanagar (NAC) 16094 2027<br />

8 Polasara (NAC) 19568 2708<br />

9 Kodala (NAC) 12345 1286<br />

10 Khalikote (NAC) 10958 1242<br />

11 Rambha (NAC) 10716 3467<br />

12 Chhatrapur (NAC) 20289 2401<br />

13 Ganjam (NAC) 11317 2701<br />

14 Gopalpur (NAC) 6663 531<br />

15 Chikiti (NAC) 10802 2436<br />

16 Digapahandi (NAC) 10890 1902<br />

17 Hinjilicut (NAC) 21347 4370<br />

18 Brahmapur (M) 307792 28817<br />

66


BLOCKS<br />

Sl No Block Name Beneficiary Populations SC/ST Poplulation<br />

1 Chhatrapur 125675 34410<br />

2 Ganjam 82702 19605<br />

3 Khallikote 137173 35680<br />

4 Beguniapoda 112970 23062<br />

5 Polasara 117281 20242<br />

6 Kavisuryanagar 102441 18208<br />

7 Purushottampur 129506 34213<br />

8 Hinjilicut 107053 24516<br />

9 Rangeilunda 139627 27958<br />

10 Kukudakhandi 124598 34986<br />

11 Chikiti 93941 28494<br />

12 Patrapur 118116 32707<br />

13 Digapahandi 136618 30191<br />

14 Sanakhemundi 147788 25639<br />

15 Bhanjanagar 122449 33816<br />

16 Sheragada 117625 22053<br />

17 Aska 133387 25328<br />

18 Dharakote 101533 24388<br />

19 Surada 125560 38299<br />

20 Bellaguntha 103592 15344<br />

21 Jaganathprasad 117894 33323<br />

22 Buguda 106747 22884<br />

67


ANNEXURE-2<br />

TRIBAL GIRLS HOSTELS<br />

SI<br />

No<br />

Name of the Block Name & Address of hostel<br />

1 Patrapur Gouduni A/S<br />

2 Jaganathprasad Rudhapadar<br />

3 Sanakhemundi Taptapani R/S<br />

4 Dharakote Balarampur R/S<br />

5 Ganjam Kushapalli A/S<br />

6 Dharakote Saba S/S<br />

7 Polosara Patalsing S/S<br />

8 Polosara Jokobandha S/S<br />

9 Khallikote Guhariapata S/S<br />

10 Khallikote Bedapalli S/S<br />

11 Digaphandi Bedapalli S/S<br />

12 Kukudakhandi Nimakhandi S/S<br />

13 Sanakhemundi Jeypore Colony S/S<br />

14 Suroda Khajuipalli S/S<br />

15 Buguda Kanasarala S/S<br />

16 Bhanjanagar Darpangia S/S<br />

68


SI<br />

No<br />

Name of the<br />

Block<br />

ANNEXURE 3<br />

PRI Members for training<br />

No. of<br />

GP<br />

No. of ZP<br />

Members<br />

No. of PS<br />

Members<br />

No. of<br />

sarpanche<br />

s<br />

No. of<br />

ward<br />

members<br />

1 Chatrapur 17 3 17 17 280<br />

2 Ganjam 14 2 14 14 215<br />

3 Khallikote 26 3 26 26 359<br />

4 Beguniapoda 22 3 22 22 321<br />

5 Polosora 26 3 26 26 339<br />

6 Purushottampur 26 3 26 26 364<br />

7 K.S.Nagar 21 3 21 21 282<br />

8 Hinjilicut 21 3 21 21 309<br />

9 Rangeilunda 24 3 24 24 346<br />

10 Kukudakhandi 20 3 20 20 299<br />

11 Digapahandi 24 4 24 24 381<br />

12 Sanakhemundi 21 4 21 21 346<br />

13 Chikiti 17 3 17 17 246<br />

14 Patrapur 23 3 23 23 332<br />

15 Bhanjanagar 20 3 20 20 332<br />

16 Bellaguntha 18 3 18 18 284<br />

17 Buguda 20 3 20 20 280<br />

18 J.N.Prasad 24 3 24 24 361<br />

19 Aska 27 4 27 27 401<br />

20 Dharakote 17 3 17 17 255<br />

21 Soroda 25 4 25 25 310<br />

22 Sheragada 22 3 22 22 301<br />

Total 475 69 475 475 6943<br />

69


SI<br />

No<br />

ANNEXURE 4<br />

BLOCK WISE LIST OF SEM FOR TRAINING<br />

Name of the<br />

Block<br />

No. of<br />

Tube<br />

Well<br />

No. of<br />

SEMselected<br />

for training<br />

Training<br />

cost<br />

1 Chatrapur 619 34 25500<br />

2 Ganjam 408 22 16500<br />

3 Khallikote 668 45 33750<br />

4 Beguniapoda 695 29 21750<br />

5 Polosora 673 33 24750<br />

6 Purushottampur 700 31 23250<br />

7 K.S.Nagar 514 24 18000<br />

8 Hinjilicut 689 18 13500<br />

9 Rangeilunda 779 20 15000<br />

10 Kukudakhandi 737 23 17250<br />

11 Digapahandi 753 38 28500<br />

12 Sanakhemundi 729 31 23250<br />

13 Chikiti 682 22 16500<br />

14 Patrapur 710 40 30000<br />

15 Bhanjanagar 1004 38 28500<br />

16 Bellaguntha 610 25 18750<br />

17 Buguda 744 28 21000<br />

18 J.N.Prasad 1052 41 30750<br />

19 Aska 861 39 29250<br />

20 Dharakote 712 32 24000<br />

21 Soroda 905 36 27000<br />

22 Sheragada 671 19 14250<br />

