15.03.2018 Views

BAKER HUGHES - Drilling Fluids Reference Manual

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRESSURE PREDICTION AND CONTROL<br />

Barite Plugs<br />

One special situation that will require the supervision of the drilling fluids engineer is the<br />

mixing of a barite plug. If during a well kick situation, the fracture gradient of the formation is<br />

exceeded, an underground flow will occur. This condition is signaled by a loss of gauge<br />

response and loss of returns. If the drill string is above both the loss zone and flowing zone, it<br />

should be stripped to bottom, if possible. If this is not practical, a lost circulation squeeze may<br />

plug the loss zone and allow circulation of fluid of required density.<br />

If pipe is below fractured zones, it is sometimes possible to spot heavy fluid on bottom through<br />

drillpipe and pump light fluid down the annulus. In some instances, a balance point can be<br />

reached by this method and flow can be stopped. One method for killing underground blowouts<br />

is to bridge off the flowing zone with a barite plug.<br />

Barite plugs seal the wellbore in four ways.<br />

1. Due to low viscosities and yield points, barite may settle to form a solid plug in the<br />

hole.<br />

2. Their high density increases the hydrostatic head on the active zone and helps<br />

prevent additional influx of formation fluid.<br />

3. Due to their high fluid loss, they may dehydrate to form a solid plug of barite in the<br />

hole.<br />

4. Their high fluid loss may also cause the hole to slough and bridge itself.<br />

Procedure to Set Barite Plugs<br />

The barite-water-phosphate slurry is usually mixed with the cementing equipment, pumped<br />

through the drillpipe and spotted on bottom. The bit jets do not have to be removed. Fresh<br />

water should be used, because barite does not settle as desired in sea water. Add SAPP to the<br />

mixing water before adding barite. This keeps the slurry thin to promote settling. The optimum<br />

amount of phosphate ranges from 0.2 to 0.7 lb m /bbl in the mixing water. A one-quart fluid cup<br />

of powdered SAPP weighs 2.5 lb. Use CAUSTIC SODA with SAPP to adjust pH to 8 to 10<br />

range (approximately 0.25 lb m /bbl). If TSPP is used, CAUSTIC SODA is not required. In high<br />

temperatures, phosphates will not be effective and lignosulfonates can be used. Up to 6 lb m /bbl<br />

may be required.<br />

Slurry<br />

Density<br />

(lb m /gal)<br />

18.0<br />

19.0<br />

20.0<br />

21.0<br />

22.0<br />

Water<br />

(gal/bbl<br />

26.9<br />

25.3<br />

23.7<br />

22.2<br />

20.6<br />

Barite<br />

(sacks/bbl)<br />

5.30<br />

5.94<br />

6.43<br />

6.95<br />

7.50<br />

Slurry Volume/<br />

Sack of Barite<br />

(bbl/sack) (ft 3 /sack)<br />

0.189<br />

0.168<br />

0.156<br />

0.144<br />

0.133<br />

1.060<br />

0.945<br />

0.873<br />

0.807<br />

0.748<br />

Table 12 - 4 Barite Slurry Weight / Volume Relationship (Barite Specific Gravity<br />

= 4.2)<br />

Follow these steps in mixing and placing a barite plug (see Table 12-4).<br />

1. Choose a slurry weight between 18 and 22 lb m /gal.<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 12-35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!