15.03.2018 Views

BAKER HUGHES - Drilling Fluids Reference Manual

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRESSURE PREDICTION AND CONTROL<br />

Baker Hughes DRILLING FLUIDS Well Control Kill Sheet<br />

BASIC DATA<br />

RECORD<br />

a. True Vertical Depth (TVD) ft k. Shut-in Drillpipe Pressure (SIDP) psi<br />

b. Measured Depth (MD) ft l. Shut-in Casing Pressure (SICP) psi<br />

c. Fluid (Mud) Weight (M.W.) ppg m. Kick Volume bbl<br />

d. Drillpipe Volume bbl CALCULATE<br />

e. Riser Volume bbl n. Initial Circulating Pressure (ICP):<br />

SCP + SIDP = ICP: _________ + _________ = ________<br />

f. Pump Output bbl/stk<br />

g. Drillpipe Strokes stks o. New Fluid (Mud) Weight:<br />

SIDP / .052 / Depth + Old M.W. = New M.W.<br />

_________ / .052 / _________ + _________ = _________ ppg<br />

h. Strokes to Displace Riser stks<br />

i. Slow Circulating Pressures (SCP):<br />

Riser or Casing<br />

Pump #1: _________ psi @ _________ SPM<br />

Pump #2: _________ psi @ _________ SPM<br />

Choke Line (SUBSEA)<br />

Pump #1: _________ psi @ _________ SPM<br />

Pump #2: _________ psi @ _________ SPM<br />

j. Choke Line Friction (CLF):<br />

SCP Choke Line SCP Riser = CLF<br />

_________ _________ = _________<br />

3000<br />

p. Final Circulating Pressure (FCP):<br />

New M.W. / Old M.W. × SCP = FCP<br />

_________ / _________ × _________ = _________ psi<br />

q. Maximum Allowable Casing Pressure:<br />

(Fracture M.W. Present M.W.) × Casing Depth × .052<br />

( _________ _________ ) × _________ × .052 = _________psi<br />

GRAPHICAL ANALYSIS OF PUMPING SCHEDULE<br />

2000<br />

1000<br />

Pump Strokes<br />

Pressure<br />

Fluid (Mud) Wt<br />

Minutes<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 12-33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!