Total 15915 668 501000<br />

70


Sl.<br />

No.<br />

Block<br />

Name<br />

List of GPs Coming within schedule area<br />

Annexure-5<br />

GP Name<br />

BPL% ST% SC%<br />

UN_IRR<br />

%<br />

DIST TOWN<br />

VALUE INDEX<br />

1 Surada Goudagotha 0.85 0.51 0.08 0.35 21.29 1.39<br />

2 Surada Merrikota 0.93 0.40 0.22 0.40 16.15 1.16<br />

3 Surada Badagochha 0.81 0.52 0.01 0.30 7.08 0.72<br />

4 Surada Borada 0.98 0.04 0.28 0.63 4.56 0.51<br />

5 Surada Ekalapur 0.65 0.03 0.29 0.36 4.61 0.44<br />

6 Surada Genja 0.85 0.35 0.22 0.93 0.20 0.43<br />

7 Surada Asurabandha 0.95 0.04 0.25 0.73 1.76 0.37<br />

8 Surada Hinjalakuda 0.82 0.05 0.24 0.44 2.08 0.35<br />

9 Surada Badabadangi 0.80 0.10 0.26 0.42 1.47 0.35<br />

10 Surada Raibandha 0.88 0.00 0.09 0.56 2.21 0.31<br />

11 Surada Hukuma 0.76 0.10 0.19 0.50 0.80 0.30<br />

12 Surada G.P.Sasan 0.80 0.07 0.24 0.48 0.27 0.28<br />

13 Surada Lathipada 0.82 0.08 0.18 0.53 0.45 0.28<br />

14 Surada Suramani 0.90 0.03 0.29 0.30 0.16 0.28<br />

15 Surada Gangapur 0.76 0.03 0.16 0.33 1.07 0.26<br />

16 Surada Palakata 0.83 0.09 0.12 0.48 0.12 0.25<br />

17 Surada Sidhapur 0.60 0.04 0.18 0.20 1.47 0.25<br />

18 Surada Borasingi 0.88 0.00 0.18 0.55 0.30 0.25<br />

19 Surada Badagada 0.59 0.01 0.20 0.60 1.02 0.24<br />

20 Surada Nuagada 0.62 0.02 0.23 0.50 0.43 0.23<br />

21 Surada Kullangi 0.71 0.02 0.16 0.44 0.44 0.22<br />

22 Surada Sarabadi 0.66 0.01 0.23 0.13 0.38 0.21<br />

23 Surada Amurutulu 0.45 0.00 0.27 0.44 0.13 0.18<br />

24 Dharakote Saba 0.88 0.50 0.11 0.34 4.85 0.65<br />

25 Dharakote Balarampur 0.88 0.49 0.16 0.25 3.44 0.60<br />

26 Dharakote Manikapur 0.85 0.06 0.23 0.52 2.35 0.37<br />

27 Dharakote Machakote 0.85 0.02 0.15 0.55 0.48 0.25<br />

28 Sheragada Bandhaguda 0.92 0.03 0.29 0.52 0.95 0.33<br />

29 Sheragada Khireida 0.81 0.04 0.22 0.59 0.41 0.27<br />

30 Sheragada Karadkana 0.72 0.04 0.17 0.41 0.23 0.23<br />

31 Sheragada Tahanra 0.42 0.00 0.31 0.05 0.17 0.17<br />

71


Sl.<br />

No.<br />

List of GPs coming within micro Project TDA Tumba<br />

Block<br />

Name<br />

GP<br />

Name BPL% ST% SC%<br />

UN_IRR<br />

%<br />

Annexure-6<br />

DIST<br />

TOWN<br />

VALUE INDEX<br />

1 Patrapur Ankuli 0.95 0.89 0.02 0.09 22.17 1.59<br />

2 Patrapur Tumba 1.00 0.73 0.05 0.15 18.51 1.38<br />

3 Patrapur Buratal 0.95 1.00 0.00 0.12 16.06 1.36<br />

72


Block wise List of Gram Panchayats Based on<br />

Backward ness Index.<br />

Annexure- 7<br />

UN DIST<br />

Sl. Block Name GP Name<br />

IRR TOWN<br />

No.<br />

BPL% ST% SC% % VALUE INDEX<br />

1 Chhatrapur Bhikaripalli 0.71 0.01 0.43 0.33 0.48 0.29<br />

2 Chhatrapur Tanganapalli 0.69 0.00 0.49 0.21 0.38 0.29<br />

3 Chhatrapur Baulagan 0.58 0.01 0.51 0.10 0.42 0.27<br />

4 Ganjam Palanga 0.95 0.02 0.71 0.25 0.38 0.40<br />

5 Ganjam Ramagada 0.66 0.02 0.31 0.20 2.13 0.32<br />

6 Ganjam Poirasi 0.68 0.00 0.45 0.20 1.00 0.30<br />

7 Khallikote Badapalli 0.43 0.86 0.00 0.43 2.96 0.62<br />

8 Khallikote Keshpur 0.84 0.00 0.49 0.21 0.97 0.34<br />

9 Khallikote Dimiria 0.67 0.15 0.34 0.39 0.39 0.32<br />

10 Beguniapoda Kumbhargaon 0.92 0.02 0.36 0.48 2.45 0.41<br />

11 Beguniapoda Chandanpur 0.87 0.14 0.26 0.15 0.62 0.33<br />

12 Beguniapoda Angargaon 0.80 0.02 0.25 0.46 1.38 0.31<br />

13 Polasara Pandiripada 0.73 0.34 0.26 0.38 9.39 0.80<br />

14 Polasara Gochabadi 0.58 0.15 0.18 0.08 2.15 0.33<br />

15 Polasara Nimina 0.91 0.03 0.19 0.30 0.18 0.25<br />

16 Purushottampur Bhutasarasingi 0.69 0.00 0.48 0.46 0.25 0.29<br />

17 Purushottampur Kama nalinakhyapur 0.66 0.00 0.47 0.43 0.26 0.28<br />

18 Purushottampur Raipur 0.60 0.00 0.45 0.49 0.34 0.27<br />

19 Kavisuryanagar Risipur 0.50 0.00 0.60 0.57 0.37 0.30<br />

20 Kavisuryanagar Jarada 0.64 0.01 0.29 0.25 0.20 0.22<br />

21 Kavisuryanagar Kaniary 0.50 0.00 0.33 0.39 0.33 0.21<br />

22 Hinjilicut Dayapalli 0.50 0.00 0.49 0.17 0.12 0.24<br />

