15.03.2018 Views

Integrated Cross-Sectorial Plan of Tirana-Durres Area

The Albanian Government and the National Spatial Plan have identified the Tiranë-Durrës area, as one of the most important economic areas of the country, and of the Balkan region. To ensure a sustainable territorial and urban development of this area, the Ministry of Urban Development in cooperation with the National Territorial Planning Agency has taken the initiative to draft a Cross-sectoral Integrated Plan for the economic area Tiranë – Durrës. The metropolitan region under study includes territories administered by 5 municipalities: Tiranë, Durrës, Vorë, Shijak, Kamëz.

The Albanian Government and the National Spatial Plan have identified the Tiranë-Durrës area, as one of the most important economic areas of the country, and of the Balkan region. To ensure a sustainable territorial and urban development of this area, the Ministry of Urban Development in cooperation with the National Territorial Planning Agency has taken the initiative to draft a Cross-sectoral Integrated Plan for the economic area Tiranë – Durrës. The metropolitan region under study includes territories administered by 5 municipalities: Tiranë, Durrës, Vorë, Shijak, Kamëz.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Article 15, paragraph 3: the Council <strong>of</strong><br />

Ministers shall, by means <strong>of</strong> a by-law,<br />

determine the content, structure and<br />

procedure for drafting, implementing /<br />

detailing and monitoring the implementation<br />

<strong>of</strong> the plans.<br />

Article 12 <strong>of</strong> DCM No.671, dated 29/07/2015,<br />

paragraph 1: the authority responsible to draft<br />

the planning document shall be responsible<br />

for monitoring its implementation, according<br />

to the respective action plan, approved as part<br />

<strong>of</strong> the planning document.<br />

Article 12, paragraph 2: the process <strong>of</strong> the<br />

planning documents implementation shall also<br />

be monitored by the Agency in coordination<br />

with the authorities responsible for planning.<br />

Article 21, paragraph 1: the GNP document<br />

shall contain, at least: f) the indicators to<br />

monitor the implementation <strong>of</strong> the GNP.<br />

Article 25, paragraph 1 <strong>of</strong> the DCM No. 671,<br />

dated 29/07/2015: the monitoring <strong>of</strong> the<br />

implementation <strong>of</strong> GNP shall be carried out<br />

by the responsible authorities in the process<br />

<strong>of</strong> drafting the plan, in line with paragraph<br />

3 <strong>of</strong> Article 6; paragraph 1 (d) <strong>of</strong> Article 8;<br />

paragraph 3 (b) <strong>of</strong> Article 9 and paragraph 1<br />

(c), (g) <strong>of</strong> Article 10 <strong>of</strong> the Law.<br />

Article 8, paragraph 1 <strong>of</strong> the Law No.<br />

107/2014: the Ministry, in line with the<br />

provisions <strong>of</strong> this law, shall be responsible for:<br />

d) the coordination <strong>of</strong> the objectives <strong>of</strong> central<br />

planning authorities in the General National<br />

<strong>Plan</strong> and detailed plans for areas <strong>of</strong> national<br />

importance.<br />

Article 25, paragraph 3 <strong>of</strong> the DCM No. 671,<br />

dated 29/07/2015: the General National <strong>Plan</strong><br />

shall be implemented through the national<br />

sectorial plans, detailed plans for areas <strong>of</strong><br />

national importance, general local plans,<br />

strategic investments and development pilot<br />

projects, under its action plan.<br />

Article 28, paragraph 1 <strong>of</strong> the DCM No.671,<br />

dated 29/07/2015: the document <strong>of</strong> the<br />

National <strong>Sectorial</strong> <strong>Plan</strong> shall contain at<br />

least: gj) the indicators to monitor the<br />

implementation <strong>of</strong> the NSP.<br />

Article 32 <strong>of</strong> the DCM No.671, dated<br />

29/07/2015: “On the approval <strong>of</strong> the<br />

Territorial <strong>Plan</strong>ning Regulation”, paragraph<br />

1: the monitoring <strong>of</strong> the NSP implementation<br />

shall be carried out by the authority<br />

responsible for drafting the plan, in line with<br />

paragraph 1(c) and (g) <strong>of</strong> Article 10 <strong>of</strong> the law.<br />

Article 10 <strong>of</strong> the Law No.107/2014, paragraph<br />

1(c). The Ministries shall be responsible:<br />

c) to take measures on the implementation<br />

<strong>of</strong> the national planning and development<br />

documents;<br />

g) to prepare in an annual basis, the<br />

Monitoring Report on the implementation<br />

<strong>of</strong> the goals and objectives stipulated in the<br />

General National <strong>Plan</strong> and detailed plans for<br />

areas <strong>of</strong> national importance, <strong>of</strong> the area <strong>of</strong><br />

responsibility, and to submit it to the NTPA…]<br />

Article 32, paragraph 2: the monitoring <strong>of</strong> the<br />

implementation <strong>of</strong> the plan shall be carried<br />

out based on the action plan and monitoring<br />

indicators document, approved as an integral<br />

part <strong>of</strong> the planning document.<br />

Article 32, paragraph 3: the National <strong>Sectorial</strong><br />

<strong>Plan</strong> shall be implemented through the<br />

sectorial plans at regional level, local plans<br />

and local sectorial plans, as well as pilot<br />

projects and capital/strategic investments<br />

under the action plan and its regulation”.<br />

7.2 Monitoring indicators<br />

The <strong>Integrated</strong> <strong>Cross</strong>-sectorial <strong>Plan</strong> <strong>of</strong> the<br />

economic area <strong>Tirana</strong>-<strong>Durres</strong> is a dynamic<br />

plan, which does not end with the closure<br />

<strong>of</strong> the planning process, but is a continuous<br />

process until the conclusion <strong>of</strong> the period<br />

that the plan is active. Through monitoring it<br />

is possible to check the compliance between<br />

the objectives and projects stated in the plan<br />

with their implementation, as well as the<br />

identification <strong>of</strong> positive and negative factors<br />

affecting the process <strong>of</strong> implementation.<br />

It is necessary to establish mechanisms for:<br />

- monitoring progress and changes in the<br />

region;<br />

237

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!