15.03.2018 Views

BAKER HUGHES - Drilling Fluids Reference Manual

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRESSURE PREDICTION AND CONTROL<br />

Chloride Trends<br />

Changes in the chloride ion content of the drilling fluid are a valid pressure indicator, but<br />

changes are difficult to establish unless there is close control and analysis of fluid properties.<br />

Most methods currently available to make routine chloride ion tests are inadequate to show<br />

subtle changes. An alternative to actually measuring the chloride content of the filtrate is<br />

continuous monitoring of the resistivity of the fluid both into and out of the hole.<br />

Paleo Information<br />

Abnormally high pore pressures are frequently related to certain environmental conditions<br />

within a given geologic time period. This depositional environment is marked by the presence<br />

of certain fossils. Should examination of cuttings reveal these fossils, then the operator should<br />

be alerted to the potential problem of encountering abnormally high pore pressures.<br />

CONTROLLING FORMATION PRESSURE<br />

Control of formation pressure is one of the primary functions of drilling fluids. The hydrostatic<br />

pressure exerted by the fluid column is the most important method of controlling formation<br />

pressure. Whenever formation pressure exceeds the total amount of pressure exerted on the<br />

formation, formation fluids may enter the wellbore causing a kick. A kick is defined as any<br />

unscheduled entry of formation fluids into the wellbore. Early recognition of a kick and prompt<br />

initiation of control procedures are the keys to successful well control. If kicks are not detected<br />

early enough or controlled properly when detected, a blowout can occur.<br />

Preplanning to Prevent or to Handle Kicks Safely<br />

The cornerstone of a safe, efficient drilling program is prediction of pressure gradient, fracture<br />

gradient, and fluid densities based on drilling, geological, and physical experience in the area.<br />

This has been discussed in the first part of this chapter.<br />

On exploratory wells, or in areas where little information is available, it is necessary to focus<br />

on drilling parameters such as penetration rate, modified “d” exponent, gas readings and trends,<br />

fluid temperature, fluid conductivity, etc., and to run confirmation logs when drilling<br />

parameters indicate changes in pressure gradient. In fact, these drilling parameters should be<br />

monitored even in areas where information is available. The preliminary drilling plan is merely<br />

a guideline and does not eliminate the possibility of unexpected changes in pressure gradient.<br />

Blowout frequency for exploratory drilling is about double that of the average for all drilling<br />

operations.<br />

Preplanning on the rig should give consideration to the following aspects of the operation.<br />

• Assignment of responsibilities. Each crew member should know who will perform various<br />

surveillance tasks, coordinate well kill procedures, and operate the choke.<br />

• Periodic inspection and testing of well control and detection equipment to insure kicks can be<br />

detected and contained.<br />

• Pit drills should be conducted on a regular basis by all crew members to condition the crew to<br />

execute proper kick control procedures.<br />

<strong>BAKER</strong> <strong>HUGHES</strong> DRILLING FLUIDS<br />

REFERENCE MANUAL<br />

REVISION 2006 12-16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!