23 Hinjilicut Pochilima 0.54 0.00 0.37 0.07 0.30 0.22<br />

24 Hinjilicut Dhobadi 0.68 0.00 0.23 0.31 0.08 0.21<br />

25 Rangeilunda Gounju 0.59 0.00 0.58 0.19 0.17 0.28<br />

26 Rangeilunda Kolathigan 0.76 0.00 0.37 0.10 0.31 0.26<br />

27 Rangeilunda Rangipur 0.73 0.00 0.29 0.28 0.22 0.23<br />

28 Kukudakhandi Kankia 0.92 0.88 0.10 0.25 1.97 0.70<br />

29 Kukudakhandi Baghalati 0.78 0.09 0.33 0.43 0.32 0.31<br />

30 Kukudakhandi Sihala 0.63 0.08 0.45 0.33 0.31 0.30<br />

31 Digapahandi Khamarigam 0.71 0.16 0.21 0.19 3.19 0.41<br />

32 Digapahandi S.Tikarapada 0.76 0.26 0.09 0.35 2.22 0.40<br />

33 Digapahandi Bhramra Pur 0.83 0.16 0.14 0.84 1.76 0.38<br />

73


34 Sanakhemundi T.Govindapur 0.80 0.51 0.15 0.15 2.93 0.56<br />

35 Sanakhemundi S.Gopalpur 0.68 0.09 0.17 0.34 2.70 0.35<br />

36 Sanakhemundi Gangapur 0.78 0.15 0.16 0.16 1.87 0.35<br />

37 Chikiti Sorala 0.73 0.00 0.74 0.02 0.47 0.36<br />

38 Chikiti Katuru 1.00 0.00 0.32 0.29 0.73 0.31<br />

39 Chikiti Govindanagar 0.64 0.02 0.34 0.43 0.89 0.28<br />

40 Patrapur Turubudi 0.80 0.26 0.20 0.46 15.32 1.04<br />

41 Patrapur Samantrapur 0.82 0.27 0.21 0.35 8.57 0.73<br />

42 Patrapur Khariaguda 0.69 0.07 0.14 0.28 10.34 0.68<br />

43 Bhanjanagar Dadarlunda 0.87 0.28 0.31 0.72 2.30 0.51<br />

44 Bhanjanagar Domuhani 0.93 0.25 0.23 0.70 1.51 0.45<br />

45 Bhanjanagar Baibali 0.96 0.26 0.09 0.48 1.36 0.40<br />

46 Bellaguntha Udhura 0.50 0.01 0.24 0.47 0.12 0.19<br />

47 Bellaguntha Gangapur 0.43 0.01 0.13 0.40 0.73 0.17<br />

48 Bellaguntha Khetribarapur 0.33 0.00 0.14 0.38 1.05 0.16<br />

49 Buguda Karachuli 0.92 0.13 0.26 0.58 2.64 0.44<br />

50 Buguda Motabadi 1.00 0.00 0.45 0.65 0.27 0.35<br />

51 Buguda Manitara 0.65 0.01 0.25 0.53 0.59 0.24<br />

52 Jaganathprasad Rudhapadar 0.73 0.50 0.28 0.68 3.96 0.65<br />

53 Jaganathprasad Khetamundalli 0.82 0.21 0.17 0.51 1.43 0.38<br />

54 Jaganathprasad Gayaganda 0.55 0.15 0.35 0.57 1.49 0.36<br />

55 Aska padiapathara 0.46 0.00 0.39 0.34 0.41 0.22<br />

56 Aska balisira 0.53 0.02 0.20 0.43 0.47 0.20<br />

57 Aska chadiapali 0.56 0.00 0.25 0.28 0.17 0.19<br />

58 Dharakote Baharapur 0.65 0.08 0.16 0.15 3.04 0.34<br />

59 Dharakote Rugumu 0.54 0.03 0.23 0.43 2.39 0.30<br />

60 Dharakote Baradabilli 0.59 0.02 0.20 0.36 2.13 0.28<br />

61 Surada Gajalabadi 0.91 0.49 0.12 0.36 6.66 0.74<br />

62 Surada Gochha 0.82 0.20 0.24 0.85 2.89 0.48<br />

63 Sheragada Punanda 0.90 0.00 0.18 0.42 0.11 0.24<br />

64 Sheragada Baramundali 0.72 0.00 0.29 0.20 0.18 0.23<br />

65 Sheragada Kumarpani 0.87 0.00 0.14 0.27 0.30 0.2<br />

66<br />

74


Sl.No<br />

LIST OF HIGH SCHOOLS AND COLLEGES DEVELOPED ON CONVERGENCE<br />

PROPOSAL OF MLA & MP LAD FUNDS<br />

Annexure-8<br />

Name of the<br />

constituency.<br />

Name of the High Schools/Colleges with location.<br />

Funds for<br />

MLA Lad &<br />

MP Lad<br />

Funds alloted<br />

from BRGF<br />

Total funds(Rs. in<br />

lakh)<br />

1 J.N.Prashad. Ballipadar High School, Kalamba Chhaka, Buguda Block 2.50 7.50 10.00<br />

2 KS Nagar Raghunath HS, Jarada, KS Nagar Block 2.50 7.50 10.00<br />

3 Aska Bhimasena HS, Bhetanai, Aska Block 2.50 7.50 10.00<br />

4 Hinjili Maa Taratarini HS, Angu, Purusottampur Block 2.50 7.50 10.00<br />

5 KS Nagar SR HS, R.Ch.Pur, Sanakhemundi Block 2.50 7.50 10.00<br />

6 Aska MG HS, Tanhara, Sheragada, Sheragada Block 2.50 7.50 10.00<br />

1 KS Nagar Saibani HS,Sunapalli, KS Nagar Block 2.50 7.50 10.00<br />

2 KS Nagar Bramhanadevi HS,Hindal, KS Nagar Block 2.50 7.50 10.00<br />

3 KS Nagar Natheswar HS, Danantara, Sheragad Block 2.50 7.50 10.00<br />

4 KS Nagar Kurula HS, Kurala, Shregada Block 2.50 7.50 10.00<br />

5 KS Nagar Dayanidhipur High School, Dayanidhipur, Sanakhemundi Block 2.50 7.50 10.00<br />

6 KS Nagar Kabisurjya Bigyana Mahabidyalaya,KS Nagar NAC 5.00 5.00 10.00<br />

1 Chatrapur Nilakantheswar HS, Bhikaripalli, Chatrapur Block 2.50 7.50 10.00<br />

2 Chatrapur Banadevi HS, Deadehi, S.R.Ch.Pur GP, Ganjam Block 2.50 7.50 10.00<br />

3 Chatrapur Malada HS, Malada, Ganjam Block 2.50 7.50 10.00<br />

4 Chatrapur Khetramohana College,Narendrapur, Chatrapur Block 2.50 7.50 10.00<br />

5 Chatrapur Girls HS, Chatrapur, Chatrapur NAC 5.00 5.00 10.00<br />

1 Mohana Sundarama HS, Ch. Tikarapada, Digapahandi Block 2.50 7.50 10.00<br />

2 Mohana RN HS, Bhramarapur, Digapandi Block 2.50 7.50 10.00<br />

3 Mohana RN HS, Gadagovindapur, Digapahandi Block 2.50 7.50 10.00<br />

4 Mohana Ujaleswara HS, Khamarigaon,Digapahandi Block 2.50 7.50 10.00<br />

5 Mohana Ramjee Mahabidyalaya, Bhismagiri,Digapahandi Block 2.50 7.50 10.00<br />

6 Mohana G.D. Bidyapitha, Manipadia, Digapahandi Block 2.50 7.50 10.00<br />

1 Chikiti Krushnapur HS Chikiti Block 2.50 7.50 10.00<br />

2 Chikiti Samantiapalli HS, Patrapur Block 2.50 7.50 10.00<br />

75


3 Chikiti Madhabandha HS, Chikiti Block 2.50 7.50 10.00<br />

4 Chikiti RL Girls HS, Chikiti, Chikiti NAC 5.00 5.00 10.00<br />

5 Chikiti Chikiti Mahabidyalaya, Chikiti NAC 5.00 5.00 10.00<br />

1 Gopalapur Sasanapada HS, Rangelund block 2.50 7.50 10.00<br />

2 Gopalapur Kukudakhandi HS,Kukudakhandi Block 2.50 7.50 10.00<br />

3 Gopalapur Sunapur HS, Chikiti Block 2.50 7.50 10.00<br />

4 Gopalapur Ramanarayana College, Dura, Rangeilunda 2.50 7.50 10.00<br />

5 Gopalapur Gopalapur Collge, Gopalpur NAC 5.00 5.00 10.00<br />

1 Kodala HS building at Barida-A, KS Nagar Block 2.50 7.50 10.00<br />

2 Kodala HS building at Budhamba, KS Nagar Block 2.50 7.50 10.00<br />

3 Kodala HS building at Kaniyari, KS Nagar Block 2.50 7.50 10.00<br />

4 Kodala HS building at Bhabarada, Polasara Block 2.50 7.50 10.00<br />

5 Kodala Science Collecge building at Polasara NAC 5.00 5.00 10.00<br />

6 Kodala HS Building at Baragam, Polosara Block 2.50 7.50 10.00<br />

1 Khallikote Nilakantha Bidyapitha HS,Kumanda, Khallikote Block 2.50 7.50 10.00<br />

2 Khallikote Amareswar Bidyapitha, K.Barida, B.Pada Block 2.50 7.50 10.00<br />

3 Khallikote K.D. HS, Mathura, Khallikote Block 2.50 7.50 10.00<br />

4 Khallikote RK HS, Saurachhachina, B.Pada Block 2.50 7.50 10.00<br />

1 Aska Mangalapur HS, Aska Block 2.50 7.50 10.00<br />

2 Aska Khulandia HS, Bangarada GP, Aska Block 2.50 7.50 10.00<br />

3 Aska Balisira HS, Aska Block 2.50 7.50 10.00<br />

4 Aska Jayapur HS, Aska Block 2.50 7.50 10.00<br />

5 Aska Govt. Wamens College,Aska for Library books& equipements 5.00 5.00 10.00<br />

1 Bhanajanagar Bahadapadar HS, Bhanjanagar Block 2.50 7.50 10.00<br />

2 Bhanajanagar Panchayat HS, Badangi, Bhanjanagar Block 2.50 7.50 10.00<br />

3 Bhanajanagar SC HS, Turumu, Bhanjanagar Block 2.50 7.50 10.00<br />

4 Bhanajanagar AKG HS, Tanarada, Bellaguntha Block 2.50 7.50 10.00<br />

5 Bhanajanagar Sabitri Womens Collecge, Bhanjanagar NAC 5.00 5.00 10.00<br />

1 JN Prasad Maa KK HS, Pochalundi, Buguda Block 2.50 7.50 10.00<br />

2 JN Prasad SBS HS, Sankuru, Buguda Block 2.50 7.50 10.00<br />

3 JN Prasad GP HS, Kokalaba, JN Prasad Block 2.50 7.50 10.00<br />

4 JN Prasad BP HS, Tarasingi, JN Prasad Block 2.50 7.50 10.00<br />

5 JN Prasad Peoples College, Buguda NAC 5.00 5.00 10.00<br />

76


1 Berhampur UM HS, Lathi, Kukudakhandi Block 2.50 7.50 10.00<br />

2 Berhampur Mahuri Kalua HS, G.R.N.Pur,Kukudakhandi Block 2.50 7.50 10.00<br />

3 Berhampur SB HS, Krupasindhupur, Kukudakhandi Block 2.50 7.50 10.00<br />

4 Berhampur Mahamayee Mahila Maha bidyalaya, Berhaqmpur Municipality 5.00 5.00 10.00<br />

5 Berhampur Girls HS, Langipalli, Berhampur 2.50 7.50 10.00<br />

1 Phulbani Gallery HS, Gallery, Bhanjanagar Block 2.50 7.50 10.00<br />

2 Phulbani KS Bidyapitha, KulladaBhanjangar 2.50 7.50 10.00<br />

3 Phulbani BLS Pur HS, BLS Pur , Bellaguntha 2.50 7.50 10.00<br />

4 Phulbani Sakambari HS, Boripadar, Bellaguntha block 2.50 7.50 10.00<br />

5 Phulbani Science College, Bellaguntha, Bellaguntha NAC 5.00 5.00 10.00<br />

1 Surada SR HS, Dharakote, Dharakote Block 2.50 7.50 10.00<br />

2 Surada KS Girls HS, Dharakote, Dharakote Block 2.50 7.50 10.00<br />

3 Surada GD HS, Bethuar, Dharakote Block 2.50 7.50 10.00<br />

4 Surada Borasingi HS, Borasingi, Surada Block 2.50 7.50 10.00<br />

5 Surada Rushikulya Degree Mahavidyalaya, Surada NAC 5.00 5.00 10.00<br />

6 Surada Sidhapur High School, Sidhapur Suruda Block. 2.50 7.50 10.00<br />

1 Berhampur BK HS, Baulajhuli, Kukudakhandi Block 2.50 7.50 10.00<br />

2 Berhampur Birabhadra HS, Huma, Ganjam Block 2.50 7.50 10.00<br />

3 Berhampur Tulasidevi Girls HS, Chikiti NAC 5.00 5.00 10.00<br />

4 Berhampur Sashibhusana Ratha Women's College, Berhampur Municipality 5.00 5.00 10.00<br />

5 Berhampur Ganjam Collecge, Ganjam Block 5.00 5.00 10.00<br />

6 Berhampur Khallikote Autonomous College, Berhampur Municipality 5.00 5.00 10.00<br />

1 Hinjili Constn of Additional Class Room Pital Boy's HS, Samantrapur 2.50 7.50 10.00<br />

2 Hinjili Constn of Additional Class Room & Science Laboratory HS, Jamuni 2.50 7.50 10.00<br />

3 Hinjili Constn of Additional Class Room HS, CH.Nuagam 2.50 7.50 10.00<br />

4 Hinjili Constn of Additional Class Room HS, AT/Sikiri 2.50 7.50 10.00<br />

5 Hinjili Constn of Additional Class Room HS, Bellagam 2.50 7.50 10.00<br />

6 Hinjili Constn of Addl Class Room Khambaya dora Scice CollegePochilima 2.50 7.50 10.00<br />

Total 255.00 605.00 860.00<br />

77


1. BERHAMPUR MUNICIPALITY<br />

PLAN PROPOSALS BRGF 2007-08<br />

Annexure-9<br />

A- Urban Local Bodies<br />

Plan item Description Allocation Outcome/Benifits<br />

Improvement of civic<br />

infrastructure<br />

Improvement of civic<br />

amenities<br />

Improvement health<br />

and sanitation<br />

infrastructure<br />

Improvement of civic<br />

infrastructure<br />

Improvement in<br />

road infrastructure<br />

Improvement of civic<br />

amenities<br />

Improvement health<br />

and sanitation<br />

infrastructure<br />

Improvement in<br />

road infrastructure<br />

and addressing<br />

traffic congestion<br />

Improvement health<br />

and sanitation<br />

infrastructure<br />

Construction of multipurpose community<br />

Hall cum recreational and cultural center<br />

Construction of Public Electric<br />

Crematorium<br />

Purchasing of back-hoe loader-cumgarbage<br />

collector & excavator for drain<br />

and street cleaning<br />

Construction of slaughter house in<br />

outskirts of the city<br />

Construction of road in identified slum<br />

area<br />

Providing lighting arrangement in slum<br />

areas<br />

Construction of Community Toilets two in<br />

numbers<br />

Widening of existing roads with lane<br />

dividers and construction of new alternate<br />

roads in heavy traffic areas of the city<br />

Improving the sanitation in slum areas by<br />

constructing drains<br />

Total<br />

Rs.15.5 lakhs<br />

Rs. 11.76<br />

Lakhs<br />

Rs. 24 Lakhs<br />

Rs. 9.6 lakhs<br />

Rs. 25.4 lakhs<br />

Rs. 6.76 lakhs<br />

Rs. 4.2 lakhs<br />

Rs. 25.6 lakhs<br />

Rs. 24.18<br />

lakhs<br />

Rs.147.00<br />

lakhs<br />

Critical gaps will<br />

be addressed in<br />

the fourth most<br />

populous city of<br />

the state and<br />

important<br />

commercial town<br />

of South Orissa<br />

for which there<br />

is no allotment of<br />

funds in normal<br />

course<br />

78


2. SURADA NAC<br />

Plan item Description Allocation<br />

(Rs. In<br />

Improvement of<br />

Civic<br />

infrastructure<br />

Improvement of<br />

Civic<br />

infrastructure<br />

Construction of<br />

drain<br />

Construction of<br />

drain<br />

3. GOPALPUR NAC<br />

Modernisation of daily market<br />

lakhs)<br />

8.00<br />

including 27 No.s of stalls &<br />

provision for double storied building<br />

with drinking water & urinal<br />

facilities<br />

Construction of children’s park 4.00<br />

Left side of Badadanda (main road) 4.00<br />

Kumbhar Sahi Gorji to Jagannath<br />

temple (Kabiteli shop)<br />

Jagannath temple to Khadala Sahi 4.00<br />

Sisu Mandir Chhak<br />

Total 20.00<br />

Plan item Description Allocation<br />

(Rs. In<br />

Improvement of<br />

Civic<br />

infrastructure<br />

Improvement of<br />

Civic<br />

infrastructure<br />

Improving health<br />

hazard<br />

preparedness<br />

lakhs)<br />

Construction of burial ground 5.40<br />

Construction of Fish market 4.00<br />

Purchase of fogging machine 5.60<br />

Total 15.00<br />

4 GANJAM NAC<br />

Plan item Description Allocation<br />

(Rs. In lakhs)<br />

Improvement of Construction of vegetable 7.50<br />

Civic infrastructure<br />

Improvement of<br />

sanitation<br />

Improvement of<br />

Civic infrastructure<br />

Improvement of<br />

Civic infrastructure<br />

market<br />

Construction of community<br />

toilet<br />

4.00<br />

Construction of cremation hall 3.00<br />

Construction of multi purpose<br />

community hall<br />

2.50<br />

Total 17.00<br />

Outcome/<br />

benefit<br />

Will improve<br />

civic amenities<br />

and leisure<br />

infrastructure<br />

Outcome/<br />

benefit<br />

Will improve<br />

civic amenities<br />

and leisure<br />

infrastructure<br />

Outcome/ benefit<br />

Critical gaps Will<br />

be addressed for<br />

which there is no<br />

allotment of funds<br />

in normal course<br />

79


5 KODALA N.A.C<br />

Plan item Description Allocation<br />

(Rs. In<br />

Improvement of<br />

Civic<br />

infrastructure<br />

Improvement of<br />

sanitation facility<br />

Improvement of<br />

Civic<br />

infrastructure<br />

6 HINJILICATU NAC<br />

lakhs)<br />

Construction of Bus stand .14.00<br />

Construction of Sulabh Sauchalaya 4.00<br />

Construction of Bada danda sahi<br />

road leading from Khallikote Aska<br />

road to haja sahi chaka with drain<br />

Total<br />

7.00<br />

25.00<br />

Plan item Description Allocation<br />

(Rs. In lakhs)<br />

Improvement of Civic Construction of Multi 12.20<br />

infrastructure purpose community hall<br />

Improvement of civic Purchase of cesspool carrier 5.40<br />

infrastructur<br />

and water tanker<br />

Improvement in health Purchasing of TIFFA 6.40<br />

preparedness mechine<br />

Improvement of Civic Construction of burial sheds 4 1.00<br />

amenities<br />

in nos<br />

Total 25.00<br />

7 CHATRAPUR NAC<br />

Plan item Description Allocation<br />

(Rs. In lakhs)<br />

Improvement of Civic Construction of Multi 8.80<br />

infrastructure purpose community hall<br />

Improvement of Construction of community 4.20<br />

sanitation<br />

latrine two in no<br />

Improvement in health Purchasing of TIFFA 5.00<br />

preparedness machine and Cesspool<br />

Improvement of Civic Renovation and beautification 4.00<br />

infrstructure<br />

of historical pond<br />

Total 22.00<br />

Outcome/<br />

benefit<br />

Improvement of<br />

Bus Stand,<br />

sanitation<br />

facility at<br />

impartment<br />

town of the<br />

District<br />

Outcome/ benefit<br />

Critical gaps Will<br />

be addressed for<br />

which there is no<br />

allotment of<br />

funds in normal<br />

course<br />

Outcome/ benefit<br />

Critical gaps Will<br />

be addressed for<br />

which there is no<br />

allotment of<br />

funds in normal<br />

course<br />

80


8 CHIKITI NAC<br />

Plan item Description Allocation<br />

(Rs. In lakhs)<br />

Improvement of Civic<br />

infrastructure<br />

Improvement of civic<br />

infrastructure and<br />

recreation facilities<br />

Improvement of Civic<br />

infrastructure<br />

9 ASKA NAC<br />

Construction of Multi<br />

purpose community hall cum<br />

recreational and cultural<br />

centre<br />

Construction of children s<br />

park<br />

8.00<br />

4.20<br />

Providing building to 4.80<br />

homeless<br />

poor.<br />

slum dwellers/<br />

Total 17.00<br />

Plan item Description Allocation<br />

(Rs. In<br />

lakhs)<br />

Improvement of<br />

Civic infrastructure<br />

Improvement of<br />

health and sanitation<br />

infrastructur<br />

10 DIGAPAHANDI NAC<br />

Bylaningand widening of M.G<br />

Road from bus stand chhak to<br />

Khambeswari patina Via Laxmi<br />

bazaar and ganesh bazaar with<br />

provision of drain and street light<br />

Cess pool for cleaning septic tanks<br />

with tractor head<br />

13.00<br />

8.00<br />

Total 21.00<br />

Plan item Description Allocation<br />

(Rs. In lakhs)<br />

Improvement of<br />

Civic infrastructure<br />

Improvement of<br />

health and sanitation<br />

infrastructur<br />

Construction of multipurpose<br />

community hall cum recreational<br />

and cultureal centre.<br />

Providing drinking water facility<br />

to the S.C Basti.<br />

16.00<br />

2.00<br />

Total 18.00<br />

Outcome/<br />

benefit<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment of<br />

funds in normal<br />

course<br />

Outcome/<br />

benefit<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment of<br />

funds in normal<br />

course<br />

Outcome/<br />

benefit<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment of<br />

funds in normal<br />

course<br />

81


11. KABISURYANAGAR NAC<br />

Plan item Description Allocation<br />

(Rs. In<br />

Improvement of<br />

Civic<br />

infrastructure<br />

Improvement of<br />

civic amenities in<br />

slum area<br />

Improvement in<br />

health<br />

preparedness<br />

Improvement of<br />

Civic amenities<br />

Improvement of<br />

Civic<br />

infrastructure<br />

12.RAMBHA N.A.C<br />

Purchase of cesspool carrier and<br />

water tanker<br />

Lighting arrangement in slum<br />

area<br />

Purchasing of fogging machine<br />

with vehicle<br />

lakhs)<br />

8.00<br />

1.00<br />

6.50<br />

Trailer mounted water tanker 1.50<br />

Community centre with<br />

Gymnasium<br />

8.00<br />

Total 25.00<br />

Plan item Description Allocation<br />

(Rs. In lakhs)<br />

Improvement of<br />

Civic<br />

infrastructure<br />

Improvement of<br />

heritage sites<br />

Improvement of<br />

Civic amenities<br />

Construction of multi purpose<br />

community hall cum recreational<br />

center<br />

12.50<br />

Renovation of historical Bangala<br />

Bandhaa<br />

2.50<br />

Electrification of Thakurani 5.00<br />

tempal road , Gopinath pur,<br />

Puruna dandasi sahi, Tikara pada<br />

to Merada bandha<br />

Total 20.00<br />

Outcome/<br />

benefit<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment of<br />

funds in normal<br />

course<br />

Outcome/ benefit<br />

Critical gaps Will<br />

be addressed for<br />

which there is no<br />

allotment of funds<br />

in normal course<br />

82


13 BELAGUNTHA NAC<br />

Plan item Description Allocation<br />

(Rs. In lakhs)<br />

Improvement of<br />

Civic infrastructure<br />

Improvement of<br />

Civic infrastructure<br />

14. BUGUDA NAC.<br />

Plan Item Description Allocation<br />

(Rs. In Lakhs)<br />

Improvement of Civic Const. of crematorium 4.00<br />

Infrastructure<br />

Improvement of Civic<br />

Amenities<br />

areas<br />

in slum<br />

Improvement of Civic<br />

Infrastructure<br />

Improvement of<br />

connectivity<br />

Improvement of Civic<br />

Infrastructure<br />

Providing Electricity in slum<br />

areas.<br />

7.00<br />

Purchasing of water tanker 1.00<br />

Const.of Bridge on the river 7.00<br />

connecting two parts of NAC<br />

area.<br />

Const.of Community toilet 1.00<br />

Total 20.00<br />

15. PURUSOTTAMPUR N.A.C.<br />

Plan Item Description Allocation<br />

(Rs. In<br />

Improvement of<br />

Civic Infrastructure<br />

Improvement of<br />

Civic Infrastructure<br />

Improvement of<br />

Civic Infrastructure<br />

Improvement of<br />

Civic Infrastructure<br />

Construction of multipurpose 15.00<br />

community hall (Kalyna<br />

mandap) and cultural center<br />

Rest shed at Bus stand 2.00<br />

Total 17.00<br />

Lakhs)<br />

Const. of Multipurpose community 5.00<br />

Hall (Kalayani Mandan cum re<br />

creational and cultural centre.<br />

Const.of Jatri Nivas over Biju 10.00<br />

Pattanayak Kalayan Mandap.<br />

Const.of fish market 2.00<br />

Market complex in ward No.12 5.00<br />

Total 22.00<br />

Outcome/<br />

benefit<br />

Critical gaps<br />

will be<br />

addressed for<br />

which there is<br />

no allotment<br />

of funds in<br />

normal course<br />

Outcome/<br />

Benefit.<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment<br />

of funds in<br />

normal course<br />

Outcome/<br />

Benefit.<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment<br />

of funds in<br />

normal course<br />

83


16. KHALLIKOTE NAC.<br />

Plan Item<br />

Improvement of<br />

Civic Infrastructure<br />

Improvement of<br />

Civic Infrastructure<br />

Improvement of<br />

Civic Infrastructure<br />

17. POLASORA NAC.<br />

Description<br />

Const.of Fruits & vegitable market.<br />

Const.of Childreens Park.<br />

Const.of Drain.<br />

Allocation<br />

(Rs. In Lakhs)<br />

7.00<br />

9.00<br />

6.00<br />

Total 22.00<br />

Outcome/<br />

Benefit.<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment of<br />

funds in normal<br />

course<br />

Plan Item Description Allocation<br />

(Rs. In Lakhs) Outcome/<br />

Benefit.<br />

Imp.of<br />

Infrastructure<br />

Civic<br />

12.00<br />

Imp.of Market<br />

Insfrsturucture<br />

Imp.of Health and<br />

Civic Infrastructure<br />

Imp.of Health and<br />

Civic Infrastructure<br />

18 . BHAJANAGAR. NAC.<br />

Const.of Multipurpose community<br />

hall (Kalayani Mandap) cum<br />

Refreshment recreational and<br />

cultural centre.<br />

Const.of Fish market. 3.00<br />

Purchasing<br />

vehicle<br />

of Cesspool with 7.00<br />

Purchasing fogging machine with<br />

vehicle<br />

6.00<br />

Total 28.00<br />

Plan Item Description Allocation<br />

(Rs. In Lakhs)<br />

Imp.of ICDS Const.of balwadi buildings at 3.00<br />

Infrastructure Nahatota sahi & Sriramnagar.<br />

Slum Electrification. Electrification of slum area as there<br />

is no sources of light for them..<br />

7.00<br />

Sulabha Souchalaya For improving the sanitation of Bus<br />

stand, main road and medical<br />

campus<br />

9.00<br />

Total 19.00<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment of<br />

funds in<br />

normal course<br />

Outcome/<br />

Benefit.<br />

Critical gaps<br />

Will be<br />

addressed for<br />

which there is<br />

no allotment of<br />

funds in<br />

normal course<br />

84


PHOTO GALLERY OF RSVY<br />

PROJECTS<br />

Ganjam<br />

DISTRICT ADMINISTRATION<br />

85


HEALTH AND SANITATION<br />

ANM center Jhaliagocha (Bhanjnagar)<br />

A.N.M Cum Anganabadi Center at Cochabadi<br />

A.N.M Cum Anganabadi Center at Bagalpur<br />

86


ANM building at Merikote (Sorada)<br />

ANM building at Dimiria (Khallikote)<br />

ANM cum AWC with common facility center (Dharakote)<br />

87


EDUCATION, WOMEN AND CHILD WELFARE<br />

K.M. High School Jagalipadar (Beguniapada)<br />

New Govt. high school building, Mardamekha (Beguniapada)<br />

88


AWC center at Udayapur (Buguda)<br />

AWC center at Keillada (Bhanjnagar)<br />

AWC center at Goudagotha (Sorada)<br />

89


LIVELIHHOD SECTOR<br />

Diversion weir over Nadagadanda Nala, Greendurileadi<br />

Construction of road from PWD road, Rajapalli<br />

Construction of check dam over Dholataila nala (Bhanjnagar)<br />

90


Box cell culvert Gochabadi GP (Polasara)<br />

91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!